This document is an Amendment (0002) to a Department of Veterans Affairs solicitation for the renovation of Building 62 AC Shop at the Temple VA facility. The amendment addresses Request for Information (RFI) responses from potential contractors, clarifying critical project details including demolition risks, sprinkler system status, building controls, and site management requirements. Key clarifications include: 1) contractors are responsible for repairing any damage caused by their work methods, 2) the building does not have a sprinkler system, 3) building automation system (BAS) controls must match the existing Johnson Controls Metasys system, and 4) the site superintendent can simultaneously serve as quality control and safety officer. The project involves renovating an existing structure with complex demolition considerations, requiring careful planning for dust control, pollution prevention, and hazardous waste management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726R0010 0003.docx | DOCX document | |
| Pre-Bid Renovation of Bldg. 62 - AC Shop - 12.29.2025.pdf | ||
| 36C25726R0010 0001.docx | DOCX document | |
| Solicitation - 36C25726R0010_1 - Renovation of Bldg. 62 AC Shop.pdf | ||
| Attachment 1 - Renovate Bldg.62 AC Shop - Drawings.pdf | ||
| Attachment 3 - Renovate Bldg.62 AC Shop - PCRA.pdf | ||
| Attachment 4 - Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| Attachment 2 - Renovate Bldg. 62 AC Shop - Specs.pdf | ||
| 36C25726R0010_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) none 01-1 -2026 674-21-252 36C257 Network Contract Office 17 Department of Veterans Affairs 11495 Turner Road El Paso TX 79936-4221 36C257 El Paso Contracting Office Department of Veterans Affairs 11495 Turner Road El Paso TX 79936-1372 To all Offerors/Bidders
36C25726R0010
X X X
Amendment 0002 is issued to post RFI responses.
Rhonda Richardson Contracting Officer
CONTINUATION PAGE
RFI’s - 36C25726R0010 - 674-21-252 - Remodel Bldg. 62 AC Shop
1. Demolition of the roof structure will be a concern given the current condition of the roof structure and exterior walls. The roof structure is still attached to the exterior walls. It is not safe to walk under the collapsed portions to completely secure bracing. If the contractor 1) uses an engineered bracing plan to help stabilize the walls, and 2) uses careful work practices, and the walls collapse or are damaged due to their existing compromised condition:
0. Will the contractor be held responsible for repairing the walls?
· VA Response: The contractor is responsible for repairing any damage caused by their means and methods.
0. If the contractor must repair the walls, will the VA allow a change order to pay for the additional work or must the contractor bear the cost within their bided/awarded amount?
· VA Response: The contractor is responsible for repairing any damage caused by their means and methods.
1. Sprinkler Status Clarification (E001 vs Life Safety Plan) - Sheet E001 identifies the building as “FULLY SPRINKLERED,” while the Life Safety Plan indicates “SPRINKLERS: NOT REQUIRED.”
1. Please confirm whether the building is to have a fire sprinkler system or not.
1. Please confirm the basis of the electrical design based upon whether the building is fully sprinklered or not sprinklered.
· VA Response: The statement on the electrical sheet is in error. There is no sprinkler system, and the electrical design was not based on including sprinklers in the building.
1. BAS / Controls Sole Source Requirements - Specifications indicate VA-approved or sole-source BAS controls. Please confirm the following:
a. approved BAS manufacturer(s)
b. whether a VA-designated controls contractor is required
c. the responsibility split between mechanical and controls contractors.
· VA Response: The BAS controls for this project shall match the existing system at the facility which is Johnson Controls Metasys.
1. Can the Site Super act as the QC and SSHO if they posses the required qualifications or will this be a two-hat project?
· VA Response: These responsibilities can be combined under a singular person.
1. The condition of the building is much different in person that it is in the site pics. Under large scale construction activity it calls for dust control plan and pollution prevention plan. What exactly does that entail? Neg air? Full building envelope, etc.?
· VA Response: The design package was developed some time ago, so there may be some differences from the existing conditions. The pre-bid site visit was provided for the bidders to evaluate existing conditions vs the project scope.
As far as the requirements for pollution protection, the requirements for ICRA and pollution protection should be as required in the VA standard specifications.
1. Does Temple have a specific waste facility that accepts hazardous waste?
· VA Response: The Temple VA does not have a specific hazardous waste facility. The contractor is responsible for identifying a permitted waste facility within the vicinity for use it taking waste materials off-site.
End of Document