36C25626R0012 Amendment 0004 2-12-26.pdf

PDF 210 KB Posted

Attached to
Y1DZ | 586-22-102 | Renovate PC Blue for PACT - Women's Health Clinic | SOLICITATION- AMEND 005
Solicitation number
36C25626R0012
Issued by

About this file

This document is Standard Form 30, Amendment 0004 to a solicitation issued by the Department of Veterans Affairs Network Contracting Office 16 in Houston, Texas for the renovation of the PC Blue Pact Women's Health facility. The solicitation number is 36C25626R0012, originally dated 12-12-2025, with the amendment effective date of 02-12-2026. The amendment extends the deadline for receipt of offers to 02-19-2026 at 2:00 PM CST and provides three substantive updates: additional RFI responses, an extension of the RFP date, and an updated Department of Labor wage determination dated 1-23-2026.

The Additional RFIs section addresses five clarifications submitted by potential offerors regarding project scope and specifications. Key responses include: (1) pricing for asbestos abatement should be based on the plans, with any discovered asbestos handled as a modification; (2) fire alarm testing is required at project end during commissioning; (3) the Swisslog pneumatic tube system located in room BC1224 must be relocated with associated piping adjusted, a new power feed installed from the breaker panel, and the system repositioned in the Med room between the column and adjacent wall with wall furring to accommodate it; (4) bids should be based on the plans with asbestos handled as a modification if discovered; and (5) ceramic tile specifications require 9"x9" mosaic floor tiles and 12"x18" porcelain/ceramic wall tiles, with additional details referenced in specifications 09 30 13 Part 2.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0004 02-12-2026

586-26-1-1577-0005

586-22-102

36C256

Department of Veterans Affairs

Network Contracting Office 16

5075 Westheimer Road, Suite 750

Houston TX 77056-5643

36C256

Department of Veterans Affairs

Network Contracting Office 16

5075 Westheimer Road, Suite 750

Houston TX 77056-5643

To all Offerors/Bidders

36C25626R0012

12-12-2025

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-19-2026 2:00 PM CST

X 1

AMENDMENT 0004

A. Provides Additional RFI responses (Located in SF30)

B. Extends RFP Date (Located in SF30)

C. Updates DOL Wage Determination 1-23-2026 (Attachment)

Tabitha Contreras

VA-VHA-2020-FB33BFA2

ADDITIONAL RFIs- RENOVATE PC BLUE PACT WOMEN’S HEALTH

2/12/2026

1. I reviewed the report posted to Sam.gov concerning asbestos. This drawing portion of the report is very difficult to follow. I am not sure what to do with this. So, my question is that it appears there are no ACM in the actual existing clinic area. However, there is some in the basement. The entire hospital shows asbestos scattered throughout. We are only to get pricing on the asbestos in the areas that we will be working, correct? The asbestos outside of the women's clinic we can disregard. Now some trades will have to go into other areas of the hospital to make connections. The drawing is so confusing I can't tell if there is asbestos or not in some of these areas.

RESPONSE: The bids should be based on the plans. If asbestos is determined to be present, that will be handled as a modification.

2. The question is referring to the required fire alarm testing. The answer given was specific to the medical gas piping recertification and testing. (Reference RFI 21).

RESPONSE: The fire alarm will need to be tested at the end of the project. During the commissioning of the project.

3. The question is referring to the existing pneumatic tube system manufactured by

Swisslog Healthcare that is located in existing room BC1224 and is assumed to be tied to the system that serves the main Hospital. The answer given refers to HVAC pneumatic tubing, not the Swisslog Pneumatic Tube System? Swisslog systems are proprietary and sole source and, if included in the Project Scope, will require their direct involvement including reprogramming the system that is to remain in service in the

Hospital. Currently, the Swisslog system is not addressed in the Plans and

Specifications. (Reference RFI 56).

RESPONSE: Swisslog tube system is to be relocated and all associated piping to be adjusted to make the system operational. Contractor will include a new power feed from the breaker panel to the Swisslog tube system. Tube system will be relocated to the Med room on the new drawings between the Column and the adjacent wall. Wall to be furred out to accommodate the system.

4. Can any info be provided on why the asbestos information was included in the latest

Amendment? Regarding the file “ACM_Drawings.pdf” it is difficult to impossible to tell where the areas labeled as “basement” and “sub-basement” are with respect to the plans we already have. The 1st in that same file indicates that the work area is “new construction”. I assume this means they did not even bother testing and that there is no

ACM present. 2nd Floor indicates “non ACM Red Speckled Tile”. Since no asbestos was indicated in the originally provided scope, the specs, or the drawings up until now, getting this info a few days before bids has us digging in to see where there is asbestos abatement scope only to find out there may be none at all. If that is the case, could the government clear that up and state succinctly that there is no abatement expected on this project? The provided info only added confusion, not clarity.

RESPONSE: The bids should be based on the plans. If asbestos is determined to be present, that will be handled as a modification.

5. What ceramic tile/porcelain tile sizes do you want priced?

RESPONSE: Tiles: mosaic tiles floor- 9”x9”; porcelain/ceramic tile wall- 12”x18”; For additional information regarding tiles, please refer to specifications 09 30 13 Part 2.

File details come from the government source that posted it. Updated .