RFI for ATS Troubleshooting.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C25624Q1131
About this file
This document is a Request for Information (RFI) for troubleshooting and repair of Automatic Transfer Switches (ATS) located at the Southeast Louisiana Veterans Healthcare System.
The key details are:
- The Government is seeking information on the existing ATS software platforms, controls and monitoring systems, and interconnected SCADA equipment.
- The RFI also requests clarification on whether the proposed repair costs are limited to ATS repairs only or if additional equipment and control systems are to be included.
- Additional information requested includes control system single line diagrams, priority load-shed schedules for all ATS units connected to the emergency power system, and generator controller details.
- This RFI is related to a forthcoming competitive solicitation (Solicitation Number 36C25624Q1131) for ATS troubleshooting and repair services. The contract period is September 15, 2024 to November 14, 2024. The solicitation is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Load Shed pg 2.pdf | ||
| 7ES611 bldg control single line Diagram.pdf | ||
| Load Shed Priority pg 1.pdf | ||
| 36C25624Q1131 0003.docx | DOCX document | |
| 36C25624Q1131 0002.docx | DOCX document | |
| ATS Troubleshoot walk through sign in 1.pdf | ||
| 36C25624Q1131 A0001.docx | DOCX document | |
| 36C25624Q1131 F.docx | DOCX document | |
| 36C25624Q1131.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Submissions for ATS Troubleshooting and Repair
1. In line 0003 of the price schedule:
1. Can you please verify the existing software platform(s) (make/model)?
1. Can you please clarify what controls and monitoring are active?
1. Can you please confirm what equipment/systems (SCADA) are interconnected to?
1. In line 0004 of the price schedule:
1. Are repairs in this line item limited to ATS repairs only
1. If not, what additional equipment and control systems are to be included in repair cost?
1. Can you please provide:
1. Controls Single Line Diagram
1. Priority Load-Shed Schedule for all ATS’s in the facility that are connected to the emergency power system.
1. Generator Controller Information