This document is an Amendment (0002) to a Request for Proposal (RFP) for a VAV Box Replacement project at the Department of Veterans Affairs in Dallas, TX. The amendment extends the proposal due date to June 20, 2025, at 1:00 p.m. CT and includes responses to multiple Request for Information (RFI) questions. Key project details include replacing existing VAV boxes with fan-powered units, performing ICRA Level IV containment, removing and reinstalling ductwork and plumbing, and installing Siemens controls. The project requires new flex duct installation, reheat water plumbing modifications, and coordination with VA stakeholders. Critical specifications include draining existing systems, installing new piping from the top of main supply lines, and ensuring all work is performed during business hours. The project has a 120-day period of performance, with a phasing plan to be developed after award in collaboration with the contractor.

View the file

Other files

File Type Posted
36C25725R0048 0003.docx DOCX document
Bldg 60 LBP Survey Report FINAL.pdf PDF
CONSTRUCTION SAFETY PIN 2025.pdf PDF
Bldg60InspMgmtPlan_Update2014FINAL JC.pdf PDF
36C25725R0048 Conformed Through Amendment A0001.pdf PDF
36C25725R0048 0001.docx DOCX document
36C25725R0048_1.docx DOCX document
Specs and drawings - SCAN0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg. 60 VAV Box Replacement

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) none 06-05-2025 549-25-3-5096-0202 none 00674 Department of Veterans Affairs Network Contracting Office 17 1901 Veterans Memorial Dr. Bldg. 171 Temple

TX

76504 00674 Department of Veterans Affairs Network Contracting Office 17 1901 Veterans Memorial Dr. Bldg. 171 Temple

TX

76504 To all Offerors/Bidders

36C25725R0048

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-20-2025 1:00 CDT The Purpose of Amendment 0002 is to:

a. Include RFI question and answer. "See attachment RFI Responses - Bldg. 60 VAV Box Replacement"

b. Move the Request for Proposal (RFP) due date to Friday June 20, 2025, at 1:00 p.m. CT.

Horacio Fernandez Contracting Officer

VA-VHA-RPOW-2024-0108

1. Plans and specs for this project indicate the boxes to be replaced are fan powered however during the site walk all boxes observed were VAV boxes with hot water coils. Please clarify what is to be priced.

Replacement VAVs are fan powered as specified in SOW

1. Are there as built drawings more up to date than the ones provided in the project documents?

No

1. Will Dust Buggy/ Hepa Cart system be sufficient for demo and install for each VAV box?

ICRA level IV containment will be required

1. Will we be required to build the ICRA barrier to the upper deck at 16 feet or can we stop at the ceiling height of 8 feet?

Please refer to ICRA document

1. How many units will we get a one time? This will affect how ICRA is priced.

Phasing plan will dictate number of rooms per phase

1. In some cases, ICRA is not required if two ceiling tiles or less are being removed. Is this the case in the Dallas VA?

ICRA Level IV containment will be required.

1. Are there more accurate and up to date plans coming out?

No

1. Are the future VAVs fan powered or not?

The current VAVs are not fan power, the ones being installed will be.

1. Are there asbestos issues that we need to be aware of?

I am attaching the most recent asbestos survey.

1. Are we providing disconnects?

Yes

1. Are we to dispose/abate of any asbestos, lead, mold or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report.

VA will abate asbestos, the contractor will notify VA attached is most recent asbestos survey.

1. What will the ICRA level be for this project?

IV

1. Are there any required/proprietary subcontractors the general contractor is to hire associated with this project?

If assistance is needed with the controls for the new VAVs, Siemens would be the proprietary contractor for that.

1. Will all work associated with this project able to be performed during regular working hours?

All work is expected to be performed during business hours.

1. It is our understanding that the Solicitation is a negotiated Bid (RFP) design-bid-build project with the Government's AE being responsible for the design portion (providing a full and complete set of Specifications and Plans) and the successful offeror being responsible for bidding and building the project based on the Specifications and Plans provided by the Government's AE. Put another way, the successful offeror will not be required to perform any design-build services as part of the contract - correct?

There is no AE design equipment replacement according to provided specifications in Statement of Work.

1. Are we required to provide a 24 hour/day on-site fire watch during demolition?

No.

1. Please confirm 1) Fire Suppression to be left in place as-is. 2) Parts of the fire suppression are to be replaced. If so, please specify what is to be replaced. 3) The entire fire suppression system is to be removed and replaced throughout the entire construction space.

The fire suppression system will not be replaced.

1. Will the government be releasing a phasing plan? If so, we request the opportunity for a second set of RFIs to be submitted once the contractor has received and had time to review. Will this be achievable?

Phasing plan will be developed after award, with contractor and stakeholders input.

1. Where is the contractor to exhaust the air for the negative pressure? Can windows be removed to achieve the pressure?

Windows and exterior doors can be utilized for this.

1. What type of ICRA barrier will the VA be allowing? Also, how many times will this be constructed?(phasing plan can dictate this) Level IV

1. Due to the amount of work that is required for each VAV and the type of phasing, 120-day POP is not achievable for the amount of work and lead times that will be needed. Will the government be willing to change the POP to 365 days?

No requirement is expected to be completed within the 120 days period

1. The solicitation states, “Contractor shall provide ICRA level IV containment and phasing plan which needs to be approved from staff and COR before any work can be performed.” What type of phasing plan will be accepted? VA should provide phasing plan that will work for the station.

Phasing plan will be developed after award, with contractor and stakeholders input.

1. The scope states the following "demo all flex duct from VAV boxes to the supply registers". The provided pictures seem to show existing galvanized ductwork attached on the low-pressure side of the VAV box. Are we to remove all galvanized duct from the demoed VAV boxes and flex duct air distribution on the low pressure side?

Yes

1. The scope states the following: "The contractor shall demo existing reheat water plumbing to the main supply line and cap at piping". This would require that the mains be drained unless there are operational valves at the mains and we can cap the branch on the downstream side. Please advise.

There are not individual shutoffs at the main line. Yes, the system will have to be drained, capped, and new supply lines need to come from the top of the pipe.

1. The scope states the following: "Contractor shall supply and install new flex duct from main supply duct to VAV boxes and from VAV boxes to supply registers" As noted above, please advise if we will be reinstalling existing galvanized duct between the VAV boxes and the flex air distribution duct.

No. Demo the existing, and install new flex duct.

1. The scope states the following: "Contractor shall provide new plumbing coming from top of reheat water supply main line to the VAV box and tie return line to top of reheat water return main line". Is the intent to provide new tee connections to the mains in all places or use the existing branch connections? The pictures are not clear if the existing branch is coming off the top of the main.

The existing branches come from the bottom of the main. Our goal is to have them come from the top of the mains.

1. The scope states the following: "Contractor shall install the existing siemens controls and test for correct operation. Any damaged siemens control shall be replaced by contractor with same type of controller". Are all of the Siemens control systems operating currently? Is Siemens going to replace any items that are currently damaged?

All the controls are currently operational.

1. Is test and balance required? If yes, we will need the duct/air distribution as-builts to price.

There are no as-builts with duct distribution

1. The solicitation states, “Contractor shall hire project scheduling consultant to build project schedule with phases aligned with period of performance. If contractor falls behind on schedule, contractor shall reproduce project schedule clearly indication critical path with deliverable identified within period of performance.”. If the contractor is capable of this requirement in-house, would the government accept?

1. Are the future VAVs fan powered or not?

Yes

1. Are there asbestos issues that the contractor needs to be aware of?

Please review attached asbestos survey

1. Will the government be releasing more accurate and up to date plans for the project?

Most up to date plans have been provided

1. Does the government have an AE firm that is onboard with the project, or is this solely directed by the VA engineering team?

No AE firm for this project, this is not a design build or design bid build project

1. Will there be specifications released pertaining to the project and tasks to be completed?

Equipment specifications are provided in the Statement of Work within the solicitation package.

End of Document 36C25725R0048 - Bldg. 60 VAV Box Replacement