This is Amendment 0002 to Solicitation 36C25726B0007 issued by the Department of Veterans Affairs Network Contracting Office for the Upgrade Fire Alarm System Campus Wide project (674A4-21-108) at the Waco VA Medical Center. The amendment provides updated Requests for Information and responses, and posts the revised Statement of Work without bid alternates. The effective date is May 15, 2026.

The Statement of Work requires a general contractor to replace the existing fire alarm system in its entirety across multiple buildings at the Waco VA Medical Center, with all systems communicating to a new Honeywell/Notifier main panel in Building 225, which will communicate off-site to the Waco Fire Department. All fire alarm systems, panels, devices, and equipment must be Notifier-specific models, including NFS2-3030 control panels, addressable smoke detectors (FSP-951 series), heat detectors, NBG-12LX pull stations, annunciators, and compatible power supplies. The contractor must coordinate with a licensed Notifier distributor for equipment programming, provide installation, testing, and commissioning services, and apply printed labels to all panels. The project encompasses 12 buildings (Buildings 4, 5, 6, 7, 8, 90, 93, 94, 202, 219, 225, and 226) with a performance period of 720 days after notice to proceed. Performance and payment bonds and proof of insurance are due within 10 days of award. Work must occur during normal business hours (0700-1630, Monday-Friday) with coordination required with the VA Contracting Officer Representative. The contractor is responsible for safety plan submission, equipment documentation, site cleaning, material storage and security, and compliance with OSHA, NFPA, UBC, and VA standards. Weekly safety inspections will be conducted, and invoicing must be submitted through the Tungsten System with detailed itemization of services performed, unit costs, and extended amounts.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

TBD

674A4-21-108 36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio TX 78240 36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio TX 78240 To all Offerors/Bidders

36C25726B0007 05-15-2026

X X X See CONTINUATION Page X The purpose of Amendment 0002:

1. To provide the the RFIs and their responses.

2. To post the updated Statement of Work without bid alternates.

All other terms and conditions remain unchanged.

Rhonda Richardson Contracting Officer

CONTINUATION PAGE

The Department of Veterans Affairs is issuing amendment 0002 to SOLICITATION NOTICE 36C25726B0007. See attached document:

Statement of Work

Statement of Work 674A4-21-108 Project Upgrade Fire Alarm Campus Wide – Waco Requirement General Contractor shall provide all necessary labor, materials, equipment, and supervision to replace the existing fire alarm system in its entirety. So that all buildings will communicate to the new main Honeywell/Notifier panel within building 225. Building 225’s panel shall communicate off site to the Waco Fire Department. The True Site and NDU shall also be replaced. All fire alarm systems, panels, devices, and equipment shall be specifically Notifier models, components, and features essential for effective fire detection, alerting, and system integration. Key components include Notifier NFS2-3030 control panels, addressable smoke detectors (such as the FSP-951 series), heat detectors, NBG-12LX pull stations, annunciators, and compatible power supplies. Notifier products can be purchased from a Notifier distributor by any SDVOSB, but the programming of the Notifier equipment must be done by a licensed Notifier distributor. The contractor will also provide installation, testing, and commissioning services to ensure that the system meets all operational and compliance standards. All fire alarm panels shall have printed labels that clearly identifies all buttons (elevator, A/V, and etc.). The Contractor shall ensure that all new panels and equipment are not located within IT closets. The notification system shall have voice commands. This is a phased project in which the Medical Center must remain in operation 24 hours a day, 7 days a week. A previous project demoed the obsolete and nonfunctional Faraday Fire Alarm System and upgraded the fire alarm system to Notifier 3030 zone modules in Buildings 202 and 6, but there is some work to be completed in these two buildings to fully upgrade them.

Work includes general construction alterations, necessary removal of existing fire alarm equipment, devices, and conduit, and replace system with a complete and operational Notifier fire alarm sytem. All associated repairs to match existing construction type and material.

The following buildings on the Waco VA Medical Center are included under the base bid of the contract.

· Building 4: Outpatient Clinic / Pharmacy / Lab / Radiology

· Building 7: Blind Rehab Unit / RISE Unit

· Building 90: HRC Pharmacy Call Center

· Building 94: Inpatient Psych / SMILE Unit / Acute Psych

· Building 225: Energy Center

· Building 6: Auditorium

· Building 8: MHICM Program / Future Acute Mental Health

· Building 202: Dietetics / Future VCS

· Building 219: Kinesiology / Physical Therapy

· Building 226: Laundry

· Building 5: Pharmacy / Education

· Building 93: Future Center of Excellence

Performance Period: 720 days after issuance of the notice to proceed.

Performance and Payment bonds: Due 10 days after award.

Proof of Insurance: Due 10 days after award.

A. Points of Contact:

1. The Contracting Officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract presented to the contractor shall be submitted to the CO for response.

2. The Contracting Officer Representative (COR) is responsible for the inspection, technical supervision, and acceptance of the work called for in the contract schedule, including related specifications and contract terms regarding onsite work requirements. Pursuant to the Delegation of Authority (by separate memo), he or she does not have the authority to make changes to the contract in quantity, dollar amount, or time.

3. Coordinate with VA COR before the start of work. See information below:

B. Government Holidays:

1. The Government hereby provides notice and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays:

New Year’s Day
January 1st
Martin Luther King Birthday
Third Monday in January
Washington’s Birthday
Third Monday in February
Memorial Day
Last Monday in May
Juneteenth
June 19th
Independence Day
July 4th
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veterans Day
November 11th
Thanksgiving Day
Fourth Thursday in November
Christmas
December 25th

C. In addition to the days designated as holidays, the Government observes the following days:

1. Any other day designated by Federal Statute

2. Any other day designated by Executive Order

3. Any other day designated by the President’s Proclamation

· It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.

D. Submit the proper documentation and reports to receive payment on this service. See information below:

1. Invoices and Payment

a) Payment to be made monthly, in arrears, following satisfactory performance by Contractor’s personnel and upon receipt of a properly prepared invoice.

b) Contractor shall be required to invoice through the Tungsten System at http://www.tungsten-network.com/us/en/veterans-affairs/. Additional information regarding Tungsten shall be provided upon award.

c) The contract shall have current registration in the System for Award Management (SAM) for this solicitation; URL: www.sam.gov.

d) The invoice MUST be itemized to include the following information. Any information listed below, and not provided on an invoice, will render that invoice incomplete and the invoice will be returned for immediate correction.

i.Time period being invoiced for
ii.Description of services performed.
iii.Unit Cost billed.
iv.Extended amount due.
v.Invoice number, date, and
vi.Contract and obligation numbers.

Other Considerations

· The contractor will be required to submit a safety plan for VA review and approval prior to the performing work.

· It is the contractor’s responsibility to provide adequate documentation verifying that any equipment and/or materials proposed will meet or exceed all federal government requirements.

· Work shall be performed during normal working hours unless otherwise noted by the COR or PM. Working hours are 0700 – 1630, Monday – Friday.

· The contractor’s supervisor shall always be available to address any needs the VA COR may have during the period of performance. All employees or sub-contractors shall be accountable solely to the Contractor, not the Government.

· The contractor shall be required to coordinate work activities and shutdowns with VA COR and Project Manager.

· The contractor shall thoroughly clean inside and outside of project site daily with contractor’s own equipment, including vacuums, mops, buckets, wash rags, dust mops, etc.

· The Government will not provide facilities or staging area for the Contractor’s use to support this contract. The contractor is responsible for all shipping, receiving, storage and security of any materials or equipment for the duration of this project.

· The Government will provide water and electrical utilities. All utilities in the facility will be available for the Contractor’s use in performance of tasks outlined in this SOW. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

· Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The Contractor shall ensure no contractor employees conduct political related activities or events on VA Facilities.

· The Contractor shall notify the COR or Government representative of any accidents requiring medical treatment. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.

Codes and Standards

· The project shall be in accordance with the latest Uniform Building Code (UBC), National Fire Protection Associate (NFPA) standard, Uniform Federal Accessibility Standard (UFAS), Inspectors Manual, VA Specifications and Standards, and local facility requirements. In the event there is a conflict between any of the standards/codes, the more stringent standard/code shall apply.

· The contractor shall provide all applicable safety signage and barricades applicable to OSHA, VHA and DOD regulations. Contractor shall comply with VHA DIRECTIVE 2004-012 and all VA Center Policy Memorandums, including but not limited to the following:

(a) Protection of patients, visitors, and employees from traumatic injury, as well as occupational and facility–associated infections.

(b) Compliance with OSHA and State construction safety regulations. Construction contracts require that the general contractor’s on-site “competent person” have completed the OSHA 30-hour construction worker course and that all other general and sub-contractor’s workers have completed the OSHA 10-hour construction worker course or other relevant competency training. The determination for training is based on the project hazards and complexity, State and Federal regulations and VA requirements. Verification of completion of training will be required prior to performing work.

(c) Compliance with EPA and State environmental regulations.

SAFETY PLAN REQUIREMENTS

Prior to performing any work, the contractor will be required to submit a safety plan in accordance with OSHA and VA Regulations. The safety plan shall include, but not limited to the following:

A. Safety and Health Policy (i.e. company policy) B. Safety and Health Objectives (i.e. company goals, procedures, etc.)

C. Job Site Inspections (i.e. safety inspection/potential hazards/prevention, etc.)

D. Contractor Safety Administrator (i.e. competent person/safety officer) E. Personal Protective Equipment (i.e. head, hearing, and eye protection, footwear, clothing, gloves, etc.)

F. Safety Rules (i.e. rules applicable to the work/task being performed, equipment, ladders, confined spaces, open flame, etc.)

G. Job Safety Training (i.e. OSHA, safety meetings, etc.)

· 30 Hour OSHA Construction Safety Course – competent person

· 10 Hour OSHA Construction Safety Course – all others H. Safety Discipline (i.e. correction of violations, etc.)

I. Hot Work Permit (i.e. responsibilities, procedures, etc.)

J. Emergency Procedures (i.e. responsibilities, procedures, etc.)

K. Written Hazard Communication Program (i.e. responsibilities, procedures, list of hazards, MSDS, etc.)

SAFETY INSPECTIONS

On a weekly basis, the VA will conduct a safety inspection of the work area. This inspection includes, but is not limited to the following:

A. Means of Egress

· Fire/Smoke Doors unlocked, free of obstructions.

· Means of Egress (includes Exits) free of obstructions and clearly marked.

B. Fire Alarm, Fire Detection, and Fire Suppression Systems.

· Fire Alarm Pull Stations are unobstructed.

· Smoke Detector smoke caps in use or removed at end of the day.

· Hot Work Permits are current, in use.

· Sprinkler Heads are unobstructed.

C. Housekeeping and Traffic Control

· Trash and debris are removed promptly and transported outside the construction area.

· Floor mats and dust tack mats are located at the entrance to construction area.

· Tools and equipment are properly stored.

· Signs installed to restrict patient access (doors locked as needed)

· Dust control measures are in place.

· Barriers are in place and properly sealed.

D. Hazardous Chemicals/Conditions

· Appropriate storage of hazardous chemicals.

· MSDS sheets are readily available on-site.

· Lock out/tag out procedures are in place.

· Hot work permit is current and posted.

E. Clothing

· PPE is available and properly worn.

· Clothing is relatively dust free with the construction area and patient areas.

Attached document: VA.WAC FIRE ALARM - RFIs.