36C25818B0320-0008000.docx
DOCX document 18 KB Posted
- Solicitation number
- 36C25818B0320
About this file
36C25818B0320 0008 36C25818B0320 0008.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25818B0320-0010000.docx | DOCX document | |
| 36C25818B0320-0009000.docx | DOCX document | |
| 36C25818B0320-0007000.docx | DOCX document | |
| 36C25818B0320-0006000.docx | DOCX document | |
| 36C25818B0320-0004000.docx | DOCX document | |
| 36C25818B0320-0003000.docx | DOCX document | |
| 36C25818B0320-0002000.docx | DOCX document | |
| 36C25818B0320-0002001.pdf | ||
| 36C25818B0320-00001000.docx | DOCX document | |
| 36C25818B0320-007.docx | DOCX document | |
| 36C25818B0320-009.pdf | ||
| 36C25818B0320-012.pdf | ||
| 36C25818B0320-008.pdf | ||
| 36C25818B0320-011.pdf | ||
| 36C25818B0320-010.pdf | ||
| 36C25818B0320-006.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-09-2018 Purchase Order No.: TBD
691A4-16-103SM
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix
AZ
85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix
AZ
85014 To all Offerors/Bidders
36C25818B0320 05-18-2018
X X X X The Purpopose of A00007 is Too:
1. Post RFIs, 8,9,10,11,12,13,14,15,16.
Proposlas must be mailed or hand carried to Department of Veterans Affairs, ATTN: Gary W. Smith 777 East Missouri Ave. Suite #300 Phoenix, AZ 85014.
Justin Hicks
8. Will any mechanical design drawings be provided? No
9. Does the test and balance contractor need to provide a pre-read on rooms/equipment/air devices? No
10. What is to be used for temperature control in the IT Rooms? N/A
11. Who is the current controls vendor for the facility? Please provide contact information.
Keycard system, it is Hirsch. Vendor contact info:
Mr. Miguel Vaporis Master Technology Integrator (MTI) 12912 S. Normandie Ave.
Gardena, CA 90249
(310) 515-4992
12. Does current controls vendor have to be utilized for this solicitation and can another vendor be brought in for HVAC controls?
Johnson Controls 5770 Warland Dr A Cypress, CA 90630 562 594 3200 562 594 3214.
13. Will night or weekend work be required for the completion of this solicitation?
Working Hours B99: daytime only (M-S: 8-5) Loud noises: during day. Occupants generally sleep over night.
B200 and B1: working hours anytime Off hour work is required for loud noises: before 7:00am, or after 7:00pm
Weekend work is not required. If contractor wishes to work weekends, please coordinate with the VA Project Manager.
Shutdowns: (2) wks. notice
14. Are liquidated damages part of this solicitation? No
15. Who is the fire alarm provider for the facility? Please provide contact information Coordinate with VA Project Manager, Steve Barrell
16. Can mechanical as built drawings be provided? Sheet T1, General Note #2 asks the Contractor to refer to the Mechanical Plans for HVAC Controls. Mechanical Plans were not included in this plan set. This requirement has been deleted from this project.