SF30 36C25726Q0885 0004.docx

DOCX document 148 KB Posted

Attached to
S207--Integrated Pest Management Services
Solicitation number
36C25726Q0885
Issued by

About this file

This is an SF 30 Amendment/Modification to federal solicitation 36C25726Q0885 (Amendment 0004), issued by the Department of Veterans Affairs Veterans Health Administration Network Contracting Office on November 20, 2026, with an extended proposal due date of November 24, 2026, at 1:00 PM CST. The amendment incorporates answers to 56 technical questions, updates to the Performance Work Statement (PWS) Revision 2, and updates to the Price Schedule, with highlighted areas indicating changes from previous versions.

The solicitation is for Integrated Pest Management Services at the El Paso VA Healthcare System, structured as a firm fixed-price contract with a base year (December 1, 2026 – November 30, 2027) and four option years. The scope includes comprehensive IPM services across multiple facility locations totaling approximately 507,000 square feet, encompassing structural pest control, wood-destroying organisms inspection, mosquito management with larval control across 30,000 square feet, bird control (including exclusion and deterrent measures on a 144,786 square-foot roof), and vertebrate pest management. The contractor must hold current Texas pest control business licenses for structural and health-related pest control, employ licensed certified applicators, provide 16 fly light units, maintain 100 interior and 10 exterior rodent monitoring stations, conduct weekly routine services at the main facility and monthly services at six satellite locations, respond to emergency callbacks within 2 hours and non-emergent requests within 8 hours, and submit comprehensive service reports with pest activity trending. The price schedule includes separate line items for 12 months of pest management services and government-established not-to-exceed amounts for emergency calls during each contract period. The incumbent contractor is Dewitt & Company, Inc. (previous contract 36C25722P0105 valued at $121,200.00). Service Contract Act labor standards apply with prevailing wage rates per the Texas Wage Determination 2015-5229, Revision 31.

View the file

Other files

File Type Posted
Site Visit Sign In.pdf PDF
36C25726Q0885 0004_1.docx DOCX document
36C25726Q0885 0003_1.docx DOCX document
SF30 36C25726Q0885 0003.docx DOCX document
PWS_Integrated Pest Management Services_revision 1.docx DOCX document
36C25726Q0885 0002_1.docx DOCX document
Attachment A - Quality Assurance Surveillance Plan.docx DOCX document
SF30 36C25726Q0885 0002.docx DOCX document
SF30 36C25726Q0885 0001.docx DOCX document
36C25726Q0885 0001_1.docx DOCX document
S02 36C25726Q0885.docx DOCX document
Service Contract Act WD_2015-5229_rv 31_8-27-2026.pdf PDF
36C25726Q0885_1.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25726Q0885 0004

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

11-20-2026

756-27-1-6045-0002

36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio, TX 78240

To all Offerors/Bidders

36C25726Q0885 09-30-2026

X

X

X

See CONTINUATION Page

This amendment is to incorporate the following changes:

1. Publish the answers to the technical questions.

2. Update the PWS (highlighted areas) and Price Schedule (highlighted areas).

3. The offeror due date remains 11/24/2026, 1PM CST.

Contracting Officer

Technical Questions

1. Is this a brand-new contract OR if there is (was) an incumbent performing these services?

Answer: Incumbent – Dewitt & Company, Inc.

2. If not brand new, could you please provide the current / previous contract number?

Answer: 36C25722P0105.

3. (B.3, CLIN x002) For the Emergency Calls line with a Government-established NTE, should offerors enter a unit price, an hourly rate, or leave it blank?

Answer: The Government inputs the price, not the contractor. The Government will establish the not-to-exceed (NTE) amount for the Emergency Call Line Item (LI).

4. Can the government clarify in the Price/Cost Schedule “Item Number 0002” Indicates “YR” as Unit, as well as “1002, 2002, 3002, 4002”. Will this Price/Cost Schedule be updated to EA or there unit as opposed to YR?

Answer: YR is correct. The Government will enter an NTE amount, to be used as needed for emergency calls only IAW Section D. The contractor should not enter an amount in these LI. These LINs are designated for separately authorized emergency services, subject to the Government-established NTE amount.

5. We are interested in bidding on this project as a subcontractor. Could you please provide a list of general contractors we can submit our bid to?

Answer: Site Visit sheet attached.

6. The Wage Determination (2015-5229, Revision 31) lists $18.92 per hour plus $5.92 per hour in health and welfare, while the solicitation wage table lists $22.95 per hour. Could you please confirm which rate offerors should use for labor pricing, and whether the $22.95 figure is the informational Statement of Equivalent Rates for Federal Hires?

Answer: Offerors shall use the labor rates and fringe benefits contained in applicable Service Contract Labor Standards Wage Determination. Listed figures are provided for informational purposes only.

7. Would it be possible to obtain previous pricing information or historical contract data for these services?

Answer: 36C25722P0105 awarded for $121,200.00 in 2021.

8. During evaluation and technical review due to public safety concerns regarding pesticide applications and managing public health pests while applying pesticides during IPM Pest Management services as outlined in the Statement of Work, will the government require Prime Contractors to have direct pest industry experience and maintain specific pesticide General Liability insurance coverage that includes pesticide pollution coverage as per the National Pest Management Association Standard of Care and Best Practices guidelines as well as state requirements? This requirement aligns with VHA Directive 1850.02 (Pest Management Operations) and VAAM Appendix M815-A (Department of Veterans Affairs Source Selection Guide), which prohibit subcontractors from qualifying Prime Contractors that lack pest industry experience and/or pesticide-related insurance.

Answer: The Prime contractor has full responsibility of the sub-contractor’s actions and must meet all specifications listed in the performance work statement. The prime contractor must have pest industry experience and pesticide-related insurance. The prime contractor is responsible for ensuring that all pest management services, including subcontracted work, comply with the PWS and applicable licensing and insurance requirements. The prime contractor must demonstrate the qualifications and capabilities required by the solicitation. Applicable pesticide-related insurance requirements shall be maintained as specified in the contract.

9. The PWS for this solicitation reflects a significant expansion from a structural IPM program to a full campus wide IPM program, including the addition of mosquito control, an extensive list of bird species and wildlife trapping (groundhogs, gophers, snakes, and rabbits) - none of which were included in the previous PWS. Can the Government confirm whether this expanded scope of services was factored into the market research conducted for this requirement?

Answer: Marker Research was conducted IAW with RFO 10.

10. PWS states emergency and non-emergent call backs are provided at no additional charge to the Government. The Price/Cost Schedule still includes "Emergency Calls" CLINs 0002, 1002, 2002, 3002, and 4002. Can the Government confirm whether CLINs 0002, 1002, 2002, 3002, and 4002 remain in the Price/Cost Schedule following PWS revision 1?

Answer: See Price Cost/Schedule below.

11. Can the government clarify how many emergency/unscheduled service requests there have been in the past 12 months?

Answer: 5.

12. Can the government confirm the number of exterior rodent bait stations that are present?

Answer: 10.

13. Will the government require exterior rodent bait stations to be provided by the contractor upon award?

Answer: Yes

14. Can the government confirm the number of fly lights that are present?

Answer: None known.

15. Will the government require fly lights to be provided by the contractor upon award?

Answer: Yes.

16. Can the Government confirm whether fumigation and ULV/thermal fogging treatments will be priced separately, or handled as an emergency, no-cost action requiring individual approval?

Answer: Emergency handling. Fumigation and ULV/thermal fogging treatments shall be performed only when authorized by the COR and CO and in accordance with applicable licensing, safety, and regulatory requirements.

17. The evaluation factors still cite PWS sections 4, 5 and 5.4. Which sections of Revision 1 should we address?

Answer: Sections A 10, A11, A12 & D.

18. Is termite and wood-destroying insect work included in the base price, or priced separately if the VA calls for it?

Answer: Separately, if required.

19. For the emergency calls line, will the not-to-exceed amount be given before quotes are due?

Answer: No.

20. How long do badging and background checks usually take, and can technicians start Dec 1 while they clear?

Answer: 14 calendar days. Awardee will communicate with the COR upon award.

21. Algae is regulated under Aquatic Waterways and not considered a structural pest. Can the government confirm that Algae is a covered pest under this solicitation as stated in lists aquatic pests (midge/mosquito larvae, algae)?

Answer: Yes.

22. How many wood-destroying organisms services (subterranean termites, dry wood termites, fungi, wood boring beetles, etc.) have occurred at El Paso VAMC over the past 12 months?

Answer: None known.

23. Is there any known or active termite activity at the facility, and if so, which buildings are affected?

Answer: None known.

24. Can the government provide how many birds service requests have occurred at El Paso VAMC in the past 12 months?

Answer: 3.

25. Can the government clarify that exclusion and bird deterrent control measures are included in the all-inclusive fixed pricing which is not within industry practices and/or government contracting for IPM Pest Management Services?

Answer: Yes, the bird control measures are required to be in the fixed price.

26. If exclusion and bird deterrent measures are to be included, then the government needs to provide the maximum square footage and linear footage to be required per the life of the contract so fair and reasonable pricing to be provided by all contractors?

Answer: The roof is approximately 144,786 square feet.

27. Can the government provide how many bedbugs service requests have occurred at El Paso VAMC in the past 12 months?

Answer: 8.

28. Can the government provide how many Bees or Wasp service requests have occurred in the past 12 months?

Answer: 4.

29. Can the government confirm if there is a height limitation for removal of accessible bees and wasps attached to the building?

Answer: No.

30. If no height limit for bees and wasps, what is the maximum height of your tallest structure for services being requested?

Answer: 4-story building.

31. Can the government provide the number of service requests that have been performed for “other vertebrate pests” over the past 12 months?

Answer: 8.

32. Can the government provide how many bats service requests have occurred in the past 12 months?

Answer: 2.

33. Can the Government confirm the expected frequency and seasonal period for mosquito surveillance and larval control?

Answer: 4.

34. PWS states that “Control of mosquitoes includes identification of breeding habitat and larval control” This includes the surface area of retention ponds, drainage areas, catch basins, and other standing water sites on campus. Can the Government provide the approximate square footage or acreage of the areas requiring mosquito surveillance and larval control?

Answer: Approximately 30,000 square feet.

35. Can the government provide how many geese service requests have occurred in the past 12 months?

Answer: None known.

36. PWS Section A, Business Licensure: The PWS states "The prime Contractor as well as all Sub-Contractors performing pest control duties must possess a current business license for pest control services" in Texas. If a certified SDVOSB subcontractor that holds the Texas Department of Agriculture structural pest control business license and the licensed applicators perform all pest control work, and the prime does not apply pesticides, is the requirement met? Or must the prime hold its own Texas pest control business license?

Answer: Subcontracting is the prime contractor’s responsibility; Prime contractor must also hold its own Texas pest control business license.

37. PWS Section D, Call Backs: Emergency call backs (2-hour response) and non-emergent calls (8-hour response) are now "at no additional charge to the government." The original price schedule had separate emergency call line items (x002). Has the price schedule been revised to remove those lines? If not, how should offerors price them?

Answer: Section D has been revised to remove the language “at no additional charge to the Government.”

38. PWS Section A, Work Hours: Routine services are now listed as "once a week" instead of Tuesdays and Thursdays. Is one weekly visit expected to cover all seven listed locations, or may the off-site locations (6 Founders, Persian Rd. Fort Bliss, E Cliff Dr, Sgt Lytle Ave) be scheduled on separate days within the same week?

Answer: Yes, the off-site locations can be scheduled on separate days within the same week.

39. PWS Section B, Locations of IPM Services: Is the Parking Garage (160,833 SF) inspected monthly on the exterior only, under "exterior of buildings and parking structures," or is it also treated routinely? Is the Maintenance Shop (5,591 SF) a separate building on the 5001 N. Piedras campus.

Answer: The Parking Garage will be inspected once a month and the maintenance shop is a separate building.

40. PWS Section A, Requirements of Contractor, and Section B note on wood-destroying organisms: A "yearly inspection for termite infestation" is required, while treatment "may be included" with "an additional service outline." Should the yearly termite inspection be included in the fixed monthly price, with any termite treatment ordered and priced separately by modification?

Answer: See # 18.

41. PWS Section E, Reporting for Scheduled Services: This section still contains template text ("Add any additional communication requirements…"). Are there any reporting requirements for the community clinics beyond those in Section I?

Answer: No.

42. Wage rate (Section C.4, FAR 52.222-42, and Service Contract Act Wage Determination 2015-5229, Rev. 31): The Wage Determination lists Pest Controller (99410) at $18.92 per hour plus $5.92 per hour in health and welfare. The solicitation wage table lists $22.95 per hour. Please confirm which rate offerors must use for labor pricing, and whether the $22.95 figure is the informational Statement of Equivalent Rates for Federal Hires.

Answer: See #6.

43. Call-backs versus the Emergency Calls line item (PWS rev. 1, Section D; Price/Cost Schedule lines 0002, 1002, 2002, 3002, and 4002): PWS rev. 1 states that emergency call-backs (on site within 2 hours) and non-emergent call-backs (within 8 hours) are at no additional charge to the Government. The Price/Cost Schedule has an Emergency Calls line with a Government-set not-to-exceed amount, ordered by COR-approved quote. Please confirm that routine call-back response is included in the monthly price, and that the Emergency Calls line covers only separately authorized, unforeseen work.

Answer: See section D for call backs information.

44. Fly light program: The original PWS (S02, Sections 5.7 to 5.8) required installing and maintaining fly light units at the main facility. PWS rev. 1 refers only to monitoring insect light traps. Please confirm whether the Contractor must furnish, install, and maintain fly lights, and if so, how many units and where.

45. Answer: 16 Fly light to (Maintenance Shop, Parking Garage, 6 Founders Suite B, 116 and 117 Persian Rd at Fort Bliss, 1250B E Cliff Dr, and 11282 Sgt Lytle Ave), 5001 N. Piedras St., (Breakdown of the quantity and locations TBD).

46. Service frequency and locations (PWS rev. 1, Section A, Work Hours, and Section B, Locations): PWS rev. 1 states that normal routine services occur once a week. Please confirm whether once a week applies to all seven listed locations, or only to 5001 N. Piedras St., and what visit frequency applies to the other locations (Maintenance Shop, Parking Garage, 6 Founders Suite B, 116 and 117 Persian Rd at Fort Bliss, 1250B E Cliff Dr, and 11282 Sgt Lytle Ave).

Answer: Currently - 5001 North Piedras required routine service occur once a week and remaining location once a month.

47. Price/Cost Schedule conformity: The Price/Cost Schedule and Section B.2 in the original solicitation document (S02) differ from PWS rev. 1. Please confirm that PWS rev. 1 and Attachment A govern where they differ, and whether the Price/Cost Schedule will be reissued.

Answer: See # 10.

48. Existing devices: Please provide the approximate number of interior and exterior rodent stations, insect light traps, and other monitoring devices currently in place at each location, so offerors can price service accurately.

Answer: Exterior rodent stations - 10, interior rodent stations - 100, insect light traps - 16.

49. PWS lists dogs and cats as other vertebrate pests. Can the Government clarify whether the contractor is responsible for capturing loose or stray dogs and cats, or whether VA staff are expected to contact local animal control?

Answer: Yes, contractor’s responsibility.

50. PWS does not specify whether live capture and relocation or another control method is required for these animals. Can the Government clarify the expected method of handling and the applicable procedures for transferring, releasing, or disposing of animals after capture?

Answer: The PWS describes what outcomes or results the Government requires, rather than telling the contractor exactly how to perform the work.

51. Licensing (PWS rev. 1, Section A, Business Licensure): When all pest control duties are performed by a subcontractor that holds a Texas structural pest control business license and directly employs a certified applicator, must the SDVOSB prime also hold its own Texas pest control business license?

Answer: Yes.

52. Does PWS revision 1 fully replace the PWS in Section B.2 of the original solicitation, including its twice-weekly schedule, bed bug and termite provisions, and the fly-light program in Table 1? Section E.4 refers to “section 4,” “section 5” and “section 5.4” of the PWS. Which revision 1 sections should offerors address?

Answer: PWS revision 2 is the current version for use.

53. Emergency Calls CLINs (Section B.3, CLINs 0002–4002): PWS rev. 1, Section D, states that emergency and non-emergent callbacks are at no additional charge, and the schedule says the Government will set the not-to-exceed amount. Should offerors enter $0.00, “NTE set by Government,” or leave these lines blank?

Answer: See #37.

54. Termite inspection (PWS rev. 1, Section A and B.8 note): Is a yearly termite inspection part of the firm-fixed price, or would it be ordered separately under an additional service outline?

Answer: See #18.

55. Existing devices: How many fly lights, interior rodent monitors and exterior bait stations are currently in service, and are they Government-owned devices that will remain in place?

Answer: Currently, fly lights - 0; exterior rodent stations - 10; interior rodent stations – 100; and no government owned devices.

56. License categories (PWS rev. 1, Site Specific Requirements): Which Texas Department of Agriculture license categories does the facility accept as “Structural (or equivalent) and Health Related”?

Answer: See PWS section A general #2.

End Document

PERFORMANCE WORK STATEMENT (revision 2) Integrated Pest Management Services

A. GENERAL:

OBJECTIVE: Per VHA Directive 1850.02, Pest Management Operations Program, it is the Veterans Health Administration (VHA) policy that Department of Veterans Affairs (VA) medical facilities effectively implement a pest management program that follows Integrated Pest Management (IPM) principles and promotes safe, efficient and environmentally preferred strategies, thereby preventing or controlling disease vectors and other pests that may adversely impact health, impede operations or damage property. AUTHORITY: 38 U.S.C. § 7301(b).

BUSINESS LICENSURE: The prime Contractor as well as all Sub-Contractors performing pest control duties must possess a current business license for pest control services in the state where contract execution is to be conducted and must directly employ a licensed and certified pesticide applicator in the state where the service is conducted. Preference will be given to QualityPro accredited pest control companies as endorsed by the National Pest Management Association (NPMA).

NOTE: The prime vendor must adhere to individual business licensing laws as outlined in each State's pest control laws and regulations and meet all VHA requirements in accordance with VHA Directive 1850.02.

CONTRACTOR RESPONSIBILITIES: The Contractor shall provide all supervision, management, process oversight, laboratory testing, tools, supplies, equipment, pesticides, transportation, and labor to develop and implement an IPM plan for the El Paso VA Healthcare System. The Contractor shall execute IPM activities in a manner that prioritizes and safeguards the health, safety and well-being of patients, staff and visitors.

PEST MANAGEMENT OFFICER (PMO): For the purpose of this Performance Work Statement (PWS), the PMO is defined as the medical facility’s designated Pest Management Officer in accordance with VHA Directive 1850.02.

PERFORMANCE PERIOD:

Base Year:12/1/2026 - 11/30/2027
Option Year 1:12/1/2027 - 11/30/2028
Option Year 2:12/1/2028 - 11/30/2029
Option Year 3:12/1/2029 - 11/30/2030

Option Year 4: 12/1/2030 - 11/30/2031

TYPE OF CONTRACT: The Government anticipates a Firm Fixed Price contract for this requirement.

WORK HOURS (FOR EXECUTION OF SERVICES): The service schedule shall be established at the beginning of the period of performance and documented in writing. The schedule shall be developed collaboratively by the Contractor, Contracting Officer (CO), Contracting Officer Representative (COR), and the PMO.

Normal routine services will occur once a week. It is expected that the Contractor be on site and perform work on the days coordinated with COR & PMO.

The Contractor must physically sign-in upon arrival and sign-out on completion of each service visit in the onsite IPM logbook. Failure to sign-in or sign-out shall constitute non-compliance. While on site, the Contractor shall check in with designated facility representative(s) to review the status and progress of the IPM program and to address observed or reported pest management issues. This coordination is required for each visit.

If special key or badge access is required for sensitive areas or outside regular hours, a written protocol will be developed between the Contractor, COR, and PMO documenting the process and points of contact necessary to ensure all hour access for pest management services.

Any work performed outside of normal business hours shall require prior approval from the COR before commencement. The Contractor shall provide a minimum of no less than one (1) business day advance notice for all after-hour work requests. Exceptions to the advance notice requirement may be granted only when the COR or PMO determine the work constitutes an emergency.

FEDERAL HOLIDAYS: Federal holidays which are observed by the federal government are annotated below.

New Year’s Day Birthday of Martin Luther King, Jr.

Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day Any additional day recognized as a federal holiday pursuant to a Presidential proclamation/order.

INTERFERENCE TO NORMAL FUNCTION: The Contractor shall suspend or modify work activities to prevent interference with normal facility operations, including but not limited to patient care, utility services, fire protection systems, as well as the safe passage of patients, staff, equipment and carts.

In the event of an emergency, Contractor services may be suspended temporarily and rescheduled at no additional cost to the government.

If access is required to secure areas, Contractor personnel shall request access from the COR/PMO.

Contractor will provide the COR and the PMO with a contingency plan if the Contractor is unable to perform or provide services.

SCOPE OF CONTRACT AND CONTRACT MODIFICATIONS: The final contract will stipulate the responsibilities of the Contractor and/or the government. The Contractor and the government are required to adhere to the scope of the finalized contract. All modifications shall be initiated and approved by the Contracting Officer. The Contractor shall not receive payment for any work/services/deliverables that are/were not specifically authorized under the contract (as written or as modified).

CONTRACTOR STAFF/PERSONNEL QUALFICATIONS, EXPERIENCE, AND OTHER REQUIREMENTS: All personnel performing work and executing services/deliverables shall possess the necessary licensure, qualifications, and experience necessary to execute the specific tasks in this PWS. Unqualified individuals shall not perform work which is covered under the scope of the finalized contract at any time during the performance period.

REQUIREMENTS OF CONTRACTOR: The following requirements/stipulations are mandatory for Contractors/Contractor personnel (e.g., Commercial Pesticide Applicators, Technicians, Pest Helpers).

If using a subcontractor – Prime and Subcontractor shall be appropriately licensed and permitted in the State of (Texas) to perform structural or equivalent pest control services, including wood destroying insect control and public health or equivalent. Only Environmental Protection Agency (EPA) and the State of (Texas) Department of Agriculture approved pesticides and equipment shall be used during the performance of services. All pesticides must be EPA registered and labeled for use in a hospital and healthcare environment.

The Contractor and all personnel assigned to this contract shall be licensed and certified applicators or certified technicians in (Texas), and fully compliant with applicable state licensing and regulatory requirements governing the mixing, handling and application of pesticides. Assigned personnel must be capable of performing pest identification and providing programmatic recommendations independently, without direct supervision, as defined by state requirements. Individuals supporting this contract shall possess current knowledge and demonstrated experience in the commercial application of pest control treatments and the execution of pest management services within a healthcare setting.

The Contractor shall have appropriate certifications and licenses to perform yearly inspection for termite infestation and treatment if required by the facility.

Basic proficiency in speaking, understanding, and writing English is required by the Contractor and Contractor personnel.

While on VA premises, all Contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility. This includes but is not limited to wearing/displaying identification badges and identifiable uniforms which specify the company they are representing.

Regulations prohibit smoking on VA property. This includes use of cigarettes, cigars, pipes, any other combustion of tobacco and non-Federal Drug Administration (FDA) approved electronic nicotine delivery systems (ENDS), including but not limited to electronic or e-cigarettes, vape pens, or e-cigars.

Contractor will ensure that employees assigned to this service contract have a general background check. Employees that do not meet security and clearance requirements shall not be allowed to perform work under this contract.

It is the responsibility of the Contractor to park in the appropriate designated parking areas while on-site. Parking arrangements shall be coordinated between the government and Contractor at the beginning of the performance period before work begins. The medical facility/government will not/does not validate or make reimbursement for parking violations for Contractor personnel under any circumstances.

SITE SPECIFIC REQUIRMENTS (ADDITIONAL CONTRACTOR QUALIFICATIONS): Assigned Technicians to the site are required to possess certification in Structural (or equivalent) and Health Related categories as acceptable to the (Texas) Department of Agriculture or other governing Boards of the State.

If required, Technicians must also hold a Rodent Control License issued by the (Texas) Department of Agriculture or other governing Boards of the State.

Apprentices or Pest Control Helpers are allowed to shadow and receive on-the-job training, provided that a Certified Applicator or Technician is always physically present on-site and remains within visual range of the Apprentice or Helper. Apprentice cards issued by the (Texas) Department of Agriculture will be provided to the COR and PMO.

***Add or modify any state specific requirements in the above section.

B. SPECIFICATIONS:

1. Contractor shall assume full responsibility for compliance with the following as they apply to IPM service in Department of Veterans Affairs (VA) medical facilities.

a. VHA Directive 1850.02, Pest Management Operations Program

b. VA Directive 0057, VA Environmental Management Program

c. VHA Directive 7707, VHA Green Environment Management System and Governing Environmental Policy

d. Federal Insecticide Fungicide Rodenticide Act (FIFRA)

e. Environmental Protection Agency (EPA) guidance and regulations

f. Occupational Safety and Health Administration (OSHA) regulations

g. Federal, State, and local ordinances

h. National Pest Management Association (NPMA) guidelines and best practices

NOTE: VA requirements for pest control may be more stringent than U.S., state, and local requirements.

2. The Contractor shall implement and maintain practices consistent with the requirements of the VA’s Environmental Management System (EMS) and shall ensure that all personnel performing work under this contract are aware of and adhere to applicable environmental policies, procedures, and requirements. The Contractor shall promptly report any environmental incidents, spills, or potential violations to the COR and take immediate corrective action as required. Failure to comply with these requirements may result in work stoppage, contract termination, or other remedies available to the government.

3. The Contractor shall conform to all federal, state, and local regulations governing examining and licensing of pest control operators, performance of pest control services, use of approved pest control chemicals and equipment, and proper disposal methods for all products/containers, which may be in effect for the area where the work under the contract is performed.

4. The Contractor shall develop and implement an IPM plan, and it must include operational and programmatic approaches that reduce food, water, harborage, and access used by pests. The Contractor’s IPM plan shall include a pest surveillance/monitoring program, pest trending, pest trapping/removal, pesticide application, and all regulatory service reporting. The Contractor will provide detailed, site-specific recommendations for structural and technical alterations (indoor and outdoor) that exclude and manage pests within the property boundaries and near buildings and structures.

a. The Contractor shall provide the COR and PMO with maps identifying the locations of all interior and exterior pest monitoring devices, including but not limited to interior rodent traps, insect monitors, rodent bait stations, and insect light traps.

b. All equipment used for insect and rodent monitoring services shall correlate with the approved maps and be documented in the logbook and reviewed with the COR and PMO at least annually.

c. All monitoring devices shall be assigned a unique identification number by the Contractor and the corresponding identification numbers will be annotated on the approved maps.

d. All exterior rodent bait stations shall be properly marked and dated in accordance with local and State requirements.

5. Locations of IPM services and estimated square feet (SF):

a. Weekly Inspection - 5001 N. Piedras St. El Paso, Texas 79930 (306,079 SF)

· Maintenance Shop (5,591 SF)

· Parking Garage (160,833 SF)

b. Monthly Inspection - 6 Founders, Suite B, El Paso, Texas 79906 (9,600 SF)

c. Monthly Inspection - 116 & 117 Persian Rd. Fort Bliss, Texas 79906 (6,657 & 6,857 SF)

d. Monthly Inspection - 1250B E Cliff Dr, El Paso, TX 79902 (5,400 SF)

e. Monthly Inspection - 11282 Sgt Lytle Ave, El Paso, TX 79908 (14,000 SF)

6. The IPM plan requires approval by the COR and PMO prior to implementation and will be submitted for review as part of the Contractor’s contract submissions.

7. The Contractor’s IPM plan must include but is not limited to the following tasks:

a. Inspection of all areas to determine which pest management measures are appropriate and required to mitigate pest risks and infestations.

b. Identification of pest entry points and identifying and communicating/documenting necessary structural remediation recommendations, monitoring and follow up to ensure remediation actions are taken.

c. Communication of recommendations in writing to the COR and PMO, which include environmental sanitation practices that restrict or eliminate food, water or harborage for pests and engineering practices that limit the entry of pests.

d. Selection and utilization of non-chemical control methods, which eliminate, exclude, or repel pests (e.g., traps, caulking, air curtains)

e. Collection of live and dead pests, and disposal of all pests off-site.

f. Selection and use of the most environmentally safe pesticide(s) that are labeled for use in medical facilities when chemical control is necessary.

g. Identification, removal, and cleanup of areas with droppings, feathers, and nesting materials that are known to be health concerns in ceilings, window ledges, crawl spaces or any other area in or around the medical center.

h. Monitoring of treated areas to ensure pest control measures were effective and that pests are not resistant to pesticide treatments.

i. At a minimum, all food service areas will be inspected weekly (e.g., Nutrition and Food Services (NFS) and Veteran Canteen Services (VCS)). Sensitive areas of the medical facility (e.g., Operating rooms (OR), Sterile Processing Services (SPS), Cath lab, endoscopy, other invasive procedure areas, Pharmacy and compounded sterile preparation (CSP) areas) will be inspected monthly at minimum. At a minimum, all patient treatment areas will be inspected semi-annually. Inspections will be documented in service reports, and any risks to health and property will be immediately reported to the COR and PMO.

j. At a minimum, the exterior of buildings and parking structures on campus will be inspected for pest activity no less than monthly.

k. In the event the PMO determines that pest activity within patient care areas or other sensitive areas of the facility exceeds acceptable thresholds, the Contractor shall develop and submit a written corrective action plan to the COR and the PMO. Pest presence and activity override minimum frequencies of inspection and must be addressed to extermination.

l. The corrective action plan shall outline a structured thirty (30) day improvement strategy and, at a minimum, include:

i. Actions to reduce and eliminate pest activity.

ii. Identification of sanitation, environmental, and structural conditions contributing to the pest activity.

iii. A list of proposed pesticide products and application methods.

iv. Pest monitoring documentation (e.g., spreadsheets or tables) tracking pest activity, numbers, and trends over time to evaluate treatment effectiveness and eradication progress.

NOTE: Although rare, fumigation and ultra-low volume (ULV)/thermal fogging treatments may be required in dire circumstances. These treatments require separate scheduling and prior approval by the COR, PMO, Engineering and Safety for the convenience and safety of staff, visitors, patients, and the facility.

8. Pests included for management in the contract include but are not limited to:

a. General structural arthropod pests (e.g., cockroaches, ants, beetles, spiders, carpenter bees, earwigs, silverfish, occasional invaders etc.).

b. Flying insect pests (e.g., houseflies, stable flies, blow flies, dung flies, fruit flies, moth flies, fungus gnats, and Phorid flies etc.) which include drain, sink, or food disposal unit treatments for flies breeding in organic habitat.

c. Pests of public health concern (e.g., bed bugs, fleas, mites, ticks, bees, wasps, mosquitoes, scorpions, etc.). Control of mosquitoes includes identification of breeding habitat and larval control.

d. Stored product pests (e.g., saw tooth grain beetle, red flour or confused flour beetle, Trogoderma beetles, weevils, grain moths etc.)

e. Mice and rats (e.g., house mouse, field mouse, roof rat, Norway rats, etc.)

f. Pest birds (e.g., pigeons, English sparrows, blackbirds, starlings, grackles, geese, etc.)

g. Other vertebrate pests (e.g., dogs, cats, bats, squirrels, gophers, groundhogs, moles, skunks, snakes, rabbits, raccoons, etc.).

h. Aquatic pests (e.g., midge and mosquito larvae, algae etc.).

NOTE: If required, control of wood destroying organisms (e.g., subterranean termites, dry wood termites, wood boring beetles, fungi etc.) may be included. An additional service outline would be necessary.

C. INITIAL BUILDING INSPECTIONS:

1. Both primary and sub-contracted Contractor(s) shall complete a thorough initial, documented inspection of each building or site within the first ten (10) business days of the starting date of the contract. The purpose of the initial inspection is for the Contractor to evaluate the pest control needs of all locations and to identify problem areas and any equipment, structural features, or management practices that are or could be contributing to pest issues or infestations. Access to building space shall be coordinated with the COR and PMO. The COR and/or PMO will inform the Contractor of restrictions or areas requiring special scheduling.

D. CALL BACKS:

1. EMERGENCY CALL BACK: The Contractor shall arrive on site at the facility within two (2) hours after receipt of notification by the COR or designee, perform IPM Services to correct an emergent condition.

1. NON-EMERGENT CALLS: Contractor shall arrive on site at the facility within eight (8) hours for non-scheduled service requests.

1. ALL CALL BACKS: Contractor will report the response time and plan of action to the COR and PMO. Contractor will respond to all after hours voice messages within the time frame allotted for the type of call received. Response time will start at the time that notification is left for the Contractor. Emergency or after-hours point of contact information for the Contractor will be made available to the COR and PMO.

E. REPORTING FOR SCHEDULED SERVICES:

1. Add any additional communication requirements for separate CBOCS, Buildings, or areas associated with the Medical Facility if required.

F. SAFETY FACTORS:

1. All rodent bait stations that use rodenticides including all interior rodent traps shall be placed only at times and in areas approved by the COR and the PMO. Rodent bait stations that utilize rodenticides shall be replaced as necessary and follow all manufacturers’ recommendations. No pest control material or trap shall be placed where it may be recovered by patients, non-target animals, nor shall such material be allowed to contact food, cooking utensils, children, staff or patients.

NOTE: The Contractor shall not spray pesticides inside the medical facility without prior written approval from the PMO.

G. STORAGE AND PROHIBITIONS OF PEST CONTROL MATERIALS:

1. Storage of pest control materials or equipment on VA property is prohibited without the written approval of the COR and PMO. In addition, per VHA Directive 1850.02, the use of the selective herbicide 2,4-Dichlorophenoxyacetic Acid (2,4-D) is banned on VA property.

I. REQUIRED CONTRACTOR REPORTING:

1. After each service (scheduled or non-scheduled) Contractor personnel will submit documentation (service reports) that include but are not limited to:

0. The name and company address of the individual who applied the pesticide.

0. The location, including the building and room number and location(s) inside room(s) where pesticide was applied (e.g., along baseboards, crack/crevice, on windowsills, etc.).

0. The target pest(s) against which the pesticide was applied.

0. The date and time of application.

0. The trade name of the pesticide applied.

0. The federal Environmental Protection Agency registration number of pesticides.

0. The rate of application or amount of the pesticide applied, and the total area treated. Square, cubic, or linear feet will be noted if applicable to the pesticide application.

0. Pest monitoring activities (e.g., inspection of insect monitoring devices, insect light traps, rodent traps, rodent bait stations etc.).

0. If pest monitoring devices or pest control devices are relocated, the Contractor will identify the number, location, and date devices were identified and moved.

8. Service reports and documentation will be provided to the PMO and COR by the end of the next business day. If the service was performed on a Friday, Saturday, or Sunday, then the service report and documentation will be provided by end of the next business day (e.g., Monday). Service and pesticide application reports shall be provided by the Contractor/Company that performs the service on-site and must conform to (Texas) rules and laws regulating pest control business and operations.

8. The Contractor is responsible for supplying, completing, and submitting all reports required or requested by Federal, State, or local ordinances which pertain to any duties contained in the contract.

8. The Contractor will furnish the COR and the PMO’s office, prior to initial pesticide application, the trade names and chemical names of all approved pesticides/chemicals along with current labels and Safety Data Sheet (SDS). The Contractor shall supply this information as new products are submitted for approval to the COR and PMO.

8. The Contractor will supply a quarterly report that annotates the total numbers and locations of pest sightings and pesticide applications on all VA property. A consolidated annual report, including historical trending of pests will be provided to the PMO each year that the contract is active.

J. CONTRACTOR PERSONNEL ID BADGES AND PARKING:

1. The Contractor shall provide the COR and the PMO with a list of Contractor employees expected to enter the buildings to pick up confidential documents. While on VA premises, all Contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.

1. An access badge will be given to the Contractor’s employees after completion of a background check. The Contractor employee must safeguard the access badge and immediately report any lost, stolen, or destroyed badges to the COR or the PMO. All contract personnel must properly display their access badges while on the VA property. Access badges must be worn at or above the waist (facing forward). The Contractor will ensure the badges of Contractor personnel who quit or are terminated are returned to the VA within 3 working days of the event.

1. The Contractor shall be required to comply with all security policies and entrance requirements of the facility. All security policies/requirements must be met, and employees cleared prior to the Contractor performing work. Employees that cannot meet the security and clearance requirements shall not be allowed to perform work under this contract.

1. It is the responsibility of the Contractor personnel to park in the appropriately designated parking areas. Parking information shall be coordinated with each facility COR or the PMO.

1. The VA does not validate or make reimbursement for parking violations of the Contractor’s personnel under any circumstance.

REFERENCES:

Code of Federal Regulations, Title 7. Accessed at:

https://www.ecfr.gov/current/title-7/section-205.271 Environmental Protection Agency, “Introduction to Integrated Pest Management”. Accessed at: https://www.epa.gov/ipm/introduction-integrated-pest-management

National Pest Management Association, “Pest Management Guidelines for Healthcare Facilities, A Guide for Pest Management Professionals”. Accessed at:

https://npmapwcdn-afabcafzhkfnebcs.z02.azurefd.net/media/epgcc12w/pest-managment-gudielines-for-healthcare-facilities_v10-1.pdf

QualityPro, The Mark of Excellence in Pest Management, QualityPro Credentials. Accessed at:

https://www.npmaqualitypro.org/available-credentials/qualitypro/

U.S. Code, Title 38 § 7301(b). Accessed at:

https://www.govinfo.gov/app/details/USCODE-2023-title38/USCODE-2023-title38-partV-chap73-subchapI-sec7301/context

VA Directive 0057, “VA Environmental Management Program”, October 25, 2022.

VHA Directive 1850.02, “Pest Management Operations Program”, December 22, 2022.

VHA Directive 7707, “VHA Green Environmental Management System and Governing Environmental Policy”, April 1, 2021.

End PWS

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
MO
__________________
__________________

Pest Management Services IAW the PWS Contract Period: Base POP Begin: 12-01-2026 POP End: 11-30-2027

1.00
YR
__________________
__________________

Emergency Calls IAW Section D

The Government will establish a Not To Exceed amount at award. This LIN covers unforeseen work only, ordered as needed. Before any work begins: (1) the COR requests a quote from the Contractor, (2) the Contractor submits pricing/scope, and (3) the COR approves the quote in writing. No work shall be performed, and no costs are reimbursable, without prior COR authorization. Total costs shall not exceed the NTE amount without a written modification from the CO.

Contract Period: Base POP Begin: 12-01-2026 POP End: 11-30-2027

12.00
MO
__________________
__________________

Pest Management Services IAW the PWS Contract Period: Option 1 POP Begin: 12-01-2027 POP End: 11-30-2028

1.00
YR
__________________
__________________

Emergency Calls IAW Section D

The Government will establish a Not To Exceed amount at award. This LIN covers unforeseen work only, ordered as needed. Before any work begins: (1) the COR requests a quote from the Contractor, (2) the Contractor submits pricing/scope, and (3) the COR approves the quote in writing. No work shall be performed, and no costs are reimbursable, without prior COR authorization. Total costs shall not exceed the NTE amount without a written modification from the CO.

Contract Period: Option 1 POP Begin: 12-01-2027 POP End: 11-30-2028

12.00
MO
__________________
__________________

Pest Management Services IAW the PWS Contract Period: Option 2 POP Begin: 12-01-2028 POP End: 11-30-2029

1.00
YR
__________________
__________________

Emergency Calls IAW Section D

The Government will establish a Not To Exceed amount at award. This LIN covers unforeseen work only, ordered as needed. Before any work begins: (1) the COR requests a quote from the Contractor, (2) the Contractor submits pricing/scope, and (3) the COR approves the quote in writing. No work shall be performed, and no costs are reimbursable, without prior COR authorization. Total costs shall not exceed the NTE amount without a written modification from the CO.

Contract Period: Option 2 POP Begin: 12-01-2028 POP End: 11-30-2029

12.00
MO
__________________
__________________

Pest Management Services IAW the PWS Contract Period: Option 3 POP Begin: 12-01-2029 POP End: 11-30-2030

1.00
YR
__________________
__________________

Emergency Calls IAW Section D

The Government will establish a Not To Exceed amount at award. This LIN covers unforeseen work only, ordered as needed. Before any work begins: (1) the COR requests a quote from the Contractor, (2) the Contractor submits pricing/scope, and (3) the COR approves the quote in writing. No work shall be performed, and no costs are reimbursable, without prior COR authorization. Total costs shall not exceed the NTE amount without a written modification from the CO.

Contract Period: Option 3 POP Begin: 12-01-2029 POP End: 11-30-2030

12.00
MO
__________________
__________________

Pest Management Services IAW the PWS Contract Period: Option 4 POP Begin: 12-01-2030 POP End: 11-30-2031

1.00
YR
__________________
__________________

Emergency Calls IAW Section D

The Government will establish a Not To Exceed amount at award. This LIN covers unforeseen work only, ordered as needed. Before any work begins: (1) the COR requests a quote from the Contractor, (2) the Contractor submits pricing/scope, and (3) the COR approves the quote in writing. No work shall be performed, and no costs are reimbursable, without prior COR authorization. Total costs shall not exceed the NTE amount without a written modification from the CO.

Contract Period: Option 4 POP Begin: 12-01-2030 POP End: 11-30-2031

GRAND TOTAL
__________________

See attached document: Site Visit Sign In.

File details come from the government source that posted it. Updated .