36C25726Q0804 0001.pdf
PDF 195 KB Posted
- Attached to
- CTX Vehicle Entry Gate Repairs/Replacements (Amended) Federal contract opportunity
- Solicitation number
- 36C25726Q0804
About this file
Amendment of Solicitation/Modification of Contract
This is an Amendment No. 0001 to Solicitation 36C25726Q0804 issued by the Department of Veterans Affairs Network Contracting Office 17 in San Antonio, Texas, effective August 6, 2026. The amendment extends the deadline for receipt of offers to August 20, 2026 at 1:00 PM CDT and provides responses to vendor questions regarding Vehicle Entrance Gate Repairs.
Key clarifications from the vendor Q&A include: no drawings are currently available; vendors should reference the site visit conducted on August 11, 2026 and the Scope of Work for specifications, with a location map to be provided upon award; UL325-compliant gate operator equivalents are acceptable if they meet SOW requirements; one new slide gate leaf will be furnished and installed; the contractor must submit a detailed project timeline upon award (subject to government approval) and is responsible for securing gates during work using barricades or appropriate methods, while traffic control remains the government's responsibility; vegetation restoration requires Bermuda grass with minimum 2-inch topsoil and watering twice during the first week; operators will be battery and solar operated with no electricity installed; and the government will not approve relocating the concrete pad at Ave U or adding stiffener bars to all gates. Offerors must acknowledge receipt of this amendment prior to the extended deadline by completing and returning copies of the amendment, acknowledging it on each offer copy, or sending separate written communication referencing the solicitation and amendment numbers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 852.219-75 VA NOTICE OF LOS.pdf | ||
| Combined Synopsis.pdf | ||
| S02 - 36C25726Q0804.pdf | ||
| WD 2015-5237 r30 - Bell County.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0001 08-17-2026 n/a
36C257
Department Of Veterans Affairs
Network Contracting Office 17
5441 Babcock Road Ste. 302
San Antonio TX 78240
To all Offerors/Bidders
36C25726Q0804
08-06-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-20-2026 13:00 CDT
The purpose of this amendment is to:
a. Extend solicitation due date as identified in Block 11 -08/20/2026 @13:00 CDT.
b. Provide responses to vendor questions. See Continuation for details.
///END OF AMENDMENT///
Responses to Vendor Questions - Vehicle Entrance Gate Repairs 36C25726Q0804
1. Drawings / specifications. No drawings, plans, or specifications were included. Will drawings or specifications (gate locations, retaining wall details, drainage, electrical) be provided for pricing? No drawings are available currently. Please refer to the information obtained during the site visit conducted on August 11, 2026, and the Scope of Work (SOW) for specifications. A map indicating the locations will be provided upon award. Each location was visited during the site inspection.
2. Gate operators make/model. The SOW requires removing seven LiftMaster HDSL24UL operators and supplying "vehicle gate controllers compatible with VA access control." Is a specific replacement operator make/model required, or is any UL325-compliant operator compatible with VA access control acceptable? Equivalents are acceptable that meet the requirements of SOW.
3. New slide gate scope. Please confirm the number of new gate leaves to be furnished and installed. The number of new gate leaves to be furnished and installed is One (1).
4. The SOW states that only one gate may be repaired at a time. Please provide the allowable outage duration for each gate and clarify whether each gate must be returned to full operation at the end of each workday. Please also identify any requirements for temporary gates, barricades, traffic control, security personnel, or temporary access while a gate is out of service. The contractor will provide a detailed project timeline upon award, which will be subject to government approval. The contractor is responsible for ensuring that the gates remain secure during any work, utilizing barricades or other appropriate methods. Traffic control responsibilities will remain with the government.
5. Please provide the required hydroseed mix, topsoil requirements, limits of restoration, watering/establishment requirements, and required establishment period for areas disturbed by the work. Bermuda / Topsoil Min 2inches / Watering twice the first week.
6. Is there going to be electricity at the operators when installed or are we just biding to set the conduit for future power to be run to the operators? No electricity will be going to the operators when installed. Operators are battery and solar operated.
7. The gate at Ave U, would the owner be open to removing the concrete pad and setting it back farther so the gate can be moved away from the columns? The owner would not be open to removing the concrete pad and setting it back farther so the gate can be moved away from the columns.
8. Would the owner be open to all the gates getting stiffener bars added to them? The owner will not be open to all the gates getting stiffener bars added to them.
File details come from the government source that posted it. Updated .