Addendum No1_Renovate Public Restrooms Project 67122111.pdf

PDF 2 MB Posted

Attached to
Z2DA--Renovate Public Restrooms, Project# 671-22-111
Solicitation number
36C25723B0004
Issued by

About this file

This document package includes an addendum to construction drawings and specifications for renovating public restrooms, along with details of the related federal contract opportunity posted on beta.SAM.gov.

The addendum provides revisions and clarifications to architectural, plumbing, and electrical drawings and notes for the restroom renovation project. Updated sheets include finish schedules, floor plans with new drain callouts, and details for floor drains. The related federal contract opportunity is a solicitation posted on beta.SAM.gov by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The project name and number match those on the construction documents. The solicitation is for renovating public restrooms at the location specified in the construction drawings. No further details are provided on response dates, pricing terms, set asides, or other procurement requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELK Consortium + WestEast Design Group JV, LLC 2797 Valencia Lane Schertz, Texas 78154 M 940.642.9158

Addendum PROJECT Phase 1 Renovate Public

Restrooms

671-22-111 PROJECT No. WestEast Design Group, LLC:

21220

TO COR, Mr. Brian Beckmann 7400 Merton Minter St., San Antonio, TX 78229

210.617.5300 EXT. 16554

ADD No. 001

ISSUE DATE 01/18/2023

ISSUED FOR: Bidding

VIA EMAIL

FROM Jon Quebe West East Design Group, LLC 200 E. Grayson Street, Suite 207 San Antonio, TX 78215 210.530.0755

This addendum shall be considered part of the Contract Documents and is issued to change or delete from or otherwise explain the drawings and specifications. Where provisions of this addendum differ from those of the original contract documents, this addendum shall have precedence over the original drawings and specifications and shall govern.

Bidders are hereby notified that they shall incorporate this addendum in their bids, and it shall be construed that the Contractor's Bid shall reflect with full knowledge, all items, changes and modifications to the contract documents herein specified. Bidders shall acknowledge receipt of this addendum in the space provided on the contractor’s bid form.

Description Architectural Narrative

Updated Sheet A6.0 Finish Schedule. Updated D6/A6.0 floor finish plan – typical with new floor drain callouts. Added floor drain details D7/A6.0 detailed plan – floor drain, and F7/A6.0 section at floor drain.

Drawings

1. Sheet A6.0 (Updated 01-18-2023) – FINISH SCHEDULE

01/18/2023

Plumbing Narrative

Plumbing Sheet P-401.1 have been updated with key note 6.

Drawings

1. Sheet P-401.1 – REVISED KEY NOTE 6

Electrical Narrative

Electrical sheets have been updated with general note 7.

Drawings

1. Sheet EP401.1 – ADDED GENERAL NOTE 7

2. Sheet EP401.2 – ADDED GENERAL NOTE 7

3. Sheet EP402 – ADDED GENERAL NOTE 7

4. Sheet EP403 – ADDED GENERAL NOTE 7

5. Sheet EP404 – ADDED GENERAL NOTE 7

END OF ADDENDUM No.1

MATERIAL LEGEND

PAINT PPG PAINTS MOUNTAIN GRAY

PPG1021-1

PAINT

1. PATCH AND REPAIR WALLS, FLOOR, AND CEILING REMOVED OR DAMAGED DURING DEMOLITION ACTIVITIES. PATCH AND REPAIR WITH EQUAL OR

BETTER QUALITY MATERIAL.

2. INSTALL FLOORING PATTERN PER MANUFACTURERS INSTALLATION INSTRUCTIONS. PROVIDE FLOOR LEVELING AT ANY AREAS THAT ARE NOT

CONTINUOUSLY FLAT, UNIFORM SURFACE PRIOR TO INSTALLATION.

3. PATCH AND REPAIR WALL TO RECEIVE PAINT.

GENERAL NOTES

ROOM FINISH SCHEDULE

COVE BASE PROFILE

PAINT PPG PAINTS

ROOM FINISH SCHEDULE NOTES

MATERIAL LEGEND GENERAL NOTES

1. FLUID APPLIED WATERPROOFING SHALL BE APPLIED 1'-0" HIGH BEHIND ALL SOLID SURFACE WALLS.

2. PROVIDE CEMENTITIOUS BACKER BOARD BEHIND ALL SOLID SURFACE WALL APPLICATIONS.

DOOR AND FRAME PROTECTION

DOOR AND FRAME PROTECTION REMARKS

MOUNTAIN GRAY

PPG1021-1

DOOR FRAME

GUARD

DOOR

PROTECTION

INPRO CORPORATION CUSTOM FORMED DOOR FRAME GUARD (MOP STOPS); COLOR: SLATE 0237

DOOR

PROTECTION

INPRO CORPORATION PALLADIUM DESIGNER KICKPLATE (MODEL 10)

INPRO, STAINLESS STEEL, NO. 4 SATIN FINISH, KICKPLATE 10" HIGH LDW

FIELD COLOR

RESTROOMS

NEOCONCRETE LIGHT GRAY,

NE03 LIGHT POLISHED 24"X24",

5/16" THICKNESS

SOLID SURFACE WILSONART

SOOTHING GRAY 9116GS,

1/2" THICK RESTROOM WALLS

DILEX-AHKA SATIN ANODIZED

INTERIOR FRAME

PPG PAINTS GYPSUM BOARD CEILINGS AND

CEILING ACCESS HATCHES

FLOOR 1/8" GROUT JOINT

PAINT TO MATCH CORRIDORTO MATCH CORRIDOR EXTERIOR FRAME

MAPEI IRON 107

MOUNTAIN GRAY

PPG1021-1

LEGEND

FLOOR-WALL TRANSITION

AT RESTROOM WITH MULTIPLE

PLUMBING FIXTURES

ACCESSORY

ACCESSORY

INSIDE CORNER

OUTSIDE CORNER

I90-AHKA SATIN ANODIZED

SCHLUTER-RENO-U, AEU80,

SATIN ANODIZED

RESTROOM TRANSITIONS

E90-AHKA SATIN ANODIZED

ACCESSORY

ACCESSORY

END CAP LEFT

END CAP RIGHT

AHKA-END CAP LEFT

AHKA-END CAP RIGHT

FLOOR FINISH PLAN - TYPICAL

D6

DETAILED PLAN - FLOOR DRAIN

D7

BABY CHANGING STATION SECTION - TYPICAL

F6

WALL SECTION - TYPICAL

F1

PLAN DETAILS - TYPICAL

F3

SECTION AT FLOOR DRAIN

F7

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

ARCHITECT:

671 -22-111

Management

APRIL 29, 2022

100% CD FINAL

CONSULTANTS:

Office of

Facilities

JQ

04/29/2022

Phase 1

Renovate Public Restrooms I

210 . 530 . 0755

E S T E DA S T SE

210 . 293. 1018FAX:

NG G UOR P

AN200 E. G SSRAYSON T., 207,UITE S T EXASNTONIO,A 78215 USA

W

Texas Registered Architectural Firm www.westeastdesign.com

D G

P-401.1

ENLARGED PLUMBING PLAN -

RESTROOMS 25 & 26D1

P-401.1

ENLARGED PLUMBING PLAN -

RESTROOMS 39.1 & 39.2F1

P-401.1

ENLARGED PLUMBING PLAN -

UNISEX RESTROOMS G004 & G005B5

P-401.1

ENLARGED PLUMBING PLAN -

UNISEX RESTROOMS F006 & F007 (ALTERNATE)F3

P-401.1

ENLARGED PLUMBING PLAN -

UNISEX RESTROOMS C010 & C011B3

P-401.1

ENLARGED PLUMBING PLAN -

UNISEX RESTROOMS C016 & C042D3

P-401.1

ENLARGED PLUMBING PLAN -

RESTROOMS GB113 & GB114F5

KEYED NOTES ( )

GENERAL NOTES

EP401.1

ENLARGED ELECTRICAL POWER PLAN -

RESTROOMS 25 & 26D1

EP401.1

ENLARGED ELECTRICAL POWER PLAN -

RESTROOMS 39.1 & 39.2F1

EP401.1

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOMS G004 & G005B5

EP401.1

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOMS F006 & F007 (ALTERNATE)F3

EP401.1

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOMS C010 & C011B3

EP401.1

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOMS C016 & C042D3

EP401.1

ENLARGED ELECTRICAL POWER PLAN -

RESTROOMS GB113 & GB114F5

EP401.2

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOM 1A143 (ALTERNATE)C4

EP401.2

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOM 1B112.7C1

EP401.2

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOM 1B113C2

EP402

ENLARGED ELECTRICAL POWER PLAN -

RESTROOMS J101 & J102D1

EP402

ENLARGED ELECTRICAL POWER PLAN -

WOMEN'S RESTROOM 122 & UNISEX RESTROOM N100.19D3

EP402

ENLARGED ELECTRICAL POWER PLAN -

ACCESSIBLE UNISEX RESTROOM H117.9 (ALTERNATE)F3

EP402

ENLARGED ELECTRICAL POWER PLAN -

ACCESSIBLE UNISEX RESTROOM 117.2 (ALTERNATE)F1

EP402

ENLARGED ELECTRICAL POWER PLAN -

RESTROOM G100.6F6

EP402

ENLARGED ELECTRICAL POWER PLAN -

LAB SPECIMEN RESTROOM 130D6

EP403

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOM M201.1 (ALTERNATE)F4

EP403

ENLARGED ELECTRICAL POWER PLAN -

RESTROOMS 241 & 244C2

EP403

ENLARGED ELECTRICAL POWER PLAN -

RESTROOMS F200 & F202C3

EP403

ENLARGED ELECTRICAL POWER PLAN -

RESTROOMS 216 & 217 (ALTERNATE)C1

EP403

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOM C202.2 (ALTERNATE)F1

EP403

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOM C236 (ALTERNATE)F2

EP403

ENLARGED ELECTRICAL POWER PLAN -

UNISEX RESTROOM 212.1 (ALTERNATE)F3

EP404

ENLARGED ELECTRICAL POWER PLAN -

WOMEN'S RESTROOM C309C3

EP404

ENLARGED ELECTRICAL POWER PLAN -

RESTROOM B304C1

EP404

ENLARGED ELECTRICAL POWER PLAN -

MEN'S AND WOMEN'S RESTROOMS D304 & D308F4

EP404

ENLARGED ELECTRICAL POWER PLAN -

MEN'S RESTROOM E306F3

EP404

ENLARGED ELECTRICAL POWER PLAN -

WOMEN'S RESTROOM E301.1F1

67122111-A6.0 Finish Schedule-A6.0-.pdf
Sheets and Views
A6.0
67122111-A6.0 Finish Schedule-A6.0.pdf
Sheets and Views
A6.0

File details come from the government source that posted it. Updated .