667-25-190 RFI Register 05142025.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C25625R0082
About this file
This document is a Request for Information (RFI) for Project No. 667-25-190, involving the installation of isolation valves on the domestic water system in Building 1 for the Department of Veterans Affairs Veterans Health Administration. The project requires installing 59 isolation valves, with specific conditions including allowing a Superintendent to also serve as the Safety and Site Health Officer (SSHO), implementing Class IV Infection Control Risk Assessment (ICRA), and performing wall modifications up to 46" x 46" for valve installations. Core drilling will be limited to one location, and ICRA setup will be permitted during normal business hours. After valve installation, 24"x24" access panels will be placed, with remaining wall areas patched and repaired to match existing conditions. The solicitation number is 36C25625R0082 and involves Veterans Integrated Service Network 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25625R0082 0003.docx | DOCX document | |
| 36C25625R0082 0002.docx | DOCX document | |
| 36C25625R0082 0001.docx | DOCX document | |
| 667-25-190 Install Isolation Valvles B1 Sign in Sheet.pdf | ||
| 36C25625R0082 RFP.docx | DOCX document | |
| 36C25625R0082 667-25-190 ISO Valves - Drawings .pdf | ||
| 36C25625R0082 667-25-190 BLDG 1 Asbestos Report .pdf | ||
| 36C25625R0082 EXHIBIT F.docx | DOCX document | |
| 36C25625R0082 EXHIBIT E.docx | DOCX document | |
| 36C25625R0082 667-25-190 Combined Specs 02102025 .pdf | ||
| 36C25625R0082 SOW 667-25-190 02102025.doc | DOC document | |
| 36C25625R0082 WD LA20250031 02282025 .pdf | ||
| 36C25625R0082 EXHIBIT A.docx | DOCX document | |
| 36C25625R0082 EXHIBIT C.docx | DOCX document | |
| 36C25625R0082 667-25-190 Class IV Precautions - ISO Valves .pdf | ||
| 36C25625R0082 EXHIBIT D.docx | DOCX document | |
| 36C25625R0082 667-25-190 ICRA - ISO Valves .pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 667-25-190 Install Isolation Valves on Domestic Water System, BLDG 1 36C25625R0082
| 1. Spec section 01 35 26 1.9 – Can the Superintendent also be the SSHO? |
| Yes. |
| 2. SOW – What is the total count of isolation valves to be installed? |
| 59 Valves. |
3. Proposal RFI #3 - Will class IV ICRA be required at all locations?
Yes.
| 4. SOW – “Cut up to 46” x 46” wall openings (128sqft. Ft., a mix of drywall and plaster)” please explain this statement. |
| In the areas that require a portion of the wall to be removed in order to complete the installation of the valve, an area up to 46”x46” of the wall may be removed. After completing all required work a 24”x24” Access Panel will be placed over the valve with the remaining area of the wall to be patched and repaired to match existing. |
| 5. Will ICRA setup be allowed during normal business hours? |
| Yes. |
| 6. Drawing P-005 show one (1) core drill, are there any locations in the north wing or other additional locations not shown on the drawings that will require core drilling? |
| This is the only location requiring a core drill. |
File details come from the government source that posted it. Updated .