580-26-103 Project Drawings.pdf
PDF 20 MB Posted
- Attached to
- Y1DA--580-26-103 Upgrade Cooling Tower B104
- Solicitation number
- 36C25626R0066
About this file
This document is a comprehensive set of design and construction drawings for the Chiller Plant Expansion project (Project No. #580-98-110) at the Michael E. DeBakey Houston Veterans Affairs Medical Center in Houston, Texas. The project involves the replacement of Building 104's cooling tower system and expansion of the chiller plant infrastructure to support six existing 1,000-ton chillers and one 300-ton chiller through a new 1,150-ton cooling tower configuration.
The scope includes construction of a new chiller building with structural, mechanical, plumbing, and electrical systems; installation of six new cooling towers (CT-2 through CT-7, each rated at 1,150 tons) in a basin configuration; replacement of condenser water supply and return piping from the chiller room to the tower basin; installation of new condenser water pumps (turbine-type, 3,450 GPM capacity); provision of chemical treatment loops and monitoring systems; site piping connections including connections to the existing 1,000,000-gallon chilled water storage tank; and all associated electrical infrastructure including 480V power distribution, motor controls, lighting, and fire alarm systems. The design employs a primary/secondary pumping arrangement with bypass valve capabilities on three towers (CT-2, CT-3, CT-4) to accommodate existing chillers requiring warmer condenser water during winter months, while towers CT-5 through CT-7 provide full-flow capacity for newer chiller installations. The drawings were prepared by Shah Smith & Associates, Inc., dated August 2001, and provide detailed specifications for construction execution including foundation plans, mechanical sections, electrical diagrams, control schematics, and equipment schedules.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626R0066 0001.docx | DOCX document | |
| 580-26-103 Site Visit Sign In Sheet.pdf | ||
| 580-26-103 Statement of Work Upgrade Cooling Tower.doc | DOC document | |
| 580-26-103 Statement of Work.docx | DOCX document | |
| 36C25626R0066_1.docx | DOCX document | |
| SF24 Bid Bond.pdf | ||
| DOL Wage Determinations TX20260253 dated 1-2-26.pdf | ||
| 580-26-103 Project Specifications.pdf | ||
| 36C25626R0066.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCC-2 CIRCUIT AND FEEDER SCHEDULE
T I
CT-1
(E) ro
CT-2 CT-3
(J) (J) t( t t( ) ro
,:,,:, SAFETY PAYS ,:,,:,
CT-4 CT-5 CT-6
(J) (J) (J) t( ) t( }
-r-
KEYED NOTES: 1 /M 1 .0
CT-7
(J)
Q) PROVIDE SCHEDULE 40, STEEL PIPING HEADER 24" SIZE,
CONSTRUCTED WITH VICTAULIC FITTINGS. EXTEND NEW 12" SCHEDULE
40, STEEL PIPING AS INDICATED TO EXISTING CHILLER CONDENSERS
AND PIPING RISERS TO TOWER. PROVIDE BLIND FLANGES AT EACH END.
@ NEW PNEUMATIC VALVE ACTUATOR. SEE M5.0 FOR DETAIL.
t( ) @ SUPPORT CONDENSER WATER SUPPLY AND RETURN HEADER IN STEEL
FRAME. SEE STRUCTURAL DRAWING S1 .0 FOR DETAIL.
@ EXISTING UNDERGROUND CONDENSER WATER SUPPLY AND RETURN
PIPING TO REMAIN. DO NOT DISTURB.
2" MA
KEUPI" =
TYP., EJ � !!II 1-1-----,,----- � -- •
,_, ___ 18 ¢ ---f-- --
� (8) .- (8) � ® � (8) .-l==;::i======='----'==='--';==W===;=i:===='-----'======'""";=W=:::;::F=====''L':::::===='""';=i--F;:F-===='-i 1 24"¢ f-- -- ,. 30¢ - •• ----24";----- ... :,======18"¢== = "'
I
@ REPLACE EXISTING TURBINE CONDENSER WATER PUMP WITH NEW
TURBINE CONDENSER WATER PUMP. SEE SCHEDULE FOR SIZING.
I
[M\ I s··
I / 1•.: 4"B.F.
I °'R/ 4,, 5•• f--
I --' � "' )
.r
.: 4"B.F.
4",-w I '_,, I•;;: 4"B.F. rcv-i) 4" 'f
4•• 3"
I / 1•.: 4"B.F . , 'RI 4"
3"
�"�,J-1 �±l ���/��������������������������������t���������������������t�����)�=���������-8�,,����I �' l-+�'-+-�,�������������������t���������������-+'� 5 � I l=±L���c�G-;==::===?� _J
I I I ••-=---- '· 1 j'J 1
1) 1 : � C.O. TO GRADE
ltl I I rt>--® ltl I I t>--@
12" ) - 1 0" ) -I '1 I I I I I I - - I I I I ltl I I 1 o·· I I I I I I I I r-"t>--® ltl I I rt>--®
) - 8" ) - 6" I I 1 1 - - I I I I
I I ,, �, / / ////
.,-,,,--------'--' ,--------�-----------7'--7-++--------{4>---------. -'-.. __ • _________ __. __ ...__ ________ �- INV. 42.93'
I 1. I 1.
I 11 I i . I I . /
) 1 I I
�jml . '' � • •. I
! ! ' I • '
I II I I
I I I • I I I
I
I
I I
I I
I I
5" GATE VALVE
(E)
I 7 '
I I I I I I I I I i i
I I I I I I I I I I I I
I I I I I I
I I I I I I I I I I I I I I I I I
:i
I I l t l l t l I I I I I I I I I I I I I I I I I I I
'..I I I I I I I I I I I
I I I I I
I I I I I I I I I I I I I I I
:i l t l I I I I
I
!i I I I I I I I I j - I I I I I I I I
I
I I I I it I I I I
I
I I I I i:
I I I I t
L
@ EXISTING 300 TON COOLING TOWER TO REMAIN IN OPERATION
THROUGHOUT THE CONSTRUCTION PERIOD.
(J) NEW 1,150 TON COOLING TOWER CONSTRUCTED IN EXISTING CONCRETE
BASIN. SEE COOLING TOWER DRAWINGS AND SCHEDULE FOR DETAIL.
@ REPLACE EXISTING CONDENSER WATER SUPPLY AND RETURN PIPING
FROM FIRST FITTING JOINT ABOVE GRADE. REFER TO M3.0 AND M5.0
FOR ADDITIONAL INFORMATION.
@ PROVIDE NEW 4" BASIN DRAIN, SCHEDULE 40 PVC. CONNECT TO
EXISTING 6" SUMP DRAIN AS INDICATED. PROVIDE P-TRAP AT WALL.
MOUNT SECURELY TO SUMP WALL.
@ PROVIDE PVC CONNECTOR PIPING BETWEEN SUMPS, PIPE SIZE AS
INDICATED. CORE DRILL SUMP WALL. SEAL AROUND PIPE WITH
SUITABLE LINK-SEAL ANNULAR RING SEAL. SEE M3.0 FOR DETAIL.
QJ) 4" BASIN DRAIN THRU CONCRETE WALL. CORE DRILL FLUSH WITH
BASIN FLOOR. PROVIDE HYDRAULIC GROUT SEAL. SEE DETAIL ON
M3.0 FOR ADDITIONAL INFORMATION.
@ 6" VENT TO REMAIN, CLEAN AND PAINT TO MATCH TOWER COLOR.
@ EXTEND BYPASS PIPING INTO TOWER BASIN, AS INDICATED. SUPPORT
__ , i� 2-1/2" 4-- -s -,:
., '·R" _•/ S •"'., 'j ,, R � J_J s ) •''···R\•. _ ; SC':1, :\, R L::ff r<D
I i'i' I C I.I i'i' C � I.I 'i" • c'i' I.I I - 'i" ' 'ici' I.I ' "' 'ici' I.I
SECURELY FROM BASIN FLOOR WITH S/S SUPPORTS AND FASTENERS.
1-------
- 6 11
Jf--
_J_ C\I __§_ 0 ---2._ 0 _±_ ::1:
2 -
-�, _j_
::E
CH-1
(N.I.C.)
r.:.1 I �,'][ ... � ,,][:� ,-:Jr,�)4t� SUPPLY HEADE�J[,_L I / , ... Jr:i. I ,,I:� Is F.
f--
H - u1 - IH ,ir--@ f--
(,.: '1 _ J
I I
CH-2
I.-p �
ITTL....... \,
I
.,-'.! l\-.__ ·--- -
I I
I , CH-3
·t''. l-., ·- ' -.
LJ
I
I I[
CH-4
,,,-;--::_- _Jv. -.
I
I
1, 1�• .. j -
CH-5 CH-6
I
CH-7 ...i -ro u--
COOLING TOWER
MARK GPM EWT
DEG F
LWT
DEG F
CT-2 THRU CT-7 3,450 96 86
AMB.WB TONS
DEG F PER CELL
80 1,150
CCS: COMPOSITE COOLING SOLUTIONS
FAN MOTOR
BHP/HP
54/60
FAN
ACFM
266,153
SCHEDULE
FAN
RPM
269.2
FAN TOWER VOLTS
TIP SPEED SP IN/H20 PHASE
11,840 0.668 480/3
MFGR MODEL
ccs 6FT-2421-60-P6IL
BLDG 104 ◄.-� � CONDENSER WATER PUMP SCHEDULE
�I� r--��������������������������1
-.._ 17 MARK SERVICE TYPE GPM HEAD MIN RPM NPSH IMPELLER BHP/HP VOLTS/PH/HZ MFGR MODEL
I I 11 C
I r
I I
CWP-2 THRU CONDENSER WATER
CWP-7
TURBINE 3,450
DATA BASED ON PUMP CURVE: JTS-16HMC-EC0247WP Rev A
FT EF RATED/MAX
69 80.97 1,770 23.84 l 1.19/12.44 74.24/75 480/3/60 SULZER JTS-16HMC
�= ]l �c=c=����F=��=�c=:
-.;;;i �:t:==' 1=F�:::r:::===:1===:==rr:::=r::=::::==rr====[�
I �I
�=rr===r===:::=1=:=c==:=r===rr:j�� I �I r���T�=� -������-,-� I I I
GRAPHIC SCALE
0 4 8 12 16 5- I I
( T \ PARTIAL PLAN - BLDG. 104-CHILLER 2 THRU 7-CONDENSER PIPING
� SCALE: 1 /8"= 1 '-0"
w ffiPLAN 5
WNORTH
E
,:,,:, SUPPORT VALUE ENGINEERING ,:,,:,
� 0 i � � "' 0 !:l� CD "' s "" "" "" 0 0 0"' '"' '"' '"'
0 0 0 i "' "' -
C) z -k1� a..-a..
CJ�
<( u-
�c z
�� I u� u
I q� z
_J a..
_J
I-a::::
a..
... 0 0 ... ... ... 0 !;. a: a: N !,! ;;,. 0 = =�N � �� '
I I!!- "' ◄ '" - < �8 c,8 ,__ z ,.. t;if "'< z "- �
� 2 � ., 0 ., � i!!i "
M 1 .0 oo SAFETY PAYS oo
I I I I I I I I t I I t
�6����)6����)6����)6����)6����)6�
CT-2
OUT
OUT�-�
y
B.F.
@ TYP 8 PLCS
B.F.
M I--�
CR CS
CH
#2
(cv'\
(E)
OUT
OUT�-�
M I--�
CR
CH
#3
CT-3
cs y er er
(cv'\
(E)
OUT
OUT�-�
1-1/2"
CWP
CT-4
y
24" SUPPLY HEADER
1-1/2"
24" RETURN HEADER
M I--�
CR
CH
#4 cs
(cv'\
(E)
G)
CWP
M I--�
CR
CH
#5
CT-5
cs y
(cv'\
(E)
(cv'\
CR
CH
#6
CT-6
cs y er er
(cv'\
(E)
1-1/2"
1-1/2"
VAMC-1O4 CHILLER 2 THRU 7 CONDENSER WATER FLOW DIAGRAM
SCALE: NONE
oo SUPPORT VALUE ENGINEERING oo
CR
CWP
CH
#7
CT-7
cs y
(cv'\ '\!5J
(E)
B.F.
B.F.
1-1/2"
1 -1 /2" BYPASS
CHEM.
PUMP
(J)
DESCRIPTION OF SYSTEM DESIGN PHILOSOPHY
BUILDING 104 HOUSES SEVEN CHILLERS. THESE CHILLERS ARE
CIRCA 1987 AND BEING 20 YEARS OLD ARE IN VARYING STATES OF
OPERATING CONDITION. THERE IS ONE 300 TON CENTRIFUGAL AND
SIX 1,000 TON CENTRIFUGAL CHILLERS. THESE CHILLERS ARE
CONNECTED IN A PRIMARY /SECONDARY PUMPING ARRANGEMENT TO
A COMMON CHILLED WATER MANIFOLD WHICH INCLUDES A
1,000,000 GALLON CHILLED WATER STORAGE TANK. VARIABLE SPEED
CHILLED WATER PUMPS SERVE THE CHILLED WATER NEEDS OF THE
SITE FORM THIS CENTRAL LOCATION.
THE CONDENSER WATER SYSTEM SERVING THE SEVEN CHILLERS IS
COMPRISED OF AN INDEPENDENT CONDENSER LOOP AND TOWER,
CT-1, SERVING THE 300 TON MACHINE AND A COMMON
CONDENSER LOOP WITH SIX TOWERS, CT-2 THRU 7, SERVING THE
SIX 1,000 TON MACHINES.
EACH CHILLER CONDENSER IS CONNECTED TO IT'S RESPECTIVE
CONDENSER RETURN OR SUPPLY HEADER. EACH TOWER IS ALSO
CONNECTED TO THE CONDENSER RETURN OR SUPPLY HEADER.
COOLING TOWERS CT-2, 3, AND 4 ARE EQUIPPED WITH A
CONDENSER WATER BYPASS VALVE. EXISTING CHILLERS 2 THRU 7
IN THE PLANT MUST HAVE REASONABLY WARM CONDENSER WATER
SUPPLY TO OPERATE PROPERLY. LOAD ANALYSIS INDICATES THAT
THROUGHOUT THE WINTER MONTHS, NOVEMBER THRU FEBRUARY,
APPROXIMATELY THREE CHILLERS ARE REQUIRED TO MAINTAIN LOAD.
CHILLERS 8 AND 9 WHICH ARE SEPARATE 1,250 TON MACHINES
LOCATED ELSEWHERE, ARE USED IN THIS ARRANGEMENT PROVIDING
3,500 TONS OF CAPACITY DURING PEAK USAGE. THERE HAVE BEEN
PEAKS REQUIRING 4,500 TONS USING THE CHILLERS 8 AND 9.
THE DESIGN IS BASED ON CURRENT ENGINEERING PRACTICE USING
CHILLERS THAT WILL ACCEPT LOW TEMPERATURE WATER ENTERING
THE CONDENSER BARREL. HOWEVER, TO ACCOMMODATE THE
EXISTING CHILLERS, THE DESIGN ALSO ACCOUNTS FOR THE NEED
OF WARMER CONDENSER WATER SUPPLY.
THE NEW COOLING TOWERS, RATED AT 1,150 TONS, ARE SITUATED
ON A BASIN WITH A COUPLING PIPE PROVIDING A COMMON SUMP.
THIS SUMP CAN BE ISOLATED ON A TOWER BY TOWER BASIS FOR
MAINTENANCE PURPOSES. EACH TOWER IS EQUIPPED WITH A
CONDENSER WATER PUMP. THE CONDENSER PIPING MANIFOLD
PROVIDES A COMMON HEADER FOR TOTAL VERSATILITY IN
CONNECTING ANY SPECIFIC CHILLER, CH-2 THRU CH-7, WITH ANY
SPECIFIC TOWER, CT-2 THRU CT-7.
THE COOLING TOWERS, CT-2 THRU CT-4 ARE EQUIPPED WITH
CONDENSER WATER BYPASS VALVES TO ACCOMMODATE THE THREE
POTENTIAL WINTER USE CHILLERS. THE COOLING TOWERS CT-5
THRU CT-7 ARE FULL FLOW TOWERS TO ACCOMMODATE ANY
CHILLER DURING THE WARMER MONTHS OF THE YEAR AND NEW
REPLACEMENT CHILLERS IN THE FUTURE.
ALL CHILLER FANS ARE EQUIPPED WITH VARIABLE SPEED DRIVES,
VSD, FOR MODULATING CONTROL AT PART LOAD. CHILLER PLANT
OPERATION IS BOTH MANUAL AND AUTOMATIC. CHILLER SELECTION
IS MANUAL AND DONE BY PLANT PERSONNEL AS COOLING DEMAND
DICTATES. THE MANIFOLD CONCEPT PROVIDES GREATER FLEXIBILITY
IN PAIRING CHILLERS WITH TOWERS, EVEN IN THE COOLER WINTER
MONTHS. THE CONDENSER WATER TEMPERATURE WILL BE
CONTROLLED BY THE JCI METASYS CONTROL SYSTEM, MODULATE
THE BYPASS CONTROL VALVE WHERE IT EXISTS AND RAMP THE
SPEED OF THE TOWER FANS AS WATER TEMPERATURE INCREASES.
KEYED NOTES: A/M5.O
G) NEW CONDENSER WATER SUPPLY AND RETURN HEADER
CONNECTING SIX CHILLERS TO SIX COOLING TOWERS.
PROVIDE 24" BUTTERFLY VALVE FOR PHASED
CONSTRUCTION.
@ PROVIDE PNEUMATIC ACTUATOR FOR EXISTING BUTTERFLY
ISOLATION VALVE. PROVIDE BRAY SERIES 90, DOUBLE
ACTING ACTUATOR WITH SERIES 60 INTEGRAL SOLENOID
VALVE AND SERIES 55 SPEED CONTROL.
@ PROVIDE BUTTERFLY VALVE W/PNEUMATIC ACTUATOR, BRAY
12" SERIES 30, CAST IRON ASTM A 126 CLASS B, BUNA-N
SEAT, 304 s/s STEM , COATED DUCTILE IRON DISC.
PROVIDE BRAY SERIES 90, DOUBLE ACTING ACTUATOR WITH
SERIES 60 INTEGRAL SOLENOID VALVE AND SERIES 55
SPEED CONTROL.
@ PROVIDE 3-WAY BUTTERFLY VALVE IM BYPASS PIPING
ARRANGEMENT, __ SIZE, WITH PNEUMATIC ACTUATOR. CAST
IRON TEE WITH SERIES 30, SAST IRON ASTM A 126 CLASS B,
BUNA-N SEAT, 304 s/s STEM , COATED DUCTILE IRON
DISC. PROVIDE BRAY SERIES 90, DOUBLE ACTING
ACTUATOR WITH SERIES 60 INTEGRAL SOLENOID VALVE AND
SERIES 55 SPEED CONTROL AND SERIES 64 PNEUMATIC
POSITION ER.
@ PROVIDE 1" WELDOLET WITH BALL VALVE FOR CHEMICAL
FEED LOOP. PIPING, VALVES AND FITTINGS TO BE CPVC
CONSTRUCTION. PROVIDE LOCKING QUADRANT ON BALL
VALVE FOR FLOW BALANCING.
@ PROVIDE NEAR CHEMICAL PUMPS, THREE 3/4" FULL PORT
BALL VALVES TO BE USED BY V.A. CHEMICAL TREATMENT
PERSONNEL FOR CONNECTIONS OF OWNER PROVIDED
CHEMICAL TREATMENT EQUIPMENT.
{J) CHEMICAL TREATMENT LOOP CIRCULATING PUMP. GRUNDFOS
UPS 32-40, 20 GPM, AT 8 FT-HD, 460V, 3\1l.
z i
CJ Q;:;
Q;:;
�c Cj t:..!)
q�
... C :<I !;c a: !l
= C ii t;.f
� a C "' � t.) t.) t.)
t.) t.) t.)
z
Iii=
� 0
Iii= � N
"'1 N �"'
CD "' �
0 0 0'"' '"' '"' &l &l &l
"'1 "'1 "'1� � �
0 0 0 0 0
Cl! ...
"' Cl! ...
:::l!:
e:::
c., 3= _J
LL.
a::::
w
3= e:::
w
U1 w z u
... a:
I 111c,O z '-' "'!;c z 11. � i!!i "
MS.O
PLAN VIEW
EAST ELEVATION END VIEW
| HOUSTON VAMC - THERMAL STORAGE TANK.pdf |
| VA001M01 Model (1) |
| VA001M02 Model (1) |
| VA001M03 Model (1) |
| VA001M04 Model (1) |
| VA001M05 Model (1) |
| VA001M06 Model (1) |
| VA001M07 Model (1) |
File details come from the government source that posted it. Updated .