About this file

36C25819B0032 S02 644-17-003 Clarifications Drawing Set - Amended June2019 02.pdf

View the file

Other files

File Type Posted
36C25819B0032-0002005.docx DOCX document
36C25819B0032-0001001.docx DOCX document
36C25819B0032-0001000.docx DOCX document
36C25819B0032-005.pdf PDF
36C25819B0032-004.doc DOC document
36C25819B0032-008.docx DOCX document
36C25819B0032-007.xlsx XLSX spreadsheet
36C25819B0032-002.pdf PDF
36C25819B0032-001.docx DOCX document
36C25819B0032-003.pdf PDF
36C25819B0032-000.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATE PCT/ PMRS BACKFILL CLINIC

PHOENIX VA HEALTH CARE SYSTEM

CARL T. HAYDEN VETERANS AFFAIRS MEDICAL CENTER

650 E. INDIAN SCHOOL ROAD

PHOENIX, ARIZONA 85012

SITE MAP

NOT TO SCALE

W DUNLAP AV.

W NORTHERN AV.

W PEORIA AV.

W CACTUS RD.

W GLENDALE AV.

W BETHANY HOME RD.

W CAMELBACK RD.

W THOMAS RD.

W MCDOWELL RD.

W VAN BUREN ST.

W BUCKEYE RD.

W JEFFERSON ST. E WASHINGTON ST.

E VAN BUREN ST.

E MCDOWELL RD.

E SKY HARBOR BL.

E UNIVERSITY DR.

E

A

I R

L

N

G

L

V

D

N

T

H

S

T

N

T

H

S

T

N

T

H

S

T

N

T

H

S

T

N

T

H

S

T

N

T

H

S

T

N

T

H

S

T

N

C

E N

T R

A L

A

V

N

T

H

A

V

W CAMELBACK RD.

E BETHANY HOME RD.

E GLENDALE AV.

E NORTHERN AV.

N

T

H

A

V

N

T

H

A

V

N

T

H

A

V

N

T

H

A

V

N

T

H

A

V

C

V

E

K

NORTH MOUNTAIN

STONEY MOUNTAIN

E SHEA BL. E SHEA BL.

E CACTUS RD.

N

N

D

S

T

N

T

H

S

T

N

T

A T

U M

B

N

T

H

S

T

PIESTEWA PEAK

PARADISE VALLEY

E LINCOLN DR.

E MCDONALD DR.

E INDIAN SCHOOL RD.

N

B

L A

N

Y O

N

A

C

N

T

H

A

V

N

R

D

A

V

W

A

W

A

N

B

L A

N

Y O

N

A

C

S

S

T

A

V

S

R

D

A

V

S

T

H

A

V

S

T

H

A

V

S

T

H

A

V

S

T

H

A

V

T

H

S

T R

E E

T

S

T R

E E

T

INDIAN SCHOOL ROAD

PHOENIX

VICINITY MAP

NOT TO SCALE

LOCATION MAP

NOT TO SCALE

PROJECT

LOCATION

ER34

13 31

23A

21B

DRAWING INDEX

SHEET NUMBER SHEET NAME

SEQUENCE

NUMBER

GENERAL

GI001 COVER SHEET AND DRAWING INDEX 1

GI002

GENERAL PROJECT NOTES, SYMBOLS AND ABBREVIATIONS

GD101 GENERAL DEMOLITION PLAN 3

GL101 LIFE SAFETY FLOOR PLAN 4

ARCHITECTURAL

AE101 FLOOR PLAN 5

AE102 FURNITURE/EQUIPMENT PLAN 6

AE103 FINISH PLAN 7

AE111 REFLECTED CEILING PLAN 8

AE401 ENLARGED FLOOR PLAN AND ELEVATIONS

AE402 ENLARGED INTERIOR ELEVATIONS

AE601 INTERIOR PARTITION SCHEDULE

AE602 DOOR SCHEDULE

AE603

FINISH AND SIGNAGE SCHEDULE, MATERIALS LEGEND, SIGNAGE DETAILS

FIRE PROTECTION

FA101 FIRE ALARM SYSTEM FLOOR PLAN 14

FP101 FIRE SPRINKLER SYSTEM FLOOR PLAN 15

PLUMBING

PL001

PLUMBING ABBREVIATIONS, NOTES AND SYMBOLS

PL101 DOMESTIC WATER SUPPLY PLAN 17

PL102 SANITARY WASTE AND VENT FLOOR PLAN 18

PL501 PLUMBING DETAILS 19

PL601 PLUMBING SCHEDULES 20

MECHANICAL

MH101 MECHANICAL HVAC PLAN 21

ELECTRICAL

EI001 ELECTRICAL GENERAL NOTES 22

EI002 ELECTRICAL ABBREVIATIONS AND SYMBOLS 23

ES100 OVERALL ELECTRICAL SITE DEMOLITION PLAN 24

ED100 OVERALL ELECTRICAL DEMOLITION PLAN 25

ED401 ENLARGED ELECTRICAL DEMOLITION PLAN 26

ED601 PARTIAL ONE LINE DIAGRAM DEMOLITION 27

EL101 LIGHTING PLAN 28

EL601 LUMINAIRE SCHEDULE 29

EP100 POWER ROUTING FROM BASEMENT 30

EP101 POWER PLAN 31

EP401 ENLARGED ELECTRICAL POWER PLAN 32

EP501 POWER DETAILS - FURNITURE SYSTEMS 33

EP601 PARTIAL ONE LINE DIAGRAM 34

EP601.1 PARTIAL ONE LINE DIAGRAM 35

EP601.2 PARTIAL ONE LINE DIAGRAM 36

EP602 PANEL SCHEDULES 37

EP603 PANEL SCHEDULES 38

EP604 PANEL SCHEDULES 39

EP605 GOVERNMENT FURNISHED CONTRACTOR INSTALLED ELECTRICAL EQUIPMENT SCHEDULE 40

TELECOMMUNICATIONS

TI001

TELECOM GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

TN101 TELECOM PLAN 42

TN501 TELECOM DETAILS 43

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

BID

DOCUMENTS

COVER SHEET AND

DRAWING INDEX

GI001

1 43

DHHALK

PROJECT

LOCATION

OVERALL BUILDING 1, 1ST FLOOR PLAN

NOT TO SCALE

PROJECT

LOCATION

A

A

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

A

A

A

A

A

A

A

A

A

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. CALL OUT OF SHEETS WITH CLARIFICATIONS MADE IN REFERENCE TO

PRE-BID RFI QUESTIONS.

A

AMENDMENT A

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

BID

DOCUMENTS

GENERAL PROJECT NOTES,

SYMBOLS AND ABBREVIATIONS

GI002

2 43

DHHALK

X

A101

VIEW NAME

SCALE: 1/8" = 1'-0"

A101

VIEW NAME

SCALE: 1/8" = 1'-0"

A101

SIM

X

ROOM NAME

A101

A

A

REVISION CLOUD

ELEVATION

NUMBER

SHEET

NUMBER

DETAIL NUMBER

SHEET NUMBER

GRAPHIC SCALE

0' 16'8' 4'

SCALE: 1/8" = 1'-0"

MATCH LINE

SEE XX/X-XXX

LEVEL

ELEVATION

ELEVATION MARKER

INTERIOR

ELEVATION MARKER

A101

SECTIONS

EXTERIOR

ELEVATION

DRAWING TITLES

DETAIL OR

ENLARGED PLAN

GRID LINE

NORTH ARROW

ROOM NAME AND

NUMBER

KEY NOTE

WINDOW TAG

PARTITION TYPE TAG

DOOR TAG

REVISION NUMBER

MATCHLINE

1X

FURNITURE, FIXTURE AND

EQUIPMENT TAG

XXX

SECTION

NUMBER

SHEET

NUMBER

ELEVATION

NUMBER

SHEET

NUMBER

DRAWING

TITLE

DRAWING

SCALE

DRAWING

TITLE

DRAWING

SCALE

SHEET NUMBER

SYMBOLS LEGEND GENERAL PROJECT NOTES

1. THE PCT/PMRS BACKFILL CLINIC PROJECT WAS STARTED

INTERNALLY AT THE VA APPROXIMATELY FIVE YEARS AGO

AND FOR MULTIPLE REASONS WAS PUT ON HOLD. SOME

LEVEL OF DESIGN, ENGINEERING, DEMOLITION AND

CONSTRUCTION WORK WAS PREVIOUSLY ACCOMPLISHED

TOWARD THE FINISHED GOALS FOR THE PROJECT. AS A

RESULT OF THIS EFFORT, BUILDING MATERIALS WERE

PURCHASED BY THE VA FOR USE ON THE PROJECT. WHILE

SOME OF THESE MATERIALS HAVE BEEN TAKEN FOR USE

ON OTHER PROJECTS AT THE VA CAMPUS, AN EXISTING

INVENTORY OF MATERIALS REMAIN THAT ARE AVAILABLE

FOR USE ON THIS PROJECT. THE VA ENGINEERING

DEPARTMENT HAS A CURRENT LIST OF THESE AVAILABLE

MATERIALS THAT THE CONTRACTOR WILL INCORPORATE

TO THE GREATEST EXTENT POSSIBLE INTO THE PROJECT.

ALL OTHER MATERIALS/SYSTEMS REQUIRED BY THE SCOPE

OF WORK FOR THE PROJECT SHALL BE PROVIDED BY THE

CONTRACTOR, UNLESS NOTED OTHERWISE.

2. THE INTENT OF THESE CONSTRUCTION DOCUMENTS IS TO

PROVIDE DIRECTION FOR COMPLETION OF THE PROJECT

AREA FOR THE VA. THESE DOCUMENTS ARE BASED ON

MINIMAL FIELD OBSERVATION, DRAWINGS AND AS-BUILT

INFORMATION PROVIDED BY THE VA. FIELD VERIFICATION

OF EXISTING CONDITIONS AND COORDINATION WITH THE

CONTRACTING OFFICER'S REPRESENTATIVE (COR) ARE

REQUIRED IN ORDER TO MEET THE DESIGN INTENT AND

PROVIDE A CONSTRUCTION PRODUCT TO ACCOMMODATE

ACTUAL CONDITIONS.

3. THE HVAC SYSTEM TO INCLUDE SUPPLY AND RETURN AIR

DUCTS, VAV BOXES, HOT WATER LOOP, T-STATS AND

DIFFUSERS HAVE BEEN DESIGNED AND INSTALLED

THROUGHOUT THE SUITE. THE CONTRACTOR WILL INSTALL

THE HVAC SUPPLY AND RETURN REGISTERS INTO THE GRID

CEILING AND CONNECT TO THE FLEX DUCTING. ALSO

INSTALL AN EMS DATA RUN FROM E-144 TO E-104. THE VA

WILL ACTIVATE AND SET UP THE CONTROL SYSTEM. THE

CONTRACTOR WILL PERFORM TESTS AND BALANCES OF

THE AIR SUPPLIES AND RETURNS IN CONJUNCTION WITH

THE VA'S PROGRAMMING SETUP OF THE HVAC CONTROL

SYSTEM FOR THIS PROJECT.

4. NOT USED.

5. NOT USED.

6. THE FIRE SPRINKLER SYSTEM HAS BEEN INSTALLED. THE

EXISTING SPRINKLER DROPS ARE AT THE LEVEL OF THE

NEW CEILING. THE CONTRACTOR WILL CUT HOLES IN THE

CEILING TILES TO INSTALL THE SPRINKLER HEADS. THE

EXISTING SPRINKLERS AND PIPING MAY REQUIRE

RECONFIGURATION TO PROVIDE COVERAGE OF THE

ARCHITECTURAL PLAN LAYOUT AND ALIGN HEADS IN THE

CENTER OF THE PANELS.

7. THE EXISTING FIRE ALARM SYSTEM TIES INTO THE

BASEMENT ROOM D-06 WHICH IS BELOW THIS WORK SPACE.

THE FIRE ALARM SYSTEM IS MAINTAINED BY CLIMATEC

USING FIRETECH SYSTEMS.

NORTH

GRID LINE

IDENTIFICATION

AO

AUTOMATIC DOOR

OPERATOR

CR

CARD READER / PIV

PR PAIR

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

RAD RADIUS

RB RUBBER BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE REFER TO, REFERENCE

REIN REINFORCE (D) (ING)

RECP RECEPTACLE, RECEPTION

RCYL RECYCLE AREA

REFR REFRIGERATOR

RO ROUGH OPENING

S SOUTH

SAFB SOUND ATTENUATING FIRE BATTS

SAN SANITARY

SB SPLASH BLOCK

SC SOLID CORE, SEALED CONCRETE

SCH SCHEDULE

SECT SECTION

SHT SHEET

SIM SIMILAR

SPF FOAMED-IN-PLACE

POLYURETHANE SPRAY FOAM INSULATION

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

T&G TONGUE AND GROOVE

TCU THIN CLAD UNIT

TELE TELEPHONE, TELECOMMUNICATIONS

THK THICK (NESS)

THRU THROUGH

T.O. TOP OF

TOB TOP OF BEAM

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL / TOP OF SLAB

TOW TOP OF WALL

TYP TYPICAL

ABV ABOVE

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLER UNIT

ALUM ALUMINUM

ALM ALARM

ALT ALTERNATE

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATING & AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

BL BUILDING LINE

BLDG BUILDING

B.O. BOTTOM OF

CAB CABINET

CG CORNER GUARD

CJ CONTROL JOINT

CL CENTERLINE

CLOS CLOSET

CLG CEILING

CLR CLEAR (ANCE)

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CRS COURSE (S)

CTR CENTER

CNTR COUNTER

CW CLEAR WIDTH

DEMO DEMOLITION

DET DETAIL

DIAM,Ø DIAMETER

DP DAMP PROOFING

DPR DAMPER

DR DOOR

DS DOWNSPOUT

DWG DRAWING

E EAST

EA EACH

ELEV ELEVATION

EJ EXPANSION JOINT

ELEC ELECTRIC (AL)

EMER EMERGENCY

EP ELECTRICAL PANEL

EPDM ETHYLENE-PROPYLENE-DIENE-

MONOMER

EF EXHAUST FAN

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXST EXISTING

EXH EXHAUST

EXP EXPOSED

EXT EXTERIOR

FMS FACILITY MANAGEMENT SERVICES

FND FOUNDATION

F.O. FACE OF

FOC FACE OF CONCRETE / CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUDS

FT FOOT / FEET

FTG FOOTING

FURR FURRED(ING)

GA GAGE, GAUGE

GALV GALVANIZE (D)

GF/CI GOVERNMENT FURNISHED, CONTRACTOR INSTALLED

GF/GI GOVERNMENT FURNISHED, GOVERNMENT INSTALLED

GFI GROUND FAULT CIRCUIT INTERRUPTER

GL GLASS, GLAZING

GWB GYPSUM WALL BOARD

GRND GROUND

GRT GROUT

HB HOSE BIB

HC HANDICAP

HW HARDWARE, HARDWARE SET

HJT HEAD JOINT

HM HOLLOW METAL

HORZ HORIZONTAL

HSKP HOUSEKEEPING

HT HEIGHT

HVAC HEATING, VENTILATION, AIR

CONDITIONING

ID INSIDE DIAMETER

IGU INSULATED GLASS UNIT

IN INCH (“)

INC INCORPORATE (D)

INFO INFORMATION

INSUL INSULATION / INSULATE (D) (ING)

INT INTERIOR

JT JOINT

LDR LADDER

LAM LAMINATE

LAV LAVATORY

LB POUND

LAG LAG SCREW

LG LENGTH / LONG

LTG LIGHTING

M METER(S)

MAX MAXIMUM

MECH MECHANICAL

MED MEDIUM

MTL METAL

MFR MANUFACTURE(R)

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MM MILLIMETER

MO MASONRY OPENING

UC UNDERCUT

UG UNDERGROUND

UL UNDERWRITERS' LABORATORIES, INC.

UNO UNLESS NOTED OTHERWISE

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VENT VENTILATE

VERT VERTICAL

VIF VERIFY IN FIELD

VIT VITREOUS

VS VERSUS

VOL VOLUME

W WEST / WIDTH / WIDE /

W / WITH

WC WATER CLOSET

WD WOOD

WH WATER HEATER

WDW WINDOW

W / O WITHOUT

WT WEIGHT

WTR WATER

XFMR TRANSFORMER

XSECT CROSS SECTION

YD YARD

YR YEAR

ABBREVIATIONS

FA FIRE ALARM

FC FOOT-CANDLE

FD FLOOR DRAIN

FE FINISH ENDS

FEB FIRE EXTINGUISHER BRACKET

FEC FIRE EXTINGUISHER CABINET

FFE FURNITURE, FIXTURES AND EQUIPMENT

FF FINISHED FLOOR

FG FIXED GLASS

FF EL FINISHED FLOOR ELEVATION

FIXT FIXTURE

N/A NOT APPLICABLE

N NORTH

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OFF OFFICE

OFD OVERFLOW DRAIN

OH OVERHEAD

OPNG OPENING

OPP OPPOSITE

ORIG ORIGINAL

OVHD OVERHEAD

PA PUBLIC ADDRESS

PH PHASE

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

CF/CI CONTRACTOR FURNISHED

CONTRACTOR INSTALLED

COMM COMMUNICATIONS, TELECOMMUNICATIONS

CHR CHAIR RAIL

FACP FIRE ALARM CONTROL PANEL

ESD ELECTRO-STATIC DISSIPATIVE TILE

ET EDGE TRIM

P PAINT

HPDL HIGH PRESSURE DECORATIVE LAMINATE

ACM ASBESTOS CONTAINING MATERIAL

LBP LEAD BASED PAINT

PMEL PRECISION MEASUREMENT EQUIPMENT LAB

MATERIALS LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

NEW CONSTRUCTION

EXISTING STRUCTURE /CONSTRUCTION

TO REMAIN

SAFB INSULATION

A

PRE-BID RFI CLARIFICATIONS JUNE 2019

AMENDMENT A

1 1 11

222 2 2 2

3 3 3 333

COMM

HAC

STAIR #5

UP

1312 14 15 15.1 16 BC

E

B A G F E B A I H

N

M

K.9

CORRIDOR

CORRIDOR

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

CORRIDOR

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

1'-4 1/4"

VIF

2'-11 1/2"

VIF

1'-9 1/2"

VIF

4 3/4" 11 5/8"

VIF VIF

1'-2 3/4" 1 1/2"

VIF VIF

1 1/2" 1'-2 5/8"

VIF

V I F

V I F

6 6

6 6

6 6 666

1 1

33333 33

1 1

GENERAL DEMOLITION PLAN

GD101

3 43

DHHALK

GENERAL NOTES

1. ALL WORK SHALL BE COMPLETED IN COMPLIANCE WITH APPLICABLE CODES AND TO

THE SATISFACTION OF THE COR.

2. PROTECT ALL EXISTING WALLS AND STRUCTURE TO REMAIN FROM DEMOLITION

ACTIVITIES.

3. CONTRACTOR SHALL EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS BOTH ON PLAN AND IN THE FIELD PRIOR TO CONSTRUCTION AND SHALL

BE RESPONSIBLE FOR COORDINATION OF ANY ADJUSTMENTS AND/OR

CORRECTIONS.

4. DIMENSIONS SHALL BE FIELD VERIFIED AND TAKE PRECEDENCE OVER DRAWING

DIMENSIONS. DO NOT SCALE FROM DRAWINGS.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING ALL NOTED CONFLICTS

AND DISCREPANCIES, REPORTING SUCH CONFLICTS AND DISCREPANCIES TO THE

COR, AND PROVIDE A RECOMMENDED RESOLUTION TO THE COR FOR

CONCURRENCE, PRIOR TO AND DURING CONSTRUCTION.

6. PATCH, REPAIR, REPLACE AND REPAINT ALL AREAS OF EXISTING CONSTRUCTION

AFFECTED BY DEMOLITION TO NEW CONDITION. MATERIALS AND FINISHES IN

EXISTING CONSTRUCTION SHALL MATCH EXISTING ADJACENT MATERIAL TO

GREATEST EXTENT POSSIBLE, INCLUDING, BUT NOT LIMITED TO: FLOORS, WALLS

AND CEILINGS. COORDINATED REMOVAL AND/OR RELOCATION OF FIXTURES,

EQUIPMENT AND OTHER APPURTENANCES WITH COR.

7. IT IS ASSUMED THAT THERE ARE NO ASBESTOS CONTAINING MATERIALS (ACM) OR

LEAD BASED PAINT REMAINING WITHIN THE PROJECT AREA. IF A SUSPECT MATERIAL

IS FOUND THAT MAY BE HAZARDOUS, DO NOT DISTURB AND IMMEDIATELY REPORT

TO COR.

8. FLOOR SLAB HAS TENSIONED CABLING AND SHALL BE IMAGED PRIOR TO CORE

DRILLING.

9. GLASS PIPING CONTAINING HAZARDOUS MATERIALS FROM THE FLOOR ABOVE RUNS

THROUGH THE EXISTING CHASE AREA AND OVER THE CEILING AREAS. PROCEED

WITH EXTREME CAUTION WHEN WORKING AROUND THIS PIPING TO AVOID

BREAKAGE. NOTIFY COR IMMEDIATELY WHERE CONFLICTS MAY OCCUR WITH

DESIGN.

KEY NOTES

1. EXISTING CONSTRUCTION TO REMAIN.

2. EXISTING DOORS / FRAMES TO BE REMOVED.

3. EXISTING PARTITION / OR PARTITION FRAMING TO BE REMOVED, COORDINATE THE

EXTENT OF REMOVAL WITH ARCHITECTURAL PLANS.

4. EXISTING ELECTRICAL ROOM PARTITION TO BE REMOVED, SEE ELECTRICAL FOR

ADDITIONAL COORDINATION.

5. EXISTING PLUMBING FIXTURE TO BE REMOVED.

6. METAL FRAMING IN PLACE FOR RENOVATION LAYOUT, TYP.

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

0' 8'4'

SCALE: 1/4" = 1'-0"

2'

PLAN

TRUE

BID

DOCUMENTS

LEGEND

LIMITS OF CONSTRUCTION

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

VA PROVIDED FRAMING IN PLACE

SCALE:

GD101

PARTIAL FLOOR PLAN - GENERAL DEMOLITION

1/4" = 1'-0"

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

UP

TOILET

TOILET

CORRIDOR

ELEC

ELEC

COPY

CENTER

HAC

SOILED

UTILITY

BREAK ROOM

CONSULT/EXAM

RECEPTION WAITING

CONSULT/EXAM CONSULT/EXAM CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

PROCEDURE

CONSULT/EXAM

PROCEDURE

PROCEDURE

PROCEDURE

PROCEDURE

PROCEDURE

CONSULT/EXAM

CONSULT/EXAM

CLEAN UTILITY

CONSULT/EXAM

GROUP 2

GROUP 1

CONSULT/EXAM

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

REF

ALCOVE

NA WORK

ROOM/TRIAGE

B

R

E

A

K

A

W

A

Y

B

R

E

A

K

A

W

A

Y

E121

E145

E138

E134

E133

E135

E137

E139

E141

E142

E143 E146 E147 E148

E149 E122

E132

E131

E129

E128

E127

E126

E125

E151

E153

E130

E124

E123

E150A

E150B

E136

E152

E154

E140 E144

ELEC

FEC

F E

C

DOOR

TRAVEL DISTANCE = 164 FEET

TO EXTERIOR BEYOND LIMITS

OF CONSTRUCTION

COMMON PATH = 34 FEET

DOOR

DOOR

CODE SUMMARY

APPLICABLE CODES & STANDARDS

2015 NFPA 101 LIFE SAFETY CODE (LSC)

2015 INTERNATIONAL BUILDING CODE (IBC)

7TH EDITION VA FIRE PROTECTION DESIGN MANUAL (VAFPDM)

OCCUPANCY CLASSIFICATION

NON-SEPARATED BUSINESS TO COMPLY WITH HEALTHCARE

(LSC CHAPTER 18) AS AN EXTENSION OF THE EXISTING

ADJACENT OCCUPANCY

CONSTRUCTION TYPE

NFPA 220: TYPE II (222)

IBC: TYPE I-B

ALLOWABLE HEIGHT AND AREA (IBC)

NEW WORK IS WITHIN THE EXISTING STRUCTURE AND DOES

NOT MODIFY THE HEIGHT AND AREA OF THE BUILDING.

FIRE RESISTIVE SEPARATION

NONE REQUIRED WITHIN AREA OF WORK.

FIRE SPRINKLER SYSTEM

PROTECTED THROUGHOUT.

PORTABLE FIRE EXTINGUISHERS

SHALL BE LOCATED AS REQUIRED BY NFPA 10.

OCCUPANT LOAD (LSC: TABLE 7.3.1.2)

BUSINESS OCCUPANCY = 100 GSF/PERSON

AREA (BUISNESS) = 7,000 GSF

OCCUPANT LOAD = 70 OCCUPANTS

MEANS OF EGRESS

MINIMUM NUMBER OF EXITS REQUIRED = 2

ACTUAL = 2

REQUIRED CAPACITY = 70 OCCUPANTS

ACTUAL CAPACITY = 510 OCCUPANTS

MAXIMUM TRAVEL DISTANCE = 300 FEET

ACTUAL = 164 FEET

MAXIMUM COMMON PATH OF TRAVEL = 100 FEET

ACTUAL = 34 FEET

DEAD END CORRIDOR LENGTH = 50 FEET

ACTUAL = NONE

SYMBOL LEGEND:

EGRESS COMPONENT

CLEAR WIDTH

CAPACITY

ACTUAL USE

PATH OF TRAVEL

FEC

FIRE EXTINGUISHER CABINET

EXIT SIGN

LIFE SAFETY FLOOR PLAN

GL101

4 43

JAMRDL

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

0' 8'4'

SCALE: 1/4" = 1'-0"

2'

PLAN

TRUE

BID

DOCUMENTS

SCALE:

GL101

LIFE SAFETY FLOOR PLAN

1/4" = 1'-0"

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

AMENDMENT A

AutoCAD SHX Text

E141

E139

E137

E135

E152

E154

E153

E151

E140

E124

E125

E123

E A

E

E

E

E

E

E

E

E

E

E

E

E B

E A

E

E

E

E

E

E

E138

E121

E121

E122

AO

AO

CR

CR

1A

1A1B 1B 1B2C 2C

2B2B2B2B2B2B

2C 2C 2C 2C 2C 2C

2B 2B 2B

1A

1A

1A

1A

1B

1B

1B

1B

1B

1B

1A 1A 1A 1A 1A 1A

2C

2C

1A

1A

1B1B 1B 1B1A

1B

1B

1B

1B

1B

1B

1B

1B1B

1B

1B

2B

2B

2B

2B

2B

2B

2B

1B

1A

1A

1A

1A

1A

1A

2E

2F

2F

1B

2F

2E

2E

2D

FF

100'-0"

1 1

2.1

2.1

2.1

2.2

2.1 2.1 2.1 2.1 2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

2.1

7 7

AE401

AE401

COMM

HAC

STAIR #5

UP

TOILET

TOILET

1312 14 15 15.1 16 BC

E

B A G F E B A I H

N

M

K.9

CORRIDOR

ELEC

ELEC

COPY

CENTER

HAC

SOILED

UTILITY

64 NSF

53 NSF

38 NSF

43 NSF

BREAK ROOM

124 NSF

119 NSF

110 NSF

137 NSF

305 NSF

CONSULT/EXAM

126 NSF 126 NSF 118 NSF 121 NSF

RECEPTION

191 NSF

WAITING

503 NSF

CONSULT/EXAM CONSULT/EXAM CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

PROCEDURE

130 NSF

140 NSF

140 NSF

147 NSF

132 NSF

CONSULT/EXAM

124 NSF

PROCEDURE

190 NSF

PROCEDURE

PROCEDURE

PROCEDURE

PROCEDURE

105 NSF

CONSULT/EXAM

CONSULT/EXAM

109 NSF

80 NSF

CLEAN UTILITY

CORRIDOR

CORRIDOR

CONSULT/EXAM

118 NSF

125 NSF

GROUP 2

271NSF

GROUP 1

349 NSF

CONSULT/EXAM

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

CORRIDOR

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

21'-3" 9'-1" 9'-1" 8'-9" 8'-9"

20'-0" 20'-0" 18'-0" 3'-0" 21'-0" 9'-2 3/4" 13'-3 1/4"

10'-8"

1'-3"

20'-6" 20'-7" 20'-5" 17'-6"

1'-1 3/4"

13'-3 1/4"

10'-3" 9'-11" 10'-6" 10'-6" 9'-7" 8'-8"

1'-0"

6'-0" 6'-0" 5'-11" 9'-8 1/2" 6'-0" 12'-9" 23'-3" 8'-0"

14'-6 1/4"

ALCOVE

55 NSF

NA WORK

ROOM/TRIAGE

B

R

E

A

K

A

W

A

Y

B

R

E

A

K

A

W

A

Y

23'-6"8'-0 1/2"

54 NSF

58 NSF56 NSF

51 NSF

E121

E145

E138

E134

E133

E135

E137

E139

E141

E142 E143 E146 E147 E148 E149 E122

E132

E131

E129

E128

E127

E126

E125

E151

E153

E130

E124

E123

E150A

E150B

E136

E152

E154

E140 E144

ELEC

11'-6"

CLEAR CLEAR CLEAR

C L E

A R

6'-0"

CLEAR

C L E

A R

24'-5"

CLEAR

21'-7 1/2"

VIF

VIF

C L E

A R

1,623 NSF

A B

A

V A

V A

A B

A

C L E

A R

17'-1 1/4"

FEC

F E

C

AE401

AE401

2D

2D

1B

101010 1010

11 11 11

FLOOR PLAN

AE101

5 43

DHHALK

GENERAL NOTES

1. ALL WORK SHALL BE COMPLETED IN COMPLIANCE WITH APPLICABLE CODES AND

TO THE SATISFACTION OF THE COR.

2. CONTRACTOR SHALL EXAMINE AND VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS BOTH ON PLAN AND IN THE FIELD PRIOR TO CONSTRUCTION AND

SHALL BE RESPONSIBLE FOR COORDINATION OF ANY ADJUSTMENTS AND/OR

CORRECTIONS.

3. DIMENSIONS SHALL BE FIELD VERIFIED AND TAKE PRECEDENCE OVER DRAWINGS

DIMENSIONS. DO NOT SCALE FROM DRAWINGS.

4. DIMENSIONS ON ARCHITECTURAL DRAWINGS ARE TO FACE OF STUD AT INTERIOR

GYPSUM WALL BOARD (GWB) PARTITIONS, TYPICAL (TYP) UNLESS NOTED

OTHERWISE (UNO).

5. LOCATE INTERIOR DOOR FRAMES 4 INCHES FROM FINISH FACE OF ADJACENT

PARTITION AT HINGE SIDE, TYP UNO.

6. PROVIDE FIRE RETARDANT TREATED PLYWOOD BACKING FOR ELECTRICAL ROOM

AS REQUIRED FOR EQUIPMENT SPECIFIED.

7. COORDINATE MOUNTING LOCATIONS FOR ALL ACCESSORIES AND APPURTENANCES

IN PARTICULAR THOSE THAT OCCUR ON OPPOSITE SIDES OF A PARTITION TO AVOID

CONFLICT AND SOUND TRANSMISSION.

8. FLOOR SLAB HAS TENSIONED CABLING AND SHALL BE IMAGED PRIOR TO CORE

DRILLING.

9. PLUMBING FIXTURES IN PROCEDURE ROOMS, THE WORKROOM/TRIAGE AND THE

BREAK ROOM ARE COMPONENTS OF THE VA'S SELECTED FURNITURE SYSTEMS.

THESE ARE INDICATED ON THE FURNITURE / EQUIPMENT PLAN, AE102, IN LIEU OF

BEING SHOWN THE FLOOR PLAN, SEE PLUMBING DRAWINGS.

10. UTILIZE VA PROVIDED CONSTRUCTION MATERIALS TO GREATEST EXTENT

POSSIBLE.

11. VERIFY LOCATION OF PRE-INSTALLED METAL FRAMING FOR OVERALL LAYOUT

COORDINATION PRIOR TO COMMENCEMENT OF WORK AND ADDITIONAL FRAMING

INSTALLATION.

12. GWB EXISTS / HAS BEEN INSTALLED IN VARIOUS LOCATIONS THROUGHOUT THE

SUITE THAT MAY OR MAY NOT BE SUITABLE FOR FINISH WORK. THE DRAWINGS

INDICATE LOCATIONS THAT ASSUME THE GWB IS ACCEPTABLE FOR FINISH WORK

AND LOCATIONS THAT HAVE METAL FURRING AND GWB WHERE ASSUMED

UNACCEPTABLE. VERIFY AND DOCUMENT THESE CONDITIONS PRIOR TO

COMMENCEMENT OF WORK IN CONJUNCTION WITH COR.

13. SEE AE601 FOR PARTITION TYPES. PARTITIONS WITHOUT TAGS ARE EXISTING TO

REMAIN.

14. THE FINISH FLOOR REFERENCE DATUM, FOR PURPOSES OF THIS PROJECT, IS SET

AT 100'-0".

KEY NOTES

1. EXISTING DEMISING PARTITION TO REMAIN THAT SEPARATES RENOVATION AREA

FROM OTHER HOSPITAL AREAS.

2. EXISTING INTERIOR PARTITION TO REMAIN. PATCH, REPAIR AND REPAINT TO MATCH:

2.1. NEW FINISHES INSIDE THE RENOVATION AREA.

2.2. EXISTING ADJACENT CONSTRUCTION OUTSIDE THE RENOVATION AREA.

3. CLEAN AND PREPARE FLOOR SLAB FOR FINISH MATERIALS THROUGHOUT SUITE.

4. PROVIDE ABA COMPLIANT PLUMBING FIXTURES, SEE PLUMBING.

5. PROVIDE ACCESS DOOR TO CHASE AREA.

6. PROVIDE ACOUSTIC RATED OPERABLE PARTITION.

7. PROVIDE HANDRAILS AS INDICATED, COORDINATE LOCATIONS AND LENGTHS W/COR,

TYP. PROVIDE CONTINUOUS 20 GAUGE METAL REINFORCING FOR ATTACHMENT.

8. LOCATIONS FOR SYSTEM FURNITURE LAVATORY / SINK, SEE AE102 FURNITURE /

EQUIPMENT PLAN AND PLUMBING DRAWINGS.

9. VERIFY DIMENSIONAL REQUIREMENTS FOR OPERABLE PARTITION BASED ON

SELECTED MANUFACTURER'S CRITERIA PRIOR TO FRAMING.

10. EXISTING 12" CAST IN PLACE (C.I.P.) CONCRETE WALLS.

11. EXISTING METAL FRAMING ADJACENT TO C.I.P. CONCRETE WALLS.

12. PROVIDE 10" BOX HEADER AT ALUMINUM/GLASS SLIDING DOOR OPENING.

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

0' 8'4'

SCALE: 1/4" = 1'-0"

2'

PLAN

TRUE

BID

DOCUMENTS

LEGEND

LIMITS OF CONSTRUCTION

EXISTING CONSTRUCTION TO REMAIN

NEW PARTITION / CONSTRUCTION

HANDRAILS

ABA/VA ACCESSIBLE FLOOR CLEARANCE AREAS

SCALE:

AE101

PARTIAL FLOOR PLAN

1/4" = 1'-0"

A

A

A

A

AAA

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. ADDITION OF KEYNOTES TO IDENTIFY EXISTING C.I.P. AND FRAMING.

2. CALL OUT HEADER AT ALUM/GLASS SLIDING DOOR.

COMM

HAC

STAIR #5

UP

1312 14 15 15.1 16 BC

E

B A G F E B A I H

N

M

K.9

CORRIDOR

CORRIDOR

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

CORRIDOR

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

REF

B

R

E

A

K

A

W

A

Y

B

R

E

A

K

A

W

A

Y

FEC

F E

C

SUITE/CORRIDOR

E121

COPY

CENTER

E145

ELEC

E138

HAC

E134

SOILED

UTILITY

E133

BREAK ROOM

E135

E137

E139

E141

NA WORK

ROOM/TRIAGE

E142

CONSULT/EXAM

E143 E146

E147

E148

RECEPTION

E149

WAITING

E122

CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

PROCEDURE

E132

E131

E129

E128

E127

CONSULT/EXAM

E126

PROCEDURE

E125

PROCEDURE

PROCEDURE

PROCEDURE

PROCEDURE

E151

CONSULT/EXAM

E153

CONSULT/EXAM

E130

CLEAN UTILITY

CONSULT/EXAM

E124

E123

GROUP 2/

CONFERENCE

E150A

GROUP 1

CONSULT/EXAM

REF

ALCOVE

E136

COPY/PRINT

SUITE/CORRIDOR

E121

TV

TV

23 SEATS

ABA ABA

VTEL

TV

TV

4' CLEAR OPENING

20 CHAIRS,

STACKABLE

E150B

11'-0" 6'-1 1/4"

2 2 2 2

GENERAL NOTES

1. THE FURNITURE AND EQUIPMENT PLAN IS PROVIDED FOR REFERENCE AND

COORDINATION ONLY. SEE PLUMBING, ELECTRICAL AND TELECOM FOR

ADDITIONAL INFORMATION.

2. FURNISHINGS AND EQUIPMENT, INCLUDING THE HERMAN MILLER COMPASS

SYSTEM WITH SINK, WILL BE PROVIDED AND INSTALLED BY THE VA TYP, UNO.

3. SEE SHEET AE401 FOR TOILET ROOM/JANITOR CLOSET ACCESSORY SCHEDULE,

ENLARGED PLANS AND ELEVATIONS.

4. SEE SHEET AE603 FOR FINISH AND SIGNAGE SCHEDULE, MATERIALS LEGEND,

SIGNAGE DETAILS.

KEY NOTES

1. HERMAN MILLER COMPASS FURNITURE SYSTEM LAVATORY / SINK LOCATION. SINK

AND MILLWORK BY THE VA. DRAIN AND SUPPLY ROUGH-IN BY CONTRACTOR.

2. PROVIDE PTD-2, GF/GI.

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

0' 8'4'

SCALE: 1/4" = 1'-0"

2'

PLAN

TRUE

BID

DOCUMENTS

SCALE:

AE102

FURNITURE / EQUIPMENT PLAN

1/4" = 1'-0"

FURNITURE / EQUIPMENT PLAN

AE102

6 43

DHHALK

LEGEND

LIMITS OF CONSTRUCTION

EXISTING CONSTRUCTION TO REMAIN

NEW PARTITION / CONSTRUCTION

HANDRAILS

ABA / VA ACCESSIBLE FLOOR CLEARANCE AREAS

A

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. CALL OUT REFERENCE SHEETS IN SET.

A

AMENDMENT A

AutoCAD SHX Text

C.I. KIOSK

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

AI-F

AutoCAD SHX Text

AI-F

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

STAIR #5

UP

TOILET

TOILET

1312 14 15 15.1 16 BC

E

B A G F E B A I H

N

M

K.9

CORRIDOR

ELEC

ELEC

COPY

CENTER

HAC

SOILED

UTILITY

BREAK ROOM

CONSULT/EXAM RECEPTION WAITINGCONSULT/EXAM CONSULT/EXAM CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

CONSULT/EXAM

PROCEDURE

CONSULT/EXAM

PROCEDURE

PROCEDURE

PROCEDURE

PROCEDURE

PROCEDURE

CONSULT/EXAM

CONSULT/EXAM

CLEAN UTILITY

CORRIDOR

CORRIDOR

CONSULT/EXAMGROUP 2

GROUP 1

CONSULT/EXAM

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

CORRIDOR

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

REF

ALCOVE

NA WORK

ROOM/TRIAGE

B

R

E

A

K

A

W

A

Y

B

R

E

A

K

A

W

A

Y

E121

E145

E138

E134

E133

E135

E137

E139

E141

E142 E143 E146 E147 E148 E149 E122

E132

E131

E129

E128

E127

E126

E125

E151

E153

E130

E124

E123

E150A

E150B

E136

E152

E154

E140 E144

ELEC

FEC

F E

C

A

A

A

A

A A

A A

A

F

A

A

A

A

D

E

D

A A A A

A A

A

A D

B

A

B

A

A

F F

2 2

AE402

AE402

AE402

1 or 1A

AE402

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

0' 8'4'

SCALE: 1/4" = 1'-0"

2'

PLAN

TRUE

BID

DOCUMENTS

SCALE:

AE103

FINISH PLAN

1/4" = 1'-0"

FINISH PLAN

AE103

7 43

KM/DHHALK

GENERAL NOTES

1. SEE SHEET AE603 FOR ROOM FINISH LEGEND AND SCHEDULE

OF FINISHES.

2. PROVIDE TRANSITION STRIPS AT ALL DIFFERING FLOOR

MATERIALS, TYP UNO.

3. ALL FLOOR FINISH CHANGES AT DOORWAYS TO OCCUR

UNDER CENTERLINE OF DOOR OR AT CENTER OF OPENING,

TYP UNO.

4. PROVIDE LEVEL AND SECURE SUBSTRATE AT ALL AREAS INDICATED TO

RECEIVE NEW FLOOR COVERING FINISHES.

KEY NOTES

1. OPERABLE PARTITION

2. PLAM-1 FINISH LOCATION AT WAITING AND RECEPTION

3. PC-1 PRIVACY CURTAIN. PROVIDE CURTAIN TRACK FOR GF/GI

PRIVACY CURTAIN.

4. REFER TO ELEVATION 12/AE401 FOR TYPICAL WALL FINISHES.

5. REFER TO SHEET AE401 ELEVATIONS FOR ADDITIONAL WALL

FINISHES AND TOILET ROOM ACCESSORIES.

6. REFER TO 9 & 10/AE401 FOR WALL FINISHES.

7. WC-2 WALL FINISH. REFER TO AE603 FOR FINISH SCHEDULE

8. P-3 PAINT FINISH. REFER TO AE605 FOR FINISH SCHEDULE.

A

LEGEND

LVT-1 FLOOR FINISH

LVT-2 ACCENT FLOOR FINISH

CPT-1 CARPET

EPY-1 FLOOR FINISH

SIGNAGE TYPE

TILE FLOORING

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. CALL OUTS FOR INTERIOR ELEVATIONS.

A

E121

E145

E138

E134 E133

E135

E137

E139

E141

E142

E143 E146 E147 E148 E149

E122

E132

E131 E129 E128 E127

E126

E125

E151

E153

E130

E124

E123

E150A

E150B

E136

E152

E154

E140 E144

COMM

HAC

STAIR #5

UP

1312 14 15 15.1 16 BC

E

B A G F E B A I H

N

M

K.9

CORRIDOR

CORRIDOR

LIMITS OF CONSTRUCTION

LIMITS OF CONSTRUCTION

CORRIDOR

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

L I M

I T

S

O

F

C

O N

S T

R U

C T

I O

N

CEILING

109'-0" AFF

CEILING

108'-6" AFF

CEILING

108'-6" AFF

333333

333333

AE601

AE601

2 22 2 2

CEILING

109'-0" AFF

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

0' 8'4'

SCALE: 1/4" = 1'-0"

2'

PLAN

TRUE

BID

DOCUMENTS

REFLECTED CEILING PLAN

AE111

8 43

DHHALK

SCALE:

AE111

REFLECTED CEILING PLAN

1/4" = 1'-0"

GENERAL NOTES

1. ALL CEILING HEIGHTS WILL BE 8'-0" AFF, UNO.

2. CENTER ACOUSTICAL GRIDS IN EACH ROOM TO THE

GREATEST EXTENT POSSIBLE, MINIMIZE CUT UNITS LESS

THAN 3 INCHES IN WIDTH, TYP UNO.

3. LOCATE CEILING MOUNTED DEVICES CENTERED IN

ACOUSTICAL GRID, TYP UNO.

4. LOCATE AIR DEVICES AND LIGHTING AS INDICATED ON

ARCHITECTURAL REFLECTED CEILING PLAN (RCP).

COORDINATE WITH MECHANICAL AND ELECTRICAL.

5. CEILING MOUNTED DEVICES AND EQUIPMENT SUCH AS: EXIT

SIGNS, SPEAKERS, SMOKE DETECTORS AND THE LIKE, ARE

INDICATED ON THE ARCHITECTURAL RCP FOR REFERENCE

AND PLACEMENT IN CEILINGS. COORDINATE WITH FIRE,

PROTECTION, MECHANICAL, ELECTRICAL AND

TELECOMMUNICATIONS FOR ADDITIONAL INFORMATION.

6. COORDINATE SPRINKLER HEAD LOCATIONS W / OTHER

CEILING MOUNTED DEVICES AND EQUIPMENT.

KEY NOTES

1. PROVIDE GWB SOFFIT WITH B.O. FINISH AT 7'-6" AFF.

2. PROVIDE CURTAIN TRACK, "ON THE RIGHT TRACK" SYSTEM,

FOR PRIVACY CURTAIN. THE VA WILL PROVIDE AND INSTALL

THE PATIENT PRIVACY CURTAINS.

3. PROVIDE SOUND ATTENUATING INSULATION ABOVE THE

CEILING THROUGHOUT THE SUITE.

LEGEND

ACOUSTICAL CEILING TILE

GWB SOFFIT OR BULKHEAD

2 X 4 RECESSED LIGHT FIXTURE

2 X 4 RECESSED EMERGENCY LIGHT FIXTURE

2 X 4 SUSPENDED INDUSTRIAL STRIP FIXTURE

1 X 4 SUSPENDED INDUSTRIAL STRIP FIXTURE

RECESSED CAN LIGHT FIXTURE

WALL MOUNTED VANITY FIXTURE

EXIT LIGHT

SPEAKER

SUPPLY AIR DIFFUSER

RETURN AIR DIFFUSER

EXHAUST FAN

CUBICLE CURTAIN TRACK

A

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. CLARIFICATION OF KEYNOTE FOR CF/CI AND GF/GI PROVIDED

EQUIPMENT.

A B

A

SCALE:

AE401

ENLARGED RESTROOM E154 PLAN

1/2" = 1'-0"

A B

A

V A

SND-1

GB-1

TTD-1

GB-2

GB-3

PTD-1

MR-1

SD-1

HS-1

1'-6" 1'-3"

MR-1MR-1

HS-1

SD-1

PTD-1

WB-1

GB-3

TTD-1

SND-1

WB-1

GB-1

7'-6"

AE401

6'-4 1/2"

1'-1 1/2"

SCALE:

AE401

ENLARGED RESTROOM E152 PLAN

1/2" = 1'-0"

SCALE:

AE401

TOILET ROOM ELEVATION

1/2" = 1'-0" SCALE:

AE401

TOILET ROOM ELEVATION

1/2" = 1'-0" SCALE:

AE401

TOILET ROOM ELEVATION

1/2" = 1'-0"

AE401

OPH

OPH

OPH

7'-6"

7'-6"

C

L E

A R

OPH

SCALE:

AE401

TOILET ROOM ELEVATION

1/2" = 1'-0"

PT-2 COVE BASE

PT-3 FIELD TILE

PT-4 ACCENT TILE

PT-3 FIELD TILE

PT-3 BULLNOSE

PT-1 FLOORING

P-1 EGGSHELL

PAINT FINISH

PT-2 COVE BASE

PT-3 FIELD TILE

PT-4 ACCENT TILE

PT-3 FIELD TILE

PT-3 BULLNOSE

PT-2 COVE BASE

PT-3 FIELD TILE

PT-4 ACCENT TILE

PT-3 FIELD TILE

PT-3 BULLNOSE

PT-1 FLOORING

P-1 EGGSHELL

PAINT FINISH

PT-2 COVE BASE

PT-3 FIELD TILE

PT-4 ACCENT TILE

PT-3 FIELD TILE

PT-3 BULLNOSE

PT-1 FLOORING

P-1 EGGSHELL

PAINT FINISH

COLUMN

COLUMN

P-1 EGGSHELL

PAINT FINISH

GH-1 GARMENT HOOK

SH-1-1

SH-1-1

P-1 SEMIGLOSS

PAINT FINISH

P-1 SEMIGLOSS

PAINT FINISH

TERRAZZO JANITOR SINK,

REFER TO PLUMBING

FRP-1 WALL PANEL

DIVISION BAR

WP-1 SHEET VINYL

TOP CAP

INSIDE CORNER MOLDING

EPY-1 FLOORING

TERRAZZO JANITOR SINK,

REFER TO PLUMBING

FRP-1 WALL PANEL

TOP CAP

EPY-1 INTEGRAL BASE

INSIDE CORNER MOLDING

SCALE:

AE401

HAC ELEVATION

1/2" = 1'-0" SCALE:

AE401

HAC ELEVATION

1/2" = 1'-0"

4'-0"

SCALE:

AE401

WATER COOLER ELEVATION

1/2" = 1'-0"

6'-0"

TOP CAP TRIM

INSIDE CORNER

TRIM

SCALE:

AE401

TYP. ELEVATION HAC/SOILED/CLEAN UTILITY

1/2" = 1'-0"

EPY-1 FLOORING

EPY-1 INTEGRAL BASE

WP-1 SHEET VINYL

F E

C

SCALE:

AE401

WATER COOLER PLAN

1/2" = 1'-0" SCALE:

AE401

OPERABLE PARTITION STORAGE PLAN

1/2" = 1'-0"

AE401

4'-0"

WC-2 DE NOVO

WALLCOVERING

WATER

COOLER, SEE

PLUMBING

3'-0 1/2"

E Q

E Q

C

L

OF OPERABLE

PARTITION

CORNER

GUARD, TYP.

C L

E A

R

V E

R I F

Y

P

F

Q

U I R

E M

E N

T S

EPY-1 FLOORING

EPY-1 INTEGRAL BASE

GB-1 VERTICAL

(18" - 24")

VARIES PER

APPLICATION

GH-1 MR-1 SH-1 PTD-1 SND-1 SD-1

HS-1

VARIES PER

APPLICATION

GB-2 SHORT

(24" - 36")

GB-3 LONG

(36" - 42")

3'-6"

TTD-1

W

H E

N

O

C C

U R

S

W

O

V

SCALE:

TYPICAL TOILET ACCESSORY MOUNTING HEIGHTS

NTS

M

M

A X

M

A X

O

O

U T

CLEAR FLOOR SPACE

BY MODERNFOLD

LEAD EXPANSION ANCHOR

FLAT HEAD SCREW

#8 - 18 X 1.25

FLOOR TRACK

GROUT AS

REQUIRED

BY MODERNFOLD

1'-0"

CLEAR

VERIFY PER MFR REQUIREMENTS

LINES OF

REQUIRED

CLEARANCE

1'-3"

MIN CLEAR

C L

R

K

N E

E

S P

A C

E

M A

X

T

O

R

I M

M

X

B

O

R E

R

F A

C E

R

R O

R

VERIFY SIZE

WITH PLANS AND

ELEVATIONS

8" DEEP

MIN

M

A X

M

1'-5" MIN

2'-1" MAX

M I N

M

I N

SIDE VIEW

FRONT VIEW

6" MAX TOE

CLEARANCE

1'-5" MIN

LAVATORY

PLUMBING LINES

WITHIN HATCHED

AREA REQUIRED

TO BE INSULATED

FINISH

FLOOR

4'-0" MIN CLR

M

I N

M

I N

CLEAR SPACE

ALLOWABLE

FOR

ACCESSIBILITY

MIRROR

M

I N

LINES OF

REQUIRED

CLEARANCE

W

H E

N

O C

C U

R S

W

O

V

1'-0"

MAX

3'-6" MIN

M

I N

M

A X

A

T

M

M

F

T

L E

T

S

P E

N S

E R

M

I N

M

B

A R

7" MIN-9" MAX

ICC / ANSI A 117.1

GRAB

BAR 1"

SANITARY

NAPKIN

DISPOSAL @

WHERE SHOWN

2"

3'-0" MAX

M

I N

M

A X

M

I N

3'-3" MIN

3'-5" MAX

VERTICAL GRAB

BAR

TOILET

PAPER

DISPENSER

4'-4" MIN

SIDE WALL

M

I N

2'-6" MIN

M

I N

M

A X

SINK

CLEAR

FLOOR

SPACE

M

I N

2'-6" MIN

5'-0"

W

A L

L

H

U N

G

F

L O

U

N T

1'-4" MIN TO

1'-6" MAX

M

I N

M

A X

WATER CLOSET

SINK

CLEAR FLOOR

SPACE

CLEARANCE AT WATER

CLOSET

CLEARANCE AT SINK

WHEELCHAIR CLEARANCE

5'-6"

TURN DIAMETER

GRAB

BAR

M

I N

M

B

A R

3'-6"

1'-4" MIN

TO 1'-6" MAX

SANITARY

NAPKIN

DISPOSAL

WHERE

SHOWN

3'-0" MIN

6" MAX

2'-0" MIN 1'-0"

M

I N

M

A X

M

I N

REAR WALL

VERTICAL

GRAB BAR

ENLARGED FLOOR PLANS

AND ELEVATIONS

AE401

9 43

DHHALK

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

PLAN

TRUE

BID

DOCUMENTS

TOILET ACCESSORY NOTES:

1. SEE REMARKS COLUMN FOR TYPICAL TOILET ACCESSORIES TO BE GOVERNMENT FURNISHED/CONTRACTOR INSTALLED (GF/CI), CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED (CF/CI), OR GOVERNMENT FURNISHED/GOVERNMENT INSTALLED (GF/GI).

2. NOTED ACCESSORIES ARE USED AS A REFERENCE FOR TYPES OF ACCESSORIES REQUIRED IN TOILET ROOMS. COORDINATE WITH COR TO DETERMINE SPECIFIC

ACCESSORIES UTILIZED BY PHOENIX VA HEALTH CARE SYSTEM.

TOILET ROOM/JANITOR CLOSET ACCESSORY SCHEDULE

TYPE MARK DESCRIPTION MANUFACTURER MODEL REMARKS

GB-1 GRAB BAR,VERTICAL (18" - 24") BRADLEY 812 CF/CI

GB-2 GRAB BAR, 1 PIECE, SHORT (24"- 36") BRADLEY 812 CF/CI

GB-3 GRAB BAR, 1-PIECE, LONG (36"- 42") BRADLEY 812 CF/CI

GH-1 GARMENT HOOK BRADLEY 911 CF/CI

HS-1 HAND SANITIZER BRADLEY GF/CI

MR-1 MIRROR BRADLEY 780-2436 CF/CI

PTD-1 PAPER TOWEL DISPENSER,

SURFACE-MOUNTED

BRADLEY 250-15 GF/CI

PTD-2 PAPER TOWEL DISPENSER,

SURFACE-MOUNTED

GEORGIA-PACIFIC 56620 CHROME COMBINATION C-FOLD/MULTIFOLD,

GF/GI

SD-1 SOAP DISPENSER BRADLEY 6562 GF/CI

SH-1 JANITOR CLOSET SHELF BRADLEY 9933 CF/CI

SND-1 SANITARY NAPKIN DISPOSAL BRADLEY 4731-15 GF/CI

TTD-1 TOILET TISSUE DISPENSER BRADLEY 5A10 GF/CI

WB-1 WASTE BASKET GF/GI

GENERAL NOTES

1. ENSURE PLUMB, SHARP, STRAIGHT AND CLEAN PAINT TRANSITIONS ON WALLS

AND CEILINGS BETWEEN VARYING COLORS OR SURFACES OF MATERIALS.

2. SEE FINISH FLOOR PLAN AE103, FINISH SCHEDULE AE603, AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

3. SEE PHOENIX MAINTENANCE AND OPERATIONS STANDARDS FOR PRODUCT

SPECIFIC CAMPUS REQUIREMENTS.

SCALE:

" = 1'-0"

0 1' 2' 6'4'

SCALE:

TYPICAL TOILET ROOM CLEARANCE AND MOUNTING HEIGHTS

NTS

A

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. CORRECT NAME OF SCHEDULE.

1/4"

EQ

5'-0"

EQ

2'-1 3/8" 4'-2"

1/4"

SCHEDULED BASE

HARDWOOD CHAIR

RAIL TO BE DETERMINED

LINE OF COLUMN INSIDE FURRING

1/4"

EQ

5'-0"

EQ

2'-1 3/8" 4'-2"

1/4"

SCHEDULED BASE. PROVIDE GLUE

ADHESIVE FOR PLAM AS

RECOMMENDED BY MFG

PLASTIC LAMINATE, PROVIDE MFG

SUGGESTED 3/4" BACKBOARD

FOR WALL PANELING. PROVIDE EDGE

TAPE TYP.ATTACH TO SUBSTRATE

WITH FRY REGLET (OR EQUAL)

MILLWORK CLEAT

LINE OF COLUMN

1/4"

3'-2 5/8" 2'-1 1/2"

3'-9 7/8" 1'-8"

PROVIDE 1/4" FRY REGLET(OR

EQUAL) MILLWORK CHANNEL POST

BETWEEN PANELS.

PROVIDE FRY REGLET(OR EQUAL)

MILLWORK OUTSIDE CORNER KEY

PROVIDE 1/4" FRY REGLET(OR

EQUAL) MILLWORK POST

TERMINATION.

PROVIDE 1/4" FRY REGLET(OR

EQUAL) MILLWORK CHANNEL POST

BETWEEN PANELS.

PROVIDE FRY REGLET(OR EQUAL)

MILLWORK OUTSIDE CORNER KEY

PROVIDE 1/4" FRY REGLET(OR

EQUAL) MILLWORK POST

TERMINATION.

2'-1 7/8"

REFER TO NOTES IN ELEVATION 1 REFER TO NOTES IN ELEVATION 1 REFER TO NOTES IN ELEVATION 1

NOTE: COLUMN LOCATED IN

RECEPTION AREA TO RECEIVE

SIMILAR PANELING

PLASTIC LAMINATE, PROVIDE MFG

SUGGESTED 3/4" BACKBOARD

FOR WALL PANELING. PROVIDE EDGE

TAPE TYP.ATTACH TO SUBSTRATE

WITH FRY REGLET (OR EQUAL)

MILLWORK CLEAT

SCALE:

AE402

ELEVATION E 122 WAITING

1/2" = 1'-0" SCALE:

AE402

ELEVATION E 122 WAITING

1/2" = 1'-0" SCALE:

AE402

ELEVATION E 122 WAITING

1/2" = 1'-0" SCALE:

AE402

ELEVATION E 122 WAITING

1/2" = 1'-0"

SCALE:

1A

AE402

ELEVATION E 122 WAITING

1/2" = 1'-0"

ENLARGED INTERIOR ELEVATIONS

AE402

10 43

DHHALK

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

BID

DOCUMENTS

GENERAL NOTES

1. ENSURE PLUMB, SHARP, STRAIGHT AND CLEAN PAINT TRANSITIONS ON WALLS

AND CEILINGS BETWEEN VARYING COLORS OR SURFACES OF MATERIALS.

2. SEE FINISH FLOOR PLAN AE103, FINISH SCHEDULE AE603, AND SPECIFICATIONS

FOR ADDITIONAL INFORMATION.

3. SEE PHOENIX MAINTENANCE AND OPERATIONS STANDARDS FOR PRODUCT

SPECIFIC CAMPUS REQUIREMENTS.

SCALE:

" = 1'-0"

0 1' 2' 6'4'

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. NEW SHEET TO INDICATE EXTENT OF LAMINATE WALL FINISH AT

WAITING ROOM.

2. DETAILS #1 AND #1A ARE THE SAME EXCEPT THAT #1A CALLS FOR THE

OPTION OF A HARDWOOD CHAIR RAIL AT THE INDICATED ELEVATION.

PROVIDE THE VA WITH A LINE ITEM COST OPTION AS AN ADDITIVE

ALTERNATE.

SILL

PLAN

HEAD

METAL DEFLECTION

TRACK

5/8" TYPE X GWB BOTH SIDES

CONTINUOUS BOTTOM

RUNNER ATTACHED TO

CONCRETE

ACOUSTIC SEALANT AROUND

PARTITION PERIMETER BOTH SIDES

PARTITION

TYPE

PART

WIDTH

STUD SIZE /

TYPE

STUD

SPACING O.C.

FIRE

RATING

UL DESIGN

NO.

A 16"

PROVIDE MIN 3" SAFB FULL

HEIGHT AT PARTITION 1A,

PROVIDE MIN 5" SAFB FULL

HEIGHT AT PARTITION 1B

AND 1C FOR STC RATINGS

METAL STUD FRAMING

STC

RATING

3 5/8" / 20 GA

PROVIDE 25 GA RESILIENT

CHANNEL INSTALLED

HORIZONTALLY AT 24" O.C.

AT PARTITION 1C

NOTES

B

4 7/8" 1, 2

SCHEDULED FLOOR FINISH

STRUCTURE ABOVE

CEILING SYSTEM AS

SCHEDULED

ACOUSTIC SEALANT

AROUND PARTITION

PERIMETER BOTH SIDES,

PROVIDE AT ACT WHEN

FRAMING DOES NOT EXTEND

TO STRUCTURE

SCHEDULED BASE

U4191-HR

SOUND

TEST

SA-870717

4916" 1, 2U4197 1/4" 1-HR

6" / 20 GA

C

5616" U4191-HR

6" / 20 GA

RAL-TL84-141 1, 27 3/4"

SA-870717

EXISTING CONCRETE FLOOR SLAB

EXISTING CONCRETE FLOOR SLAB

WITH POST TENSIONED CABLES,

IMAGE SLAB PRIOR TO CORING, TYP.

PARTITION

TYPE

PART

WIDTH

STUD SIZE /

TYPE

STUD

SPACING O.C.

A 16"

7/8" / 20 GA

NOTES

1 1/2"

NOT USED

B 16"

2 1/2 / 20 GA

3 1/8"

SILL

PLAN

HEAD

METAL DEFLECTION

TRACK

CONTINUOUS BOTTOM

RUNNER ATTACHED TO

CONCRETE

METAL STUD FRAMING

5/8" TYPE X GYPSUM

WALL BOARD

SCHEDULED FLOOR FINISH

STRUCTURE ABOVE

CEILING SYSTEM AS

SCHEDULED

SCHEDULED BASE

C 16"

3 5/8" / 20 GA

4 1/4"

D 16" 2

EXISTING CONCRETE

FLOOR SLAB

F 16"

6" / 20 GA

6 5/8"

1 5/8" / 20 GA

2 1/4"

ACOUSTIC SEALANT

AROUND PARTITION

PERIMETER BOTH SIDES,

PROVIDE AT ACT WHEN

FRAMING DOES NOT EXTEND

TO STRUCTURE

3 5/8" / 20 GA

4 5/8"

E 16" -

PARTITION TYPE 2E: PROVIDE

5/8" TYPE X GYPSUM WALL

BOARD ABOVE TILE WAINSCOT

AND 5/8" CEMENT BOARD

BEHIND TILE WAINSCOT

PROVIDE 5/8" CEMENT

BOARD AT TILE WAINSCOT

PROVIDE 3" SAFB FULL

HEIGHT AT PARTITION 2D

3"

R 1/8"

PARTITION ASSEMBLY, AS

SCHEDULED

RESILIENT CORNER

GUARD, 3" WINGS.

8'-0" AFF TO TOP OF

GUARD. SEE SCHEDULE

OF FINISHES FOR MORE

INFORMATION

8'-0" AFF

7'-6" AFF

METAL STUD FRAMING

AS SCHEDULED

AS

INDICATED

ON PLAN

ACOUSTICAL CEILING GRID

AND TILE, AS SCHEDULED

PAINTED GWB SOFFIT, AS

SCHEDULED. METAL CORNER

BEAD TRIM ALONG EDGE JOINT

HANGER WIRE AT 48"

O.C SECURE TO

STRUCTURE ABOVE

CONTINUOUS METAL

WALL ANGLE

BRACKET

GWB PARTITION, AS

SCHEDULED

ACOUSTICAL TILE,

AS SCHEDULED

SUSPENDED

T-BAR MAIN

3"

SUSPENDED

METAL CROSS-T

SAFB ABOVE

CEILINGS, TYP

GWB CAP, TYP

CEILING

AS SCHEDULED

SUSPENSION WIRE AND

T-BAR FOR

ACOUSTICAL GRID

9'-0" AFF

OPERABLE PARTITION,

INSTALL PER MFR

RECOMMENDATIONS

OPERABLE PARTITION,

INSTALL PER MFR

RECOMMENDATIONS

HANGAR BRACKET ASSEMBLY

#30 TRACK

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: OF

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

BID

DOCUMENTS

INTERIOR PARTITION SCHEDULE

AE601

11 43

DHHALK

SCALE: 3" = 1'-0"

0 3" 6" 9" 1'

SCALE: 1" = 1'-0"

PARTITION TYPE 1

GENERAL NOTES

1. ALL PARTITIONS SHALL EXTEND TO THE UNDERSIDE OF STRUCTURE ABOVE, TYP

UNO.

2. USE 5/8" TYPE "X" GWB FOR ALL PARTITIONS, UNO.

3. PROVIDE CONTROL JOINTS IN GWB PARTITIONS IN ACCORDANCE WITH INDUSTRY

STANDARD FOR GYPSUM CONSTRUCTION.

4. PROVIDE 20 GAUGE METAL FRAMING WITH MINIMUM 33 MILS (0.0346 IN)

THICKNESS, TYP.

5. PROVIDE 20 GAUGE METAL BACKING / STRAPPING FOR ANCHORING ALL

WALL-MOUNTED CABINETS, EQUIPMENT, GRAB BARS, HARDWARE, FIXTURES,

ETC., TYPICAL UNO.

6. PROVIDE FIRESTOPPING AROUND ALL PENETRATIONS OCCURRING THROUGH

FLOORS, WALLS AND CEILINGS AT FIRE RESISTIVE RATED ASSEMBLIES, EQUAL

TO THE RATING OF THE ASSEMBLY. SEE LIFE SAFETY PLANS FOR LOCATIONS OF

FIRE - RESISTIVE RATED PARTITIONS.

7. PROVIDE SEALANT AT ALL ELECTRICAL OUTLETS, PLUMBING FIXTURES, PIPING

OR OTHER EQUIPMENT ABUTTING OR PENETRATING A PARTITION.

8. PROVIDE CEMENT BOARD BEHIND TILE AND WATER RESISTANT GYPSUM

WALLBOARD AT WET LOCATIONS.

PARTITION NOTES

1. TYPE "1" PARTITIONS, EXCEPT AT MECHANICAL ROOM ENCLOSURES, DO NOT

REQUIRE A FIRE RESISTIVE RATING. THE UL DESIGN ASSEMBLY INDICATED IS

SPECIFICALLY UTILIZED TO ACHIEVE THE SOUND TRANSMISSION CLASS RATING.

THE PARTITION SHALL BE CONSTRUCTED AS SHOWN IN ORDER TO FULLY

ACHIEVE THE REQUIRED STC RATING.

2. PROVIDE FULL HEIGHT SOUND ATTENUATING FIRE BATT (SAFB) IN STUD CAVITY.

SCALE: 1" = 1'-0"

PARTITION TYPE 2

SCALE: 3" = 1'-0"

CORNER GUARD DETAIL

SCALE:

" = 1'-0"

CEILING SOFFIT DETAIL

SCALE:

" = 1'-0"

ACOUSTICAL CEILING TILE DETAIL

SCALE:

" = 1'-0"

SOFFIT AT OPERABLE PARTITION

SCALE: 1

" = 1'-0"

0 6" 1' 18" 2'

SCALE: 1" = 1'-0"

0 6" 2'1' 3'

SCALE:

" = 1'-0"

AUTOMATIC BOTTOM SEAL AT

OPERABLE PARTITION

PRE-BID RFI CLARIFICATIONS JUNE 2019

9"

9" 4"

2" 2"

EXISTING / VISION

V

NARROW LITE

N G

HALF LITE

(NOT USED)

SEE

SCHEDULE

9" VIF

V I F

V I F

VIF

FLUSH

F

VARIES

VARIES

MUNTIN OPTIONAL

SO SX

SENSOR

S

SLIDING

TYPE "X"

5/8" GWB

DOUBLE JAMB

STUDS

HOLLOW METAL

FRAME

Z ANCHOR

PLATE

DOOR AS

SCHEDULED

TYPE "X" 5/8"

GWB

TRACK

HOLLOW

METAL FRAME

BOX

HEADER

SEALANT

BOTH

SIDES

DOOR AS

SCHEDULED

DOOR AS SCHEDULED

HOLLOW METAL FRAME

SEALANT AT FRAME

PERIMETER, TYP

2X BUCK

BLOCKING

ANGLE AT CONC

OPENING

FRAME ANCHOR

DOOR AS SCHEDULED

HOLLOW METAL FRAME

SEALANT AT FRAME

PERIMETER, TYP

BLOCKING

2X BUCK

FRAME ANCHOR

4'-8" MAX OPENING

EXISTING CIP WALL

(2) L6 x 4 x 5/16 A36

STEEL ANGLES

AE602

12" V.I.F.

(2) L6 x 4 x 5/16 (LLV) A36

STEEL ANGLES

EXISTING CONC WALL

1/2"Ø A325 THRU BOLT 1'-4"

O.C. MAX.

DOOR SCHEDULE

ROOM NAME

DOOR FRAME

REMARKS

SIZE

TYPE MATERIAL FINISH VA PROVIDED

HARDWARE

SET

FIRE

LABEL

TYPE MATERIAL FINISH GLAZING

NO WIDTH HEIGHT THICK

CORRIDOR E121

(2) 3'-6"

7'-0" 1-3/4" EXST / V HM PT-2

HW-113 - EXST HM PT-2 EXST

EXISTING DOOR/HARDWARE TO REMAIN,

RE-PAINT INTERIOR SIDE OF DOOR/FRAME

WAITING E122

(2) 4'-0"

7'-0" 1-3/4" S AL/GL - - HW-111 - - AL - 2

AUTOMATIC SLIDING DOOR INSTALL PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS,

HARDWARE BY DOOR MANUFACTURER.

PROVIDE 10" BOX HEADER.

WAITING E122A 4'-0" 7'-0" 1-3/4" N HM PT-2 X / RH-V HW-110 - 1 HM PT-2 1

CR, AO

CONSULT/EXAM E123 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-102 - 1 HM PT-2

CONSULT/EXAM E124 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-102 - 1 HM PT-2

PROCEDURE E125 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-101 - 1 HM PT-2

CONSULT/EXAM E126 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-102 - 1 HM PT-2

PROCEDURE E127 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-101 - 1 HM PT-2

PROCEDURE E128 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-101 - 1 HM PT-2

PROCEDURE E129 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-101 - 1 HM PT-2

CLEAN UTILITY E130 3'-0" 7'-0" 1-3/4" F HM PT-2 X HW-106 - 1 HM PT-2

PROCEDURE E131 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-101 - 1 HM PT-2

PROCEDURE E132 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-101 - 1 HM PT-2

SOILED UTILITY E133 3'-0" 7'-0" 1-3/4" F HM PT-2 X HW-106 - 1 HM PT-2

HAC E134 3'-0" 7'-0" 1-3/4" F HM PT-2 X HW-107 - 1 HM PT-2 180° SWING

BREAK ROOM E135 3'-0" 7'-0" 1-3/4" N HM PT-2 HW-104 - 1 HM PT-2 1

CONSULT/EXAM E137 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-102 - 1 HM PT-2

COPY CENTER E138 3'-0" 7'-0" 1-3/4" N HM PT-2 HW-103 - 1 HM PT-2 1 CR

CONSULT/EXAM E139 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-102 - 1 HM PT-2

ELEC E140 3'-0" 7'-0" 1-3/4" F HM PT-2 HW-108 - 1 HM PT-2 180° SWING

CONSULT/EXAM E141 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-102 - 1 HM PT-2

NA WORK ROOM/TRIAGE E142 4'-0" 7'-0" 1-3/4" N HM PT-2 HW-109 - 1 HM PT-2 1

CONSULT/EXAM E143 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-102 - 1 HM PT-2

ELEC E144 3'-0" 7'-0" 1-3/4" F HM PT-2 HW-108 - 1 HM PT-2 180° SWING

ELEC E145 3'-0" 7'-0" 1-3/4" F HM PT-2 HW-108 - 1 HM PT-2 180° SWING

CONSULT/EXAM E146 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-102 - 1 HM PT-2

CONSULT/EXAM E147 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-102 - 1 HM PT-2

CONSULT/EXAM E148 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-102 - 1 HM PT-2

RECEPTION E149 3'-0" 7'-0" 1-3/4" N HM PT-2 HW-109 - 1 HM PT-2 1

GROUP 2/CONFERENCE E150A 4'-0" 7'-0" 1-3/4" N HM PT-2 HW-105 - 1 HM PT-2 1

GROUP 1/CONFERENCE E150B 4'-0" 7'-0" 1-3/4" N HM PT-2 HW-105 - 1 HM PT-2 1

CONSULT/EXAM E151 4'-0" 7'-0" 1-3/4" F HM PT-2 X / LH HW-102 - 1 HM PT-2

TOILET E152 3'-6" 7'-0" 1-3/4" F HM PT-2 HW-100 - 1 HM PT-2

CONSULT/EXAM E153 4'-0" 7'-0" 1-3/4" F HM PT-2 X/ RH HW-102 - 1 HM PT-2

TOILET E154 3'-6" 7'-0" 1-3/4" F HM PT-2 HW-100 - 1 HM PT-2

DOOR ABBREVIATIONS LEGEND GL TYPE GLAZING SCHEDULE

AL/GL ALUMINUM / GLASS 1 GLAZING FOR INTERIOR DOOR TYPES 'N' AND 'G': 1/4" CLEAR TEMPERED - SAFETY RATED.

AO AUTOMATIC DOOR OPERATOR 2 GLAZING FOR DOOR TYPE 'S': 1/4" NOMINAL LAMINATED GLASS WITH TRANSLUCENT FROSTED WHITE INTERLAYER

CR CARD READER / PIV

HM HOLLOW M ETAL

HW HARDWARE SET

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

PROJECT TITLE:

LOCATION:

ISSUE DATE: CHECKED: DRAWN:

DRAWING TITLE:

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

RENOVATE PCT/ PMRS

BACKFILL CLINIC

PHOENIX, ARIZONA

644-17-003

PROJECT DIRECTOR:

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

DWG: 12 OF 43

NORTH

NAME: GARY ZETTL, COR

PHONE: 602.277.5551 X5512

EMAIL: Gary.Zettl@va.gov

PLAN

TRUE

BID

DOCUMENTS

SCALE:

AE602

DOOR SCHEDULE

NTS

SCALE:

AE602

DOOR TYPES

NTS SCALE:

AE602

ALUMINUM DOOR

NTS SCALE:

AE602

FRAME TYPES

NTS

SCALE:

AE602

HEAD DETAIL

NTS SCALE:

AE602

JAMB DETAIL

NTS

GENERAL NOTES

1. INSTALL CONTINUOUS CAULKING AROUND METAL FRAMES, TYP UNO.

2. COORDINATE EXISTING VA PURCHASED MATERIALS INVENTORY W/ COR PRIOR

TO ORDERING ADDITIONAL DOORS AND FRAMES. ADDITIONAL REQUIRED

MATERIALS SHALL MATCH EXISTING STOCK MATERIALS. DOORS SHALL BE

FLUSH, 1 3/4" THICK, TYP.

3. SEE 7/AE602 FOR TYPICAL WRAP AROUND FRAME HEAD DETAIL , AND 8/AE602

FOR TYPICAL WRAP AROUND FRAME JAMB DETAIL.

4. SEE 9/AE602 FOR TYPICAL BUTT FRAME HEAD DETAIL, AND 10/AE602 FOR

TYPICAL BUTT FRAME JAMB DETAIL.

5. SEE 5/AE602 FOR TYPICAL CAST-IN-PLACE CONCRETE OPENING DETAIL.

6. SEE ELECTRICAL FOR DOORS WITH POWER REQUIREMENTS.

SCALE:

AE602

HEAD DETAIL

NTS SCALE:

AE602

JAMB DETAIL

NTS

SCALE:

AE602

CONCRETE OPENING SUPPORT

NTS

SCALE:

AE602

CONCRETE OPENING DETAIL

NTS

NORTH AND EAST SIDE OF CORR. E 121

A

PRE-BID RFI CLARIFICATIONS JUNE 2019

A

PRE-BID RFI CLARIFICATIONS NOTE:

1. CLARIFY NOTE FOR SLIDING DOOR.

A

AE602

ROOM FINISH SCHEDULE

ROOM

NO.

ROOM NAME FLOOR BASE

WALLS

CEILINGS

CEILING

HEIGHTS

REMARKS

NORTH EAST SOUTH WEST

E121 SUITE CORRIDOR

LVT-1 RB-1 WC-2/P-3 WC-2/P-3 WC-2/P-3 WC-2/P-3 ACT-1 8'-0" REFER TO PLAN FOR LOCATION OF FINISH

E122 WAITING