Updated Drawing E301.pdf
PDF 494 KB Posted
- Attached to
- Y1DZ | 586-22-102 | Renovate PC Blue for PACT - Women's Health Clinic | SOLICITATION- AMEND 005
- Solicitation number
- 36C25626R0012
About this file
This document is an electrical panelboard schedules drawing for a construction project at the U.S. Department of Veterans Affairs facility in Jackson, Mississippi. The project, titled "Renovation of PC Blue for Women's Health," is located at 1500 E. Woodrow Wilson Drive and is being designed by LACHIN Architects, apc (Michael G. Lachin, AIA) with offices at 5190 Canal Boulevard, Suite 201, New Orleans, Louisiana. The drawing, numbered E301 and dated February 20, 2025, represents the final submission for a fully sprinklered renovation project (Drawing Number 586-22-102).
The document details six electrical panelboards serving the mechanical room 123 location: Panel MH1EQ (400 amp, 120/208V, 3-phase) powering HVAC equipment including chilled water pumps, hot water pumps, relief fans, and an air handling unit with connected loads of 168.3A (Phase A), 163.0A (Phase B), and 162.9A (Phase C); Panel LH1M (100 amp, 480/277V, 3-phase) serving PC Blue lighting circuits with 11.0A, 6.0A, and 9.0A connected loads respectively; Panel LS1M (225 amp, 480/277V, 3-phase) supplying emergency and exit lighting with 68.9A, 60.9A, and 63.4A connected loads; Panel LL1M (225 amp, 120/208V, 3-phase) serving receptacles throughout the facility with 93.0A, 63.0A, and 83.0A connected loads; Panel LQ1M (100 amp, 120/208V, 3-phase) for HVAC controls and VAV boxes with 24.3A, 12.0A, and 11.8A connected loads; and Panel LC1M (100 amp, 120/208V, 3-phase) providing power to medical equipment receptacles with 69.0A, 57.5A, and 54.0A connected loads. All panels feature 18,000 AIC ratings, surface-mounted NEMA 1 enclosures, and detailed circuit descriptions with wire gauges and amperage specifications for each connected load.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E301
PANELBOARD SCHEDULES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
5190 Canal Boulevard, Suite 201 New Orleans, LA 70124 (504)835-8013
LACHIN
Architects, apc
Architecture . Planning . Project Management
N :\L
AC
H
IN
A rc hi te ct s Jo bs \2
8-
PC
B lu e fo r P
AC
T\
D ra w in gs \R ev it\
R ev it_ te m p\
PC
B lu e fo r P
AC
T_ de ta ch ed
.rv t
8/ 3/
1:
:5
AM
Michael G. Lachin, AIA
RENOVATION OF PC BLUE FOR
WOMENS HEALTH
1500 E. Woodrow Wilson Dr. Jackson, MS
586-22-102
2/20/2025 GPW WH
FINAL SUBMISSION
FULLY SPRINKLERED
Revisions: Date:
Revision 1 - 50% Resubdivision 10-23-2024 75% Review 12-5-2024
S
S
ID
I P
M IFO
ER
TS A T E
G
I SS S
P.
OG
YR W ORY
C
PI
K
E SS
GER
R
SI
ET
P FOR
I N
ED
O
LAENGINEER
15175
100% SUBMISSION 1-8-2025
PANEL BUSS: 400 AMP VOLT: 120/208 VOLT, 3 PHASE, 4 WIRE AIC RATING: 18,000
MH1EQ MAINS: 400 AMP M.B. MOUNT: SURFACE, NEMA 1 LOCATION: MECH. ROOM 123
CKT. BKR. DESCRIPTION FEEDER
LOAD (AMPS) LOAD (AMPS)
FEEDER DESCRIPTION BKR. CKT.
A B C A B C
20/3 CHILL WATER PUMP CHP-1 3-12, 1-12G
11 11
3-12, 1-12G HOT WATER PUMP HWP-1 20/3
3 11 11 4
5 11 11 6
20/3 CHILL WATER PUMP CHP-2 3-12, 1-12G
11 11
3-12, 1-12G HOT WATER PUMP HWP-2 20/3
9 11 11 10
11 11 11 12
20/3 RELIEF FAN RAF-1 3-12, 1-12G
4.8 10.51
3-8, 1-10G PANEL "LQ1M" (30 kVA XRFMR) 50/3
15 4.8 5.199 16
17 4.8 5.09 18
30/3 SPARE
21 22
23 24
30/3 SPARE
27 28
29 30
150/3 AIR HANDLING UNIT AHU-1 3-1/0, 1-6G
109 32
33 109 34
35 109 36
37 38
39 40
41 42
135.8 135.8 135.8 32.5 27.2 27.1
CONNECTED LOADS PER PHASE
A phase 168.3 amps
B phase 163.0 amps
C phase 162.9 amps
PANEL BUSS: 100 AMP VOLT: 480/277 VOLT, 3 PHASE, 4 WIRE AIC RATING: 18,000
LH1M MAINS: 100 AMP M.B. MOUNT: SURFACE, NEMA 1 LOCATION: MECH. ROOM 123
CKT. BKR. DESCRIPTION FEEDER
LOAD (AMPS) LOAD (AMPS)
FEEDER DESCRIPTION BKR. CKT.
A B C A B C
1 20/1 PC BLUE LIGHTS 2-12, 1-12G 6 2
3 20/1 PC BLUE LIGHTS 2-12, 1-12G 6 4
5 20/1 PC BLUE LIGHTS 2-12, 1-12G 9 6
7 20/1 PC BLUE LIGHTS 2-12, 1-12G 5 8
9 20/1 SPARE 10
11 20/1 SPARE 12
13 20/1 SPARE 14
15 20/1 SPARE 16
17 20/1 SPARE 18
19 20/1 SPARE 20
21 20/1 SPARE 22
23 20/1 SPARE 24
25 20/1 SPARE 26
27 20/1 SPARE 28
29 20/1 SPARE 30
11.0 6.0 9.0 0.0 0.0 0.0
CONNECTED LOADS PER PHASE
A phase 11.0 amps
B phase 6.0 amps
C phase 9.0 amps
PANEL BUSS: 225 AMP VOLT: 480/277 VOLT, 3 PHASE, 4 WIRE AIC RATING: 18,000
LS1M MAINS: 225 AMP M.B. MOUNT: SURFACE, NEMA 1 LOCATION: MECH. ROOM 123
CKT. BKR. DESCRIPTION FEEDER
LOAD (AMPS) LOAD (AMPS)
FEEDER DESCRIPTION BKR. CKT.
A B C A B C
1 20/1 EXISTING EXIT LIGHTS 2-12, 1-12G 3 6 2-12, 1-12G EXISTING NIGHT LIGHTS 20/1 2
3 20/1 EXISTING EXIT LIGHTS 2-12, 1-12G 3 3 2-12, 1-12G EXISTING EXIT LIGHTS 20/1 4
5 20/1 PC BLUE EMERG. LIGHTS 2-12, 1-12G 8 2 2-12, 1-12G MECH. PENTHOUSE LIGHTS 20/1 6
7 20/1 SPARE 29.89
3-8, 1-10G PANEL "LC1M" (30 kVA XRFMR) 50/3
9 20/1 SPARE 24.91 10
11 20/1 SPARE 23.39 12
13 20/1 SPARE 30
4-3, 1-8G EXISTING PANEL "LS2M" 100/3
15 20/1 SPARE 30 16
17 20/1 SPARE 30 18
19 20/1 SPARE 20
21 20/1 SPARE 22
23 20/1 SPARE 24
25 20/1 SPARE 26
27 20/1 SPARE 28
29 20/1 SPARE 30
3.0 3.0 8.0 65.9 57.9 55.4
CONNECTED LOADS PER PHASE
A phase 68.9 amps
B phase 60.9 amps
C phase 63.4 amps
PANEL BUSS: 225 AMP VOLT: 120/208 VOLT, 3 PHASE, 4 WIRE AIC RATING: 18,000
LL1M(1) MAINS: 225 AMP M.B. MOUNT: SURFACE, NEMA 1 LOCATION: MECH. ROOM 123
CKT. BKR. DESCRIPTION FEEDER
LOAD (AMPS) LOAD (AMPS)
FEEDER DESCRIPTION BKR. CKT.
A B C A B C
1 20/1 REC. - WAITING 100 2-12, 1-12G 9 4.5 2-12, 1-12G REC. - PACT TEAM 105 20/1 2
3 20/1 REC. - RECEPTION 116 2-12, 1-12G 4.5 20/1 4
5 20/1 REC. - RECEPTION 116 2-12, 1-12G 7.5 20/1 6
7 20/1 REC. - RECEPTION 116 2-12, 1-12G 6 4.5 2-12, 1-12G REC. - PACT TEAM 105 20/1 8
9 20/1 REC. - GPR 115 2-12, 1-12G 7.5 4.5 2-12, 1-12G REC. - HALL 106/STOR 107 20/1 10
11 20/1 REC. - MHO 138 2-12, 1-12G 7.5 4.5 2-12, 1-12G REC. - MPE 115 20/1 12
13 20/1 REC. - SUO 139 2-12, 1-12G 7.5 4.5 2-12, 1-12G REC. - MPE 114 20/1 14
15 20/1 REC. - EHRM 140 2-12, 1-12G 7.5 4.5 2-12, 1-12G REC. - MPE 108 20/1 16
17 20/1 REC. - SUR 124 2-12, 1-12G 7.5 4.5 2-12, 1-12G REC. - MPE 109 20/1 18
19 20/1 REC. - BREAK 132 2-12, 1-12G 6 4.5 2-12, 1-12G REC. - MPE 110 20/1 20
21 20/1 REC. - REFRIDGE BREAK 132 2-12, 1-12G 6 4.5 2-12, 1-12G REC. - MPE 111 20/1 22
23 20/1 REC. - ICE MACH. BREAK 132 2-12, 1-12G 8 13.5 2-12, 1-12G REC. - CORR. 102/RR 112, 113 20/1 24
25 20/1 REC. - BREAK 132 2-12, 1-12G 6 10 2-12, 1-12G REC. - MICROWAVE BREAK 132 20/1 26
27 20/1 REC. - GYNO 133 2-12, 1-12G 6 3 2-12, 1-12G REC. - IT SERVERS 20/1 28
29 20/1 REC. - SUPPLY 134/HAC 135 2-12, 1-12G 9 10.5 2-12, 1-12G REC. - CORRIDOR 120 20/1 30
31 20/1 AUTO DOORS RESTROOMS 2-12, 1-12G 10 10 2-12, 1-12G REC. - PACT TEAM COPY MACH. 20/1 32
33 20/1 REC. - CUR 125 2-12, 1-12G 7.5 7.5 2-12, 1-12G REC. - DIETICIAN 129 20/1 34
35 20/1 REC. - CHIEF 126 2-12, 1-12G 7.5 3 2-12, 1-12G REC. - MECH. ROOM 20/1 36
37 20/1 SPARE 10.5 2-12, 1-12G REC. - CORR. /STOR. 20/1 38
39 20/1 SPARE SPARE 20/1 40
41 20/1 SPARE SPARE 20/1 42
43 20/1 SPARE SPARE 20/1 44
45 20/1 SPARE SPARE 20/1 46
47 20/1 SPARE SPARE 20/1 48
49 20/1 SPARE SPARE 20/1 50
51 20/1 SPARE SPARE 20/1 52
53 20/1 SPARE SPARE 20/1 54
55 20/1 SPARE SPARE 20/1 56
57 20/1 SPARE SPARE 20/1 58
59 20/1 SPARE SPARE 20/1 60
44.5 39.0 47.0 48.5 24.0 36.0
CONNECTED LOADS PER PHASE
A phase 93.0 amps
B phase 63.0 amps
C phase 83.0 amps
PANEL BUSS: 100 AMP VOLT: 120/208 VOLT, 3 PHASE, 4 WIRE AIC RATING: 18,000
LQ1M MAINS: 100 AMP M.B. MOUNT: SURFACE, NEMA 1 LOCATION: MECH. ROOM 123
CKT. BKR. DESCRIPTION FEEDER
LOAD (AMPS) LOAD (AMPS)
FEEDER DESCRIPTION BKR. CKT.
A B C A B C
1 20/1 HEAT EXCHANGE CONTROL 2-12, 1-12G 3 3 2-12, 1-12G VAV BOXES 20/1 2
3 20/1 VAV BOXES 2-12, 1-12G 3 3 2-12, 1-12G VAV BOXES 20/1 4
5 20/1 VAV BOXES 2-12, 1-12G 3 2.75 2-12, 1-12G FCU-1 20/1 6
7 20/1 A/C UV LIGHT 2-12, 1-12G 3.25 10 2-12, 1-12G A/C CONTROLS 20/1 8
9 20/1 AFMS-1 2-12, 1-12G 3 3 2-12, 1-12G VAV BOXES 20/1 10
11 20/1 VAV BOXES 2-12, 1-12G 3 3 2-12, 1-12G VAV BOXES 20/1 12
13 20/1 OVERHEAD DOOR 2-12, 1-12G 5 SPARE 20/1 14
15 20/1 SPARE SPARE 20/1 16
17 SPACE SPACE 18
19 SPACE SPACE 20
21 SPACE SPACE 22
23 SPACE SPACE 24
25 SPACE SPACE 26
27 SPACE SPACE 28
29 SPACE SPACE 30
11.3 6.0 6.0 13.0 6.0 5.8
CONNECTED LOADS PER PHASE
A phase 24.3 amps
B phase 12.0 amps
C phase 11.8 amps
PANEL BUSS: 100 AMP VOLT: 120/208 VOLT, 3 PHASE, 4 WIRE AIC RATING: 18,000
LC1M MAINS: 100 AMP M.B. MOUNT: SURFACE, NEMA 1 LOCATION: MECH. ROOM 123
CKT. BKR. DESCRIPTION FEEDER
LOAD (AMPS) LOAD (AMPS)
FEEDER DESCRIPTION BKR. CKT.
A B C A B C
1 20/1 REC. - MPE 108 2-12, 1-12G 3 3 2-12, 1-12G REC. - MPE 109 20/1 2
3 20/1 REC. - MPE 110 2-12, 1-12G 3 3 2-12, 1-12G REC. - MPE 111 20/1 4
5 20/1 REC. - MPE 114 2-12, 1-12G 3 3 2-12, 1-12G REC. - MPE 115 20/1 6
7 20/1 REC. - MEDICATION 128 2-12, 1-12G 3 3 2-12, 1-12G REC. - MEDICATION 128 20/1 8
9 20/1 REC. - PHARM 130 2-12, 1-12G 9 1.5 2-12, 1-12G REC. - MECHANICAL 123 20/1 10
11 20/1 POWER DOORS 2-12, 1-12G 3 6 2-12, 1-12G REC. - CRASH CART 20/1 12
13 20/1 REC. - RECEPTION 2-12, 1-12G 9 10 2-12, 1-12G REC. - RECEPTION COPIER 20/1 14
15 20/1 REC. - SERVERS 2-12, 1-12G 3 6 2-12, 1-12G REC. - BREAK REFRIDGE 20/1 16
17 20/1 REC. - BREAK MICROWAVE 2-12, 1-12G 10 6 2-12, 1-12G REC. - PHARM 130 20/1 18
19 20/1 REC. - NURSE 137 2-12, 1-12G 9 9 2-12, 1-12G REC. - NURSE 121 20/1 20
21 20/1 REC. - PENTHOUSE 2-12, 1-12G 6 6 2-12, 1-12G REC. - PYXIS 20/1 22
23 20/1 REC. - SERVERS 2-12, 1-12G 3 10 2-12, 1-12G EXISTING EQUIPMENT 20/1 24
25 20/1 EXISTING EQUIPMENT 2-12, 1-12G 10 10 2-12, 1-12G EXISTING EQUIPMENT 20/1 26
27 20/1 EXISTING EQUIPMENT 2-12, 1-12G 10 10 2-12, 1-12G EXISTING EQUIPMENT 20/1 28
29 20/1 EXISTING EQUIPMENT 2-12, 1-12G 10 SPARE 20/1 30
31 20/1 SPARE SPARE 20/1 32
33 20/1 SPARE SPARE 20/1 34
35 20/1 SPARE SPARE 20/1 36
37 20/1 SPARE SPARE 20/1 38
39 20/1 SPARE SPARE 20/1 40
41 20/1 SPARE SPARE 20/1 42
34.0 31.0 29.0 35.0 26.5 25.0
CONNECTED LOADS PER PHASE
A phase 69.0 amps
B phase 57.5 amps
C phase 54.0 amps
LUMINAIRE SCHEDULE
MARK LAMPS MOUNTING DESCRIPTION MANUFACTURER EQUALS
C1 LED RECESSED CEILING LED, 6" RECESSED CAN LIGHT NDR LIGHTING RZR-CCT-600-4K-WH OR APPROVED EQUAL
F1 LED RECESSED CEILING LED, 2x4 LAY-IN FLAT PANEL COOPER LIGHTING 24FPSL2SCT3-4K-HIGH OR APPROVED EQUAL
F2 LED RECESSED CEILING LED, 2x4 LAY-IN FLAT PANEL COOPER LIGHTING 24FPSL2SCT3-4K-LOW OR APPROVED EQUAL
F3 LED RECESSED CEILING LED, 2x2 LAY-IN FLAT PANEL COOPER LIGHTING 22FPSL2SCT3-4K-HIGH OR APPROVED EQUAL
L1 LED SURFACE CEILING LED, 4' SURFACE WRAP W/SELECTABLE LUMENS COOPER LIGHTING 4NWS3C3-UNV-4K-MED OR APPROVED EQUAL
M1 LED WALL ABV MIRROR LED, 2' WALL MOUNT VANITY COOPER LIGHTING 2BCLED-LD4-20SL-F-UNV-L840-CD1 OR APPROVED EQUAL
X1 RED LED WALL/CEILING EDGE LIT LED SINGLE FACED EXIT SURE-LITE APXEL71R OR APPROVED EQUAL
X2 RED LED WALL/CEILING EDGE LIT LED DOUBLE FACED EXIT SURE-LITE APXEL72R OR APPROVED EQUAL
REV 1 - RESPONSES TO RFI'S 01-07-2026
AutoCAD SHX Text 2/20/25
AutoCAD SHX Text
| Sheets and Views |
| E301 |