36C25818B0331 0007 033053 cast-in-place.pdf
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B126 RENOVATE HOSPITAL ROOM SERVICE KITCHEN SWA ARCHITECTS
VA LONG BEACH HEALTH CARE SYSTEM PROJECT NO. 600-17-102
CONSTRUCTION DOCUMENTS SUBMISSION – 100% 04/06/18
SECTION 03 30 53
(SHORT-FORM) CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies cast-in-place structural concrete and material and mixes for other concrete.
1.2 RELATED WORK:
A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES.
B. Concrete roads, walks, and similar exterior site work: Section 32 05 23, CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS.
1.3 TOLERANCES:
A. ACI 117.
B. Slab Finishes: ACI 117, F-number method in accordance with ASTM E1155.
1.4 REGULATORY REQUIREMENTS:
A. ACI SP-66 ACI Detailing Manual
B. ACI 318 - Building Code Requirements for Reinforced Concrete.
1.5 SUBMITTALS:
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Concrete Mix Design.
C. Shop Drawings: Reinforcing steel: Complete shop drawings.
D. Manufacturer's Certificates: Air-entraining admixture, chemical admixtures, curing compounds.
1.6 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.
B. American Concrete Institute (ACI):
117-10..................Specification for Tolerances for Concrete
Construction, Materials and Commentary
211.1-91(R2009).........Standard Practice for Proportions for Normal, Heavyweight, and Mass Concrete
211.2-98(R2004).........Standard Practice for Selecting Proportions for
Structural Lightweight Concrete
301-10..................Specifications for Structural Concrete
305.1-06................Specification for Hot Weather Concreting
306.1-90(R2002).........Standard Specification for Cold Weather
Concreting
03 30 53 - 2
SP-66-04 ...............ACI Detailing Manual
318-11..................Building Code Requirements for Structural
Concrete and Commentary
347-04..................Guide to Formwork for Concrete
C. American Society for Testing And Materials (ASTM):
A185/A185M-07...........Standard Specification for Steel Welded Wire
Reinforcement, Plain, for Concrete Reinforcement
A615/A615M-09...........Standard Specification for Deformed and Plain
Carbon Steel Bars for Concrete Reinforcement
A996/A996M-09...........Standard Specification for Rail Steel and Axle
Steel Deformed Bars for Concrete Reinforcement
C31/C31M-10.............Standard Practice for Making and Curing Concrete
Test Specimens in the Field
C33/C33M-11a............Standard Specification for Concrete Aggregates
C39/C39M-12.............Standard Test Method for Compressive Strength of
Cylindrical Concrete Specimens
C94/C94M-12.............Standard Specification for Ready Mixed Concrete
C143/C143M-10...........Standard Test Method for Slump of Hydraulic
Cement Concrete
C150-11.................Standard Specification for Portland Cement
C171-07.................Standard Specification for Sheet Material for
Curing Concrete
C172-10.................Standard Practice for Sampling Freshly Mixed
Concrete
C173-10.................Standard Test Method for Air Content of Freshly
Mixed Concrete by the Volumetric Method
C192/C192M-07...........Standard Practice for Making and Curing Concrete
Test Specimens in the Laboratory
C231-10.................Standard Test Method for Air Content of Freshly
Mixed Concrete by the Pressure Method
C260-10.................Standard Specification for Air-Entraining
Admixtures for Concrete
C330-09.................Standard Specification for Lightweight
Aggregates for Structural Concrete
C494/C494M-11...........Standard Specification for Chemical Admixtures for Concrete
C618-12.................Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
D1751-04(R2008) ........Standard Specification for Preformed Expansion
Joint Fillers for Concrete Paving and Structural
03 30 53 - 3
Construction (Non-extruding and Resilient
Bituminous Types)
D4397-10................Standard Specification for Polyethylene Sheeting for Construction, Industrial and Agricultural
Applications
E1155-96(2008)..........Standard Test Method for Determining FF Floor
Flatness and FL Floor Levelness Numbers
PART 2 - PRODUCTS
2.1 FORMS:
Wood, plywood, metal, or other materials, approved by Resident Engineer, of grade or type suitable to obtain type of finish specified.
2.2 MATERIALS:
A. Portland Cement: ASTM C150, Type I or II.
B. Fly Ash: ASTM C618, Class C or F including supplementary optional requirements relating to reactive aggregates and alkalis, and loss on ignition (LOI) not to exceed 5 percent.
C. Coarse Aggregate: ASTM C33, Size 67. Size 467 may be used for footings and walls over 300 mm (12 inches) thick. Coarse aggregate for applied topping and metal pan stair fill shall be Size 7.
D. Fine Aggregate: ASTM C33.
E. Lightweight Aggregate for Structural Concrete: ASTM C330, Table 1
F. Mixing Water: Fresh, clean, and potable.
G. Air-Entraining Admixture: ASTM C260.
H. Chemical Admixtures: ASTM C494.
I. Vapor Barrier: ASTM D4397, //0.25 mm (10 mil).
J. Reinforcing Steel: ASTM A615 or ASTM A996, deformed. See structural drawings for grade.
K. Welded Wire Fabric: ASTM A185.
L. Expansion Joint Filler: ASTM D1751.
M. Sheet Materials for Curing Concrete: ASTM C171.
N. Abrasive Aggregates: Aluminum oxide grains or emery grits.
SPEC WRITER NOTE: Use liquid chemical floor hardeners only to improve an existing soft or dusting slab. A properly finished and cured slab does not need this treatment. This is an old technology.
Liquid Densifier/Sealers are superior.
O. Liquid Hardener and Dustproofer: Fluosilicate solution or magnesium fluosilicate or zinc fluosilicate. Magnesium and zinc may be used separately or in combination as recommended by manufacturer.
P. Liquid Densifier/Sealer: 100 percent active colorless aqueous siliconate solution.
03 30 53 - 4
Q. Grout, Non-Shrinking: Premixed ferrous or non-ferrous, mixed and applied in accordance with manufacturer's recommendations. Grout shall show no settlement or vertical drying shrinkage at 3 days or thereafter based on initial measurement made at time of placement, and produce a compressive strength of at least 18mpa (2500 psi) at 3 days and 35mpa (5000 psi) at
28 days.
2.3 CONCRETE MIXES:
A. Design of concrete mixes using materials specified shall be the responsibility of the Contractor as set forth under Option C of ASTM
C94.
B. Compressive strength at 28 days shall be not less than // 4000 psi // ).
C. Establish strength of concrete by testing prior to beginning concreting operation. Test consists of average of three cylinders made and cured in accordance with ASTM C192 and tested in accordance with ASTM C39.
D. Maximum slump for vibrated concrete is 100 mm (4 inches) tested in accordance with ASTM C143.
E. Cement and water factor (See Table I):
TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE
Concrete: Strength Non-Air-Entrained Air-Entrained
Min. 28 Day Comp.
Str.
MPa (psi)
Min. Cement kg/m3 (lbs/c.
yd)
Max. Water
Cement Ratio
Min. Cement kg/m3
(lbs/c. yd)
Max. Water
Cement Ratio
35 (5000)1,3 375 (630) 0.45 385 (650) 0.40
30 (4000)1,3 325 (550) 0.55 340 (570) 0.50
25 (3000)1,3 280 (470) 0.65 290 (490) 0.55
25 (3000)1,2 300 (500) * 310 (520) *
1. If trial mixes are used, the proposed mix design shall achieve a compressive strength 8.3 MPa (1200 psi) in excess of f'c. For concrete strengths above 35 Mpa (5000 psi), the proposed mix design shall achieve a compressive strength 9.7 MPa (1400 psi) in excess of f’c.
2. Lightweight Structural Concrete. Pump mixes may require higher cement values.
3. For concrete exposed to high sulfate content soils maximum water cement ratio is 0.44.
4. Determined by Laboratory in accordance with ACI 211.1 for normal concrete or ACI 211.2 for lightweight structural concrete.
03 30 53 - 5
F. Air-entrainment is required for all exterior concrete and as required for Section 32 05 23, CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS. Air content shall conform with the following tables //:
TABLE I - TOTAL AIR CONTENT
FOR VARIOUS SIZES OF COARSE AGGREGATES (NORMAL CONCRETE)
Nominal Maximum Size of
Coarse Aggregate
Total Air Content
Percentage by Volume
10 mm (3/8 in) 6 to 10
13 mm (1/2 in) 5 to 9
19 mm (3/4 in) 4 to 8
25 mm (1 in) 3 1/2 to 6 1/2
40 mm (1 1/2 in) 3 to 6
TABLE II TOTAL AIR CONTENT
AIR CONTENT OF LIGHTWEIGHT STRUCTURAL CONCRETE
Nominal Maximum size of Total Air
Content
Coarse Aggregate, mm’s (Inches)
Percentage by Volume
Greater than 10 mm (3/8 in) 4 to 8 10 mm (3/8 in) or less 5 to 9
2.4 BATCHING & MIXING:
A. Store, batch, and mix materials as specified in ASTM C94.
1. Job-Mixed: Concrete mixed at job site shall be mixed in a batch mixer in manner specified for stationary mixers in ASTM C94.
2. Ready-Mixed: Ready-mixed concrete comply with ASTM C94, except use of non-agitating equipment for transporting concrete to the site will not be permitted. With each load of concrete delivered to project, ready-mixed concrete producer shall furnish, in duplicate, certification as required by ASTM C94.
3. Mixing structural lightweight concrete: Charge mixer with 2/3 of total mixing water and all of the aggregate. Mix ingredients for not less than 30 seconds in a stationary mixer or not less than 10 revolutions at mixing speed in a truck mixer. Add remaining mixing water and other ingredients and continue mixing. Above procedure may be modified as recommended by aggregate producer.
PART 3 - EXECUTION
3.1 FORMWORK:
A. Installation conform to ACI 347. Sufficiently tight to hold concrete without leakage, sufficiently braced to withstand vibration of concrete, 03 30 53 - 6 and to carry, without appreciable deflection, all dead and live loads to which they may be subjected.
B. Treating and Wetting: Treat or wet contact forms as follows:
1. Coat plywood and board forms with non-staining form sealer. In hot weather cool forms by wetting with cool water just before concrete is placed.
2. Clean and coat removable metal forms with light form oil before reinforcement is placed. In hot weather cool metal forms by thoroughly wetting with water just before placing concrete.
3. Use sealer on reused plywood forms as specified for new material.
C. Inserts, sleeves, and similar items: Flashing reglets, masonry ties, anchors, inserts, wires, hangers, sleeves, boxes for floor hinges and other items specified as furnished under this and other sections of specifications and required to be in their final position at time concrete is placed shall be properly located, accurately positioned and built into construction, and maintained securely in place.
D. Construction Tolerances:
1. Contractor is responsible for setting and maintaining concrete formwork to assure erection of completed work within tolerances specified to accommodate installation or other rough and finish materials. Remedial work necessary for correcting excessive tolerances is the responsibility of the Contractor. Erected work that exceeds specified tolerance limits shall be remedied or removed and replaced, at no additional cost to the Government.
2. Permissible surface irregularities for various classes of materials are defined as "finishes" in specification sections covering individual materials. They are to be distinguished from tolerances specified which are applicable to surface irregularities of structural elements.
3.2 REINFORCEMENT:
Details of concrete reinforcement, unless otherwise shown, in accordance with ACI 318 and ACI SP-66. Support and securely tie reinforcing steel to prevent displacement during placing of concrete.
3.3 VAPOR BARRIER:
A. Except where membrane waterproofing is required, place interior concrete slabs on a continuous vapor barrier.
B. Place 100 mm (4 inches) of fine granular fill over the vapor barrier to act as a blotter for concrete slab.
C. Lap joints 150 mm (6 inches) and seal with a compatible pressure-sensitive tape.
D. Patch punctures and tears.
03 30 53 - 7
3.4 PLACING CONCRETE:
A. Remove water from excavations before concrete is placed. Remove hardened concrete, debris and other foreign materials from interior of forms, and from inside of mixing and conveying equipment. Obtain approval of
Resident Engineer before placing concrete. Provide screeds at required elevations for concrete slabs.
B. Before placing new concrete on or against concrete which has set, existing surfaces shall be roughened and cleaned free from all laitance, foreign matter, and loose particles.
C. Convey concrete from mixer to final place of deposit by method which will prevent segregation or loss of ingredients. Do not deposit in work concrete that has attained its initial set or has contained its water or cement more than 1 1/2 hours. Do not allow concrete to drop freely more than 1500 mm (5 feet) in unexposed work nor more than 900 mm (3 feet) in exposed work. Place and consolidate concrete in horizontal layers not exceeding 300 mm (12 inches) in thickness. Consolidate concrete by spading, rodding, and mechanical vibrator. Do not secure vibrator to forms or reinforcement. Vibration shall be carried on continuously with placing of concrete.
D. Hot weather placing of concrete: Follow recommendations of ACI 305R to prevent problems in the manufacturing, placing, and curing of concrete that can adversely affect the properties and serviceability of the hardened concrete.
E. Cold weather placing of concrete: Follow recommendations of ACI 306R, to prevent freezing of thin sections less than 300 mm (12 inches) and to permit concrete to gain strength properly, except that use of calcium chloride shall not be permitted without written approval from Resident
Engineer.
3.5 PROTECTION AND CURING:
Protect exposed surfaces of concrete from premature drying, wash by rain or running water, wind, mechanical injury, and excessively hot or cold temperature. Curing method shall be subject to approval by Resident
Engineer.
3.6 FORM REMOVAL:
Forms remain in place until concrete has a sufficient strength to carry its own weight and loads supported. Removal of forms at any time is the
Contractor's sole responsibility.
3.7 SURFACE PREPARATION:
Immediately after forms have been removed and work has been examined and approved by Resident Engineer, remove loose materials, and patch all
03 30 53 - 8 stone pockets, surface honeycomb, or similar deficiencies with cement mortar made with 1 part portland cement and 2 to 3 parts sand.
3.8 FINISHES:
A. Vertical and Overhead Surface Finishes:
1. Unfinished Areas: Vertical and overhead concrete surfaces exposed in unfinished areas, above suspended ceilings in manholes, and other unfinished areas exposed or concealed will not require additional finishing.
2. Interior and Exterior Exposed Areas (to be painted): Fins, burrs and similar projections on surface shall be knocked off flush by mechanical means approved by Resident Engineer and rubbed lightly with a fine abrasive stone or hone. Use an ample amount of water during rubbing without working up a lather of mortar or changing texture of concrete.
3. Interior and Exterior Exposed Areas (finished): Finished areas, unless otherwise shown, shall be given a grout finish of uniform color and shall have a smooth finish treated as follows:
a. After concrete has hardened and laitance, fins and burrs have been removed, scrub concrete with wire brushes. Clean stained concrete surfaces by use of a hone or stone.
b. Apply grout composed of 1 part portland cement and 1 part clean, fine sand (smaller than 600 micro-m (No. 30) sieve). Work grout into surface of concrete with cork floats or fiber brushes until all pits and honeycomb are filled.
c. After grout has hardened, but still plastic, remove surplus grout with a sponge rubber float and by rubbing with clean burlap.
d. In hot, dry weather use a fog spray to keep grout wet during setting period. Complete finish for any area in same day. Confine limits of finished areas to natural breaks in wall surface. Do not leave grout on concrete surface overnight.
B. Slab Finishes:
1. Scratch Finish: Slab surfaces to receive a bonded applied cementitious application shall all be thoroughly raked or wire broomed after partial setting (within 2 hours after placing) to roughen surface to insure a permanent bond between base slab and applied cementitious materials.
2. Floating: Allow water brought to surface by float used for rough finishing to evaporate before surface is again floated or troweled.
Do not sprinkle dry cement on surface to absorb water.
3. Float Finish: Ramps, stair treads, and platforms, both interior and exterior, equipment pads, and slabs to receive non-cementitious
03 30 53 - 9 materials, except as specified, shall be screened and floated to a smooth dense finish. After first floating, while surface is still soft, surfaces shall be checked for alignment using a straightedge or template. Correct high spots by cutting down with a trowel or similar tool and correct low spots by filling in with material of same composition as floor finish. Remove any surface projections on floated finish by rubbing or dry grinding. Refloat the slab to a uniform sandy texture.
4. Steel Trowel Finish: Applied toppings, concrete surfaces to receive resilient floor covering or carpet, future floor roof and all monolithic concrete floor slabs exposed in finished work and for which no other finish is shown or specified shall be steel troweled.
Final steel troweling to secure a smooth, dense surface shall be delayed as long as possible, generally when the surface can no longer be dented with finger. During final troweling, tilt steel trowel at a slight angle and exert heavy pressure on trowel to compact cement paste and form a dense, smooth surface. Finished surface shall be free of trowel marks, uniform in texture and appearance.
5. Broom Finish: Finish all exterior slabs, ramps, and stair treads with a bristle brush moistened with clear water after the surfaces have been floated.
6. Finished slab flatness (FF) and levelness (FL) values comply with the following minimum requirements:
Slab on grade & Shored suspended slabs
Unshored suspended slabs
Specified overall value FF 25/FL 20 Specified overall value FF 25
Minimum local value FF 17/FL 15 Minimum local value FF 17
3.9 SURFACE TREATMENTS:
A. Surface treatments shall be mixed and applied in accordance with manufacturer's printed instructions.
B. Liquid Densifier/Sealer: Use on all exposed concrete floors and concrete floors to receive carpeting // except those specified to receive non-slip finish //.
C. Non-Slip Finish: Except where safety nosing and tread coverings are shown, apply non-slip abrasive aggregate to treads and platforms of all concrete steps and stairs, and to surfaces of exterior concrete ramps and platforms. Aggregate shall be broadcast uniformly over concrete surface. Trowel concrete surface to smooth dense finish. After curing, 03 30 53 - 10 rub the treated surface with abrasive brick and water sufficiently to slightly expose abrasive aggregate.
3.10 APPLIED TOPPING:
A. Separate concrete topping with thickness and strength shown with only enough water to insure a stiff, workable, plastic mix.
B. Continuously place applied topping until entire section is complete, struck off with straightedge, compact by rolling or tamping, float and steel trowel to a hard smooth finish.
3.11 RESURFACING FLOORS:
Remove existing flooring, in areas to receive resurfacing, to expose existing structural slab and to extend not less than 25 mm (1 inch) below new finished floor level. Prepare exposed structural slab surface by roughening, broom cleaning, wetting, and grouting. Apply topping as specified.
- - - E N D - - -