This document provides instructions for calculating self-performed work for a federal contract opportunity to replace primary medium voltage switchgear. The opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. Offerors must complete calculations showing the percentage of work projected to be paid to non-VIP listed SDVOSBs and the resulting percentage of self-performed work. For contracts valued between $2,000,000 and $5,000,000, the contractor must replace the existing medium voltage switchgear in Building 133 at the Doris Miller VAMC in Waco, Texas. The NAICS code for this procurement is 238210 with a small business size standard of $16.5 million.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW

“Limitations on Subcontracting” (VAAR 852.219-10)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________

c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%

d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%

A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)