36C25624R0109 - ICRA - Inpatient Wards Isolation Rooms Exhaust System Class I Precautions .docx
DOCX document 19 KB Posted
- Solicitation number
- 36C25624R0109
About this file
This document is a set of Class I Precautions for infection control procedures required for a project to upgrade the inpatient isolation room exhaust system at the Overton Brooks VA Medical Center. The key details are:
The project requires noninvasive work activities to be performed on the roof, coordinated with nursing staff to minimize disruption to patient care. Workers must adhere to strict PPE requirements and ensure there is no dust generation or interruption to the HVAC system. After completion, the work areas must be thoroughly cleaned, and the HVAC system verified to meet original airflow and air exchange specifications. This document outlines the minimum required infection control precautions for this project.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overton Brooks VA Medical Center Infection Prevention & Control Class I Precautions
Minimum Required Infection Control Precautions Required for
Project: Upgrade Inpatient Isolation Rooms Exhaust System Date: 5/29/24
| CLASS I PRECAUTIONS |
| Before and During Work |
| Upon Completion |
1. All work is to be conducted on the roof.
2. All work will be coordinated with Nursing Service for room shut down.
3. Perform noninvasive work activity as to not block or interrupt patient care.
4. Perform noninvasive work activities in areas that are not directly occupied with patients.
5. Perform noninvasive work activity in a manner that does not create dust.
6. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
7. Strict adherence to PPE while working in the exhaust system.
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces, and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.