36C25818B0320-0010000.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C25818B0320
About this file
36C25818B0320 0010 36C25818B0320 0010.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25818B0320-0009000.docx | DOCX document | |
| 36C25818B0320-0008000.docx | DOCX document | |
| 36C25818B0320-0007000.docx | DOCX document | |
| 36C25818B0320-0006000.docx | DOCX document | |
| 36C25818B0320-0004000.docx | DOCX document | |
| 36C25818B0320-0003000.docx | DOCX document | |
| 36C25818B0320-0002000.docx | DOCX document | |
| 36C25818B0320-0002001.pdf | ||
| 36C25818B0320-00001000.docx | DOCX document | |
| 36C25818B0320-007.docx | DOCX document | |
| 36C25818B0320-009.pdf | ||
| 36C25818B0320-012.pdf | ||
| 36C25818B0320-008.pdf | ||
| 36C25818B0320-011.pdf | ||
| 36C25818B0320-010.pdf | ||
| 36C25818B0320-006.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-16-2018 Purchase Order No.: TBD
691A4-16-103SM
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25818B0320 05-18-2018
X X X The Purpopose of A00010 is Too:
1. Post RFI's 17,18,19,20,21,22,23,24,25,26,27
2.
Proposal due date is now Wednesday, August 22, 2018 @ 1:00PM AZ Time
3. RFI Period is closed no addtional RFI's will be answered.
Justin Hicks
17. General Sheet Notes indicate that CONTRACTOR SHALL NOT MOVE OR TOUCH ANY I.T. PORTS. THIS IS THE RESPONSIBILITY OF THE VA I.T. DEPARTMENT. Please confirm that the data cabling in closets G-104 and G-105 is not to be relocated to the new I.T. closet and is NOT a part of the scope of this project.
Confirmed
18. Referencing question #1 above, please clarify which I.T. equipment is to be relocated from closets G-104 and G-105.
IT equipment relocation is by VA IT Dept. Contractor shall provide conduit, and set new racks, as indicated on the drawings.
19. Please provide location of ALL existing Hirsch access control controllers, model, type and number of free ports on each controller.
Confirm with Mr. Miguel Vaporis (below).
| 20. | Drawing references a Hirsch (brand) door strike. Hirsch doesn’t manufacturer door strikes. Please clarify. |
| Confirm w/ Hirsch vendor. Contact info: |
Mr. Miguel Vaporis Master Technology Integrator (MTI) 12912 S. Normandie Ave.
Gardena, CA 90249
(310) 515-4992
21. Please provide manufacturer and part number(s) for PDUs or specifications.
Confirm w/ VA IT Dept., as indicated on the drawings.
22. Is a conduit schedule for Building 200 available?
NA.
23. Is a conduit schedule exiting closets G-104 and G-105 in Building 99 available?
NA.
24. Please define V.E.L. on drawing E6.
Verify exact location.
25. Please clarify new circuit power requirements for the new I.T. closet in building 99, and from which panel it will be served.
Provide (4) 20A-1P circuits., from Elec. Rm. G-105 branch circuit panel; verify w/ VA IT Dept. - as indicated on the drawings.
26. What is the expected disposition of the DEMO lighting? (return to customer or recycle?)
Contractor shall dispose as appropriate.
27. Cable management is generally non-existent in the approximately 15 I.T. closets. Is the data contractor expected to “clean up” the patch cords, etc. by adding new cable managers?
NA.