This document contains an amendment to a solicitation for upgrading the fire alarm system at the Central Texas Veterans Health Care System campus in Waco, Texas. The solicitation seeks a general contractor to replace the existing fire alarm system across 25 buildings, including necessary labor, materials, equipment and supervision. The project is estimated at $5-10 million and will be completed over one year in phases to avoid disrupting hospital operations. Bids are due by email on December 10, 2021. The amendment clarifies that existing multi-mode fiber should be used where possible and that replacement of damaged fiber outside the construction limits would constitute a change order. It also directs offerors to bid the system as either fully class A or class B wired, as required by applicable standards. The procurement is open only to verified Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0003 A00002.docx | DOCX document | |
| 36C25722B0003 A00001.docx | DOCX document | |
| VA_WAC Fire Alarm - Bid Set Specifications.pdf | ||
| 36C25722B0003.docx | DOCX document | |
| VA_WAC Fire Alarm - Bid Set Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00003 674A4-21-108 36C257 Network Contracting Office NCO17 Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.
Temple TX 76504 Network Contracting Office NCO17 Department of Veterans Affairs Central Texas Veterans HCS Scott Blvd.
Temple TX 76504 To all Offerors/Bidders
36C25722B0003
X X X
X 1 (one) AMENDMENT A00003 is hereby executed to provide a 'final' clarification to previously addressed RFI responses. The bids are due via email to gaila.lowe@va.gov on FRIDAY, DECEMBER 10, 2021 at 1:00 P.M., CST.
GAILA P. LOWE
Contracting Officer
CONTINUATION PAGE
PROJECT NAME: PROJECT #674A4-21-108 UPGRADE FIRE ALARM SYSTEM, CAMPUS-WIDE, WACO, VAMC
SOLICITATION NUMBER: #36C25722B0003/36C257-22-B-0003
AMENDMENT A00003:
BID DUE DATE: FRIDAY, DECEMBER 10, 2021 @ 1:00 PM, CST, SUBMIT VIA EMAIL TO gaila.lowe@va.gov
1. RFI #5 and #6 direct that existing multi-mode fiber is to be used and that if new fiber is needed, this would be a change to the contract. 5. The campus riser diagram on drawing G002 does not indicate if the campus fire alarm loop is new, what size and type cable nor the routing of the cable? Please clarify if the campus fire alarm loop is new and if there is an existing underground conduit between the buildings? COR RESPONSE: Existing multi-mode fiber is to be used. Note: A/E team is looking at wireless system. 6. If there are new conduit between the buildings can we bore under the roadways using HDPE conduit? COR RESPONSE - If a new conduit or fiber is needed, this would be a change to the contract.
A/E SECONDARY CLARIFICATION RESPONSE: This is actually in conflict with #22. Per the contract, only work inside the buildings is included under this project. Anything regarding the fiber loop would be additional to the base contract. In theory, if the GC doesn’t touch anything outside the building it wouldn’t matter about the fiber loop. But, as discussed, several times we do know the loop needs to be replaced and the infrastructure is already in place with an empty duct bank. I think the response is that anything outside the building envelope would be in addition to the base contract.
COR SECONDARY CLARIFICATION RESPONSE: Amendment #2, item #5: If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? COR Response: If it is working now, we expect it to be working with new equipment. The Contractor would not be responsible for something outside limits of construction.
2. RFI #23 conflicts with RFI #5 and #6. RFI#23 states that the contractor is responsible for replacement of fiber if it is found to be damaged or inoperable. 23. If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? A/E RESPONSE: Yes
COR SECONDARY CLARIFICATION RESPONSE: (Again Amendment #2, item #5 same as above) -- Amendment #2, item #5: If fiber existing network is found to be damaged or inoperable, is contractor responsible for replacement of fiber? COR Response: If it is working now, we expect it to be working with new equipment. The Contractor would not be responsible for something outside limits of construction.
3. How do you want contractors to proceed? Full replacement of the existing multi-mode fiber is in the magnitude of $250,000?
COR SECONDARY CLARIFICATION RESPONSE: Excerpt from Amendment #A00001:
5. The campus riser diagram on drawing G002 does not indicate if the campus fire alarm loop is new, what size and type cable nor the routing of the cable? Please clarify if the campus fire alarm loop is new and if there is an existing underground conduit between the buildings? COR RESPONSE: Existing multi-mode fiber is to be used. Note: A/E team is looking at wireless system.
6. If there are new conduit between the buildings can we bore under the roadways using HDPE conduit? COR RESPONSE - If a new conduit or fiber is needed, this would be a change to the contract.
Do not include the full replacement of the existing multi-mode fiber.
4. Also, RFI #77 response directs contractors to comply with VA Fire Protection Design Manual and the specifications. Neither provide guidance on whether a Class A or Class B system is to be used. It is up to the Authority Having Jurisdiction (VA) and the customer (VA) to determine the class of system to install. How do you want contractors to proceed? Should contractors bid the entire system as Class A or Class B? 77. Is Class A or Class B fire alarm wiring required? A/E RESPONSE: Comply with requirements of the VA Fire Protection Design Manual and the specifications.
A/E SECONDARY CLARIFICATION RESPONSE: Excerpt from the VAFPDM addressing wiring class:
Excerpt from the spec addressing wiring class:
image2.png image1.png