36C25722B0007_1.docx
DOCX document 131 KB Posted
- Solicitation number
- 36C25722B0007
About this file
This document outlines a solicitation for a construction contract. The Department of Veterans Affairs intends to award a firm-fixed-price contract to install lighting upgrades at the Audie Murphy VA Medical Center in San Antonio, Texas. The project includes replacing lamps and fixtures with more efficient devices, installing lighting controls, and upgrading existing systems. The contractor will provide all labor, materials, and equipment. The period of performance is 365 calendar days from the notice to proceed. This requirement is set aside for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 236220 and the estimated value is between $1 million to $5 million. The solicitation is expected to be issued on October 15th, 2021 with bids due on November 15th, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Sign In_11.15.21.pdf | ||
| 36C25722B0007 0002.docx | DOCX document | |
| 36C25722B0007 0001.docx | DOCX document | |
| Final_CD_Drawings - AE Lighting - Audie Murphy - 20201028_v2.pdf | ||
| Final_CD_Specs - AE Lighting - Audie Murphy - 20201028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5.
REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL
SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
1. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than ____ ___________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25722B0007 X
TBD
36C257-21-AP-3693
671-15-132 Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.
Temple TX 76504 Department of Veterans Affairs Network Contracting Office, NCO17 2002 Scott Blvd.
Temple TX 76504 Harold Robbins 254-899-6017
Acquisition Title: Install Lighting Upgrade Energy Efficiency, Project No. 671-15-132
Contractor shall provide all necessary labor, materials, equipment, and supervision to complete all required project work in accordance with the provided SOW, Specifications, and Plans. Pro ject is located at the Audie Murphy VA Medical Center (VAMC) 7400 Merton Minter, San Antonio, Texas 78229
This is a "Competitive" requirement Set Aside 100% Service Disabled Veteran Owned Small Business (SDVOSB).
Magnitude of the Construction Project: $1,000,000.00 and $2,000,000.00 The applicable North American Industry Classification System (NAICS) code for this project is 236220.
Pre-Bid Site Visit shall be held on November 15, 2021 @ 9:00am CST. All interested Contacto rs shall meet at the San Antonio, VAMC Engineering Office.
All Contractors attending the Pre-Bid Site Visit must go through COVID Screening to enter the facility.
Please ensure early arrival to the facility to allow enough time to go through screening. Face Masks and picture ID is required.
Cut off for submission of RFI(s)/Questions shall be November 21, 2021 @ 3:00 PM CST. All RFI/Questions must be emailed to: harold.robbins2@va.gov. Please include the solicitationNo.36C25722B0007 on the subject line. RFI/Questions in word format.
All Bidders must submit a Bid Guarantee as part of their Bid Package. Additionally, the Awardee must be able to obtain the necessary level of Performance and Paym ent Bonds.
SUBMISSION OF BIDS: All bids shall be submitted via email to the following email address: harold.robbins2@va.gov by the date and time as stated in Block 13a below.
**All Contractors are required to comply with EO 14042 regarding COVID vaccines.
X X 52.211-10 X 0 (zero) 2:00
CST
12-10-2021 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b.
SIGNATURE
20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to s ign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.
Temple TX 76504 This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
(877) 353-9791
(512) 460-5540
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| Scope of Work | 9 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 16 |
| COVID-19 Bid Submission Instructions | 16 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 16 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 16 |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 17 |
| 2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 18 |
| 2.5 52.228-1 BID GUARANTEE (SEP 1996) | 19 |
| 2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 19 |
| 2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 20 |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 20 |
| 2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 21 |
| 2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 21 |
| 2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 21 |
| REPRESENTATIONS AND CERTIFICATIONS | 23 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021) | 23 |
| 3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 27 |
| 3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021) | 28 |
| GENERAL CONDITIONS | 31 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 31 |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) | 31 |
| 4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 32 |
| 4.4 52.210-1 MARKET RESEARCH (JUN 2020) | 33 |
| 4.5 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) | 34 |
| 4.6 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) | 34 |
| 4.7 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) | 35 |
| 4.8 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021) | 35 |
| 4.9 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 38 |
| 4.10 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 39 |
| 4.11 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021) | 41 |
| 4.12 SUPPLEMENTAL INSURANCE REQUIREMENTS | 45 |
| 4.13 52.236-4 PHYSICAL DATA (APR 1984) | 46 |
| 4.14 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE II (APR 1984) | 46 |
| 4.15 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 48 |
| 4.16 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 50 |
| 4.17 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 52 |
| 4.18 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 53 |
| 4.19 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 54 |
| 4.20 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 55 |
| 4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 56 |
| 4.22 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 56 |
| 4.23 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 57 |
| 4.24 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018) | 59 |
| 4.25 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 59 |
| 4.26 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 59 |
| 4.27 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 60 |
| 4.28 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 60 |
| 4.29 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 63 |
SECTION B – SCHEDULE OF PRICES/DESCRIPTION
Install Lighting Upgrade for Energy Efficiency, San Antonio, Texas, Project No. 671-15-132 DESCRIPTION: The Contractor shall provide all labor, supervision, materials, equipment, and supervision to complete all required project work in strict accordance with the SOW, Specifications and Plans, located at San Antonio VAMC, 7400 Merton Minter, San Antonio, Texas 78229.
BID
| ITEMS | UNIT | TOTAL | |
| NO. DESCRIPTION OF SERVICE | QTY UNIT PRICE | AMOUNT |
| 0001 | BASE BID – INSTALL LIGHT | 1 JB | $_________ | $_________ |
| CONTROL DEVICES FOR CANTEEN: |
WORK INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN THE CANTEEN AREA.
| 0002 PERFORMANCE AND PAYMENT BONDS | 1 EA | $ _________ | $________ |
| . | |||
| BASE BID TOTAL (Line Items 0001 & 0002) $_____________ |
BASE BID + BID ADD ALTERNATE #1:
| 0003 | BASE BID – INSTALL LIGHT | 1 JB | $_________ | $_________ |
| CONTROL DEVICES FOR CANTEEN: |
WORK INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN THE CANTEEN AREA.
0004 ALTERNATE NO. 1 – INSTALL 1 JB $________ $________
NEW LIGHT CONTROL DEVICES IN
SINGLE OCCUPANCY ROOMS: WORK
INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN SINGLE OCCUPANCY ROOMS ON THE
1ST FLOOR OF THE HOSPITAL ONLY.
0005 PERFORMANCE AND PAYMENT BONDS 1 EA $ _________ $________
BASE BID + BID ALTERNATE #1 TOTAL (Line Items 0003, 0004 & 0005) $______________
BASE BID + BID ADD ALTERNATES #1 and #2
| 0006 | BASE BID – INSTALL LIGHT | 1 JB | $_________ | $_________ |
| CONTROL DEVICES FOR CANTEEN: |
WORK INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN THE CANTEEN AREA.
0007 ALTERNATE NO. 1 – INSTALL 1 JB $________ $________
NEW LIGHT CONTROL DEVICES IN
SINGLE OCCUPANCY ROOMS: WORK
INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN SINGLE OCCUPANCY ROOMS ON THE
1ST FLOOR OF THE HOSPITAL ONLY.
0008 ALTERNATE NO. 2 – INSTALL 1 JB $________ $________
NEW LIGHT CONTROL DEVICES IN
MULTI- OCCUPANCY ROOMS: WORK
INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN MULTI-OCCUPANCY ROOMS ON THE
1ST FLOOR OF THE HOSPITAL ONLY.
0009 PERFORMANCE AND PAYMENT BONDS 1 EA $ _________ $________
| BASE BID + BID ALTERNATES 1 & 2 (Line Items 0006, 0007, 0008 & 0009) | ||
| TOTAL | $__________ |
BASE BID + BID ADD ALTERNATES #1, #2 and #3:
| 0010 | BASE BID – INSTALL LIGHT | 1 JB | $_________ | $_________ |
| CONTROL DEVICES FOR CANTEEN: |
WORK INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN THE CANTEEN AREA.
0011 ALTERNATE NO. 1 – INSTALL 1 JB $________ $________
NEW LIGHT CONTROL DEVICES IN
SINGLE OCCUPANCY ROOMS: WORK
INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN SINGLE OCCUPANCY ROOMS ON THE
1ST FLOOR OF THE HOSPITAL ONLY.
0012 ALTERNATE NO. 2 – INSTALL 1 JB $________ $________
NEW LIGHT CONTROL DEVICES IN
MULTI- OCCUPANCY ROOMS: WORK
INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN MULTI-OCCUPANCY ROOMS ON THE
1ST FLOOR OF THE HOSPITAL ONLY.
0013 ALTERNATE NO. 3 – INSTALL 1 JB $________ $_________
NEW LIGHT CONTROL DEVICES FOR
MULTI- ROOM SYSTEMS: WORK
INCLUDES GENERAL CONSTRUCTION,
ALTERATIONS, ELECTRICAL, NECESSARY
REMOVAL OF EXISTING STRUCTURES AND
CONSTRUCTION AND CERTAIN OTHER ITEMS
IN ADJACENT MULTI-OCCUPANCY ROOMS ON THE
1ST FLOOR OF THE HOSPITAL ONLY.
0014 PERFORMANCE AND PAYMENT BONDS 1 EA $ _________ $________
BASE BID + BID ALTERNATES 1, 2 & 3 (Line Items 0010, 0011, 0012, 0013 & 0014)
TOTAL $____________
**Bid Item(s): 365 Calendar days to complete.
Scope of Work Construction Statement of Work 671-15-132 Install Lighting Upgrade for Energy Efficiency Audie L. Murphy Medical Center
BACKGROUND:
The purpose of this project is to reduce the energy consumption and upgrade lighting systems to current standards and codes used at the Department of Veteran Affairs Audie L. Murphy Hospital located at 7400 Merton Minter Blvd, San Antonio, TX, 78229.
STATEMENT OF WORK:
The contractor shall furnish all labor, materials, equipment, supervision and all other necessary provisions to install the lighting upgrades at Audie Murphy VA Medical Center as called out in the Construction Documents.
The project is focused on reducing power consumption in the canteen and on the 1st floor. This is conducted through the following primary methods:
· Replacing existing lamps and fixtures with more efficient devices
· Installing light control devise that turn off lights when users are not in the vicinity of the monitored area.
· Installing light harvesting sensors that decrease the fixture/bulb energy output when supplemental daylight is detected.
Reduced energy consumption and lighting system upgrades in accordance with the contract documents include the following:
· Upgrade existing lighting fixtures and bulbs with more energy efficient options.
· Integrate technology sensors and energy efficient lighting controls.
· Install new light control devices in single occupancy offices and restrooms
· Install new light control devices in multi-occupancy offices and restrooms
· Install new multi-room light control systems
· Design light harvesting systems for the canteen.
· The system for the canteen shall be addressable and programmable from a central location. For example, the dimming shall enable the halls to be dimmed to 80% from 10pm to 5 am the following day.
For the fixtures to coordinate with the new control devices, a variety of fixtures will be replaced. New fixtures will be more energy efficient and be able to operate with low voltage operating controls. This will reduce the wattage requirements when the system is on as well as provide the ability to turn off the system automatically conserving additional energy. In most cases, the modifications to existing system will be direct replacement fixtures and switches. Most material installation will be above the acoustic ceiling tiles and should cause minimal disruptions or construction. Areas with hardened ceilings should be avoided other than direct fixture/lamp or light switch replacement.
This design is based on the Touché control lighting system. Contractor is to use Touché control lighting systems or approved equivalent. If contractor ops for using an approved equivalent, contractor will be responsible for verifying system functionality from any wiring/design changes resulting from alternate equipment.
If existing conditions vary from the construction documents, contractor is to notify the COR immediately on how to proceed as some areas in the hospital may have been updated since the design.
Base Bid – Canteen Light harvesting controls will only be installed in the Canteen. The canteen is broken up into four (4) zones that will detect the current light settings and automatically dim the lights in each zone. Lights will also begin to brighten as the exterior lighting reduces. These controls can also turn off or dim during the evening hours.
The light control devices utilized in this work include a master interface, a local relay module (LRM) for each zone, touchscreen multifunction switch for each zone, and ceiling mounted occupancy sensors. Additionally, lighting fixtures in these rooms will also need to be updated or replaced to ensure they are compatible with a low voltage lighting control system.
Add Alternate #1 – Single Occupancy Rooms This includes all single occupancy rooms and restrooms which have only one (1) entrance and contain no partitions or separators. Examples of this include private offices and restrooms. The light control device utilized in these rooms will be a wall mounted occupancy switch that is controlled by both infrared sensors and sound sensors to accurately detect occupants in the space. These are very cost-effective products. Additionally, lighting fixtures in these rooms will also need to be updated or replaced as seen in the plans and specifications.
Add Alternate #2 – Multi-Occupancy Rooms This includes all multi-occupancy rooms that have multiple occupants, multiple entrances, or partitions. Examples of this include large offices, conference rooms, and restrooms with stalls/partitions. Since a wall mounted occupancy switch sensor cannot cover the entirety of these rooms, ceiling mounted sensors will be installed to provide full coverage. Depending on the size of the room, multiple ceiling sensors may be required to completely cover the area. Additional light control devices to be installed in these rooms include a room manager (RM) and a touchscreen multifunction switch. Lighting fixtures in these rooms will also need to be updated or replaced to ensure they are compatible with a low voltage lighting control system as seen in the plans and specifications.
Add Alternate #3 – Multi-Room Systems This includes any two (2) or more multi-occupancy rooms that are adjacent to each other. The light control devices utilized in these rooms will be the same as the multi-occupancy rooms; However, only one (1) RM be will required for each multiroom group. Each RM can connect with up to 20 devices. Light fixtures in these rooms will also need to be updated or replaced as seen in the plans and specifications.
ADDITIONAL REQUIREMENTS:
Contractor shall be responsible for complying with all the construction documents and applicable Department of Veterans Affairs Master Specifications as part of this project. Specifications, Designs, Procedures, Standards, etc. can be found at https://www.cfm.va.gov/til/dManual.asp, and/or https://www.cfm.va.gov/til/index.asp.
The contractor will hire highly qualified, experienced, and licensed professionals to accomplish all tasks required. Licensed electrical professionals will be hired where appropriate. Licensed technicians for all inspection related work must meet the qualifications seen in the VA standards.
The majority of the contractor work will be done outside of the normal hours of operation. The Contractor will be required to work during evenings or on Saturday, Sunday, or holidays outside the project site’s normal working hours for items impacting patient care (i.e. power outages and/or demo placing patients in harm’s way) or work causing VA employee displacement. An appropriate working schedule will be discussed and agreed upon between the contractor and the COR before any work begins. Any additional time needed outside of the agreed upon schedule between the COR and the contractor will need to submit a written request for approval to the VA-COR at least three (3) working days prior to the proposed start of such work. Work causing VA employee displacement will be done outside of normal hours of operation and shall be coordinated with the COR.
It is recommended that bidders attend the pre-bid site visit to become fully acquainted with existing site conditions and the scope of work.
The Contractor shall be responsible for obtaining and coordinating the services of any and all third-party Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely delivery, and documented final product.
Demolition debris shall be recycled to the best ability of the contractor. Reports of weight and deposition of all waste are to accompany the monthly progress payments (C&D Waste Form attached). Form also included in corresponding specification. Contractor responsible for disposal of old lighting fixtures and components unless stated otherwise by the COR.
Any item damaged during removal is the contractor’s responsibility to replace with no additional cost to the government.
Housekeeping – Contractor is expected to keep the campus clean of debris daily. Normal hospital operation must not be interrupted. Contractor must keep construction areas fenced off when not working to prevent unauthorized access.
Smoking is strictly prohibited in all facilities, near flammable liquids, highly combustible materials. Smoking is not authorized on VA property.
Security – Contractors will wear security badge in plain sight above the waist at all times. Contractors found without a badge will be immediately removed from VA property by VA Police. Contractors responsible for getting all employees and subcontractors working onsite badged. Badging is about a 2 week process which requires a background check, TB test, and ICRA class.
Parking – Contractor parking is located in the front parking lot of the VA hospital. Contractor can coordinate material drop off in the front or dock location with the COR.
Tuberculosis (TB) – Contractor is responsible for ensuring that if contracted construction worker(s) have been determined to be at risk for transmission of TB based upon the TB pre-construction risk assessment. The contractor must provide written certification, within 24 hours upon request, to the COR that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the work site and been found to be free of active TB. Refer to the contract documents for this requirement
OSHA 10 & 30 -Hour Training Course – All construction workers are required to have the OSHA 10-hour Construction Safety training certification. The construction safety manager and/or superintendent shall have the 30-hour Construction Safety course certification. Proof of certification shall be on site at all times.
Infection Control (IC) and Safety– All contractors, construction workers and COR’s must attend the Infection Prevention training every fiscal year. All construction workers shall always have a current IC training sticker attached to their badges. If this requirement is not met, workers will be removed from construction site. Refer to construction documents for additional information. Construction sign and copy of IC permit (attached) shall always be posted in project site. All IC and dust control measures shall always be implemented.
All construction and installation work shall comply with VA specifications for material and workmanship, NEC, NFPA and all applicable city, county, state, and federal regulations and codes and OSHA standards. Refer construction drawings and specs for requirements.
Conduct work as to interfere as little as possible with facility operations. All coordination for utilities shutdown shall be coordinated at least 72 hours prior to event with COR. For major utility system shutdowns, coordination shall be done at least 2 weeks in advance.
OTHER DELIVERABLES:
Period of Performance: 90 Calendar days after Notice to Proceed for the Base Bid + 120 Calendar days for the Additional Alternative #1, +90 calendar days for Additional Alternate #2, + 60 calendar days for Additional Alternate #3.
Performance and Payment bonds: Due 10 Calendar days after Notice of Award Proof of Insurance: Due 10 Calendar days after Notice of Award Contractor Construction Plan and Schedule: The contractor is expected to submit a construction plan and schedule to the COR within 15 calendar days of the NTP. The contractor must have an approved construction plan and schedule prior to beginning work.
Contractor Quality Control Plan (CQCP): The contractor shall develop a quality control plan and shall furnish to VA for review no later than 30 calendar days after the receipt of notice to proceed. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. VA will consider an interim plan for the first 45 calendar days of operation. Installation will be allowed to begin only after acceptance of the CQCP or acceptance of an interim plan applicable to the feature of the work to be started. Work outside of the features of the work included in an accepted interim plan will not be permitted to begin until acceptance of a CQCP or another interim plan containing the additional features of the work to be started. After acceptance of the CQCP, the Contractor shall notify the Contracting Officer Representative (COR) in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer. Please see Appendix H for additional details.
Safety Plan: Contractor shall develop and implement a Comprehensive safety plan to eliminate injuries occurring relative to providing the design and installation services for this project. Contractor shall furnish to VA for review no later than 15 calendar days after the receipt of notice to proceed. The plan shall also describe how final system installation will meet all applicable requirements of NFPA30 and NFPA30A. Construction/Renovation work will be allowed to begin only after VA’s acceptance of the Safety Plan. Contractor is responsible for providing enough project lead time to allow for VA review of Safety Plan before acceptance. The Department of Labor OSHA requires that all Contractors involved in installation on VA owned or leased property comply with the Incorporation of General Industry Safety and Health Standards applicable to Installation Work and Technical Amendments, Final Rule 29 CFR Parts 1910 and 1926 as published in the Federal Register Volume 58, No. 124, June 30, 1993. In addition, any Contractor that performs construction type work on any VA project as defined by the Scope of the referenced regulation is required to; (1) Provide and maintain his own protective equipment and devices, etc.; and (2) Require all sub-contractors used on site to follow these same provisions in the regulation.
Warranty: Contractor shall provide a minimum one (1) year warranty, unless specified otherwise in the specs, on all newly installed work and components.
ACCEPTANCE:
For the purposes of Warranty and payment for the work performed at a location, government “Acceptance” will be provided by the VA upon the completion of all the following:
1. All newly installed work has been completed and inspected to meet VA codes and standards
2. All punchlist items have been resolved.
3. Contractor has provided a physical and legible set of as built record drawings
CONFIDENTIALITY AND NONDISCLOSURE:
· The preliminary and final deliverables and all associated working papers, application source code, and other material deemed relevant by the VA which has been generated by the contractor in the performance of this Order are the exclusive property of the U.S. Government and shall be submitted to the VA-COR at the end of the contract.
· The Contracting Officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract presented to the contractor shall be submitted to the CO for response.
· Press releases, marketing material or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO.
· the extent that the work under this contract requires that the contractor be given access to proprietary business, technical or financial information belonging to the Government or other companies, the contractor shall treat such information as proprietary business sensitive and agrees not to appropriate such information to its own use or to disclose such information to third parties unless specifically authorized by the CO in writing. A mutually agreed to agreement for exchange of sensitive information or nondisclosure agreement may be required.
GENERAL REQUIREMENTS FOR PRIVACY INFORMATION:
· Information Systems Officer, Information Protection: The contractor will not have access to VA Desktop computers nor will they have access to online resources belonging to the government while conducting services.
· Privacy Officer: The contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA.
· Records Manager: There will be no federal records created, maintained, used or dispositioned with this contract; regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.].
“VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors
1. Contractor employees who work in or travel to VHA locations must comply with the following:
1. Documentation requirements:
0. If fully vaccinated, shall show proof of vaccination
0. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination
0. If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.
0. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
0. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the following website: COVID-19 Screening Tool. Regularly check the website for updates.
1. Contractor employees who work away from VA locations, but who will have direct patient contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.”
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
COVID-19 Bid Submission Instructions
A. In order to comply with Federal mandate to limit Face-to-Face interaction and/or Social Distancing hard copy bid package(s) shall not be submitted via FedEx, UPS, or Hand Deliver to the Contracting Office. All bid packages shall be submitted via email to the following email address: harold.robbins2@va.gov , by the specified Bid Closing date and time.
B. All public Bid Opening are hereby suspended until further notice due to the COVID-19 limiting Face-to-Face interaction and/or Social Distancing. Bids shall be opened by the Contracting Officer and/or Contract Specialist and recorded on an official Bid Abstract. Bid Abstracts will be available upon request via email.
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 49.4 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is San Antonio, Texas
(End of Provision)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.5 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be percent of the bid price or , whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Hand-Carried Address:
Harold Robbins Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.
Temple TX 76504 Mailing Address:
Harold Robbins Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.
Temple TX 76504
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— November 15, 2021 @ 9:30 am CST
(c) Participants will meet at— San Antonio VAMC Engineering Office (End of Provision)
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.214-18 |
| PREPARATION OF BIDS—CONSTRUCTION |
| APR 1984 |
| 52.214-19 |
| CONTRACT AWARD—SEALED BIDDING—CONSTRUCTION |
| AUG 1996 |
| 52.214-34 |
| SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE |
| APR 1991 |
| 52.214-35 |
| SUBMISSION OF OFFERS IN U.S. CURRENCY |
| APR 1991 |
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
(End of Clause)
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
(End of Provision)
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
(a) Any protest filed by an interested party shall—
(1) Include the name, address, fax number, email and telephone number of the protester;
(2) Identify the solicitation and/or contract number;
(3) Include an original signed by the protester or the protester’s representative and at least one copy;
(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;
(5) Specifically request a ruling of the individual upon whom the protest is served;
(6) State the form of relief requested; and
(7) Provide all information establishing the timeliness of the protest.
(b) Failure to comply with the above may result in dismissal of the protest without further consideration.
(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.
(End of Provision)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.
(2) The small business size standard is $39.5 Million.
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition—
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or…
This is the start of the file's text. The full file is on GovTribe.