Revised Bid Schedule SECTION B.pdf

PDF 195 KB Posted

Attached to
6150--674A4-19-101 Replace Primary Medium Voltage Switchgear Federal contract opportunity
Solicitation number
36C25722B0014
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This bid schedule outlines pricing and specifications for the replacement of primary electrical medium voltage switchgear at the Doris Miller VA Medical Center in Waco, Texas. The base bid includes all labor, materials and equipment to replace the existing switchgear in Building 216. Five add alternates are provided to accommodate additional scope of work including replacing transformers and removing overhead conductors, capacitor banks and switchgear in other buildings. Pricing is requested for the base bid alone and cumulatively with each add alternate. The project duration is 365 calendar days from notice to proceed. This procurement is set aside solely for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $2-5 million.

View the file

Other files for this federal contract opportunity

Other files attached to 6150--674A4-19-101 Replace Primary Medium Voltage Switchgear, newest first.
File Type Posted
251010 ADVANCED UTILITY METERING SYSTEM_ADD1.pdf PDF
Answers 36C25722B0014 Replace Primary MV Switchgear Waco VAMC RFI-Questions - 1-66.pdf PDF
261313 MEDIUM-VOLTAGE CIRCUIT BREAKER SWITCHGEAR_ADD1r1.pdf PDF
36C25722B0014 0006.docx DOCX document
SELF-PERFORMED CALCULATIONS.pdf PDF
OSHA - EMR requirement.pdf PDF
36C25722B0014 0004.docx DOCX document
36C25722B0014 0003.docx DOCX document
Pre-Bid site visit sign in sheet 674A4-19-101.pdf PDF
36C25722B0014 0002.docx DOCX document
36C25722B0014 0001.docx DOCX document
Waco Electrical Feeder Drw.pdf PDF
36C25722B0014_1.docx DOCX document
21-09-29-1908-7 VA-Switchgear_Sealed.pdf PDF
21-09-30_VA Switchgear Specifications_Sealed.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – SCHDULE OF PRICES/DESCRIPTION

DESCRIPTION: Contractor shall provide all necessary labor, materials, equipment, and supervision to Replacement of Primary Electrical MV Switchgear located at the Doris Miller VAMC, 4800 Memorial Drive, Waco, Texas 76711. The work shall be in accordance with the provided specifications and drawings.

** NOTE: Award shall be made on the Base Bid unless the base bid is less than the allocated funding for the project. If the Base Bid is less than allocated funding, award shall be made, in order, on the basis of a Add Alternates beginning with Add Alternate #1 to accommodate allocated funding. Offerors must bid all items in order to be considered.

BASE BID:

ITEM UNIT TOTAL

NO. DESCRIPTION OF SERVICE QTY UNIT PRICE AMOUNT

BID:

0001 PROVIDE ALL NECESSARY 1 JB $___________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY FOR REPLACEMENT

SWITCHGEAR IN EXISTING BUILDING 216

AS SHOWN ON CONTRACT DOCUMENTS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A, BASE BID)

0002 COST OF PERFORMANCE AND 1 EA $___________ $_________

PAYMENT BONDS

**TOTAL PROJECT DURATION for Base Bid: 365 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid TOTAL (Line items 0001 & 0002) $____________

Base Bid + Bid Add Alternate #1:

0003 Base Bid: PROVIDE ALL NECESSARY 1 JB $___________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY FOR REPLACEMENT

SWITCHGEAR IN EXISTING BUILDING 216

AS SHOWN ON CONTRACT DOCUMENTS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A, BASE BID

0004 AND ADD TO INCLUDE ADD ALTERNATE #1: 1 JB $__________ $_________

PROVIDE ALL NECESSARY LABOR, MATERIALS,

AND EQUIPMENT NECESSARY FOR REPLACEMENT

OF FOUR (4) TRANSFORMERS, T18, T24, T160 AND T-159.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #1)

0005 COST OF PERFORMANCE AND 1 EA $___________ $_________

PAYMENT BONDS

**TOTAL PROJECT DURATION for both the Base Bid and Bid Alterante #1: 365 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid + Bid Alternate #1 TOTAL (Line items 0003, 0004 & 0005) $____________

Base Bid + Bid Add Alternate #1 + Bid Add Alternate #2

0006 Base Bid: PROVIDE ALL NECESSARY 1 JB $___________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY FOR REPLACEMENT

SWITCHGEAR IN EXISTING BUILDING 216

AS SHOWN ON CONTRACT DOCUMENTS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A, BASE BID

0007 AND ADD TO INCLUDE ADD ALTERNATE #1: 1 JB $__________ $_________

PROVIDE ALL NECESSARY LABOR, MATERIALS,

AND EQUIPMENT NECESSARY FOR REPLACEMENT

OF THREE (3) TRANSFORMERS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #1)

0008 AND ADD TO INCLUDE ADD ALTERNATE #2: 1 JB $__________ $_________

REMOVE EXISTING OVERHEAD CONDUCTORS, ELEC.

POLES AND INTERCONNECTING WIRE. POLE FOUNDATIONS

REMOVED TO 3’-0” BELOW EXISTING GROUND LEVEL.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #2)

0009 COST OF PERFORMANCE AND 1 EA $___________ $_________

PAYMENT BONDS

**TOTAL PROJECT DURATION for both the Base Bid and Bid Alterante #1: 365 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid + Bid Alternate #1 + Bid Alternate #2 TOTAL (Line items 0006, 0007, 0008& 0009) $____________

Base Bid + Bid Add Alternate #1 + Bid Add Alternate #2 + Bid Add Alternate #3

0010 Base Bid: PROVIDE ALL NECESSARY 1 JB $___________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY FOR REPLACEMENT

SWITCHGEAR IN EXISTING BUILDING 216

AS SHOWN ON CONTRACT DOCUMENTS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A, BASE BID

0011 AND ADD TO INCLUDE ADD ALTERNATE #1: 1 JB $___________ $_________

PROVIDE ALL NECESSARY LABOR, MATERIALS,

AND EQUIPMENT NECESSARY FOR REPLACEMENT

OF THREE (3) TRANSFORMERS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #1)

0012 AND ADD TO INCLUDE ADD ALTERNATE #2: 1 JB $__________ $_________

REMOVE EXISTING OVERHEAD CONDUCTORS, ELEC.

POLES AND INTERCONNECTING WIRE. POLE FOUNDATIONS

REMOVED TO 3’-0” BELOW EXISTING GROUND LEVEL.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #2)

0013 AND ADD TO INCLUDE ADD ALTERNATE #3: 1 JB $__________ $_________

REMOVE EXISTING CAPACITOR BANK, REMOVE EXISTING

MAIN SWITCHGEAR, BLDG. 133 AND BLDG. 133 FOUNDATION

DOWN TO 3’-0” BELOW EXISTING GROUND ELEVATION.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #3)

0014 COST OF PERFORMANCE AND 1 EA $___________ $_________

PAYMENT BONDS

**TOTAL PROJECT DURATION for both the Base Bid and Bid Alterante #1: 365 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid + Bid Alternate #1 + Bid Alternate #2 + Bid Alternate #3 TOTAL (Line items 0010, 0011, 0012, 0013 & 0014) $____________

Base Bid + Bid Add Alternate #1 + Bid Add Alternate #2 + Bid Add Alternate #3 + Bid Add Alternate #4

0015 Base Bid: PROVIDE ALL NECESSARY 1 JB $___________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY FOR REPLACEMENT

SWITCHGEAR IN EXISTING BUILDING 216

AS SHOWN ON CONTRACT DOCUMENTS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A, BASE BID

0016 AND ADD TO INCLUDE ADD ALTERNATE #1: 1 JB $___________ $_________

PROVIDE ALL NECESSARY LABOR, MATERIALS,

AND EQUIPMENT NECESSARY FOR REPLACEMENT

OF THREE (3) TRANSFORMERS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #1)

0017 AND ADD TO INCLUDE ADD ALTERNATE #2: 1 JB $__________ $_________

REMOVE EXISTING OVERHEAD CONDUCTORS, ELEC.

POLES AND INTERCONNECTING WIRE. POLE FOUNDATIONS

REMOVED TO 3’-0” BELOW EXISTING GROUND LEVEL.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #2)

0018 AND ADD TO INCLUDE ADD ALTERNATE #3: 1 JB $__________ $_________

REMOVE EXISTING CAPACITOR BANK, REMOVE EXISTING

MAIN SWITCHGEAR, BLDG. 133 AND BLDG. 133 FOUNDATION

DOWN TO 3’-0” BELOW EXISTING GROUND ELEVATION.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #3)

0019 AND ADD TO INCLUDE ADD ALTERNATE #4: 1 JB $__________ $_________

REMOVE THREE COOLING TOWERS AND ASSOCIATED

CONCRETE AND PIPING TO B216.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #4)

0020 COST OF PERFORMANCE AND 1 EA $___________ $_________

PAYMENT BONDS

**TOTAL PROJECT DURATION for both the Base Bid and Bid Alterante #1: 365 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid + Bid Alternate #1 + Bid Alternate #2 + Bid Alternate #3 + Bid Alternate #4 TOTAL (Line items 0015, 0016, 0017, 0018, 0019 & 0020) $____________

Base Bid + Bid Add Alternate #1 + Bid Add Alternate #2 + Bid Add Alternate #3 + Bid Add Alternate #4 + Bid Add Alternate #5

0021 Base Bid: PROVIDE ALL NECESSARY 1 JB $___________ $_________

LABOR, MATERIALS, AND EQUIPMENT

NECESSARY FOR REPLACEMENT

SWITCHGEAR IN EXISTING BUILDING 216

AS SHOWN ON CONTRACT DOCUMENTS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH A, BASE BID

0022 AND ADD TO INCLUDE ADD ALTERNATE #1: 1 JB $___________ $_________

PROVIDE ALL NECESSARY LABOR, MATERIALS,

AND EQUIPMENT NECESSARY FOR REPLACEMENT

OF THREE (3) TRANSFORMERS.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #1)

0023 AND ADD TO INCLUDE ADD ALTERNATE #2: 1 JB $__________ $_________

REMOVE EXISTING OVERHEAD CONDUCTORS, ELEC.

POLES AND INTERCONNECTING WIRE. POLE FOUNDATIONS

REMOVED TO 3’-0” BELOW EXISTING GROUND LEVEL.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #2)

0024 AND ADD TO INCLUDE ADD ALTERNATE #3: 1 JB $__________ $_________

REMOVE EXISTING CAPACITOR BANK, REMOVE EXISTING

MAIN SWITCHGEAR, BLDG. 133 AND BLDG. 133 FOUNDATION

DOWN TO 3’-0” BELOW EXISTING GROUND ELEVATION.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #3)

0025 AND ADD TO INCLUDE ADD ALTERNATE #4: 1 JB $__________ $_________

REMOVE THREE COOLING TOWERS AND ASSOCIATED

CONCRETE AND PIPING TO B216.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #4)

0026 AND ADD TO INCLUDE ADD ALTERNATE #5: 1 JB $__________ $_________

CAP AND REMOVE ALL CHILLED WATER PIPING,

PUMPS, SUPPORTS, AND HANGERS IN B-216.

(SEE GENERAL REQUIREMENT 1.3 STATEMENT

OF BID ITEMS, PARAGRAPH B, BASE BID,

ITEMS ADD ALTERNATE #5)

0027 COST OF PERFORMANCE AND 1 EA $___________ $_________

PAYMENT BONDS

**TOTAL PROJECT DURATION for both the Base Bid and Bid Alterante #1: 365 Calendar days from issuance of the Notice to Proceed to complete the project work.

Base Bid + Bid Alternate #1 + Bid Alternate #2 + Bid Alternate #3 + Bid Alternate #4 + Bid Alternate #5 TOTAL (Line items 0021, 0022, 0023, 0024, 0025, 0026 & 0027) $____________