Technical Questions and Answers.pdf

PDF 71 KB Posted

Attached to
N041--Variable Refrigerant Flow (VRF) Air Condition Units Federal contract opportunity
Solicitation number
36C25724Q0193
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document contains a request for quote for the procurement and installation of two variable refrigerant flow air conditioning units. The Department of Veterans Affairs Network Contracting Office 17 is soliciting offers for a firm-fixed price contract as a Service-Disabled Veteran Owned Small Business set-aside. Offerors must be registered in the System for Award Management and proposals will be evaluated based on technical capability, past performance, and price in descending order of importance. A site visit is scheduled for January 16, 2024 and technical questions must be submitted by email no later than January 18, 2024. The selected contractor will provide all labor, materials, equipment, transportation, and supervision to install two 5-ton VRF units with one indoor and one outdoor unit each for the hospital's main telephone room in accordance with federal, state, and local regulations.

View the file

Other files for this federal contract opportunity

Other files attached to N041--Variable Refrigerant Flow (VRF) Air Condition Units, newest first.
File Type Posted
Site Visit Sign - In Sheet 01-16-2024.pdf PDF
36C25724Q0193 0001.pdf PDF
Attachment 1 - Service Contract Act WD 2015-5237.pdf PDF
36C25724Q0193.pdf PDF
36C25724Q0193_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Questions and Answers

Request for Quote (RFQ) 36C25724Q0193

AC Unit Replacement

1. Is this project Tax Exempt?

Answer: Yes, the Federal Government is Tax exempt

2. Will Quick Sling Stands be acceptable for the condensers?

Answer: I’m told that they can provide this as an option but not preferred.

3. Will PVC be acceptable for the drain-off unit?

Answer: No, must be copper

4. Will a separate disconnect be required off of the indoor unit?

Answer: Yes, a separate disconnect is required

5. Does the drain need to be pumped or gravity-fed off of the indoor unit?

Answer: No, Gravity Feed is fine.