SF30 36C25726Q0041 0001.docx

DOCX document 121 KB Posted

Attached to
J065--NTX Mobile Lift PM Services_Base plus 4 Option Years Federal contract opportunity
Solicitation number
36C25726Q0041
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document is a Standard Form 30 (SF30) Amendment of Solicitation/Modification of Contract for the Department of Veterans Affairs. The amendment provides technical questions and answers for solicitation 36C25726Q0041 for NTX Mobile Lift Preventive Maintenance (PM) Services. The current solicitation is a follow-on contract to the previous contract 36C25723P0013/36C25723P0012, which was performed by Outside Vendor Interior Fusion.

Key details include a solicitation due date of 11/10/2025 at 4 PM CST, with PM services for mobile/general floor lifts to be performed flexibly throughout the year based on room availability. The contract allows for potential modifications if the number of lifts increases. The vendor will replace straps as needed or every 20,000 lifts, and the VA does not currently have a separate line item for non-PM parts and corrective maintenance. An attachment includes a sample PM checklist for mobile lifts. The solicitation is issued by the Department of Veterans Affairs Network Contracting Office in San Antonio, Texas, and covers a base period plus four option years.

View the file

Other files for this federal contract opportunity

Other files attached to J065--NTX Mobile Lift PM Services_Base plus 4 Option Years, newest first.
File Type Posted
36C25726Q0041 0001_1.docx DOCX document
Attachment A_PM Checklist Mobile List-Sample.pdf PDF
Service Contract Act WD_2015-5257_Smith.pdf PDF
Service Contract Act WD_2015-5273_Fannin.pdf PDF
Attachment B_PM Checklist.pdf PDF
S02 36C25726Q0041.docx DOCX document
Service Contract Act WD_2015-5231_Tarrant.pdf PDF
Service Contract Act WD_2015-5839_Hood.pdf PDF
Service Contract Act WD_2015-5227_Denton.pdf PDF
Service Contract Act WD_2015-5227_Collin.pdf PDF
Service Contract Act WD_2015-5227_Hunt.pdf PDF
36C25726Q0041_3.docx DOCX document
Service Contract Act WD_2015-5227_Dallas.pdf PDF
Service Contract Act WD_2015-5255_Grayson.pdf PDF
Attachment A_Patient Safety Alert AL 14-04.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Questions 36C25726Q0041 | NTX Mobile Lift PM Services

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

10-31-2025

549-26-1-089-0002

36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio, TX 78240

To all Offerors/Bidders

36C25726Q0041 10-02-2025

X

The purpose of this amendment is to:

1. Provide the answers to the technical questions received.

2. The due date remains 11/10/2025, 4PM CST.

1. Is this a brand-new contract OR if there is (was) an incumbent performing these services?

Answer: Previous Contract.

2. If not brand new, could you please provide the current / previous contract number?

Answer: 36C25723P0013 / 36C25723P0012.

3. Who currently has or had the previous contract? OEM, other outside vendors, in-house or none.

Answer: Outside Vendor - Interior Fusion.

4. When was the last time PM inspections were completed? In some cases, the OEM will recommend strap replacements every two years. Were straps replaced during last PM?

Answer: Straps are replaced as needed and or every 20 thousand lifts. Last PM’s 10/3/2024-10/2/2025

5. Are the PMs scheduled throughout the year or are they mostly completed all at one time. Would the current schedule have to be adhered to strictly or is there flexibility?

Answer: Through the year, flexible due to room availability.

6. Can you share the contract number and/or award amount of the previous contract?

Answer: See question #2.

7. On the first year of similar contracts, we often see an increased number of repairs required to bring the devices to OEM standard. Will the VA allow for an “as needed” parts line item to cover the costs of non-pm parts required for corrective maintenance.

Answer: Not currently.

8. If the number of lifts increase over the years, will there be contract modification to cover the cost of these new requirements?

Answer: Yes.

9. Please would you provide a copy of the mobile/general floor lift PM checklist.

Answer: See attached Sample checklist (Attachment A).

See attached document: Attachment A_PM Checklist Mobile List-Sample.

File details come from the government source that posted it. Updated .