36C25726R0010 0003.docx
DOCX document 19 KB Posted
- Attached to
- Y1DZ--36C257-26-AP-0167 | NEW CON FY26 | 674-21-252 - Renovate Bldg. 62 AC Shop (VA-26-00003429)
- Solicitation number
- 36C25726R0010
About this file
This is Amendment 0003 to solicitation 36C25726R0010, issued by the Department of Veterans Affairs El Paso Contracting Office on January 27, 2026. The amendment updates self-performed work calculation requirements for offerors responding to the solicitation for Renovation of Building 62 AC Shop at the VA facility in El Paso, Texas (674-21-252). The contracting officer is Rhonda Richardson.
The amendment provides instructions for calculating self-performed work in compliance with VAAR 852.219-73 (Limitations on Subcontracting) applicable to Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Offerors must calculate: total proposed price, cost of materials, total cost excluding materials, amount projected to be paid to non-VetCert SDVOSBs, the percentage of non-VetCert work relative to total work excluding materials, and the percentage of self-performed work. For general construction contracts, the government will not pay more than 85% of amounts paid to firms that are not VIP-listed SDVOSBs. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline by completing required forms, acknowledging receipt on their offer copies, or submitting separate written communication that references both the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Renovation of Bldg. 62 - AC Shop - 12.29.2025.pdf | ||
| 36C25726R0010 0002.docx | DOCX document | |
| 36C25726R0010 0001.docx | DOCX document | |
| Solicitation - 36C25726R0010_1 - Renovation of Bldg. 62 AC Shop.pdf | ||
| Attachment 4 - Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| Attachment 2 - Renovate Bldg. 62 AC Shop - Specs.pdf | ||
| 36C25726R0010_1.docx | DOCX document | |
| Attachment 1 - Renovate Bldg.62 AC Shop - Drawings.pdf | ||
| Attachment 3 - Renovate Bldg.62 AC Shop - PCRA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) none 01-27-2026 674-21-252 36C257 Network Contract Office 17 Department of Veterans Affairs 11495 Turner Road El Paso
TX
79936-4221 36C257 El Paso Contracting Office Department of Veterans Affairs 11495 Turner Road El Paso
TX
79936-1372 To all Offerors/Bidders
36C25726R0010
X X X
See Continuation page.
Rhonda Richardson Contracting Officer
CONTINUATION PAGE
Amendment 0003 is issued to update the Self-performed calculations.
Self-performed calculations:
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-73)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Cost of Materials : $ __________
c) Total excluding materials (a-b) : $ __________
d) Amount projected to be paid on Non-VetCert (SBA.gov) SDVOSBs $__________
e) Offeror’s percentage of estimated Non-VetCert work (d/c X 100 = %) _________%
f) Offeror’s percentage of estimated self-performed work (100 – d = %) _ _________%
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
End of Document