S06 - 36C25726Q0099 0001.pdf
PDF 191 KB Posted
- Solicitation number
- 36C25726Q0099
About this file
This document is an Amendment (0001) to a Department of Veterans Affairs (VA) solicitation for repair and remediation work at multiple buildings, specifically focusing on water and mold damage. The amendment includes several key attachments: RFI responses, site visit sign-in sheet, asbestos survey report, mold assessment report, building location details, and VA moisture and mold program documentation. The solicitation covers comprehensive remediation work including equipment removal, wallpaper/paint removal, drywall replacement, flooring installation, and potential gym equipment relocation across Building 1 and Building 29. Critical requirements include temperature-controlled equipment storage, VA verification of inventory, certification of mold remediation, ICRA Level III containment specifications, and submission of detailed plans like action prevention, hazardous analysis, and dust mitigation plans at least two weeks prior to work commencement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
549A-SL-251
00674
Department of Veterans Affairs Network Contracting Office 17 1901 Veterans Memorial Dr. Bldg. 171 Temple TX 76504
00674
Department of Veterans Affairs Network Contracting Office 17 1901 Veterans Memorial Dr. Bldg. 171 Temple TX 76504
To all Offerors/Bidders
36C25726Q0099
X
X X
The Purpose of Amendment 0001 is to:
1. Include the RFI Responses, see attachment - S05 - RFI's Combined.
2. Include the Site Visit Sign-In-Sheet from 11/19/2025 at1:00pm CTS at Bldg. 9. conference room.
3. Include the Asbestos Report, see attachment - Asbestos Survey Report.
4. Include the Mold Assessment, see attachment - Mold Assessment Report.
5. Include Bldg. 1 Location, see attachment - Bldg. 1 Location.
6. Include VA Moisture and Mold Program, see attachment - VA Moisture and Mold Program.
7. Include Bldg. 1 Asbestos Report, see attachment - Bldg. 1 Asbestos Report.
Horacio Fernandez Contracting Officer
VA-VHA-RPOW-2026-0001
1. Could the VA please provide a ‘detailed’ Scope of Work for each area to be remediated for the water/mold damage. The Water Mitigation and Build Back sections in the Description of Work are not detailed enough. Reference included mold protocol
2. Prior to the start of the project, the VA will be assisting in the removal of the equipment from each area and then put it back in place at the end of the project.
This will be on the GC to remove and store until complete. Storage must be temperature controlled. GC shall inventory all equipment for removal and reinstall. VA will verify GC inventory for all equipment during removal and reinstall.
3. Is there a designated area set aside to store all equipment that has been removed from the affected areas? NO
4. Will built-in desks, cabinets and gym equipment be required to be removed and re-installed by the Contractor?
Only the gym equipment will be removed
5. The walls are currently covered by wallpaper. Will new wallpaper be installed on the walls, or will they be painted ? GC will remove wallpaper, build back is paint.
6. What is the height of the removal of drywall materials? Reference included mold protocol
7. Will the door frames be required to be repainted? Yes
8. What type of flooring will be installed? VA provided samples for each specific location
9. Will a certification be required for mold remediation? Yes, by VA 3rd party
10. If handrails are to be removed and replaced, will they be required to be anti-ligature proof? They are not required to be anti-ligature, but need to be reused, if possible, if not as specified by VA Interior Design.
11. Please identify on a map, the location where a dumpster can be placed for construction debris. This will be coordinated during preconstruction meetings.
12. Missing Floorplans, Moisture Maps & Drawings, Please provide the complete floorplans, moisture maps, and all drawings/spec sheets referenced in the solicitation and shown during the site visit, including Building 29 (A1011/A1011-A/A1011-G), Building 1 (Room 530), all 5th-floor corridor areas, and all A.5 referenced specification documents. Reference map in mold protocol.
13. Asbestos Survey & Mold Remediation Protocol, Please provide the latest asbestos survey and mold remediation protocol referenced in the SOW. Reference included mold protocol
14. Building 1 5th Floor Corridor Scope Clarification, Please confirm whether the 5th floor hallway, elevator waiting room, and the patient area beyond the double doors are included in the project scope. For the 5th floor reference mold remediation protocol and floor plan for finishes.
15. Flooring Quantities & Material Breakdown, Please confirm the total square footage of flooring requiring removal/replacement, including rolls vs. tiles, transition locations, and any subfloor preparation requirements. See floor plans provided
16. Door & Hardware Replacement Scope, Please identify which doors require replacement, whether frames require replacement, and provide all required hardware sets. Reference included mold protocol
17. Drywall Replacement Extent, Please confirm whether any walls require full-height demolition beyond the 2-foot removal described in the SOW. Reference included mold protocol
18. Furniture & Equipment Removal Responsibilities, Please confirm whether the contractor or the VA is responsible for removal and reinstallation of furniture/equipment.
SEE questions 2&4
19. Furniture/Equipment Storage Location, If contractor removal is required, please confirm whether the VA will provide onsite secure storage or if offsite storage is required SEE questions 2&4
20. Work Hours, Occupancy Restrictions & Noise Limits, Please confirm whether any areas require after-hours work, and specify noise/odor restrictions.
Coordinate with COR for after hours work
21. Containment, Negative Air & HVAC Requirements, Please confirm containment specifications, negative-air pressure requirements, ACH requirements, and whether tie-in to building HVAC is allowed.
ICRA LEVEL III see provided
22. Utility Shutdown Coordination, Please confirm any required plumbing, electrical, or mechanical shutdowns and the notification requirements for each.
Shut down must be coordinated with COR and VA and meet safety requirements
ie. Lockout tag out
23. Hazardous Material & Mold Debris Disposal Requirements, Please confirm disposal procedures, manifest requirements, staging areas, and approved disposal locations.
Disposal of hazardous materials are the GC’s responsibility and must dispose of properly
24. Required Submittals List, Please confirm all required submittals, including materials, equipment, containment plans, safety plans, and compliance documentation.
All submittals will be provided in construction meeting and must be submitted to the COR and VA for approval.
Example: Action prevention plan, Activity hazardous analysis, lock/tag out plan, hot work permit if required, dust mitigation plan etc. All must be submitted 2weeks prior to start any work.
See attached document: S04 - Site Visit sign in sheet.
See attached document: S05 - 01M1010074 - Asbestos Survey Report.
See attached document: S05 - Mold Assessment Report - Building 29 -CLC - Gym.
See attached document: S05 - Bldg 1 Location.
See attached document: S05 - VA Moisture and Mold Managmen Program M3P.
See attached document: S05 - Bldg 1 Asbestos report.
36C25726Q0099 - Repair PM&R and Bldg.1 5th FLR
End of Document
File details come from the government source that posted it. Updated .