RFIs 0002 2026.06.23 Pre-Bid Amend 0003 VA.WAC FIRE ALARM.xlsx
XLSX spreadsheet 66 KB Posted
- Solicitation number
- 36C25726B0007
About this file
This is a Request for Information (RFI) response document for a federal solicitation to upgrade the fire alarm system campus-wide at the Waco VA Medical Center (Project #674A4-21-108). The document contains 178 RFIs submitted on 06/05/26, with responses provided by 06/15/26, along with follow-up amendments addressing contractor clarifications.
The base bid scope includes fire alarm system replacement in 12 buildings at Waco VA Medical Center: Buildings 4, 5, 6, 7, 8, 90, 93, 94, 202, 219, 225, and 226. The contractor must provide a complete, code-compliant fire alarm system utilizing Notifier equipment as the basis of design, with integration of voice evacuation systems in designated buildings and general evacuation signaling in others. Key deliverables include metal raceways (concealed in finished spaces, exposed only in unfinished areas), campus-wide fiber optic cabling interconnecting buildings to main graphic annunciator panels in Buildings 225 and 18, all notification appliances and detectors required by NFPA 72 and VA standards, interfaces with sprinklers, elevators, HVAC systems, door locks, and other building components, manual voice messaging microphones, programming and configuration of all systems, shop drawings in Revit format, operations and maintenance training for VA staff, and record documents. The contractor bears responsibility for field-verifying all existing conditions, determining quantities of devices not fully shown in diagrammatic drawings, providing any required new underground conduits and pathways, maintaining the existing Simplex/Faraday systems operational until new systems are accepted and cutover is authorized, and completing all work within a 720-calendar-day performance period. The contract period of performance is 720 days from Notice to Proceed, the contractor must comply with Texas State Fire Marshal licensing requirements and employ a NICET Level III technician or registered Fire Protection Engineer, and all major fire alarm components must be American-made per VA requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726B0007 0006.docx | DOCX document | |
| 36C25726B0007 0005.docx | DOCX document | |
| RFIs 3.docx | DOCX document | |
| Fire Alarm Repair Budget.pdf | ||
| 36C25726B0007 0004.docx | DOCX document | |
| 36C25726B0007 0003.docx | DOCX document | |
| VA.WAC FIRE ALARM - RFIs.xlsx | XLSX spreadsheet | |
| 36C25726B0007 0002.docx | DOCX document | |
| 36C25726B0007 0001.docx | DOCX document | |
| Site Visit Sign In Sheet 36C25726B0007 Upgrade Fire Alarm System Campus Wide Waco FA Sign-in Sheet.pdf | ||
| Attachment 6 CTVHCS ICRA 2025.docx | DOCX document | |
| Attachment 4 Site map.docx | DOCX document | |
| Attachment 2 Sealed VA.WAC Fire Alarm - 100 Bid Set Specifications_.pdf | ||
| 36C25726B0007_1.docx | DOCX document | |
| Attachment 1 Sealed VA.WAC Fire Alarm - 100 Bid Set Drawings_.pdf | ||
| Attachment 7 4-10-2026 PCRA Waco Campus Wide Fire Alarm bidding PCRA.pdf | ||
| Attachment 5 Price Breakout.xlsx | XLSX spreadsheet | |
| Attachment 3 Sealed VA.WAC Fire Alarm - 100 Bid Set Narrative_.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA.WAC FIRE ALARM - BID RFI
PROJECT #674A4-21-108
UPGRADE FIRE ALARM SYSTEM, CAMPUS-WIDE
| WACO, VA MEDICAL CENTER | Rhonda.richardson5@va.gov; stephanie.ingersoll@va.gov | ||||||
| RFI # | DATE | ||||||
| SUBMITTED | DATE | ||||||
| ANSWERED | RFI QUESTION | RFI RESPONSE | RESPONSE | ||||
| FROM | NEW RFI's DUE TO RFI RESPONSES | RFI RESPONSE | |||||
| AMENDMENT #1 | |||||||
| 1 | 06/05/26 | 06/15/26 | What is the VA’s intent to monitor any buildings that are not selected for system replacement, ie bid alternate 1, bid alternate 2, other buildings that have Simplex fire alarm systems but are not on the list. Will the Simplex network need to remain intact? | Buildings not included in the awarded scope shall remain on their existing Simplex/Faraday fire alarm systems; existing network functionality serving non project buildings shall be maintained. No additional monitoring or network integration beyond the awarded scope is authorized. | VA COR / | ||
| VA CO | Based on the response for RFI #1 can the VA define "existing network functionality serving non project buildings shall be maintained" when Drawing G002 CAMPUS RISER DIAGRAM does not reflect the non awarded buildings, information pertaining to any of them are provided, who is responsible for maintaining them and how if they are not part of the SOW? | EXISTING NETWORK FUNCTIONALITY REFERS TO HOW THE CURRENT SYSTEM OPERATES AND IS INTEGRATED INTO THE CAMPUS NETWORK. BOTTOM LINE IS IF THE FIRE ALARM WORKSA IN A BUILDING THAT IS NOT IN THIS SOW, IT MUST WORK THE SAME AFTER ALL NEW WORK IS COMPLETED. IF IT DOESN'T, IT IS ON THE GC TO CORRECT AND MAKE IT FUNTIONAL. | |||||
| 2 | 06/05/26 | 06/15/26 | Per the original specifications dated 6/25/21 section 28 31 00 part 1.1.C states that certain buildings call for voice evacuation, (2,5,7,8,90,93,94) while others a general evacuation signal (4,6,15,16,17,18,24,99,202,216,219,222,224,225,226,) Is this still applicable or do those panels also need to be voice evacuation? | Provide notification appliances and evacuation functions exactly as specified in Section 28 31 00 1.1.C for voice and general evacuation buildings, and in accordance with the contract documents, approved submittals, and applicable codes. No change in scope or expansion of voice systems beyond those buildings is authorized. | VA COR / | ||
| VA CO | Based on the response for RFI #2 can the VA clarify for bid purposes the use of "approved submittals" is not applicable as submittals are not required for bid? | REMOVE REFERENCE TO APPROVED SUBMITTALS IN THE ORIGINAL RFI RESPONSE. CONTRACTOR TO PROVIDE NOTIFICATION APPLIANCES AND EVACUATION FUNCTIONS EXACTLY AS SPECIFIED IN SECTION 28 31 00 1.1.C FOR VOICE AND GENERAL EVACUATIONBUILDINGS AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND APPLICABLE CODES. NO CHANGE IN SCOPE OR EXPANSION OF VOICE SYSTEMS BEYOND THOSE BUILDINGS IS AUTHORIZED | |||||
| 3 | 06/05/26 | 06/15/26 | Will surface mounted conduit be allowed? | New fire alarm raceways shall be metal and concealed in finished spaces, with exposure permitted only in unfinished spaces such as mechanical and electrical rooms, per FA general notes and Division 26/Section 28 31 00. Surface mounted conduit in finished areas is not approved as a general method and will be considered only where specifically requested and approved by the Government. | VA COR / | ||
| VA CO | Based on the RFI # 3 Can the VA confirm the response in the specs allow for surface mounting in unfinished areas, and not per a specific room type as the RFI response indicated as an example? | ORIGINAL RFI RESPONSE CLEARLY STATES THAT SURFACE MOUNTED CONDUIT IS ALLOWED IN UNFINISHED SPACES. MECHANICAL AND ELECTRICAL ROOMS ARE ONLY PROVIDED AS AN EXAMPLE OF AN UNFINISHED SPACE. AS A GENERAL RULE, SURFACE MOUNTED CONDUIT IS NOT ALLOWED IN ANY FINISHED SPACES UNLESS EXPRESSLY APPROVED BY THE GOVERNMENT | |||||
| 4 | 06/05/26 | 06/15/26 | Will there be a designated area for a laydown yard? | Staging and laydown areas, if available, will be identified and coordinated by the VA after award. The contractor shall include all logistics, handling, and internal material movements required to perform the work within the contract price. | VA COR / | ||
| VA CO | Based on the Response to RFI# 4 all bidders need to know prior to bid what the laydown expectations are in order to capture all needed costs, rather than as a surprise after award. Can the VA either say there is laydown space or not to create a level playing field for all bidders? Also, division 01 00 00 states "A limited number of (5) permits shall be issued for General Contractor and its employees for parking in designated areas only." Can the VA confirm this as well? | IT IS UNDERSTOOD THAT A REASONABLE STAGING AND LAYDOWN AREA WILL BE IDENTIFIED AND COORDINATED BY THE VA AFTER THE AWARD | |||||
| 5 | 06/05/26 | 06/15/26 | Will the government pay for materials stored onsite? | Payment for stored materials shall be governed by the contract and FAR requirements and will be based on properly supported, approved payment applications. Provision of a storage area by the Government does not change the contractor’s risk and responsibility for security and protection of stored materials. | VA COR / | ||
| VA CO | Based on the response for RFI #5 Division 01 00 00 states "Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to replace the existing fire alarm system in its entirety, project #674-19-102 as required by drawings and specifications. Can the VA clarify if the drawings and specifications shall govern over the narrative, and in what order of precedence? | IF THERE IS A DISCREPANCY BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, THE MORE STRINGENT AND COSTLY METHOD OR MATERIAL SHALL APPLY IN ALL INSTANCES. | |||||
| 6 | 06/05/26 | 06/15/26 | What is the intended scope of work? Is the project meant to replace the existing fire alarm system on a 1-for-1 basis—replacing panels and devices as shown in the design documents—or is the intent to upgrade the system to meet current code and standards? | The contractor shall provide a complete, code compliant, fully functional fire alarm system in each building within scope, meeting the narrative, drawings, and Section 28 31 00. The fire alarm drawings are diagrammatic and shall not be used as the sole basis for device counts or system design; the contractor shall furnish all devices and infrastructure required to meet NFPA and VA requirements. | VA COR / |
VA CO
| 7 | 06/05/26 | 06/15/26 | Is there an existing Fiber network to be used for building-to-building communications? | Existing fire alarm and communications infrastructure is shown for reference only; suitability, capacity, and condition are not guaranteed by the Government. The contractor shall field-verify existing conditions and provide any additional network infrastructure required to deliver a complete and operational system, except where specific reuse is clearly identified and approved. | VA COR / | ||
| VA CO | Based on the response for RFI # 7 Can the VA confirm there is no "additional network infrastructure required…" as the word "infrastructure" is not present in the drawings, specification or the narrative; and no infrastructure details have been provided for an addition to or new one-line diagrams reflecting new infrastructure requirements? | INFRASTRUCTURE IS A GENERAL TERM USED TO DESCRIBE THE FIRE ALARM DEVICES AND ANY SUPPORT EQUIPMENT OR MATERIAL REQUIRED TO PROVIDE A CODE COMPLIANT, FULLY FUNCTIONAL FIRE ALARM SYSTEM FOR EACH BUILDING COVERED UNDER THE PROJECT SCOPE. | |||||
| 8 | 06/05/26 | 06/15/26 | What are the working hours for each building (laundry/ pharmacy, ect..) so we do not interfere with daily operations? | Building access and work hours will be coordinated with facility operations after award, including any building specific restrictions for patient care and critical functions. The contractor shall plan for phased work in occupied healthcare facilities, including after hours work where required and at no additional cost beyond the contract price. | VA COR / |
VA CO
9 06/05/26 06/15/26 What are the ICRA levels we will have to adhere to for each building? The contractor shall comply with all project specific Infection Control Risk Assessment (ICRA) and infection control requirements as established by the VA Safety/ICRA team. All temporary barriers, negative air systems, and work practices shall be submitted and approved as part of the ICRA process at no additional cost. VA COR /
VA CO
| 10 | 06/05/26 | 06/15/26 | What is the bldg. 94 (mental health) work hours and are there any security concerns? | Work in Building 94 shall be coordinated with facility staff and conducted only within VA approved work windows. Contractor personnel shall comply with all Building 94 security, escort, and patient safety requirements, including any special tool control measures imposed by the facility. | VA COR / | ||
| VA CO | Based on the response for RFI # 10 Can the VA provide details on what to expect prior to bid for "security, escort, and other requirements specific to this building? | AS STATED IN THE ORIGINAL RFI RESPONSE, THE CONTRACTOR AND ALL ASSOCIATED PERSONNEL SHALL COMPLY WITH CURRENT BUILDING SECURITY PROTOCOLS (BADGING, RESTRICTED AREAS, ETC.). ANY REQUIREMENTS TO BE ESCORTED BY VA REPRESENTATIVES WILL BE COORDINATED WITH ADVANCED NOTICE. ALL PATIENT SAFETY REQUIREMENTS WILL BE FOLLOWED INCLUDING BUT NOT LIMITED TO ANY RESTRICTIONS FOR SPECIAL TOOLS THAT WOULD CAUSE NOISE OR ANY OTHER TYPE OF DISTURBANCE TO PATIENTS AND STAFF | |||||
| 11 | 06/05/26 | 06/15/26 | Will this project interfere with any ongoing project in any of the buildings listed for replacement? | Contractor shall coordinate work with all ongoing VA projects and contractors; no guarantee is made regarding concurrent construction activities or their schedules. Concurrent work does not relieve the contractor of completing the project within the contract requirements. | VA COR / | ||
| VA CO | Based on the response for RFI # 11 Can the VA provide details to any ongoing VA of project(s) under contract that will or may need to be coordinated with and/or need to be given schedule considerations prior to bid? | THE CONTRACTOR MUST ANTICIPATE THAT COORDINATION WITH CONCURRENT PROJECTS WILL BE REQUIRED. AS THESE ARE CONSTANTLY EVOLVING A LIST WILL BE PROVIDED AFTER AWARD. THIS IS SUBJECT TO CHANGE IF ANOTHER PROJECT STARTS WHILE THIS PROJECT IS UNDER CONSTRUCTION. COORDINATION IS REQUIRED BY ALL PARTIES. | |||||
| 12 | 06/05/26 | 06/15/26 | Will we be using red conduit as the standard for the new work? Existing conduit has been painted or is metallic. | New fire alarm conduit shall comply with Division 26, Section 28 31 00, and the fire alarm general notes, including use of metal raceway and required identification (e.g., red couplings, striping where indicated). Specific identification details shall be confirmed during submittal review; no reduction in these requirements is authorized. | VA COR / |
VA CO
| 13 | 06/05/26 | 06/15/26 | Are there any asbestos or LBP concerns? Has there been a HAZMAT survey done for all of the areas we will be working in and can it be provided to us? | Available environmental and hazardous materials reports (asbestos, lead, etc.) will be provided for reference if available; accuracy and completeness are not guaranteed. The contractor shall comply with all hazardous material requirements in the contract and shall not disturb suspect materials without VA direction. | VA COR / | ||
| VA CO | Based on the response for RFI # 13 Can the VA provide any and all hazardous material reports prior to bid? | THE VA HAS PROVIDED ALL AVAILABLE HAZARDOUS MATERIALS REPORTS. IF ADDITIONAL REPORTS ARE AVAILABLE | |||||
| 14 | 06/05/26 | 06/15/26 | Can the VA provide the utility map of each of the areas we will be working in or around? | Available utility mapping and underground infrastructure information will be provided for reference only. The contractor shall field verify all utilities, protect existing services, and is responsible for safe excavation and routing regardless of the completeness of VA records. | VA COR / | ||
| VA CO | Based on the response for RFI # 14 Can the VA provide any and all UG utility as-builts prior to bid unless the scope does not include any work exterior to the buildings?? | ALL AVAILABLE UG UTILITY AS-BUILTS HAVE BEEN PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR MUST FIELD VERIFY ALL UTILITIES AS INDICATED IN THE ORIGINAL RFI RESPONSE. | |||||
| 15 | 06/05/26 | 06/15/26 | Can the VA provide an overlay/drawings for the pathways we are to use for this new install? | No additional pathway drawings beyond the contract documents are available. The contractor shall field verify routing requirements and design/install all raceways and pathways necessary for a complete fire alarm network in accordance with NFPA 72, VA standards, and Section 28 31 00. | VA COR / |
VA CO
| 16 | 06/05/26 | 06/15/26 | Can we re-use any of the existing fiber? | Existing fiber may only be reused where its type, routing, capacity, condition, and performance are demonstrated suitable and compatibility is documented, and where reuse is approved through the submittal process. All reused fiber shall meet Section 28 31 00 requirements and be warranted as part of the new system. | VA COR / | ||
| VA CO | Based on the response for RFI # 16 The word "fiber" is not on the dwgs, specs, SOW or the narrative. Can the VA provide details on the drawings where "fiber" is to removed/ reconnected; and/or new fiber is to be installed as part of the existing or new FA infrastructure? | IT IS THE BELIEF OF THE VA THAT ANY CONTRACTOR INTENDING TO BID THIS PROJECT SHOULD UNDERSTAND AT A MINIMUM THAT EACH INDIVIDUAL BUILDING'S FIRE ALARM SYSTEM IS CONNECTED BACK TO THE MAIN GRAPHIC ANNUNCIATOR PANELS LOCATED IN BUILDINGS 225 AND 18 AS INDICATED ON THE CONTRACT DOCUMENTS USING FIBER OPTIC CABLING. | |||||
| 17 | 06/05/26 | 06/15/26 | Since the old system has to remain in place and functional while the new system is being installed; is there room in the existing fiber pathways for the new fiber cable or will we have to directional drill new pathways and new HDPE? | The Government makes no representation regarding spare capacity or condition of existing pathways. The contractor shall determine pathway capacity during field investigation and provide any new pathways required to support the specified Class X campus network and building interconnections. | VA COR / | ||
| VA CO | Based on the response for RFI # 17 Wiring a pathway as Class X in NFPA 72 means using redundant, isolated conductors so that a single fault does not impair any device. IAW the TIL Fire Protection design Manual it is not required that Class X circuits be run in separate conduits from each other. Can the VA confirm the design guide requirement, otherwise please provide infrastructure riser diagrams, site civil plans that show the existing UG fiber loops and new UG fiber requirements, to include specifications for fiber so all bidders are proposing based on the same defined scope? | PER THE ORIGINAL RFI RESPONSE, THE GOVERNMENT MAINTAINS THAT IT IS NOT REQUIRING THE CONTRACTOR RUN CLASS X CIRCUITS IN SEPARATE CONDUITS AND RESTATES THAT IT MAKES NO REPRESENTATION REGARDING SPARE CAPACITY OR CONDITION OF THE EXISTING PATHWAYS. THE CONTRACTOR MUST DETERMINE PATHWAY CAPACITY DURING FIELD INVESTIGATION AND PROVIDE ANY NEW PATHWAYS REQUIRED TO SUPPORT THE SPECIFIED CLASS X CAMPUS NETWORK AND BUILDING INTERCONNECTIONS. | |||||
| 18 | 06/05/26 | 06/15/26 | Can the VA provide an overlay or drawings for the existing fire alarm infrastructure, both above and below ground? | Any available existing fire alarm as built drawings and infrastructure information will be provided for reference only. The contractor shall field-verify all existing conditions and shall not rely on legacy documents as complete or accurate. | VA COR / | ||
| VA CO | Based on the response for RFI # 18 Can the VA provide any and all FA as-builts for both buildings and site prior to bid? | ALL AVAILABLE FA AS BUILTS HAVE BEEN PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR MUST FIELD VERIFY ALL EXISTING CONDITIONS AS INDICATED IN THE ORIGINAL RFI RESPONSE. | |||||
| 19 | 06/05/26 | 06/15/26 | How many duct detectors are there per building? | Drawings are diagrammatic and are not intended to provide complete inventories or counts of duct detectors. The contractor shall field-verify quantities and locations and provide all duct detectors and interfaces necessary to meet NFPA 72, VA standards, and Section 28 31 00 requirements. | VA COR / | ||
| VA CO | Based on the response for RFI # 19 A review of the TIL Program Guide, PG-18-15, Volume C this document appears to require the DOR to provide the interconnection of fire alarm system with smoke dampers, elevators and various other HVAC and FP equipment. Apparently there can be up to five supervised control circuits from the fire alarm system that will interface with the elevator system alone. Can the VA provide this information not otherwise provided in the current drawing set? | THE CONTRACTOR MUST FIELD VERIFY QUANTITIES AND LOCATIONS OF ALL DUCT DETECTORS AND INTERFACES NECESSARY TO MEET NFPA 72, VA STANDARDS AND SECTION 28 31 00. THE CONTRACT DOCUMENTS ARE DIAGRAMMTIC AND ARE NOT INTENDED TO NOR DO THEY PROVIDE COMPLETE INVENTORIES OR COUNTS OF DUCT DETECTORS. THE CONTRACTOR IS RESPONSIBLE FOR THIS AND SHOULD BID ACCORDINGLY TO COVER THESE REQUIREMENTS. | |||||
| 20 | 06/05/26 | 06/15/26 | How many magnetic door holders are there per building? | Drawings are diagrammatic and not a complete inventory of magnetic door holders. The contractor shall field-verify quantities and locations and provide all required door holders and interfaces to achieve a complete, code compliant system as required by the contract documents. | VA COR / |
VA CO
| 21 | 06/05/26 | 06/15/26 | Will we be able to surface mount conduit? | Surface mounted conduit in finished spaces is not granted blanket approval. Requests for surface mounted conduit in specific locations shall be submitted with justification and will be reviewed case by case by the Government; concealed raceways remain the default requirement. | VA COR / | ||
| VA CO | Based on the RFI #21 response per 28 31 00 para 3.1 INSTALLATION (B) there is no mention of "request" for "conduit mounting". Can the VA confirm that there is no request required as indicated in para 3.1 specific to conduit? | TO CLARIFY: CONCEALED RACEWAYS ARE THE DEFAULT REQUIREMENT IN ANY AND ALL FINISHED SPACES. ANY DEVIATION FROM THIS MUST BE REQUESTED BY THE CONTRACTOR IN WRITING TO THE VA ON AN INDIVIDUAL BASIS FOR CONSIDERATION AND ANY POSSIBLE ACCEPTANCE TO THE DEFAULT REQUIREMENT. | |||||
| 22 | 06/05/26 | 06/15/26 | Can we abandon conduit and back boxes in areas where the removal would require substantial damage to the existing structure? | Existing abandoned conduit and backboxes may remain in place only where removal would damage existing construction and where specifically approved by the Government. Any abandoned raceways and boxes shall be rendered inactive, safely terminated, and documented on as built drawings. | VA COR / |
VA CO
| 23 | 06/05/26 | 06/15/26 | Will all new panels be located in the same room where the current panels are located? | Existing panel locations are not guaranteed to be reused. The contractor shall propose final fire alarm control panel and annunciator locations that meet code, accessibility, and operational requirements and obtain Government approval through the submittal process. | VA COR / | ||
| VA CO | Based on the RFI #23 response, there are several references to extending existing circuit to new panel locations. However, there are no electrical panel schedules that reflect the circuit of which the panel is located or the room of which the electrical panel is that serves the FA equipment. Can the VA provide the necessary missing electrical drawing information prior to bid? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED. | |||||
| 24 | 06/05/26 | 06/15/26 | How many power supplies, amplifiers and boosters are there per building? | Existing equipment counts are for reference only. The contractor shall field verify requirements and provide all power supplies, amplifiers, boosters, and associated infrastructure needed for a complete, code compliant system per Section 28 31 00 and the approved design. | VA COR / |
VA CO
25 06/05/26 06/15/26 Will the government have an FPE do all the review of the buildings or do we need to provide an FPE to do so? Government reviews, including by the VA Fire Protection Engineer, do not relieve the contractor of design, coordination, and code compliance responsibilities. The contractor shall provide all engineering and design services required by Section 28 31 00 (NICET III or FPE) and Division 28. VA COR /
VA CO
| 26 | 06/05/26 | 06/15/26 | With some of the buildings being historic, what materials will we need to use to make repairs from installing new and removing old conduit? | The contractor shall follow applicable details located on Dwg GI003. For conditions not captured on these details, contractor shall repair any damaged surface by matching the adjacent material. For specific locations where the contractor cannot identify or needs clarification on the adjacent material or specific repairs, they shall submit specific RFI's for that condition. | CBDG | Based on the RFI #26 response; we request either a comprehensive site visit to look at each and every possible location that the work would disrupt historic features such as the existing wall, ceiling and/or floor finishes OR the VA provide photographic images of all locations anticipated to be disturbed by the work. The referenced detail GI003 does not address any finish requirements. Please confirm which can be achieved so all bidders have the similar information to bid by, not just the firms that have had past knowledge and or is currently working on the campus that can do they own survey outside of an organized site visit? | A SITE VISIT WAS PREVIOUSLY HELD FOR ALL BIDDERS AND ADVERTISED IN SAM.GOV. AN ADDITIONAL SITE VISIT WILL NOT BE PROVIDED FOR. | ||
| 27 | 06/05/26 | 06/15/26 | How many elevators are there per building? | Contractor shall coordinate all elevator interfaces with the elevator contractor and field verify existing elevator controls, recall functions, and monitoring points. Any prior work in the referenced buildings does not change the contractor’s obligation to provide complete elevator/fire alarm interfaces per the contract documents. | VA COR / | ||||
| VA CO | Based on the RFI #27 response; we request the POC for each and every elevator company servicing all elevators subject to the SOW for this project? Can the VA provide this prior to bid so all bidders have an opportunity to make contact with them if the VA will not provide the existing controls? | THE VA WILL CONSIDER THIS REQUEST AND IF POSSIBLE RELEASE POC INFORMATION FOR THE ELEVATOR SERVICING COMPANY. | |||||||
| 28 | 06/05/26 | 06/15/26 | Will the elevator contractor be available to test the elevator recall during final, or will we need to coordinate and pay for that? | The contractor shall coordinate all testing activities, including elevator recall and related interfaces, with all affected trades and VA staff. Costs associated with contractor required coordination, scheduling, and vendor participation necessary to complete testing shall be included in the contract price. | VA COR / |
VA CO
| 29 | 06/05/26 | 06/15/26 | Do you have a diagram of the existing fiber raceways? | Existing fiber raceway diagrams and campus network drawings, if available, will be provided for reference only. The contractor shall field-verify all pathways and provide any additional raceways needed to implement the new campus fire alarm network. | VA COR / | ||
| VA CO | Based on the RFI #29 response; we request the full as-builts for fiber related to FA on this campus. Can the VA provide prior to bid so all bidders have the same information to base their bid on? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED. ALL BIDDERS HAVE THE SAME AVAILABLE INFORMATION. | |||||
| 30 | 06/05/26 | 06/15/26 | Is there room for us to pull new fiber through the existing fiber raceway? | No guarantee is made regarding available capacity in existing fiber raceways. The contractor shall assess capacity, fill, and condition and shall provide new raceways where existing capacity is insufficient to meet code and project requirements. | VA COR / |
VA CO
31 06/05/26 06/15/26 Is there enough existing fiber that we can tie into the existing fiber network, so we do not have to pull new fiber? Existing fiber availability, length, and performance are not guaranteed. The contractor shall provide all fiber infrastructure necessary for a complete and operational system; existing fiber may only be used where suitability is verified and approved by the Government. VA COR /
VA CO
32 06/05/26 06/15/26 If there is not enough new fiber, can we use the existing fiber and just move it to the new panel once we have completely tested it out to save money? Existing fiber may only be reused or relocated if it is demonstrated suitable, compatible with the new system, and approved through the submittal process. Any reuse remains fully the contractor’s responsibility and must meet all warranty and performance requirements. VA COR /
VA CO
33 06/05/26 06/15/26 The Price/Cost Schedule does not account for the bid alternates. Can the VA provide a revised schedule? Offerors shall follow the CLIN structure and Price/Cost Schedule as established in the solicitation and any amendments. Any revisions to the CLIN structure or alternate pricing format will be issued by amendment; no alternate pricing structures are authorized without such direction. VA COR /
VA CO
| 34 | 06/05/26 | 06/15/26 | We will need to know if we are dealing with a dropped ceiling or a hard ceiling for all rooms. Can the VA provide a reflected ceiling plan for all buildings? | The contractor shall field verify ceiling conditions (hard vs suspended) and coordinate device mounting accordingly. Existing reflected ceiling plans, if available, will be provided for reference only and shall not be relied upon as complete. | VA COR / | ||
| VA CO | Based on the RFI #34 response; we request the full as-builts for reflected ceiling plans related to each building within the scope of this project. Can the VA provide prior to bid so all bidders have the same information to base their bid on? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED. ALL BIDDERS HAVE THE SAME AVAILABLE INFORMATION. | |||||
| 35 | 06/05/26 | 06/15/26 | Will the VA provide a device equipment schedule to include quantities for each building? | The contractor shall field verify all device quantities and locations; drawings and narratives are diagrammatic and not intended for device counting. The contractor shall furnish devices sufficient to meet NFPA 72, VA Fire Protection Design Manual, and Section 28 31 00 requirements. | VA COR / | ||
| VA CO | Based on the RFI #35 response; how does the VA expect the bidder to be contractually obligated to plans, specs and a narrative when the VA also states everything is diagrammatic and not intended to reflect any given condition? Can the VA confirm that any scope not otherwise shown would be a case by case change in conditions for the contractor? | THE VA CANNOT CONFIRM | |||||
| 36 | 06/05/26 | 06/15/26 | Can the VA provide the mechanical plans for each building? | Available mechanical drawings will be provided for reference only. The contractor remains responsible for coordination with mechanical systems, field verification of ductwork and equipment, and providing all fire alarm interfaces required by the contract documents. | VA COR / | ||
| VA CO | Based on the RFI #36 response; we request the full as-builts for HVAC plans related to each building within the scope of this project. Can the VA provide prior to bid so all bidders have the same information to base their bid on? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED. ALL BIDDERS HAVE THE SAME AVAILABLE INFORMATION. | |||||
| 37 | 06/05/26 | 06/15/26 | Are duct detectors included in this project? | Duct smoke detectors shall be provided, modified, replaced, or interfaced as required by the contract documents, fire alarm general notes, NFPA 72, and applicable VA standards. The contractor shall field verify all duct detector locations and ensure all required duct detectors are connected to and supervised by the new system | VA COR / | ||
| VA CO | Based on the RFI #37 response; we request the full as-builts for HVAC plans related to each building within the scope of this project. Can the VA provide prior to bid so all bidders have the same information to base their bid on? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED. ALL BIDDERS HAVE THE SAME AVAILABLE INFORMATION. | |||||
| 38 | 06/05/26 | 06/15/26 | If duct detectors are included in the project, can the VA provide an equipment schedule for each building? | Contractor shall field verify existing magnetic door holder quantities and locations. Drawings are not intended to provide complete inventories; contractor shall ensure all required fire door hold open devices are properly interfaced and controlled by the new fire alarm system. | VA COR / | ||
| VA CO | Based on the RFI #38 response; we request the full as-builts for FA plans related to each building within the scope of this project. Can the VA provide prior to bid so all bidders have the same information to base their bid on? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED. ALL BIDDERS HAVE THE SAME AVAILABLE INFORMATION. | |||||
| 39 | 06/05/26 | 06/15/26 | What additional building components are tied into the fire alarm systems for each building (elevators, mag locks, HVAC, etc)? | The contractor shall identify, field verify, and connect all required interfaces, including but not limited to sprinklers, kitchen hoods, smoke/fire dampers, HVAC equipment, elevators, door locks, fire doors, generators, and other systems as described in the narrative and Section 28 31 00. | VA COR / | ||
| VA CO | Based on the RFI #39 response; we request the full as-builts for FA plans related to each building within the scope of this project. Can the VA provide prior to bid so all bidders have the same information to base their bid on? We also request that the VA updates the provided FA Matrix that incudes everything that requires interfacing. Can the VA provide a new Matrix per the VA response to this RFI? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED. ALL BIDDERS HAVE THE SAME AVAILABLE INFORMATION. | |||||
| 40 | 06/05/26 | 06/15/26 | Electrical Room Panel Installations — While the plans indicate no panels are to be installed in electrical rooms, several existing panels observed during the site visit are located within spaces typically designated as such. Could you clarify whether you have preferred alternate locations in mind for panel installation? | Final fire alarm control panel, power supply, amplifier, and annunciator locations shall be coordinated with the Government, approved through the submittal process, and shall comply with all code, accessibility, maintainability, and VA operational requirements. Existing locations shown are not guaranteed. | VA COR / |
VA CO
| 41 | 06/05/26 | 06/15/26 | Current System Documentation — Can you provide current as-built drawings or design documents for the fire alarm systems scheduled to be demo’d? | Available as built and record drawings, if any, will be provided for reference only; their accuracy and completeness are not guaranteed. The contractor shall field-verify all conditions and shall produce accurate as built drawings in the required Revit format per Section 28 31 00. | VA COR / | ||
| VA CO | Based on the RFI #41 response; we request the REVIT version applicable to the project. Can the VA confirm that the VA will provide the REVIT files used for the design and the vesing of software required? | THE VA SHALL PROVIDE REVIT MODELS FROM THE DESIGN TEAM ONCE THE PROJECT IS AWARDED. | |||||
| 42 | 06/05/26 | 06/15/26 | Demolition Scope Above Ceiling — Will the demolition include removal of above-ceiling wiring and raceways, or will it be limited to devices and tying up wiring above the ceiling? | Demolition shall be performed as necessary to complete the work in accordance with Section 28 31 00 1.2.B–C, which requires removal of all existing fire alarm equipment and conduit not reused. Existing systems shall remain operational until approved cutover is complete, after which demolition shall proceed as coordinated with the VA. | VA COR / |
VA CO
| 43 | 06/05/26 | 06/15/26 | Conduit Requirements — What are the conduit expectations for this scope? Specifically, what type of conduit will be required? | Conduit and raceways for the fire alarm system shall comply with the contract documents, NFPA 70, NFPA 72, applicable NEC requirements, Division 26, and Section 28 31 00, including use of metal raceways and required concealment in finished spaces. Approved submittals will govern specific product selections but shall not reduce these minimum requirements. | VA COR / | ||
| VA CO | Based on the RFI #43 response; we request the type of conduit applicable to the project even though the specs have that information. If flex is acceptable to be snaked down walls as an example; then all bidders need to know this. Can the VA confirm that rigid EMT is to be used not flex conduit? | AS CLEARLY STATED IN THE FOLLOW UP RFI - ALL INFORMATION IS PROVIDED IN THE SPECIFICATIONS. IF ANY DEVIATION IS BEING REQUESTED THIS MUST BE SUBMITTED TO THE VA FOR APPROVAL. | |||||
| 44 | 06/05/26 | 06/15/26 | Reuse of Existing Conduit in Cinder Block Walls — In areas like the laundry building, where conduit runs into cinder block walls, will surface-mounted conduit be acceptable if reuse proves impractical due to system changeover sequencing? Maintaining operation of the current system during transition will make reuse challenging. | Surface mounted conduit is not granted blanket approval. Where reuse of existing conduit (e.g., in cinder block walls) is not practical, the contractor may submit specific requests for surface mounted conduit with justification; each request will be reviewed on a case by case basis and must still meet aesthetics, historic, and code requirements. | VA COR / | ||
| VA CO | Based on the RFI #44 response; we request any and all historic requirements. Can the VA provide all wall types and location that may not have cavities for conduit to be inserted for each building, so we understand how and where we need to meet aesthetics, historic, and code requirements and that all bidders have the same information to bid by? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED | |||||
| 45 | 06/05/26 | 06/15/26 | What fire caulk requirements should we anticipate for penetrations or system transitions? | All firestopping materials and methods shall comply with UL listed firestop systems, Section 07 84 00, Section 28 31 00, and applicable codes. Existing and new penetrations shall be sealed to restore required fire and smoke ratings, and all systems shall be submitted for VA review. | VA COR / |
VA CO
46 06/05/26 06/15/26 Lift Access and Restrictions — Are there any restrictions on lift equipment access or usage we should be aware of? Contractor shall coordinate lift access, locations, and use with facility operations and safety; restrictions may apply, particularly in patient care and sensitive areas. Contractor shall provide alternate OSHA compliant access (e.g., ladders) where lifts are not permitted. VA COR /
VA CO
47 06/05/26 06/15/26 Work Hour Limitations — Will any building-specific restrictions apply to working hours due to usage or occupancy considerations? Contractor shall coordinate building specific work hours with facility operations; work may require phasing and after hours activities to limit patient and operational impact. Any premium time necessary to meet these constraints is the contractor’s responsibility. VA COR /
VA CO
| 48 | 06/05/26 | 06/15/26 | Evaluation Factor – Please confirm whether local presence / proximity to the place of performance will be favorably evaluated, given the Specification Section 28 31 00-5 1.6.H.2 requirement for a two-hour on-site response time. | Evaluation criteria are limited to those identified in the solicitation. The two hour on site response time requirement in Section 28 31 00 is a performance requirement, not a separate evaluation preference for “local” offerors; offerors shall comply with all response time requirements specified. | VA COR / | ||
| VA CO | Based on the RFI #48 response and Based on the solicitation para A.3 PRICE/COST SCHEDULE the "Government will evaluate the proposed total schedule bid items and make an award on the proposed total schedule bid items to the bidder whose bid conforms to this solicitation and is deemed the most advantageous to the Government." Can the VA confirm that the wording "schedule bid items" used in the RFI response is the same as A.3 PRICE/COST SCHEDULE? | Please follow the solicitation instructions. | |||||
| 49 | 06/05/26 | 06/15/26 | The scope of work lists buildings by number to be included in the Base Bid, Bid Alternate 1, and Bid Alternate 2, but the drawing package includes additional buildings. Please confirm which buildings are included. | Buildings included in the project are limited to those identified in the solicitation, contract documents (including the design narrative building list), and any subsequent amendments. In the event of discrepancies, the final building list will be defined by amendment; no additional buildings are included without written modification. | VA COR / |
VA CO
| 50 | 06/05/26 | 06/15/26 | Per Statement of Work Requirements Paragraph 1, please confirm whether offerors must submit proof of Notifier distributorship at the time of proposal. | Offerors shall comply with all solicitation and Section 28 31 00 requirements regarding manufacturer authorization, distributorship, and factory support documentation. Required proof shall be submitted at the time and in the format specified by the solicitation and any amendments. | VA COR / | ||
| VA CO | Based on the RFI #50 response and based the question, it does not apper that the question was clearly answered. Can the VA confirm whether the bidder needs to submit anything on the distributor as part of the proposal package? If so please clearly identify what is needed so all bidders have the same informantion. | The bids need to bid Notifier equiptment. | |||||
| 51 | 06/05/26 | 06/15/26 | Please confirm Prime Contractor shall employ NICET Level III or registered Fire Protection Engineer, per specifications. | Contractor personnel qualifications shall comply with Section 28 31 00, including provision of a NICET Level III fire alarm technician or registered FPE for design, layout, and supervision. Government reviews do not waive these requirements. | VA COR / |
VA CO
52 06/05/26 06/15/26 Please confirm that the Prime Contractor shall have a Fire Alarm License from the Texas State Fire Marshal’s office. The contractor shall comply with all applicable Texas licensing requirements identified in the contract documents, including electrical and fire alarm licensing. No work may be performed without required state and local licenses. Additionally, the contractor shall comply with all Texas State Fire Marshal fire alarm licensing requirements applicable to this project. The licensed firm and individuals shall be identified in submittals as required by the contract documents. VA COR /
VA CO
53 06/05/26 06/15/26 Clarify pricing structure to match CLIN schedule for Base Bid, Alternate 1, Alternate 2. Contractor shall structure bid and pricing in accordance with the CLIN schedule and pricing instructions in the solicitation and any amendments. Any clarification or revision to CLIN structure or price breakout will be issued by amendment; no alternative structures are authorized without written direction. VA COR /
VA CO
54 06/05/26 06/15/26 Confirm subcontracting limitations related to SDVOSB participation and percentages. Contractor shall comply with all SDVOSB subcontracting limitations and self performance requirements identified in the solicitation, FAR, and VA regulations. No additional or reduced limitations are imposed beyond those governing requirements. VA COR /
VA CO
55 06/05/26 06/15/26 Confirm requirement for two parallel workstations for Simplex and Notifier systems if partial conversion occurs. Contractor shall provide temporary and permanent system configurations as necessary to maintain required fire alarm functionality throughout construction, including maintaining existing systems in service until new systems are accepted. Any parallel operation of old and new systems shall be coordinated with VA and included in the contract price. VA COR /
VA CO
56 06/05/26 06/15/26 Confirm intent for two parallel fiber networks and whether government provides fiber paths if required. Contractor shall provide all fire alarm network infrastructure required for a complete and operational campus wide system, including inter building Class X signaling line circuits and building SLC/NAC circuits, unless the contract documents specifically identify items provided by others. Existing Simplex campus network infrastructure will not be reused as the primary system. VA COR /
VA CO
57 06/05/26 06/15/26 If network failures exist, what remediation plan should be followed? Contractor shall identify existing network deficiencies discovered during installation and notify the Government. Correction of pre existing, unrelated deficiencies is not included in this contract without specific Government direction and modification; contractor remains responsible for proper performance of new work. VA COR /
VA CO
58 06/05/26 06/15/26 Confirm VA will facilitate access in Building 226. Access to Building 226, including any restricted areas, will be coordinated with facility personnel after award. Contractor shall plan work to comply with any security, safety, and logistics requirements imposed by the facility. VA COR /
VA CO
59 06/05/26 06/15/26 Will the VA provide an exterior area for a locked Conex box to secure tools and equipment? Contractor may request secured storage or Conex locations after award; availability and location will be determined by the VA based on site constraints. The contractor retains responsibility for security and protection of stored tools and materials regardless of VA provided space. VA COR /
VA CO
60 06/05/26 06/15/26 Clarify conflict between Uniform Building Code and International Building Code in SOW and narrative. Contractor shall comply with the codes and standards identified in the contract documents, including the VA Fire Protection Design Manual, NFPA 72, NFPA 101, and applicable IBC/IFC references. Any references to superseded codes (e.g., UBC) are overridden by the current adopted codes listed in the narrative and Section 28 31 00. VA COR /
VA CO
| 61 | 06/05/26 | 06/15/26 | Provide drawings and information for VA Project #67A4-20-110, Improve Fire Suppression System. | Available information and drawings for related projects (e.g., VA Project 67A4 20 110, Improve Fire Suppression System) will be provided for reference only. Accuracy and completeness are not guaranteed, and they do not alter this project’s scope unless specifically incorporated by amendment. | VA COR / | ||
| VA CO | Based on the RFI #61 response; we request the project 67A4 20 110 referenced. Can the VA provide all relevent project design and/or as-builts for this other project? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED | |||||
| 62 | 06/05/26 | 06/15/26 | Confirm whether AutoCAD is acceptable instead of Revit for fire alarm submittals. | Fire alarm submittals and as built record drawings shall comply with Section 28 31 00 requirements, which mandate preparation using Revit with VA defined layering. AutoCAD or other equivalent formats are not acceptable substitutes unless specifically authorized in writing by the VA. | VA COR / |
VA CO
63 06/05/26 06/15/26 Do all buildings require manual voice messaging microphone or only those three stories and above? Manual voice evacuation capability, including microphones, shall be provided where required by the contract documents and Section 28 31 00, including building FACPs and the campus FACUs in Buildings 225 and 18. No additional microphones beyond those requirements are authorized without written modification. VA COR /
VA CO
64 06/05/26 06/15/26 Will Manual Voice Messages from Building 225 broadcast to all buildings, and must zones be separated? Voice evacuation zoning and message distribution shall comply with the approved fire alarm design, NFPA 72, the VA Fire Protection Design Manual, and Section 28 31 00, including smoke zone based messaging and campus voice control from Building 225. Contractor shall implement the specified zoning; changes require VA approval. VA COR /
VA CO
| 65 | 06/05/26 | 06/15/26 | Who is responsible for the fire alarm conduit? | The fire alarm contractor shall provide all conduit and raceways required for a complete and operational fire alarm system, unless specific segments are clearly identified as provided by others. This includes building and campus raceways shown or implied in the drawings and specs. | VA COR / | ||
| VA CO | Based on the RFI #65 response; Can the VA provide clarification to "campus raceways…" "shown or implied..." as there are nothing shown for campus raceways in order for all bidders to propose on the same SOW? | ALL AVAILABLE INFORMATION HAS BEEN PROVIDED | |||||
| 66 | 06/05/26 | 06/15/26 | Is there a more specific Fire alarm shop drawing available? | No additional Government prepared fire alarm shop drawings will be issued. The contractor shall develop and submit complete NFPA 72 compliant fire alarm shop drawings in Revit, including floor plans, risers, wiring diagrams, IO matrix, and device schedules, in accordance with Section 28 31 00. | VA COR / |
VA CO
67 06/05/26 06/15/26 Will the NTP be issued prior to submittals and long lead time items being ordered? Notice to Proceed and submittal timing shall be administered in accordance with the contract. Contractor shall prepare submittals for prompt review after NTP and shall not rely on pre NTP material ordering unless specifically authorized by the Contracting Officer; long lead risk prior to NTP rests with the contractor. VA COR /
VA CO
68 06/05/26 06/15/26 What are the badging requirements for working at the Waco VA? Contractor personnel shall comply with all VA badging, background check, and security procedures required by the facility. Badging requirements and processes will be coordinated at project start; no additional compensation is provided for compliance. VA COR /
VA CO
69 06/05/26 06/15/26 Will this project require a separate QC and Site Superintendent? Contractor shall provide required Quality Control personnel and site supervision in accordance with the contract, including any requirements for separate QC Manager, Superintendent, and SSHO. Any proposed dual role arrangements (e.g., superintendent as SSHO) must be submitted and approved by the Contracting Officer. VA COR /
VA CO
| 70 | 06/05/26 | 06/15/26 | Can any existing panel cans be reused with new Notifier components? | Existing panel enclosures may only be reused if they are demonstrated suitable for the proposed installation, compatible with new equipment, and approved through the submittal process, and if reuse meets all listing, code, and manufacturer requirements. Otherwise, new enclosures shall be provided. | VA COR / | ||
| VA CO | Based on the RFI #70 response; Can the VA provide clarification to "approved though the submittal process..." as submittals are post award activities and cannot be approved prior to bid? | THIS IS ON A CASE BY CASE BASIS. THE QUESTION IS IF EXISTING PANELS CAN BE REUSED. THE ORIGINAL RFI RESPONSE IS THAT YES, THEY MAY BE REUSED IF AND ONLY IF THEY ARE DEMONSTRATED SUITABLE FOR THE PROPOSED INSTALLATION, COMPATIBLE WITH THE NEW EQUIPMENT, MEETS ALL CODE, LISTING AND MANUFACTURER REQUIREMENTS. ALL OF THIS WILL BE APPROVED THROUGH THE TYPICAL SUBMITTAL PROCESS. | |||||
| 71 | 06/05/26 | 06/15/26 | Is the installing contractor responsible for clearing any existing or reoccurring troubles on existing system? | Contractor shall document existing system deficiencies and troubles observed prior to or during work and notify the Government. Correction of unrelated, pre existing deficiencies is not included in the contract unless specifically directed by the Government through modification; contractor shall correct troubles associated with new work and interfaces. | VA COR / |
VA CO
| 72 | 06/05/26 | 06/15/26 | Can the installing contractor operate sprinkler valves for system testing? | Contractor shall coordinate sprinkler valve operation and fire protection system testing with facility operations and the VA’s sprinkler contractor per Section 28 31 00 and related Division 21 specifications. Testing procedures shall follow approved plans; valve operation by the fire alarm contractor is permitted only as allowed by facility policy and under VA direction. | VA COR / | ||
| VA CO | Based on the RFI #72 response; Can the VA provide the referenced related division 21 specifications prior to bid so all bidders are bidding the same information? | THIS CAN BE PROVIDED FROM THE RECENTLY COMPLETED FIRE SUPPRESSION PROJECT IF THE VA FEELS THERE IS A NEED TO DO SO. | |||||
| 73 | 06/05/26 | 06/15/26 | Are detailed drawings required for all new power supplies to NAC/FACP locations? | Contractor shall provide complete shop drawings showing all new equipment, power supplies, NAC and SLC power distribution, pathways, and connections required for the installation, in accordance with Section 28 31 00. No additional VA prepared power supply drawings will be provided. | VA COR / |
VA CO
| 74 | 06/05/26 | 06/15/26 | Did the engineer use a particular system for basis of design? | The Basis of Design system, including panel type and manufacturer, is identified in the contract documents and Section 28 31 00. Any substitutions must be submitted in accordance with the specifications and approved by the VA before use. | VA COR / |