Attachment A_PM Checklist Mobile List-Sample.pdf
PDF 67 KB Posted
- Attached to
- J065--NTX Mobile Lift PM Services_Base plus 4 Option Years Federal contract opportunity
- Solicitation number
- 36C25726Q0041
About this file
This document is a periodic inspection checklist for a Guldmann lifter, conforming to DS/EN ISO 10535:2006 standard for a 12-month inspection. The checklist is divided into three main sections: electrical connections, lifter components, and lifting hanger.
The electrical connections section requires checking cable integrity, securing, isolation, and charger functionality. The lifter section involves comprehensive checks including emergency stop and lowering functions, full lifting and leg spreading cycles with rated load, welding inspection, wheel condition and brakes, and fastener assessment. The lifting hanger section focuses on attachment safety mechanisms, sling attachment rubber finger condition, and potential damage to plastic covers. The form provides spaces to record inspection location, serial number, date, and inspector, with a "SAMPLE" watermark indicating this is a template document for standard inspection procedures.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 36C25726Q0041 0001.docx | DOCX document | |
| 36C25726Q0041 0001_1.docx | DOCX document | |
| Service Contract Act WD_2015-5257_Smith.pdf | ||
| Service Contract Act WD_2015-5273_Fannin.pdf | ||
| Attachment B_PM Checklist.pdf | ||
| S02 36C25726Q0041.docx | DOCX document | |
| Service Contract Act WD_2015-5227_Dallas.pdf | ||
| Service Contract Act WD_2015-5255_Grayson.pdf | ||
| Attachment A_Patient Safety Alert AL 14-04.pdf | ||
| Service Contract Act WD_2015-5227_Hunt.pdf | ||
| 36C25726Q0041_3.docx | DOCX document | |
| Service Contract Act WD_2015-5231_Tarrant.pdf | ||
| Service Contract Act WD_2015-5839_Hood.pdf | ||
| Service Contract Act WD_2015-5227_Denton.pdf | ||
| Service Contract Act WD_2015-5227_Collin.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G ul dm an n
G B
/U S
-0 1/
CO
NT
RO
L
Checklist
G ul dm an n G
B -2
5/
/1
Periodic Inspection according to DS/EN ISO 10535:2006 12-month inspection of lifter
Checklist
1. Electrical connections Check that all cables are intact Check that all cables are secured with a cable relief Check for rupture on cables and on isolation Check that the charger I fully functional
2. Lifter Check connection between hook and hanger Check the emergency stop Check the emergency lowering Do a full lifting cycle with rated load – must be effortless and without jarring sound Do a full leg spreading cycle with rated load – must be effortless and without jarring sound Check that all welding are free of cracks Check that the wheels are free of filth and hair – must rotate effortless Check the wheel brakes – must lock the wheel Visual control of all fasteners – loose fasteners with thread locking adhesive must not be tightened, but replaced with new thread locking adhesive applied
Place a sticker with a new date for next inspection
3. Lifting Hanger Check hanger attachment safety mechanism for correct function Check sling attachment rubber finger for correct function and wear Check for damage to plastic covers that could compro-mise use of the hanger
Comments:
Place of Inspection:
Serial number:
Inspection date:
Inspection by:
SAMPLE
SAM
PLE
| Text1: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text2: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| CheckBox1: Off |
| CheckBox2: Off |
| CheckBox3: Off |
| CheckBox4: Off |
| CheckBox5: Off |
| CheckBox6: Off |
| CheckBox7: Off |
| CheckBox8: Off |
| CheckBox9: Off |
| CheckBox10: Off |
| CheckBox11: Off |
| CheckBox12: Off |
| CheckBox13: Off |
| CheckBox14: Off |
| CheckBox15: Off |
| CheckBox16: Off |
| CheckBox17: Off |
File details come from the government source that posted it. Updated .