674-22-210 VEG 23.03 Basement MRI Pre-Bid RFIs - 2-5-2025.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
Z2DZ--Network (VISN) 17 Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for Site Prep
Solicitation number
36C25724R0046
Issued by

About this file

This file contains questions and answers (RFIs) and related drawings for a VA Medical Center MRI room renovation project in Temple, TX. The Q&A document includes 112 technical questions and responses covering topics like ICRA requirements, temporary shoring, RF shielding, patient lifts, fire protection, and other construction details.

Key details from the Q&A and drawings indicate the work involves demolition and renovation of an MRI suite in Building 163's basement, including asbestos abatement of a door, installation of a new Guldmann GH3 patient lift rated for 800lbs minimum, and RF shielding designed by the contractor. The project requires ICRA Class III containment measures at minimum, with air venting to the loading dock. The floor-to-deck height is approximately 13'3" with a 4-6' crawl space below. Other requirements include a full-time quality control manager and safety officer, weekend/after-hours work for disruptive activities, and coordination with existing building systems vendors like Johnson Controls (HVAC), GROT Company (fire alarm), and American Roofing.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFI #QuestionResponseColumn1
1Please confirm the number of air scrubbers required for each containment area.As required to meet pressurization and other conditions of spec
2What fire alarm system is expected to be installed in the renovated space. Please advise.Match and tie into existing for the building
3Please provide name and contact information for the fire alarm contractor currently servicing the building and existing panels.GROT Company. Mike Bafundo, Edwards
4Will there be a need for HEPA filtration for the containment of infection control?Comply with ICRA Class III requirements at minimum. Obtain ICRA permit from VA citing final class protection.
5Are ICRA requirements established by the A.S.H.E (American Society for Healthcare Engineering) in place for this project? Note: On page 73 of 67422210 VEG 2303 100 percent CD Technical Specifications_01.pdf states the VA personnel will handle infection control but does not specify how nor is a class of ICRA given (but is highlighted “yellow” on the page)See response to RFI #4. Contractor is responsible for all ICRA requirements of the specification.
6Confirm there are 3 containment areas on AD111; only 2 of the areas are called out on plan page AD111.Confirmed, there are three containment areas shown on AD111.
7Will the three separate containment areas serve as ante rooms? Will there be a need for doors and air scrubbers on the three separate containment sections?Comply with ICRA Class III requirements at minimum. Confirm requirements with COR.
8Will handrails be present on or around the hallway of temporary barriers? If so, would the handrails affect the 4’-0” minimum space requirement of the hallway?Handrails are allowed to extend into the minimum required width.
9Please provide magnetic shield design for RF shielding contractor to determine the amount (thickness) of the magnetic shielding.Magnetic shielding will need to be designed by the shielding contractor based on the specific MRI unit that is procured by the VA. Coordinate with COR. Refer to Siemens spec documents.
10Please confirm the floor to deck height for the patient lift to attach to.Floor to deck height is approximately 13'-3".
11Please confirm weight capacity of the motor for the patient lift.Confirm station standard patient lift manufacturer with COR and provide bariatric rated lift (800lb min). GULDMANN GH3
12Please confirm the number of air scrubbers required for each containment area.See response to RFI #1.
13Please provide “2012 Asbestos Reinspection Report -18708” called out on page AD111.EXISTING DOOR CONTAINS ACM TO BE ABATED AS PART OF DOOR

DEMOLITION. REFER TO THE 2012 ASBESTOS REINSPECTION REPORT -

18708 FINAL REPORT, BLDG. 163; INCLUDED WITH BID DOCUMENTS

14Are we to dispose/abate any asbestos, lead, mold, or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report(s).Refer to RFI #13
15What will the ICRA level be for this project?Refer to RFI#4
16Are there any required/proprietary subcontractors the successful Offeror is required to hire associated with this project? For example, is there a required/proprietary HVAC/mechanical system controls subcontractor?No. Refer to RFI 3 for fire alarm contractor information. Johnson Controls Metasys
17Will all work associated with this project be performed during regular working hours? If not, specify when will work be required to be performed.Refer to specs and scope of work. Alternate hours to be cordinated in advance with COR. ,Normal working hours, however, all loud, high vibration and and disruptive work will have to be done after hours or on the weekend
18It is our understanding that the Solicitation is a negotiated Bid (RFP) design-bid-build project with the Government's AE being responsible for the design portion (providing a full and complete set of Specifications and Plans) and the successful Offeror being responsible for bidding and building the project based on the Specifications and Plans provided by the Government. Put another way, the successful offeror will not be required to perform any design-build services as part of the contract - correct? Contracting officer to answerRefer to specifications. Certain elements of the project are delegated design (eg fire protection) as is typical industry practice.
19Are we required to provide a 24 hour/day on-site fire watch during any portion of the project?Refer to specification 01 35 26
20Please confirm 1) Fire suppression system to be left in place as-is. 2) Parts of the fire suppression system are to be replaced. If so, please specify what is to be replaced. 3) The entire fire suppression system is to be removed and replaced throughout the entire project space.The fire suppression scope is #3. Refer to sheets FD110, FX110 and FX120 for requirements.
21Please confirm 1) Fire alarm system to be left in place as-is. 2) Parts of the fire alarm system are to be replaced. If so, please specify what is to be replaced. 3) The entire fire alarm system is to be removed and replaced throughout the entire project pace.See RFI#20. Refer to sheet FD110 and FA110 for requirements.
22Telecom Room BB117 is not shown on the technology drawings. Please provide a drawing showing where telecom Room BB117 is located.Refer to Partial Overall Floor Plan - Basement on sheet A-101 for location of Telecom Room BB117.
23Is the wireless access point (WAP) referenced in the drawings being provided by the Government and contractor is responsible for installing, or is the WAP a contactor supplied and contractor installed item? If contractor supplied and contractor installed, please provide details on the type of WAP required.Contractor to provide Category 6A Cabling for Wireless Access Point locations designated in the plans. The VA will provide and install Wireless access point devices.
24How many open ports are on the patch panels in the intermediate distribution frame (IDF) in telecom Room BB117?Refer to specification section 27 11 19. Contractor to provide and install patch panels as needed for newly installed cables.
25Are the cameras in Room BA118B being mounted to the wall or the ceiling?Refer to specification section 28 23 00. Surveillance devices are to be installed per typical industry practice and in accordance with PSRDM.
26Drawing GI004, Keynote 1 requires the contractor to provide temporary shoring for removal of the old MRI and delivery of the new MRI. Please provide the structural as built drawings for below the project area floor to allow the temporary shoring system to be priced for bidding purposes.Existing as-builts can be obtained from the COR.
27Drawing GI0004, Keynote 1 requires the successful Offeror to provide temporary shoring for removal of the old MRI and delivery of the new MRI. What is the weight of the old MRI being removed and what is the weight of the new MRI being installed? This is needed to price the temporary shoring system for bid purposes.The existing machine is approximately 8,000 lbs and the new machine is approximately 10,000 lbs.
28Reference Sheet A-101, Room Schedule. Where is Room BA108B1 located?Between Grids J/K & 13/14.
29Sheet AE 121, Keynote 1 and EP111, Keynote 1 reference a “patient lift.” What type of patient lift is required? Provide the make, model number, power requirements, overhead anchoring, and other requirements to price the correct patient lift system.Refer to response to RFI #11.
30Is the successful Offeror required to provide the patient lift referenced in Sheet AE 121, Keynote 1 and EP111, Keynote 1?Refer to response to RFI #11.
31Drawing AE531 and other contract drawings reference roof work required. Is the roof under warranty? If so, who should be contacted to ask the contractor holding the roof warranty to perform required work so as not to invalidate the warranty.American Roofing
32Drawing MD111, Keynote 6, Drawing MD112, Keynote 3, and Drawing MP111, Keynote 8 reference BID ALT 1. There is no BID ALT 1 shown in the Solicitation A.3 PRICE/COST SCHEDULE for the seed project. Is there a BID ALT 1 for this project? If so, what are the requirements for BID ALT 1 and please amend A.3 to include BID ALT 1.Bid Alternate 1 per drawing sheets noted, which involves replacing the chilled water line set from the MRI heat exchanger to the chiller, will be part of the base bid. Replace chilled water lines completely in the base scope. There are no alternates.
33Drawing ET111, Keynote 4 requires the contactor to provide and install 50” display with wall mount. Provide details on the 50” display the VA wants to fulfill this requirement.Display will be VA provided and installed. However, the wall backing shall be installed per the CDs.
34The Solicitation instructions for Volume II (Past Performance) Subparagraph i.1. on page 15 of 89 states (in part): “Offerors are encouraged to submit information relating to up to three projects it has completed or is in the process of completing.” If an Offeror submits two projects it has successfully completed instead of three projects will the Offeror submitting two projects be evaluated lower than an Offeror submitting three projects?The projects are used for evaluating past performance. If only submit two of the required three are submitted, the third would receive a neutral rating.
35We noticed that the vendors site specific drawings show a 350amp feeder to a UPS, however the 100 percent combined drawings do not show this feeder, which should we go by.Siemens sheet E-102 shows the 350 amp breaker is part of the UPS. The 25 and 200 amp panel DPEQ circuit breakers shown on Valhalla EP601 should be a 350 amp circuit breaker.
36The Siemens drawings indicate a 180KW UPS (other than the E4504FP – 0.7KVA shown for Rundown), but the engineered drawings do not, are we not installing the 180KW 93PM UPS?Yes, contractor installs the UPS. Refer to notes on Siemens drawings.
37If the 93PM UPS is actually used, who is moving the UPS into the equipment room from the dock?The contractor. See Siemens drawings.
38Engineered drawings do not show the panel “MP” shown in vendor drawings, with the shunt trip main “M”, and sub breakers “A and B” is it not being used? (1-Line only shows 200amp ECB, with no indication of shunt tripPanel MP will take the place of the CRAC-1 and MRI enclosed circuit breakers shown on Valhalla sheet EP111.
39Is the shield being replaced?Yes. Refer to RFI # 9 for Siemens Drawing Specs.
40If shielding is being replaced, who is the shielding contractor?Shielding to be installed by the GC
41Please clarify the space below the MRI Suite. What is the depth of the crawl space?4-6 ft to floor deck
42Please advise if there is any overhead structural support required for the patient lift system, as one is not shown on the drawings.Refer to the Specifications, Drawings, Calculations that reflect the suport needed from the ground.
43Please provide the contact information for the roofing contractor to modify the existing roof system.Refer to RFI #31
44Please advise if the facility provided fire extinguisher cabinet will be flush mounted, fully recessed or semi recessed.Fully recessed.
45Please provide the fire alarm company’s contact information to modify the fire alarm system.Refer to RFI#3
46MRI lighting “F31” shows to be surface mounted in the lighting schedule, is this correct?Light Fixture Type 'F31' is an under counter task light that is to be surface mounted on the bottom side of the upper cabinet.
47Can the Superintendent also be the Prime Contractor’s Commissioning Manager during commissioning?No.
48Is any commissioning essential on this project?Refer to specification 01 91 00. VA to confirm if 3rd party CxA is under contract.
49Is a full-time on-site quality control manager required for this project?Yes
50Can the Project Manager also be the quality control manager?Yes.
51Is a full-time on-site Safety and Health Officer required for this project?Yes.
52Can the Superintendent also be the site safety and Health Officer?Yes.
53As is typical for most VA projects, can the QC plan be executed by the onsite superintendent and Administrated by the PM without additional staff?Yes.Question needs to be answered.
54Is there any tax charged to labor performed on the project?Yes
55Is there any tax charged to equipment on the project?Yes
56Is there any reason to believe the slab has moisture in it and moisture remediation will be needed?This project is located in Texas rain and humity charts apply.
57Do other areas on this floor need moisture remediation on the concrete slab?Refer to RFI # 57
58Will any of this work have to be performed after hours or weekends?Refer to RFI # 17
59Will this project be done in phases?Mean and Methods.
60Will each phase have to be fully completed before moving to the next or can some phases be completed simultaneously?Refer to RFI # 60
61How many areas will we be given at a time?Refer to RFI # 60. Have a Formal Memo for requesting access to areas that are shared with departments outside the project to the COR.
62Where do we need to vent air to the outside of the building for the ICRA?Loading dock
63Will we have to remove a window in each room to vent air outside or is there another means of venting air from the space to achieve the negative pressure required by ICRA?Vent air to loading dock
64Can plastic wall panels be used for the ICRA walls, such as STARC Panels?Non-flexable panels are required.
65Will temporary sprinklers be required?PROVIDE TEMPORARY HEAT SENSORS ABOVE CEILING LEVEL WHERE

CEILINGS ARE REMOVED FOR DEMO OR NEW WORK. ENGAGE LICENSED AND

SITE-APPROVED FIRE ALARM CONTRACTOR TO INCORPORATE TEMPORARY

SENSORS INTO FA SYSTEM. REFER TO SPECIFICATION 01 35 26 FOR

ADDITIONAL INTERIM LIFE SAFETY AND INFECTION PREVENTION

REQUIREMENTS IN WORK AREAS.

66Will the contractor be required to turn the existing sprinkler heads up during construction once the ceiling is removed?If protecting above ceiling during construction to avoid imparing sprinkler system, listed upright heads must be used.
67Will we have to test and balance the HVAC system after the work is complete?Yes.
68Who is the manufacturer of the current Nurse Call systemLone Star
69Please provide a contact for who services the current Nurse Call SystemLone Star
70Who is the manufacturer of the current Fire Alarm systemRefer to RFI#3
71Please provide a contact for who services the current Fire Alarm SystemRefer to RFI#3
72Who is the manufacturer of the current Security and Access Control system?Refer to RFI#45
73Please provide a contact for who services the current Security and Access Control System? Who is the manufacturer of the current Security and Access Control system?Refer to RFI#45
74Please provide a contact for who services the current Security and Access Control System?Services by the VA.
75Who is the manufacturer of the current Security and Access Control system?Refer to RFI#45
76Please provide a contact for who services the current Security and Access Control System?Services by the VA.
77Who is the manufacturer of the current HVAC Controls?Johnson Controls
78Please provide a contact for who services the current HVAC Controls?Johnson Controls
79Is there any chance of uncovering hazardous materials?Refer to existing hazardous material survey to be provided by VA.
80Who is the existing signage vendor for this VA?Services by the VA.
81Are doors to be factory finished or field finished?Means and MethodsIs this according to the Specs?
82Will there need to be insulation above the new ceilings?Yes.
83What is the height from finished floor to bottom of deck above?Refer to RFI # 10
84When touch-up painting in the corridors, can we go doorway to doorway, or do we have to go corner to corner?Corner to Corner
85Is there a floor or crawl space below the work area or is it the bottom floor with slab on grade?There is a crawl space
86If there is a crawl space, please provide pictures and details of how we can access it?Can be accessed from stair BS-2.
87At the site visit it appeared that the MRI is in the Basement on the bottom floor. However, Sheet GI004 calls for temporary shoring to be placed under the slab during transport of the MRI machines, if this is a slab on grade then there is no way possible to support the slab any further, please clarify how to proceed?There is a crawl space
88Is the Existing Concrete Located in Mechanical BA229, to be Left as is or, is it to be Polished/ Finished?Left as is.
89Is the Overhead Door to Remain in Place or Removed for Access?Refer to AD111 keynote #5
90Will the VA have the space entirely cleared out before the contractor begins construction?Yes.
91Will the contractor be required to move any of the existing furniture or equipment?Any remaining equipment/furniture will be removed by Contractor.
92Who is the existing Signage Vendor?Refer to RFI # 81
93Is there an Asbestos Abatement Report Available?Refer to RFI #13
94On Sheet AE611 it shows a Barn Door detail, please provide a basis of design for this door?No basis of design for the sliding barn doors.
95On Sheet AE121, Note 1 calls for a Patient Lift. Can you provide a Specification and basis of design for the new Patient Lift?Refer to response to RFI #11.
96On sheet AE151 it states that equipment number A1132 will be provided by the VA but installed by the contractor. Can the VA please provide some information and details of what this is and how it will need to be installed (shop drawings, cut sheets, brochures)?The accessory mounting rail is similar to this -

https://nexxspan.com/wp-content/uploads/2015/08/Nexxspan-Equip-Rail-brochure-07151.pdf

97On sheet AE531 it shows a roof penetration, is this roof still under warranty?Yes.
98What contractor installed the existing roof so we can get in contact with them to make the repairs?Refer to RFI #31
99What is the existing brick on the exterior that we will need to match (manufacturer, color, brand)?Acme Brick : send sample best matching existing brick to be approved by interior designerstill needs to be answered
100In Specification Division 01 00 00 – 4, Note J; it Calls for a 7’-0” High Chain Link Fence Around the Construction Area. The Project is Mostly Taking Place Inside. Can You Supply a Drawing that shows where the required fence will need to be placed?Fencing is reqiured for layout yard. Layout Yard will be provided after Project is Awarded.
101The section view of wall type RF1 on Sheet AE601 has a note that states RF Shielding by Shielding Contractor, is the VA hiring a Shielding contractor under a separate contract or are we supposed to provide a Shielding contractor?Shielding subcontractor is provided by the General Contractor
102If the contractor is to provide a Shielding contractor, can you provide a basis of design product for the RF Shielding panels?Refer to RFI #40
103The section view of wall type RF1 on Sheet AE601 shows the RF Shielding being recessed into the concrete slab, this is the only area that shows or annotates anything of such. Is this accurate and do we have to recess the concrete slab to install RF Shielding under the floor?No depressed slab is required. RF shield on MRI room floor can be installed on top of the existing concrete slab, which is more typical for renovation projects.
104If this is on the bottom floor and there is nothing underneath it, then this should not be required.Refer to RFI # 104
105Since this room was already an MRI room is any of the RF Shielding already in place that could be reused?No
106What is the period of performance for the seed project? Check SOWPer the SOW on page 3 paragraph 2.3 A, the POP is 365 days
107The solicitation states the magnitude of construction for the IDIQ is $20MM - $50MM but then also states that the maximum ordering limit per task order is $3MM. Which is correct? Contracting officer to answerThe magnitude and max ordering period are two different things. Per FAR 36.204, Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range. The max ordering per task order is just that.
108Can the NAICS code be changed to 236220, since the seed project is clearly general construction and most all “Site Prep” projects are general construction? NAICS 238390, by definition, is for singular trades such as window shades and blinds, water proofing, modular furniture, installing drywall, flooring, it is not for projects that encompass multiple of these trades to be done together. Contracting officer to answerthough the seed project may fit under the NAICS of 236220, the scope of the IDIQ contract will have many projects that will have Lead lining walls for X-ray room contractors which is incorporated in the assigned NAICS of 238390.
109Does the original bid bond need to be mailed? Contracting officer to answerCan be sent via email
110Page 15 of the solicitation states to provide proof of bonding capability along with performance/payment bond for seed project. Is this an error? Is it supposed to say along with a bid bond for the seed project? We cannot get a P&P bond without having a contract in place for the project. Contracting officer to answerOnly Bid bond for seed project is required at proposal submission
111Page 15 of the solicitation states to include the Past Performance Questionnaire. Does the contractor need to provide the complete PPQ or only Pages 1&2 or only Page2? Contracting officer to answerPages 2-4
112Is the only Representation and Certifications required pages 31 – 42 in the solicitation? Contracting officer to answerYes

DN

UP

BA118D

RESTROOM

BA118B

MRI

BA120

MAIL ROOM

BA118G

CONTROL ROOM

BA118E

BA118F

BA118H

MECHANICAL ROOM

BA228

MENS ROOM

BA114A

STORAGE

BA114B

CANTEEN

BA112

CANTEEN RETAIL

BA108C

VIEWING

ROOM

BA121E

BA121H

PREP

BA117

GEN. STO.

BA121A

WOMEN

CB-6

CORRIDOR

CB-5

BA115

BA113

HOUSEKEEPING

EQUIPMENT RM

BS-2

STAIR 2

BA114

VCS STORAGE

CB-4

BA221

CLOSET

BA227

WOMENS ROOM

BA200B

MECHANICAL

BA222

NUTRITION & FOOR

SERVICE ADMIN.

BA224

SITE MANAGER

DIETITIAN

BA223

FOOD SERVICE

ASSISTANT

BA220

OFFICE

SUPPLIES

BA225

N & FS

CLASS/CONFERENCE

BA216

ADMINISTRATIVE

BA217

COOK FORMAN

BA218

DIET

COMMUNICATION

CENTER

BA225A

BA213

RECEIVING

BA219

SUPERVISOR

BA214

CENTRAL TRAY

ASSEMBLY

BA215

EMPLOYEE ED &

DEV COORD

BA214A

STORAGE CONTROL

PANELS

BA214B

EMPLOYEE

ED & DEV

COORD

BA226

FOOD BANK

BA118C

DRESSING ROOM

BA123

CAN STORAGE

C D E F G

G'

BA229

MIN

4' - 0"

A. REFER TO SHEET GI002 FOR GENERAL ABBREVIATIONS, NOTES, SYMBOLS

AND LEGENDS.

B. REFER TO FIRE PROTECTION, MECHANICAL AND ELECTRICAL DRAWINGS

FOR ADDITIONAL DEMOLITION INFORMATION.

C. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA CONTRACTING OFFICER'S REPRESENTATIVE (VHA COR) BEFORE

PROCEEDING WITH THE WORK.

D. ENSURE THAT EXISTING CONDITIONS, WHICH ARE NOT IN CONTRACT,

REMAIN UNDAMAGED THROUGHOUT THE DURATION OF CONSTRUCTION.

DAMAGED EXISTING CONDITIONS MUST BE REPLACED IN KIND AT THE SOLE

EXPENSE OF THE CONTRACTOR.

E. PROVIDE TEMPORARY CONSTRUCTION BARRIERS PER THE REQUIREMENTS

OF SPECIFICATION SECTION 01 35 26, 1.12, B. CONFIRM LOCATION AND TYPE

OF BARRIER TO BE USED WITH VHA COR.

F. ALL ITEMS SHOWN WITH A DEMOLITION CROSS HATCH ARE TO BE

DEMOLISHED WHETHER THE ITEM IS KEYNOTED OR NOT.

G. DEMOLISH ALL FINISH FLOORING THROUGHOUT IN-SCOPE AREAS.

H. DEMOLISH ALL FINISHED CEILINGS THROUGHOUT ALL IN-SCOPE AREAS UNO.

7' -6

5'

1"

3/

8'

1/

0'

9" 6"

3"

1'

2"

2'

3'

4"

4'

6'

8"

KEY PLAN

GENERAL NOTES

SHEET KEYNOTES

P la n N or thT rue N orth

BLDG 163

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

10987654321

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

SEE REVISION

SCHEDULE

R

V

IS

IO

S

H

U

L

:\R ev it

\2 3.

_A

_R

_k m ar on ey

.r vt

/1 8/

1:

:5

M

AD111

DEMOLITION FLOOR PLAN -

BASEMENT

SITE PREP REPLACE MRI ROOM

BA118E-163-T

1901 VETERANS MEMORIAL DRIVE, TEMPLE, TX 76504

674-22-210

MVP KM

100% CONSTRUCTION

DOCUMENTS

VEG 23.03

3/16" = 1'-0"

DEMOLITION FLOOR PLAN - BASEMENT

F3

1. PROPOSED LOCATION OF TEMPORARY CONSTRUCTION BARRIER.

2. REMOVAL OF EXISTING MRI BY EQUIPMENT VENDOR.

3. EXISTING DOOR CONTAINS ACM TO BE ABATED AS PART OF DOOR

DEMOLITION. REFER TO THE 2012 ASBESTOS REINSPECTION REPORT -

18708 FINAL REPORT, BLDG. 163; INCLUDED WITH BID DOCUMENTS.

4. RE: MECHANICAL DEMOLITION.

5. DEMOLISH COILING OVERHEAD DOOR IN ITS ENTIRETY.

6. EXISTING CEILING TO REMAIN.

7. DEMOLISH EXISTING CASEWORK.

8. RE: ELECTRICAL DEMOLITION.

Number: Revision: Date:

0 100% CONSTRUCTION DOCUMENTS 12/21/2023

rafed

Highlight

EXISTING DOOR CONTAINS ACM TO BE ABATED AS PART OF DOOR

DEMOLITION. REFER TO THE 2012 ASBESTOS REINSPECTION REPORT -18708

FINAL REPORT, BLDG. 163; INCLUDED WITH BID DOCUMENTS.

image4.emf

BA118A

MRI SCAN ROOM

MRI EQUIP

BA118J

IN-PATIENT HOLD

BA120B

DRESS

BA119

TOILET

MECHANICAL BA118B

STAFF

BA120A

MRI CONTROL

EQ EQ

Q

D7

AE601

/4

/8

2' - 2 1/8"

4' - 0" 4' - 0"

8" 2' - 6 1/2" 5' - 0" 5' - 0" 6' - 0" 6' - 7 1/4" 8"

D5

8' - 8"

8' - 6"

BA121

SUB WAIT

ENTRY

BA122

1' - 1"

8' - 2"

7' - 0"

D1

8' - 0"

2' - 9 1/4"

TYP

AIR TERMINALS, RE MECH

CEILING HEIGHT AFF

REFLECTED CEILING PLAN SYMBOLS LEGEND

LIGHT FIXTURES, RE ELEC

ACT AS SCHEDULED

GWB AS SCHEDULED

OPEN TO STRUCTURE

(OR EXISTING TO REMAIN)

EXIT SIGNS, SEE ELEC

AND LIFE SAFETY DWGS

SPRINKLERS, SEE FIRE

SUPPRESSION DRAWINGS

A. REFER TO FIRE PROTECTION, MECHANICAL AND ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

C. ENSURE THAT EXISTING CONDITIONS, WHICH ARE NOT IN CONTRACT,

D. PROVIDE TEMPORARY INFECTION CONTROL BARRIERS PER THE

REQUIREMENTS OF SPECIFICATION SECTION 01 35 26, 1.12, B. CONFIRM

LOCATION AND TYPE OF BARRIER TO BE USED WITH VHA COR.

E. REFER TO SHEET GI002 FOR GENERAL ABBREVIATIONS, NOTES, SYMBOLS

F. ALL CEILINGS ARE 8'-0" AFF UNO.

G. SPRINKLER HEADS ARE TO BE CENTERED IN ACOUSTIC TILES.

ENGLEWOOD, CO 80110

:1

9:

AE121

REFLECTED CEILING PLAN -

REFLECTED CEILING PLAN - BASEMENT

1. PATIENT LIFT.

2. GYP BD CONTROL JOINT. ALIGN WITH CORNER OF WALL/SOFFIT.

3. LINE OF PERIMETER LIGHT COVE.

4. CEILING ACCESS PANEL.

09-01-22

01 35 26 -17

Project Manager and Facility Safety Manager or Contracting Officer

Representative (COR) or Government Designated Authority in circumstances of no foot hazards.

4. Hearing protection - Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks.

1.12 INFECTION CONTROL

A. Infection Control is critical in all medical center facilities.

Interior construction activities causing disturbance of existing dust, or creating new dust, must be conducted within ventilation-controlled areas that minimize the flow of airborne particles into patient areas.

Exterior construction activities causing disturbance of soil or which creates dust in some other manner must be controlled.

B. An AHA associated with infection control will be performed by VA personnel in accordance with FGI Guidelines (i.e. Infection Control

Risk Assessment (ICRA)). The ICRA procedure found on the American

Society for Healthcare Engineering (ASHE) website will be utilized.

Risk classifications of Class II or lower will require approval by the

Project Manager and Facility Safety Manager or Contracting Officer

Representative (COR) or Government Designated Authority before beginning any construction work. Risk classifications of Class III or higher will require a permit before beginning any construction work.

Infection Control permits will be issued by the Resident Project

Engineer. The Infection Control Permits will be posted outside the appropriate construction area. More than one permit may be issued for a construction project if the work is located in separate areas requiring separate classes. The primary project scope area for this project is:

Class [____}, however, work outside the primary project scope area may vary. The required infection control precautions with each class are as follows:

1. Class I requirements:

a. During Construction Work:

1) Notify the Project Manager and Facility Safety Manager or

Contracting Officer Representative (COR) or Government

Designated Authority.

Olin E. Teague Veterans Affairs Medical Center Site Prep Replace MRI Room BA118E-163-T Temple, TX

December 21, 2023 100% Construction Documents

Project No. 674-22-210 image1.emf

DN

UP

RESTROOM

BA120

MAIL ROOM

CONTROL ROOM

MECHANICAL ROOM

BA228

MENS ROOM

BA114A

BA114B

CANTEEN

BA112

CANTEEN RETAIL

BA108C

VIEWING

BA121E

BA121H

PREP

BA117

GEN. STO.

BA121A

WOMEN

CB-5

BA115

BA113

HOUSEKEEPING

EQUIPMENT RM

BS-2

STAIR 2

BA114

VCS STORAGE

BA221

CLOSET

BA227

WOMENS ROOM

BA200B

BA222

NUTRITION & FOOR

SERVICE ADMIN.

BA224

SITE MANAGER

BA223

ASSISTANT

BA220

SUPPLIES

BA225

N & FS

CLASS/CONFERENCE

BA216

ADMINISTRATIVE

BA217

COOK FORMAN

BA218

DIET

COMMUNICATION

CENTER

BA225A

BA213

RECEIVING

BA219

SUPERVISOR

BA214

CENTRAL TRAY

ASSEMBLY

BA215

EMPLOYEE ED &

DEV COORD

BA214A

STORAGE CONTROL

PANELS

BA214B

EMPLOYEE

ED & DEV

COORD

BA226

FOOD BANK

DRESSING ROOM

CAN STORAGE

A. REFER TO SHEET GI002 FOR GENERAL ABBREVIATIONS, NOTES, SYMBOLS

B. REFER TO FIRE PROTECTION, MECHANICAL AND ELECTRICAL DRAWINGS

FOR ADDITIONAL DEMOLITION INFORMATION.

C. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

D. ENSURE THAT EXISTING CONDITIONS, WHICH ARE NOT IN CONTRACT,

E. PROVIDE TEMPORARY CONSTRUCTION BARRIERS PER THE REQUIREMENTS

OF SPECIFICATION SECTION 01 35 26, 1.12, B. CONFIRM LOCATION AND TYPE

OF BARRIER TO BE USED WITH VHA COR.

F. ALL ITEMS SHOWN WITH A DEMOLITION CROSS HATCH ARE TO BE

DEMOLISHED WHETHER THE ITEM IS KEYNOTED OR NOT.

G. DEMOLISH ALL FINISH FLOORING THROUGHOUT IN-SCOPE AREAS.

H. DEMOLISH ALL FINISHED CEILINGS THROUGHOUT ALL IN-SCOPE AREAS UNO.

ENGLEWOOD, CO 80110

1:

:5

AD111

DEMOLITION FLOOR PLAN -

DEMOLITION FLOOR PLAN - BASEMENT

1. PROPOSED LOCATION OF TEMPORARY CONSTRUCTION BARRIER.

2. REMOVAL OF EXISTING MRI BY EQUIPMENT VENDOR.

3. EXISTING DOOR CONTAINS ACM TO BE ABATED AS PART OF DOOR

DEMOLITION. REFER TO THE 2012 ASBESTOS REINSPECTION REPORT -

18708 FINAL REPORT, BLDG. 163; INCLUDED WITH BID DOCUMENTS.

4. RE: MECHANICAL DEMOLITION.

5. DEMOLISH COILING OVERHEAD DOOR IN ITS ENTIRETY.

6. EXISTING CEILING TO REMAIN.

7. DEMOLISH EXISTING CASEWORK.

8. RE: ELECTRICAL DEMOLITION.

0 100% CONSTRUCTION DOCUMENTS 12/21/2023

image2.emf

BA118A

MRI SCAN ROOM

MRI EQUIP

BA118J

IN-PATIENT HOLD

BA120B

BA119

TOILET

MECHANICAL BA118B

BA120A

MRI CONTROL

D7

/8

2' - 2 1/8"

4' - 0" 4' - 0"

8" 2' - 6 1/2" 5' - 0" 5' - 0" 6' - 0" 6' - 7 1/4" 8"

D5

BA121

SUB WAIT

ENTRY

BA122

1' - 1"

8' - 2"

7' - 0"

D1

2' - 9 1/4"

TYP

AIR TERMINALS, RE MECH

CEILING HEIGHT AFF

REFLECTED CEILING PLAN SYMBOLS LEGEND

LIGHT FIXTURES, RE ELEC

ACT AS SCHEDULED

GWB AS SCHEDULED

OPEN TO STRUCTURE

(OR EXISTING TO REMAIN)

EXIT SIGNS, SEE ELEC

AND LIFE SAFETY DWGS

SPRINKLERS, SEE FIRE

SUPPRESSION DRAWINGS

A. REFER TO FIRE PROTECTION, MECHANICAL AND ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

C. ENSURE THAT EXISTING CONDITIONS, WHICH ARE NOT IN CONTRACT,

D. PROVIDE TEMPORARY INFECTION CONTROL BARRIERS PER THE

REQUIREMENTS OF SPECIFICATION SECTION 01 35 26, 1.12, B. CONFIRM

LOCATION AND TYPE OF BARRIER TO BE USED WITH VHA COR.

E. REFER TO SHEET GI002 FOR GENERAL ABBREVIATIONS, NOTES, SYMBOLS

F. ALL CEILINGS ARE 8'-0" AFF UNO.

G. SPRINKLER HEADS ARE TO BE CENTERED IN ACOUSTIC TILES.

ENGLEWOOD, CO 80110

:1

9:

AE121

REFLECTED CEILING PLAN -

REFLECTED CEILING PLAN - BASEMENT

1. PATIENT LIFT.

2. GYP BD CONTROL JOINT. ALIGN WITH CORNER OF WALL/SOFFIT.

3. LINE OF PERIMETER LIGHT COVE.

4. CEILING ACCESS PANEL.

image3.emf image5.png image6.png