36C25818Q0273-00001039.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C25818Q0273
About this file
36C25818Q0273 00001 36C25818Q0273 00004.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25818Q0273-00001043.docx | DOCX document | |
| 36C25818Q0273-00001040.pdf | ||
| 36C25818Q0273-00001042.pdf | ||
| 36C25818Q0273-00001041.pdf | ||
| 36C25818Q0273-00001032.jpg | JPG image | |
| 36C25818Q0273-00001029.docx | DOCX document | |
| 36C25818Q0273-00001038.pdf | ||
| 36C25818Q0273-00001037.pdf | ||
| 36C25818Q0273-00001033.jpg | JPG image | |
| 36C25818Q0273-00001030.jpg | JPG image | |
| 36C25818Q0273-00001035.jpg | JPG image | |
| 36C25818Q0273-00001036.jpg | JPG image | |
| 36C25818Q0273-00001034.jpg | JPG image | |
| 36C25818Q0273-00001031.jpg | JPG image | |
| 36C25818Q0273-00001028.docx | DOCX document | |
| 36C25818Q0273-00001027.docx | DOCX document | |
| 36C25818Q0273-007.docx | DOCX document | |
| 36C25818Q0273-006.docx | DOCX document | |
| 36C25818Q0273-011.pdf | ||
| 36C25818Q0273-008.docx | DOCX document | |
| 36C25818Q0273-009.pptx | PPTX presentation | |
| 36C25818Q0273-012.docx | DOCX document | |
| 36C25818Q0273-010.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 06-07-2018 605-16-430 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25818Q0273 05-02-2018
X X X X The purpose of this amendment is to:
1. Answer questions that were timely but unintentionally left out of the last amendments and/or clarified further.
2. Project period of performance has been increased from 217 days to 270 d ays.
3. Project has changed from one room at a time to TWO rooms at a time during renovation.
4. Add additional attachments (3).
5. All other terms and conditions remain the same.
Justin Hicks Contracting Officer
NCO1815L2-2499
CONTINUATION PAGE
Amendment 4 Project 605-16-430 4 SW Bathroom Renovation 36C25818Q0273 6/07/18
1. The RFP references Specifications for this solicitation and it would seem that they are necessary to complete an offer. Will the VA issue the requisite specifications for this solicitation?
ANSWER: Specifications attached in amendment 3.
2. Amendment 00001, VA response to RFI question #6 states that the HAZMAT Survey will be provided to the “Winning Bidder.” Since the VA will not supply the HAZMAT report during the solicitation process, the presence, or lack thereof, of asbestos or Lead-Based Paint cannot be determined or quantified. Will the VA confirm that after the provision of the HAZMAT Survey to the winning bidder, post-award, that any abatement or remediation of hazardous materials that may be required will then become a “Differing Condition” and subject to a Contract Modification?
ANSWER: Based upon further research, there is no expected ACM. If ACM is encountered, a CO may need to be generated. The applicable sheets from the Asbestos & Lead Survey report have been attached. One sheet for asbestos and one sheet for lead. They both show no asbestos or lead within the project limits. Sheet A1-4G depicts the area of 4SW that pertains to this bathroom remodel. This report is dated March 30, 2017, conducted by Mabbett & Associates, Inc. and titled Loma Linda VAMC Asbestos & Lead Survey Volume II – Building 1.
3. Amendment 00001, VA response to RFI question #10 did not respond to the intent of the original question. Will the VA provide the as-built elevations for the restrooms so that the restoration of impacted finishes can be quantified? Will the elevations and information requested to accurately provide pricing for this restoration of finishes include information / specifications for the existing finishes?
ANSWER: As-built elevations, sections, and finish schedule have been provided for the restrooms. See attachments to this amendment. Specification 09 30 13 in previously provided specs addresses Ceramic tiling.
4. The VA has scheduled four (4) bids for the same date (06/15/18) for new projects at the VA Loma Linda campus. These solicitations are 1) Solicitation 36C25818R0176 VA Loma Linda Renovate Three Stairwells; 2) Solicitation 36C25818Q0273 VA Loma Linda 4SW Bathroom Remodel; 3) Solicitation 36C25818R0178 VA Loma Linda Legionella Mitigation; & 4) Solicitation 36C25818R0181 VA Loma Linda Replace Main Stormwater Waste & Vent Piping. Three (3) of the solicitations are even due at the same exact time, on the same date. Many of these solicitations involve the same subcontractor trades. This will cause the resources of the Contractor, Subcontractors, and suppliers to be stretched beyond capacity to achieve these simultaneous bid submittals and may cause the VA to receive a diminished bid response over all. Will the VA consider staggering these solicitations by at least a day between each one?
ANSWER: At this time, the VA doesn’t intend to change the RFP due date for 4SW bathroom remodel as this is the first proposal due from the ones mentioned above.
5. The SF 1442, Block 11 states that the Period of Performance for this project will be 217 days. The supplied Project Location Map indicates that there are (18) Bathrooms to be renovated. Sheet GI001, Last Sentence of the Project Description, states that the Contractor can only work on one Bathroom at a time. Not even figuring the unanswered issue regarding any asbestos abatement required in these bathrooms, conservatively, the heavy demolition, concrete work, plumbing, epoxy flooring, and restoration of finishes will take a minimum of 30 days per room. At one room at a time, (18) Rooms X 30 Days equals 540 days for the Period of Performance once construction is approved to begin. Will the VA allow access to 3-4 Bathrooms at one time or extend the budget and Period of Performance to accommodate the required estimated 540 Calendar Days?
ANSWER: After careful consideration and research, the period of performance will be increased to 270 days and TWO bathrooms will be allowed access for renovation at a time.
See attached document: 8-Bldg-1 Fourth Floor Lead Survey Plan-L1-4G.
See attached document: 8-Bldg-1 Fourth Floor Asbestos Survey Plan-A1-4G.
See attached document: 4SW Restroom Elevations Asbuilts from 2008.
File details come from the government source that posted it.