Exhibit 1 Steam and Condensate Return.pdf
PDF 6 MB Posted
- Attached to
- J041--STX Steam and Chill Water line Inspection
- Solicitation number
- 36C25726Q0281
About this file
This is a site plan and technical drawing for steam and chilled water infrastructure inspection and maintenance at a federal facility. The drawing depicts the layout of steam supply and condensate return lines, chilled water piping, and associated mechanical systems across multiple buildings or zones on a campus-style property. The plan is color-coded to distinguish between different piping systems: green lines indicate steam/condensate routes, blue lines show chilled water distribution, red lines denote additional mechanical connections, and purple lines mark the property boundary.
The document includes general notes specifying that all existing piping must be inspected and documented, with particular attention to valve conditions and line integrity prior to work performance. Three critical site visit notes dated February 2026 are included: contractors must refer to supplementary drawing notes for steam supply and condensate return details with specified 8-inch steam and 3-inch condensate pipe sizes; the drawing applies only to the steam and chilled water systems and supersedes other project documentation; and contractors must ensure lines are valved and locked, with verification that all valves are holding before commencing work. The document includes multiple photographs showing existing mechanical infrastructure, valve assemblies, piping connections, and equipment installations. A VA (Veterans Affairs) logo appears on the document, indicating this is a Department of Veterans Affairs facility project. The drawing is identified as Site Plan M1.01 and includes a reference number 36C2572S0B281.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHASTXLAGATA
Text Box NOTES FOR SITE VISIT FOR STEAM AND CHILLED WATER INSPECTION FEB/MAR 2026 (RFQ 36C25726Q0281):
1. Refer solely to keyed note 1 in this drawing for the steam supply and condensate return route and details. The steam lines to be inspected are the 8" steam and 3" condensate return.
2. This drawing was for a separate project. Ignore all other portions than NOTE 1 above.
3. The contractor shall ensure that the lines are valved off and locked, and verify the valves are holding before performing any work.
VHASTXLAGATA
Architect
VHASTXLAGATA
Text Box
VHASTXLAGATA
Architect
VHASTXLAGATA
Text Box
VHASTXLAGATA
Architect
VHASTXLAGATA
Text Box
VHASTXLAGATA
Architect
VHASTXLAGATA
Text Box
VHASTXLAGATA
Architect
VHASTXLAGATA
Text Box
VHASTXLAGATA
Callout
PICTURE LOCATIONS
VHASTXLAGATA
Callout
VHASTXLAGATA
Image 1
VHASTXLAGATA
Text Box
VHASTXLAGATA
Image 2 Steam and condensate piping as they exit the 'steam plant'. This is the outdoor portion of the pipe run.
VHASTXLAGATA
Text Box PIC 2: Steam and condensate piping as they exit the 'steam plant'. This is the outdoor portion of the pipe run.
VHASTXLAGATA
Text Box PIC 1: End of condensate return in 'Steam Plant' building
VHASTXLAGATA
Image
VHASTXLAGATA
Text Box PIC 3: Location where the pipes enter the canopy. Pipes suspended approx 15' AFF.
VHASTXLAGATA
Image
VHASTXLAGATA
Text Box PIC 4: 90 degree turn for piping.
VHASTXLAGATA
Image
VHASTXLAGATA
Text Box PIC 5: Multiple 90 degree turns, then proceeds to the valve.
File details come from the government source that posted it. Updated .