This Quality Assurance Surveillance Plan (QASP) is for a contract to provide privacy curtains and installation at the Michael E. DeBakey VA Medical Center. The contract requires the contractor to install privacy curtains at one time, with multiple possible trips, and no restrictions on installation days or hours. Key performance requirements include removing existing materials, disposing of packaging and debris, installing new curtain carriers, and following manufacturer instructions and applicable codes.
The QASP establishes performance standards with acceptable quality levels of 97-98% for installation and 95% for delivery. Surveillance methods include direct observation and periodic inspection. If performance falls below the acceptable quality level, the government may issue a Contract Deficiency Report (CDR), require corrective action within 2 days, and potentially pursue additional remedies including adverse performance ratings, reperformance of work, or contract termination. The delivery schedule is set for March 31, 2026, with a complete written report required within 30 days of project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25626Q0067
ATTACHMENT D QUALITY ASSURANCE SURVEILLANCE PLAN 1
1. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP):
1.1 Title: Privacy Curtains or Equal including Installation
1.2 Introduction: This Quality Assurance Surveillance Plan has been developed to evaluate Contractor performance while implementing and executing Statement of Work (SOW) tasks for this requirement. It is designed to provide an effective surveillance method for monitoring and evaluating the Contractor’s performance for the requirements listed in the SOW.
1.3 This QASP does not detail how the Contractor will accomplish the work that is required by the SOW. Rather, this QASP has been created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
1.4 This QASP is a ‘living document’ and the government may review and revise it on a regular basis to ensure that the QASP remains a valid, useful, and enforceable document. However, the government will coordinate changes with the Contractor (if changes are required). Copies of the original QASP and revisions will be provided to the Contractor and government officials implementing surveillance activities.
1.5 Government Roles and Responsibilities: The following government employees are responsible for overseeing and coordinating surveillance activities:
1.5.1 Contracting Officer Representative (COR)- The COR is responsible for technical administration of the contract and is responsible for ensuring proper government surveillance of the Contractor’s performance. The COR is responsible for keeping a quality assurance file and after the contract, or when requested by the CO, providing corresponding documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. The Contractor shall reference any changes they deem may affect contract price, terms, or conditions to the CO for action.
1.5.2 Contracting Officer (CO). The CO is responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the contract terms, and safeguarding the interests of the United States in the contractual relationship. The CO is responsible for ensuring that the Contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
1.6 Performance standards and quality management: The designated government point of contact shall be responsible for monitoring the Contractor’s performance. Performance deficiencies or poor performance identified during the term of the contract shall be documented by the government and reported to the Contractor. Upon notification of deficiencies or poor performance, the Contractor shall be given 5 days’ time to take corrective action. If determined appropriate, the Contracting Officer and/or other VHA Regional Contracting Office-16 staff members shall meet with representatives of the Contractor to review performance and resolve issues. All deficiencies or poor performance shall be documented and must be corrected within the timeframe specified by the government. The Contractor shall notify the CO when correction(s) have been made. If the appropriate correction is not made within the timeframe specified, the government shall have the right to terminate the contract in its entirety.
ATTACHMENT D QUALITY ASSURANCE SURVEILLANCE PLAN 2
SOW
Para
Performance Objective
Performance Standard
Acceptable Quality Level
(AQL)
Surveillance Method
Compliance
5. Equipment shall be installed at one time, multiple trips possible.
No restrictions with days or hours for installation.
Taking down existing materials is required.
Disposal of existing materials required as per VA instruction. Removal of packaging materials/debris required. Install new carriers in track to hang new privacy curtains.
Install/modify new carriers in track to hang new privacy curtains as outlined in paragraph 5.
9. All curtains removed and installed under this contract shall be in accordance with the manufacturer instructions, applicable codes and standards herein this SOW.
97-98% performance level
Direct observation, periodic inspection or inspection
Corrected performance at no additional cost to the government.
Acceptable performance rating in Contracting Performance Assessment Reporting System
(CPARS).
May result in adverse CPARS and/or reperformance of work. Below AQL, non-acceptance of services.
A Contract Deficiency report (CDR) will be issued for performance below the AQL.
Additional remedies provided by the contract may be pursued.
7. The Contractor shall submit a complete written report of the work performed to the COR/ VA POC within 30 days of completion.
4. The Contractor shall deliver all items to the Michael E.
DeBakey VA Medical Center.
All items shall meet manufacturer specifications. The Contractor is responsible for any missing equipment, parts, and components not included to carry out the delivery.
Delivery Schedule:
March 31, 2026.
95% performance level
Direct observation, periodic inspection or inspection
Corrected performance at no additional cost to the government.
Acceptable performance rating in Contracting Performance Assessment Reporting System
(CPARS).
May result in adverse CPARS and/or reperformance of work. Below AQL, non-acceptance of services.
ATTACHMENT D QUALITY ASSURANCE SURVEILLANCE PLAN 3
A Contract Deficiency report (CDR) will be issued for performance below the AQL.
Additional remedies provided by the contract may be pursued.
3. CONTRACTOR DEFICIENCY REPORT (CDR):
When the Contractor does not achieve satisfactory performance, the COR/ VA POC will notify the Contracting Officer by forwarding the Contract Deficiency Report to the Contracting Officer who will issue this report to the Contractor. Within 2 days after receiving this report from the Contracting Officer, the contractor shall provide a thorough response to the Contracting Officer for the reported discrepancies by completing the appropriate sections of this report designated to be filled by the Contractor shall immediately correct substantiated deficiencies to the standards listed in the award. The Contractor shall provide a Ready Reaction Plan to address all issues cited in the CDR. The Ready Reaction Plan shall address how to meet the performance standard listed in the contract, the due date when the issue will be remedied, the cause of the performance issue and a plan to prevent this issue from occurring again in the future Contractor shall maintain the performance standards set forth in this contract. Failure to achieve the performance standards can lead to the issuance of Cure Notices which can lead to termination of this contract for cause.
ATTACHMENT D QUALITY ASSURANCE SURVEILLANCE PLAN 4
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
Contract#: ________________________________Contractor: ___________________________________
SERVICE or STANDARD: _______________________________________________________________
SURVEY PERIOD: _____________________________________________________________________
SURVEILLANCE METHOD (Check):
[__] Periodic Inspection [__] Customer Complaint
LEVEL OF SURVEILLANCE (Check):
[__] Monthly [__] Quarterly [__] As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check):
[__] Meets Standards [__] Does Not Meet Standards
Narrative of Performance During Survey Period: ___________________________________________
PREPARED BY: ___________________________________ DATE: _________________