36C25627R0004 0002.pdf
PDF 231 KB Posted
- Attached to
- J041--OBVAMC Chiller Maintenance Service- RFQ
- Solicitation number
- 36C25627R0004
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office 16 for solicitation number 36C25627R0004, dated August 24, 2026, with Amendment Number 0002. The amendment extends the deadline for receipt of quotations to September 4, 2026 at 10:00 CDT. The purpose of the amendment is to replace the Performance Work Statement with an amended version dated August 28, 2026, incorporate answers to prospective quoters' questions, and notify that no further questions will be accepted.
The underlying contract is for chiller preventative maintenance services at Overton Brooks VA Medical Center in Shreveport, Louisiana, covering three York chillers and one Trane chiller, with an ordering period of October 1, 2026 through September 30, 2031. The Performance Work Statement requires the contractor to provide all labor, materials, tools, equipment, and supervision for monthly, quarterly, and annual preventative maintenance, inspections, testing, and cleaning on the chillers and four cooling towers in compliance with manufacturer specifications, OSHA requirements, EPA requirements, and federal, state, and local laws. Contractor qualifications include EPA 608 Universal Certification, State of Louisiana HVAC licensing, OSHA ten-hour safety training, lockout/tagout training, VA Medical Center safety protocol training, and York and Trane industry certification. Key deliverables include monthly maintenance reports within 48 hours, annual maintenance and cooling tower inspection reports within five business days, and oil and vibration analysis reports. Work hours are Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays. The Quality Assurance Surveillance Plan establishes performance objectives requiring 100 percent compliance for monthly and annual maintenance, 95 percent pass rate on first cooling tower inspection, and 95 percent on-time reporting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25627R0004 0003.pdf | ||
| 36C25627R0004 0001.pdf | ||
| 36C25627R0004_1.docx | DOCX document | |
| 36C25627R0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 13
N/A
36C256
Department of Veterans Affairs
Network Contracting Office 16
5075 Westheimer Road, Suite 750
Houston TX 77056-5643
36C256
Department of Veterans Affairs
Network Contracting Office 16
5075 Westheimer Road, Suite 750
Houston TX 77056-5643
To all Offerors/Bidders
36C25627R0004
08-24-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 09-04-2026 10:00 CDT
See CONTINUATION Page
See attached continuation pages.
Contracting Officer
CONTINUATION PAGE
The purpose of this amendment is to extend the date and time to receive quotations and provide the Government’s response to prospective quoters’ questions and answers.
1. The deadline for the receipt of quotations is extended to the date and time to receive quotations to the time listed in block 11 of this SF30;
2. The Performance Work Statement (PWS) is removed and replaced with the attached version entitled “PERFORMANCE WORK STATEMENT- Amended 08/28/2026”;
3. The attached “QUESTIONS AND ANSWERS” are hereby incorporated into the solicitation; and
4. No further questions will be accepted.
A.1 PERFORMANCE WORK STATEMENT- Amended 08/28/2026
Chiller Preventative Maintenance
Performance Work Statement and QASP
1. Scope
The contractor shall provide all labor, materials, tools, equipment, supervision, and transportation necessary to perform preventative maintenance, inspections, testing, and cleaning on three York chillers and one Trane chiller. All work shall comply with manufacturer requirements, OSHA requirements, Environmental Protection Agency requirements, and all applicable federal, state, and local laws.
The Towers and Chillers listed in Section 9, with the exception of the Trane Chiller, are newly installed.
2. Place of Performance
Overton Brooks VA Medical Center
510 East Stoner Avenue
Shreveport, LA 71101
3. Period of Performance
This Contract has an ordering period of October 1, 2026, through September 30, 2031. Periods of performance will be specified in each individual task order.
4. Normal Working Hours
Normal work hours are Monday through Friday, 8:00 a.m. to 4:30 p.m., except federal holidays.
5. Federal Holidays
New Year’s Day January 1
Martin Luther King Jr.’s Birthday
Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Juneteenth June 14
Independence Day July 4
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25
When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday.
When a holiday falls on a Saturday, the preceding Friday is observed by the US government agencies.
In addition to the days designated as holidays, the Government observes the following days:
- Any other day designated by Executive Order
- Any other day designated by the President’s Proclamation; and
- Any other day designated by Federal Statute
6. Changes/Modifications
Changes to the terms and conditions of this contract are only authorized in writing by a warranted Government Contracting Officer. Non-warranted individuals are not authorized to make changes.
If any service awarded under this requirement requires modification or removal the contractor shall notify the Contracting Officer, in writing, by the most expeditious manner possible. This notification shall include but not be limited to the following:
• The contract number and a complete description of the affected work.
• Reasons for modifications or removal.
• Necessary instructions for any corrective action.
7. Invoices
The contractor shall submit invoices for any completed and government accepted items on the
Price Schedule. See VAAR Clause 852.232-72, Electronic Submission of Payment Requests for invoicing procedures. Payment will be made upon receipt of a properly prepared detailed invoice, prepared by the Contractor, validated by the Contracting Officer’s Representative
(COR). A properly prepared invoice will contain:
• Invoice Number and Date
• Contractor’s Name and Address
• Accurate Purchase Order Number
• Supply or Service provided
• Total Amount
8. Emergency and Urgent Response
No Emergency response is required under this Contract. Emergencies and urgent unscheduled work will be accomplished by others.
9. Applicable Equipment
• York Chiller 1 Model YKLGLLH9 EVHS Serial SKKM088520
• York Chiller 2 Model YKLGLLH9 EVHS Serial SKKM088530
• York Chiller 3 Model YKLGLLH9 EVHS Serial SKKM088540
• Trane Chiller 4 Model CVHE 1N 3B Serial L03F05451 seasonal
• Evapco Cooling Tower Model AXS14-16024 Serial 21P111885
• Evapco Cooling Tower Model AXS14-16024 Serial 21P111884
• Evapco Cooling Tower Model AXS14-16024 Serial 21P111883
• Evapco Cooling Tower Model AT19-3L14 Serial 22P129656
10. Contractor Qualifications. Contractor employees shall have current and valid professional certifications and licenses required to perform the work in this PWS, prior to contract award. All certification and licensing requirements by the Federal, State, and local agencies shall be complied with at the contractor's expense.
• EPA 608 Universal Certification
• State of Louisiana HVAC license if required by state law
• OSHA ten-hour minimum safety training
• Training on lockout and tagout procedures
• Training on VA Medical Center safety protocols
• York and Trane Industry certification.
11. OEM Specific Maintenance Intervals
York YK Series Requirements
Monthly leak testing and electrical tightening
Quarterly leak testing
Annual megohm motor testing, filter and drier replacement, oil analysis, vibration analysis, tube cleaning
Trane CVHE Requirements
Quarterly cleaning of water strainers
Semiannual lubrication of linkage bearings and purge maintenance
Annual inspection of controls, safety devices, and system components
12. Monthly Preventative Maintenance Requirements
Check oil return system operation
Inspect motor starter operation
Test sump heater and thermostat
Check three phase voltage and current balance
Verify condenser and evaporator water flow
Verify and calibrate all chiller safety controls
Inspect for leaks and conduct refrigerant leak testing
Check purge unit (on Trane chiller only)
Check oil and refrigerant levels
Record all operating conditions
13. Annual Maintenance Requirements
Tighten electrical connections
Perform megohm testing on motor windings
Replace oil filters and oil return filter driers
Clean or back flush heat exchangers
Replace starter coolant if applicable
Clean or replace air filters
Clean tubes
Verify motor lubrication
Perform oil analysis
Perform vibration analysis
14. Annual Cooling Tower Maintenance
Clean upper and lower decks- Cleaning shall take place during winter or spring
Clean fill material- Cleaning shall take place during winter or spring
Clean tower sumps- Cleaning shall take place during winter or spring
Clean tower strainers- Cleaning shall take place during winter or spring
Inspect all mechanical components
Check motor voltage and meg windings
Change gearbox oil every five years- shall take place during winter or spring
Inspect and test all controls and drives
Verify condenser water bypass valve operation
15. Safety Requirements
Contractor personnel shall comply with OSHA requirements, VA Safety Office procedures, and all site-specific safety rules. Contractor must maintain an accident reporting program.
16. Security and Access Requirements
All contractor employees shall undergo background checks as required by VA policy and shall obtain temporary or permanent badges before starting work.
17. Deliverables
Monthly preventative maintenance report submitted within 48 hours
Annual maintenance report submitted within five business days
Cooling tower inspection report submitted within five business days
Oil and vibration analysis reports
Emergency repair findings if applicable
18. Records Management Requirements
Contractor shall comply with all federal and VA records management policies. Records may not be removed, destroyed, altered, or disposed of without written approval from the Contracting
Officer.
19. Invoicing Requirements
Invoices shall be submitted through the Tungsten system and must include the contract number, dates of service, and confirmation of completed deliverables.
Quality Assurance Surveillance Plan
This QASP establishes methods for the Government to assess contractor performance in compliance with the PWS.
Performance Objectives and Acceptable Levels
Monthly Maintenance: 100 percent compliance
Annual Maintenance: 100 percent compliance
Cooling Tower Maintenance: 95% pass on first inspection
Emergency Response: Arrival within four hours
Urgent Response: Arrival within 24 hours
Reporting: 95% submitted on time
Records Management: Zero violations
OEM Compliance: All OEM intervals met with supporting documentation
Incentive Assessment
Incentives are awarded only if no liquidated damages are assessed during the same evaluation period.
Remedies
Unsatisfactory performance may result in deductions, cure notice, or termination if required by the circumstances.
A.2 QUESTIONS AND ANSWERS
Q1. How many chillers are normally needed to carry the building at peak load in the summer?
A1. 2 chillers are required in summertime.
Q2. Can one chiller be taken out of service for a day or two in the winter without affecting the hospital?
(We plan to do the annual work one machine at a time, November through
February, to keep the rest of the plant available.)
A2. Yes.
Q3. Is there a plant operator or stationary engineer on site who valves and isolates machines, or is the contractor expected to do that?
A3. Plant operator will start and stop chillers, but any manual valves must be operated by contractor.
Q4. Which months does the Trane chiller normally run?
A4. Normally around March through October or so. This chiller is used in hottest months to maintain temperatures in surgery area. However, this new plant can maintain temps year-round without the Trane chiller.
Q5. How many tubes are in the condenser and in the evaporator of each machine?
A5. This is unknown. Chiller make and models are provided in the Performance Work
Statement Section 9.
Q6. What is the tube outside diameter and wall thickness?
A6. This is unknown. Chiller make and models are provided in the Performance Work
Statement Section 9.
Q7. Are any tubes currently plugged? If so, how many on which machine?
A7. No.
Q8. When was the last eddy current test on each machine, and do you have the reports?
A8. We have not done this test on these chillers.
Q9. Has eddy current been done on the evaporators, or only the condensers?
A9. Neither.
Q10. Are all four towers on one common condenser water loop?
A10. Surgery cooling tower is for the Trane chiller only. The other three are on one loop.
Q11. Can a tower be taken offline for cleaning during the season, or does all tower work have to happen in the winter or early spring?
A11. Cleaning shall take place during winter or spring. THE PWS HAS BEEN MODIFIED
ACCORDINGLY.
Q12. Who handles the condenser water chemical treatment — VA staff, a separate water treatment vendor, or is it expected to be part of this contract?
A12. VA staff handles daily treatment, and a separate contractor comes in monthly.
Q13. Is there a Legionella or water management plan we need to follow when draining and cleaning the towers?
A13. Our legionella plan does not address a specific draining method. We do regular legionella testing in the towers.
Q14. Does the government require a pre and post disinfection when cleaning the towers?
A14. No. We will be adjusting chemical treatment to maintain levels and our towers are tested monthly for bacteria count.
Q15. Will the award contractor be able to dispose of waste accumulated while cleaning cooling towers at the Overton Brooks VA?
A15. Yes.
Q16. For each tower, when was the gearbox oil last changed?
A16. Never. All towers are new. Main plant has only run for 2 months and surgery tower is only 2 years old.
Q17. Can the government please specify what option year of the contract the gear oil needs to be changed in the cooling tower gearboxes?
A17. This should occur during Ordering Period 3- the resultant Contract will not include options. See CLIN 2001.
Q18. Whose lockout/tagout program applies in the chiller plant — the VA's or the contractor's?
A18. The VA’s LOTO program applies while working on VA property.
Q19. Who is responsible for maintaining the chiller plant BMS system not directly associated with the chillers themselves? (Automated valves, temperature sensors, flow sensors, DP sensors)
A19. The Government maintains this with the assistance of a separate contractor.
Q20. Is the awarded contractor responsible for any sort of calibration of the chiller plant BMS system?
A20. No.
Q21. Is a rewarded contractor responsible for maintaining a refrigerant monitor system?
A21. No.
Q22. Section 9 of the solicitation document mentions Eddie Current every two to five years under the Y series requirements but does not mention Eddy for the train
CVHE. Can the government please provide a detailed schedule that dictates what option Eddy current is required for the condenser and evaporator of each machine group?
A22. This requirement is removed. THE PWS HAS BEEN MODIFIED ACCORDINGLY.
Q23. Would the government accept performing Eddy Current on both condenser and evaporator barrels of both the York and Train chillers in option year one of the contract and then only the condensers in option year four?
A23. This requirement is removed. THE PWS HAS BEEN MODIFIED ACCORDINGLY.
Q24. Section 10 contractor qualifications: Can the government please provide an example of a EVAPCO certification?
A24. This requirement is removed. THE PWS HAS BEEN MODIFIED ACCORDINGLY.
Q25. If the prime contractor (SDVOSB) possesses a EPA 608 Universal Certification, Training on lockout and tagout procedures, Trane CenTraVac certificate, York YK certificate, Osha 10 or 30 certificate and state of Texas HVAC license does that satisfy the requirement of section 10?
A25. The Personnel on-site doing the work must have the certifications listed in the PWS section entitled “Contractor Qualifications” (as modified).
Q26. How many chillers can be taken down at one time to perform annual maintenance and still meet the VA requirements of N + 1?
A26. 1 chiller can be taken down at one time.
Q27. How many cooling towers can be taken down at one time to perform annual maintenance and still meet the VA requirements of N + 1?
A27. 1 cooling tower can be taken down at one time.
Q28. Section 9 does not mention Monthly inspections on Trane chiller but section 11 calls out Trane specific parts/ Components. Does the government want monthly inspections on the trained chiller?
A28. Yes. Trane should be inspected monthly also.
Q29. Does the government want monthly inspections on the cooling towers?
A29. No. VA personnel do monthly PMs on the towers. Only Chillers monthly inspections are needed from Contractor.
Q30. Is the awarded contractor responsible for routine maintenance of the condenser water and chilled water pumps? If yes, please provide the scope of work and the frequency of service required, including the model and serial number of each pump.
A30. Only annual vibration analysis is required for pumps.
Q31. Is the awarded contractor responsible for preventive maintenance of the variable frequency drives controlling the pumps and the cooling tower motors? If yes, please provide the frequency of service, the scope of work required, and the equipment model and serial numbers.
A31. No.
Q32. Would the government like to add a separate CLIN for the air-cooled chillers residing at the Overton Brooks VA Medical Center?
A32. No. These are maintained by the Government. This work only concerns water-cooled chillers.
Q33. For scheduling purposes — eddy current inspection in particular — it is important that interested bidders understand how many chillers may be taken out of service at one time. If, for example, only two of the three chillers in the new chiller plant may be taken down simultaneously, the work will require additional trips and therefore additional charges. Without this information, an interested contractor must price that risk, which ultimately drives the price up and results in a disservice to the Medical Center and to the taxpayer. Please state the maximum number of chillers that may be out of service at one time, at each plant.
A33. Depending on the season, we can shut 2 chillers down. In warm seasons, we will need to run 2 chillers. (Eddy current inspections are no longer required.)
Q34. Is the awarded contractor responsible for cleaning strainers? If yes, please identify which strainers are included in the scope and where each is located.
Section 9 references quarterly cleaning of water strainers for the Trane CVHE, and
Section 13 references cleaning tower strainers; please confirm whether any additional strainers, such as pump suction strainers, are also included.
A34. No additional strainers or strainer cleaning is included. This is performed by the
Government.
Q35. Is the awarded contractor responsible for calibration of the Onicon flow meters? If yes, please provide a detailed scope of work. Specifically, does the Government require that the flow meters be removed and sent out for factory calibration, or does the Government prefer that an offset be entered into the BMS system?
A35. No.
Q36. Is the awarded contractor responsible for any preventive maintenance of the water filtration systems, specifically the VAF filtration system located on the fourth floor? If yes, please provide the scope of work, the frequency of service required, and the model and serial number of each unit. Please also identify any additional water filtration equipment installed at the other plant locations.
A36. No.