580-20-118 Renovate ER Fast Track Space Project Drawings.pdf
PDF 28 MB Posted
- Attached to
- Y1DA--580-20-118 Renovate ER Fast Track Space
- Solicitation number
- 36C25623R0015
About this file
This document is a request for information from the Department of Veterans Affairs regarding renovations to the emergency room fast track space at the Michael E. DeBakey VA Medical Center in Houston, Texas. The project involves renovating approximately 4,153 square feet across three phases, including administrative areas, private offices, and fast track examination rooms. Responses are requested by May 15th, 2020 and should not exceed three pages. Firms are asked to provide their small business category and certification status if applicable, capability statement demonstrating how they can self-perform 15% of work and obtain performance bonds up to $2 million, contact information, and details on three relevant past projects as prime or subcontractor. The anticipated contract type is firm-fixed-price between $2-5 million.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
BLDG 201
CAMBRIDGE AVE.
H O
LC
O
M B E
BLVD
100A
D
E
F G
H
I
J K
L
M
N
P
Q R
EAST LEE
WEST LEE
S O
U T
H L
E E
RINGNESS AVE
C A
T E
T E
R R
A C
E
MIXON AVE
SH
E
EH
AN
AVE
LE CAPITAN
CAMBRIDGE
H O
L C
O M
B E
O L D
S P
A N
IS
H
T R
A
IL
E N
E R
G Y
C E
N T
E R
D R
IV
E
B L V
D
OUT PTNT
SUBSTNCE ABUSE
TRTMT CTR.
RESEARCH
VA
MED. CTR.
V A
R E
G
IO
N A
L
O F
F
IC
E
O
PROJECT LOCATION
BID DEDUCT ALTERNATES (REFERENCE VA DOCUMENT SF1442)
BID DEDUCT ALTERNATE #1
ALL WORK IN CONTRACT EXCEPT OMIT CASEWORK IN CARE STATION 1A-752. PROVIDE POWER AND DATA FOR VA PROVIDED AND
INSTALLED FURNITURE - SEE SHEET I-411.
BID DEDUCT ALTERNATE #2
ALL WORK IN CONTRACT EXCEPT DEDUCT #1 AND OMIT LOCKERS IN STAFF LOUNGE 1A-190 - SEE SHEET A-101.
BID DEDUCT ALTERNATE #3
ALL WORK IN CONTRACT EXCEPT DEDUCT #1, #2 AND CHANGE FLOORING FROM SHEET VINYL TO LVT IN ALL ROOMS EXCEPT
TREATMENT 1A-753 - SEE SHEET I-121.
BID DEDUCT ALTERNATE #4
ALL WORK IN CONTRACT EXCEPT DEDUCT #1, #2, #3 AND DELETE STAFF TOILET 1A-190B IN STAFF LOUNGE - SEE SHEET A-101.
BID DEDUCT ALTERNATE #5
ALL WORK IN CONTRACT EXCEPT DEDUCT #1, #2, #3, #4 AND SHELL OF EXAM ROOM #6 (1A-746). STUDS TO BE EXPOSED ON THE INTERIOR SIDE OF ROOM WITH PLUMBING ROUGHED-IN. EXISTING FINISHES TO BE DEMOLISHED WITH EXISTING FLOOR SLAB TO BE PREPARED TO RECEIVE NEW FLOOR FINISH ONLY. PROVIDE SOUND ATTENUATION BLANKETS AT STUD CAVITY. SEE SHEET A-101.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP
PROJECT LOCATION MAP
/1
/2
:4
:4
P
M C
U s e rs
\a p u lle n
\D o c u m e n ts
\A
V A
H o u s to n E
R F a s t
T ra c k -T
X -2
-2 a p u lle n V
D X
T
.r v t
G-001
COVER
1 6ANP
RENOVATE ER FAST TRACK
SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 AUGUST 15, 2022
100% CONSTRUCTION DOCUMENTS
580-20-11820-252
RENOVATE ER FAST TRACK SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
VA PROJECT #: 580-20-118
HED
DRAWING LIST
GENERAL
G-001 COVER 1 6
G-100 PRE CONSTRUCTION RISK ASSESSMENT (PRCA) 2 6
G-101 INFECTION CONTROL RISK ASSESSMENT (ICRA) 3 6
G-102 FIRST FLOOR PHASING AND ICRA PLAN 4 6
LS101 OVERALL FIRST FLOOR LIFE SAFETY PLAN 5 6
LS102 FIRST FLOOR LIFE SAFETY PLAN - PHASE 1A, 1B, AND 2 6 6
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 7
AD101 FIRST FLOOR DEMOLITION PLANS - PHASE 1A, 1B, AND 2 2 7
AD110 FIRST FLOOR REFLECTED CEILING DEMOLITION PLANS - PHASE 1A, 1B, AND 2 3 7
A-101 FIRST FLOOR PLANS - PHASE 1A, 1B, AND 2 4 7
A-110 FIRST FLOOR REFLECTED CEILING PLANS - PHASE 1A, 1B, AND 2 5 7
A-501 PARTITION TYPES, DOOR SCHEDULE, AND DETAILS 6 7
A-601 PLAN & SECTION DETAILS 7 7
INTERIORS
I-001 PRODUCT SCHEDULES, SYMBOLS AND ABBREVIATIONS 1 12
I-101 FIRST FLOOR FINISH AND WALL PROTECTION PLAN 2 12
I-121 FIRST FLOOR PATTERN PLAN 3 12
I-141 FIRST FLOOR SIGNAGE PLAN 4 12
I-142 SIGNAGE SCHEDULE 5 12
I-201 CASEWORK ELEVATIONS AND INTERIOR DETAILS 6 12
I-401 INTERIOR ELEVATIONS 7 12
I-411 FIRST FLOOR OVERALL EQUIPMENT PLAN 8 12
I-421 ENLARGED EQUIPMENT PLANS 9 12
I-422 ENLARGED EQUIPMENT PLANS 10 12
I-431 ENLARGED TOILET PLANS AND ELEVATIONS 11 12
I-601 EQUIPMENT SCHEDULE 12 12
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 3
FK101 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1A, 1B, AND 2 2 3
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - PHASE 1A, 1B, 2, AND PHASE 1A BID ALTERNATE #4 3 3
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 8
PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 1B & 2 2 8
PW101 FIRST FLOOR DRAIN, WASTE, AND VENT PLAN - PHASE 1A, 1B, AND 2 3 8
PW102 FIRST FLOOR DRAIN, WASTE, AND VENT PLAN - PHASE 1A AND 2 BID ALTERNATE DEDUCTS 4 8
PP101 FIRST FLOOR DOMESTIC WATER PLAN - PHASE 1A, 1B, AND 2 5 8
PP102 FIRST FLOOR DOMESTIC WATER PLAN - PHASE 1A AND 2 BID ALTERNATE DEDUCTS 6 8
PG101 FIRST FLOOR MEDICAL GAS PLAN PHASE 2 7 8
P-501 PLUMBING DETAILS 8 8
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 6
MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1A, 1B, AND 2 2 6
MH101 FIRST FLOOR HVAC PLAN - PHASE 1A, 1B, 2, AND PHASE 1A BID ALTERNATE #4 3 6
MP101 FIRST FLOOR MECHANICAL PIPING PLAN - PHASE 1A, 1B, AND 2 4 6
M-501 MECHANICAL DETAILS 5 6
M-601 MECHANICAL SCHEDULES 6 6
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 10
ED101 FIRST FLOOR OVERALL ELECTRICAL EXISTING PLAN 2 10
E-101 FIRST FLOOR OVERALL POWER PLAN 3 10
ED401 ELECTRICAL DEMOLITION ENLARGEMENTS 4 10
E-401 ELECTRICAL DISTRIBUTION ENLARGEMENTS 5 10
EP401 ELECTRICAL POWER ENLARGEMENTS 6 10
EL401 LIGHTING ENLARGEMENTS 7 10
E-501 ELECTRICAL DETAILS 8 10
E-601 AREA-'L' PANEL SCHEDULES 9 10
E-602 AREA-'K' PANEL SCHEDULES 10 10
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 6
TD101 FIRST FLOOR TECHNOLOGY DEMOLITION PLAN 2 6
T-101 FIRST FLOOR OVERALL TECHNOLOGY PLAN 3 6
TD401 TECHNOLOGY DEMOLITION ENLARGEMENTS 4 6
T-401 TECHNOLOGY ENLARGEMENTS 5 6
T-501 TECHNOLOGY DETAILS 6 6
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 5
FD101 FIRST FLOOR FIRE ALARM DEMOLITION PLAN 2 5
FA101 FIRST FLOOR FIRE ALARM PLAN 3 5
FD401 FIRE ALARM DEMOLITION ENLARGEMENTS 4 5
FA401 FIRE ALARM ENLARGEMENTS 5 5
BID DEDUCT ALTERNATES
AT
T S
XETE FO
SA
C
UL
LEN S. KEEN
2 6 112
R
EG
IS
TE
RED ARCHITEC
T
DocuSign Envelope ID: D3379614-D552-45B2-83C5-352B77C873DC
8/12/2022
GENERAL
1. ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK. PERMITS INCLUDE: ICRA, PCRA, ILSM, ABOVE
CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER,
FIRE ALARM SYSTEM, MEDICAL GASES, CONFINED
SPACE AND HOT WORK.
DUST CONTROL PLAN NOTES
A. THIS PROJECT INCLUDES CONSTRUCTION ENTRY
VESTIBULE - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION
AREA AND LEAVING THE CONSTRUCTION AREA AND
TIGHT SEALS SHALL BE MAINTAINED AT THE FULL
PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF
TRACKED OUTSIDE OF THE CONSTRUCTION
BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE
REMOVED CAREFULLY AFTER VA COR'S APPROVAL
TO MINIMIZE SPREADING OF DUST AND THE
CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
INTERNAL DEMOLITION AND CONSTRUCTION
ACTIVITIES DUST AND DEBRIS CONTROL
B. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES SHALL BE DEFINED. EGRESS PATHS
SHALL BE FREE OF DEBRIS AND ONLY AUTHORIZED
PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
C. CONTRACTOR SHALL USE TWO CARTS TO
TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN
THE MAIN ENTRY AND THE CONSTRUCTION STAGING
PREP AREA.
D. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN
CARTS WITH TIGHTLY FITTED COVERS, USING
DESIGNATED TRAFFIC ROUTE. EFFORTS SHALL BE
MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST
PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED
DAILY AND AT TIMES SPECIFIED BY THE COR. IF
CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE,
HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT IN
USE. FILTERS SHALL BE BAGGED AND SEALED
BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL
NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS
WITHOUT PRIOR APPROVAL OF THE COR.
E. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL BE
PROTECTED TO PREVENT DAMAGE BY ADJACENT
CONSTRUCTION WORK.
VENTILATION AND ENVIRONMENTAL CONTROLS
F. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND
ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHALL BE ADDED OR
RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM
CLEAN TO DIRTY PLACES.
G. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.
USE OF THE NEGATIVE AIR PRESSURE SYSTEM
WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE
PORTABLE HEPA FILTER CAPABLE OF FILTRATION
RATES OF 300-800 CUBIC FEET PER MINUTE.
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY COR IF EXHAUST SHALL BE TIED INTO
A RE-CIRCULATED AIR SYSTEM, PRE-FILTER AND
HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
H. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
I. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE
AIR IS NOT BEING RE-CIRCULATED WITHOUT
FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES,
EQUIPMENT AND RELATED AREAS
J. WORKSITE CLOTHING: CONTRACTOR PERSONNEL
CLOTHING SHALL BE FREE OF LOOSE SOIL AND
DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,
COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-
FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE
BARRICADE. THE CONTRACTOR SHALL CONSTRUCT
AN ANTEROOM FOR CHANGING CLOTHING AND
STORING EQUIPMENT (DESIGNATED AREA. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL
BE MADE FREE FROM DUST AND MOISTURE BY
VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR
WORK AREA.
K. POST CONSTRUCTION: DO NOT REMOVE BARRIERS
AND KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR
HAS CLEANED CONSTRUCTION SITE, CONTRACTOR
HAS DONE A TERMINAL CLEANING, AND VA
INFECTIOUS DISEASE CONTROL HAS INSPECTED
AND APPROVED THE CLEANING, AND AN RTO FORM
HAS BEEN COMPETED.
GENERAL
L. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL PHASES.
M. VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO BEGINNING
ANY WORK ON SITE. PERMITS INCLUDE:
ICRA, PCRA, ILSM, ABOVE CEILING, FIRE/SMOKE
WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM
SYSTEM, MEDICAL GASES, CONFINED SPACE AND
HOT WORK.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:0
A
M C
U s e rs
\a p u lle n
\D o c u m e n ts
\A
V A
H o u s to n E
R F a s t
T ra c k -T
X -2
-2 a p u lle n V
D X
T
.r v t
G-100
PRE CONSTRUCTION RISK
ASSESSMENT (PRCA)
2 6ANP
RENOVATE ER FAST TRACK
SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 AUGUST 15, 2022
100% CONSTRUCTION DOCUMENTS
580-20-11820-252
HED
AT
T S
XETE FO
SA
C
UL
LEN S. KEEN
2 6 112
R
EG
IS
TE
RED ARCHITEC
T
GENERAL
1. ALL APPLICABLE PERMITS AND COR APPROVALS
SHALL BE COMPLETED PRIOR TO BEGINNING ANY
WORK. PERMITS INCLUDE: ICRA, PCRA, ILSM, ABOVE
CEILING, FIRE/SMOKE WALL, UTILITY, FIRE SPRINKLER,
FIRE ALARM SYSTEM, MEDICAL GASES, CONFINED
SPACE AND HOT WORK.
DUST CONTROL PLAN NOTES
A. THIS PROJECT INCLUDES CONSTRUCTION ENTRY
VESTIBULE - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION
AREA AND LEAVING THE CONSTRUCTION AREA AND
TIGHT SEALS SHALL BE MAINTAINED AT THE FULL
PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF
TRACKED OUTSIDE OF THE CONSTRUCTION
BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE
REMOVED CAREFULLY AFTER VA COR'S APPROVAL
TO MINIMIZE SPREADING OF DUST AND THE
CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
INTERNAL DEMOLITION AND CONSTRUCTION
ACTIVITIES DUST AND DEBRIS CONTROL
B. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES SHALL BE DEFINED. EGRESS PATHS
SHALL BE FREE OF DEBRIS AND ONLY AUTHORIZED
PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
C. CONTRACTOR SHALL USE TWO CARTS TO
TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT - CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN
THE MAIN ENTRY AND THE CONSTRUCTION STAGING
PREP AREA.
D. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN
CARTS WITH TIGHTLY FITTED COVERS, USING
DESIGNATED TRAFFIC ROUTE. EFFORTS SHALL BE
MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST
PERIOD OF ACTIVITY. DEBRIS SHALL BE REMOVED
DAILY AND AT TIMES SPECIFIED BY THE COR. IF
CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE,
HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT IN
USE. FILTERS SHALL BE BAGGED AND SEALED
BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL
NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS
WITHOUT PRIOR APPROVAL OF THE COR.
E. EXTERIOR WINDOWS: EXISTING WINDOWS SHALL BE
PROTECTED TO PREVENT DAMAGE BY ADJACENT
CONSTRUCTION WORK.
VENTILATION AND ENVIRONMENTAL CONTROLS
F. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND
ACKNOWLEDGE CONTRACTOR WHETHER THE
CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHALL BE ADDED OR
RETURN VENTS COVERED AS NEEDED WITH FILTER
MATERIAL OR PLASTIC. AIR MUST FLOW FROM
CLEAN TO DIRTY PLACES.
G. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS.
USE OF THE NEGATIVE AIR PRESSURE SYSTEM
WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE
PORTABLE HEPA FILTER CAPABLE OF FILTRATION
RATES OF 300-800 CUBIC FEET PER MINUTE.
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY COR IF EXHAUST SHALL BE TIED INTO
A RE-CIRCULATED AIR SYSTEM, PRE-FILTER AND
HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
H. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
I. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE
AIR IS NOT BEING RE-CIRCULATED WITHOUT
FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING
THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES,
EQUIPMENT AND RELATED AREAS
J. WORKSITE CLOTHING: CONTRACTOR PERSONNEL
CLOTHING SHALL BE FREE OF LOOSE SOIL AND
DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.,
COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-
FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE
BARRICADE. THE CONTRACTOR SHALL CONSTRUCT
AN ANTEROOM FOR CHANGING CLOTHING AND
STORING EQUIPMENT (DESIGNATED AREA. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL
BE MADE FREE FROM DUST AND MOISTURE BY
VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR
WORK AREA.
K. POST CONSTRUCTION: DO NOT REMOVE BARRIERS
AND KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR
HAS CLEANED CONSTRUCTION SITE, CONTRACTOR
HAS DONE A TERMINAL CLEANING, AND VA
INFECTIOUS DISEASE CONTROL HAS INSPECTED
AND APPROVED THE CLEANING, AND AN RTO FORM
HAS BEEN COMPETED.
GENERAL
L. PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL PHASES.
M. VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO BEGINNING
ANY WORK ON SITE. PERMITS INCLUDE:
ICRA, PCRA, ILSM, ABOVE CEILING, FIRE/SMOKE
WALL, UTILITY, FIRE SPRINKLER, FIRE ALARM
SYSTEM, MEDICAL GASES, CONFINED SPACE AND
HOT WORK.
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS EITHER
KEEP RUNNING OR COVER
WHEN RUNNING TO KEEP
DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
PRESSURE MONITOR
45 MIN. RATED HARD
DOOR IN A RATED
FRAME WITH
CLOSER
G-100
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. COVER WITH ROSIN PAPER /
FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE WHEN
WINDOWS ARE USED
FOR VENTILATION.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
WHEN WINDOWS ARE NOT ACCESSIBLE, CONTRACTOR SHALL PROVIDE DUCTWORK TO THE EXTERIOR OR AS
COORDINATED WITH THE COR.
OR
USE PORTABLE DUST EXTRATOR AND AIR SCRUBBER WITH HEPA FILTRATION SYSTEM.
4" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16"
O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5 1/2"
A
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U419
5/8" FIRE RESISTANT
GYPSUM BOARD - BOTH
SIDES PER UL 419
INFECTION CONTROL RISK ASSESSMENT MEASURES
IN EFFECT FOR THE
RENOVATION OF ER FAST TRACK SPACE
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
ICRA SIGNAGE
PROVIDE STICKY MATS AT ICRA BARRIER
ENTRANCE AND CHANGE DAILY OR MORE
OFTEN AS NEEDED TO PREVENT THE
SPREAD OF DUST AND DEBRIS INTO
ADJACENT CLEAN SPACE.
EXISTING DOOR TO SERVE AS PART OF
BARRIER SYSTEM. CONTRACTOR TO USE
EXISTING DOOR AND FRAME.
EXISTING PARTITION SHALL SERVE AS PART
OF SLAB-TO-SLAB BARRIERS CONSISTING OF
4" METAL STUD FRAMING WITH 5/8" GYPSUM
BOARD ON ONE SIDE. BARRIERS SHALL BE
INSPECTED BY VA LIFE SAFETY AND ICRA
STAFF PRIOR TO START OF CONSTRUCTION IN
SPACE. MAINTAIN NEGATIVE PRESSURE
VENTILATION IN CONSTRUCTION SPACE.
PROVIDE SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER TO THE UNDERSIDE OF
CEILING WITH ZIPPER ENTRY. ZIPPER WALL
CURTAIN BARRIER SHALL BE INSPECTED BY
VA ICRA STAFF, PRIOR TO THE START OF
CONSTRUCTION IN SPACE. MAINTAIN
NEGATIVE PRESSURE VENTILATION IN THE
CONSTRUCTION SPACE.
G.3
PROVIDE STICKY MATS AT
ICRA BARRIER ENTRANCE AND
CHANGE DAILY OR MORE
OFTEN AS NEEDED TO
PREVENT THE SPREAD OF
DUST AND DEBRIS INTO
ADJACENT CLEAN SPACE.
PROVIDE SUSPENDED
PLASTIC ZIPPER WALL
CURTAIN BARRIER TO THE
UNDERSIDE OF CEILING WITH
ZIPPER ENTRY. ZIPPER WALL
CURTAIN BARRIER SHALL BE
INSPECTED BY VA ICRA
STAFF, PRIOR TO THE START
OF CONSTRUCTION IN SPACE.
MAINTAIN NEGATIVE
PRESSURE VENTILATION IN
THE CONSTRUCTION SPACE.
EXISTING PARTITION SHALL SERVE
AS PART OF SLAB-TO-SLAB
BARRIERS CONSISTING OF 4"
METAL STUD FRAMING WITH 5/8"
GYPSUM BOARD ON ONE SIDE.
BARRIERS SHALL BE INSPECTED
BY VA LIFE SAFETY AND ICRA
STAFF PRIOR TO START OF
CONSTRUCTION IN SPACE.
MAINTAIN NEGATIVE PRESSURE
VENTILATION IN CONSTRUCTION
SPACE.
C
LE
AR6'
-0
PROVIDE STICKY MATS AT
ICRA BARRIER ENTRANCE
AND CHANGE DAILY OR
MORE OFTEN AS NEEDED
TO PREVENT THE SPREAD
OF DUST AND DEBRIS INTO
ADJACENT CLEAN SPACE.
EXISTING PARTITION SHALL SERVE AS
PART OF SLAB-TO-SLAB BARRIERS
CONSISTING OF 4" METAL STUD FRAMING
WITH 5/8" GYPSUM BOARD ON ONE SIDE.
BARRIERS SHALL BE INSPECTED BY VA
LIFE SAFETY AND ICRA STAFF PRIOR TO
START OF CONSTRUCTION IN SPACE.
MAINTAIN NEGATIVE PRESSURE
VENTILATION IN CONSTRUCTION SPACE.
EXISTING DOOR TO SERVE AS
PART OF BARRIER SYSTEM.
CONTRACTOR TO USE
EXISTING DOOR AND FRAME.
A P
P R
O X
A .F
.F
1-HR RATED
DOOR AND
FRAME.
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS VISIBLE
TO PUBLIC
3'-6"
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:5
:0
A
M C
U s e rs
\a p u lle n
\D o c u m e n ts
\A
V A
H o u s to n E
R F a s t
T ra c k -T
X -2
-2 a p u lle n V
D X
T
.r v t
G-101
INFECTION CONTROL RISK
ASSESSMENT (ICRA)
3 6ANP
RENOVATE ER FAST TRACK
SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 AUGUST 15, 2022
100% CONSTRUCTION DOCUMENTS
580-20-11820-252
HED
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION PLAN LAYOUT WHEN
WINDOWS ARE ACCESSIBLE
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION SECTION WHEN WINDOWS
ARE ACCESSIBLE
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL
CONSTRUCTION DETAILS
Scale: 6" = 1'-0"
ICRA SIGNAGE
Scale: 1/4" = 1'-0"
ICRA PHASING PLAN - PHASE 1A
Scale: 1/4" = 1'-0"
ICRA PHASING PLAN - PHASE 1B
Scale: 1/4" = 1'-0"
ICRA PHASING PLAN - PHASE 2
Scale: 1/2" = 1'-0"
TYPICAL ICRA CONSTRUCTION ELEVATION
AT
T S
XETE FO
SA
C
UL
LEN S. KEEN
2 6 112
R
EG
IS
TE
RED ARCHITEC
T
CJ
CJCJ
CJ
CJ
CJ
CJ
CJ
FD
FDFD
FD
FDFD
4" CONC PAD
GP17
TB(22)
Z1K02
Z 1G
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
SS
S
S
S
S
S S
S S
S
S
S
S
S S
S S
S
S
S
S
SS
S
S
S S
S
SS
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S SS S SS S
S
S S
S
20.5
E
20 19 18 17 16 15
E.5
E.8
F.5
F.8
G
G.3
H
I
J
15.818.8
COPY
1A-747
BED CONTROL
1A-710
BED CONTROL
1A-711
CONF ROOM
1A-746
TOILET
1A-745
CORRIDOR
1A-741C
CODER OFFICE
1A-748
NURSE
1A-749
CORRIDOR
1A-741B
STOR. RM
1A-744
OFFICE
1A-743
SOCIAL
WORKER
1A-742
STOR
1A-751A
CORRIDOR
1A-741A
OFFICE
1A-743
MED. DIR
1A-751
MW/CT
1A-768
CLEAN
STORAGE
1A-841
STAFF
LOUNGE
1A-839
SOILED
UTILITY
1A-838
WAITING
C1A-711
CORRIDOR
1A-837
LINEN
1A-835
WAITING
1A-833
PAT TOILET
1A-832
PAT EFFECTS
1A-836
CHIEF
OFFICE
1A-314
OD EXAM
1C-312
STAFF
OFFICE
1A-847
STAFF
OFFICE
1A-846
REPROCESS
LAB
ROOM
1A-310
PAT TLT
1A-308
OFFICE
1A-306
WORK
ROOM
1A-843
COPY
WORK
ROOM
1A-848
SEC
OFFICE
1C-316B
AO
OFFICE
1A-758
STAFF
OFFICE
1A-849
CORRIDOR
C1A-843 STAFF
TOILET
1A-852
OFFICE
1A-851
STAFF
OFFICE
1A-850
TOILET
1A-829
READING
1A-831
CORRIDOR
C1A-848
FILE
CLERK
1A-776
VEST
1A-690
FOOD
STORAGE
1A-690A
MEN'S
TLT &
LOCKER
ROOM
1A-680
WOMEN'S
LOCKER
ROOM
1A-680C
WOMEN'S
TLT
1A-680D
ASST CH
1A-610E
SECY/TRING
1A-610
ASST CH
1A-610A
FIRE
CONT
1A-100
BMS
STOR
1A-102
ELEVATOR
P-16
ELEVATOR
P-15
SERV
1A-186
MECHANICAL
BAY-11
1A-755
ISOLATION
1A-813
MEDS
1A-814
ASSISTED
CARE
1A-812 CORRIDOR
C1A-810
AMBULANCE
VESTIBULE
C1A-811
STRETCHER
C1A-809
WHEELCHAIR
SHOWER
1A-808
RESUS
1A-807
RESUS
1A-805
EXAM 24
1A-795
EQUIP
STORAGE
1A-773
CORRIDOR
C1A-774
WORK
ROOM
1A-772
TLT
1A-768A
EXAM 3
1A-768
EXAM 4
1A-767
EXAM 5
1A-766
TRIAGE
1A-761
TRIAGE
1A-762
TRIAGE
1A-763
CORRIDOR
C1A-764ACORRIDOR
C1A-764
TRIAGE
WORK
1A-760
TRIAGE
1A-759
TRIAGE
1A-758
POLICE
1A-756
RECEPTION
1A-757
WALK-IN
VESTIBULE
1A-754
SOILED
1A-804
CARE
STATION
1A-799
CARE
STATION
1A-798
CARE
STATION
1A-797
PSYCH
EXAM 23
1A-796
ANTE
1A-795
ISOL
NEG
EXAM 22
1A-794
TOILET
ROOM
1A-793
TOILET
ROOM
1A-792
ISOL
POS
EXAM 21
1A-791
ANTE
1A-790A
CORRIDOR
C1A-720
CORRIDOR
C1A-721
CORRIDOR
C1A-719
CORRIDOR
C1A-718
ADMISSIONS
CLERK
1A-775
EXAM 7
1A-777
EXAM 8
1A-806
EXAM 9
1A-803
EXAM 10
1A-801
EXAM 11
1A-813
EXAM 12
1A-815
EXAM 13
1A-816
EXAM 14
1A-785
MEDICATION
ROOM
1A-731
EXAM 12
1A-732
EXAM 11
1A-733
EXAM 18
1A-790
PAT TLT
1A-786
EXAM 15
1A-811
EXAM 16
1A-810
EXAM 17
1A-809
ALCOVE
1A-734A
CLEAN
1A-734
INTERVIEW
1A-765
STAFF
TOILET
1A-764A
OFFICE
1A-200E ER/URGENT
WAITING
C1A-703
CORRIDOR
C1A-711
CORRIDOR
C1A-713
ELEVATOR
S-12
EQUIPMENT
1A-725
EXAM 1
1A-724
EXAM 2
1A-723
EXAM 3
1A-722
TRANSFER
COORDINATORS
1A-802
BED
CONTROL
1A-802A
CORRIDOR
1A-715STAFF
WORK
1A-730
CARE
STATION
1A-729
EXAM 4
1A-726
EXAM 5
1A-727
EXAM 6
1A-728EXAM 10
1A-735
EXAM 9
1A-736
EXAM 8
1A-737
CORRIDOR
C1A-712
CORRIDOR
1A-714
EXAM 7
1A-738
SOILED
1A-739
NOURISHMENT
1A-740A
EQUIPMENT
1A-740
ALC
1A-721
VISC
ESCORT
1A-800
CLERK
WORKROOM
1A-704
VIC
1A-705
OFFICE
1A-706
MEAN'S
TEST
1A-707
MEAN'S
TEST
1A-708
TOILET
1A-764B
BARIATRIC
TLT
1A-764C
TOILET
1A-755
TOILET
1A-754
BARIATRIC
TLT
1A-753
SECY
1A-190
CHIEF
1A-190A
OFFICE
1A-190B
ASST CH
1A-190C
ASST CH
1A-190D
6 7
6 7
6 7
6 7
6 7
6 7
F
TOILET
1A-829
ON CALL
1A-828
CORRIDOR
C1A-827
TOILET
1A-830
PET
1A-822
HOT LAB
1A-822A
CONTROL
1A-822G
SCAN ROOM
1A-822F
CORRIDOR
C1A-834
CORRIDOR
C1A-815
C L
E A
R M
IN
/2
C
LE
A R M
IN
6' -0
PHASE 2
PHASE 1A
PHASE 1B
S
S
S
C
LEA
R M
IN
6'-0"
C
LEA
R M
IN
6'-0"
A. WORK FOR THE PROJECT CONSISTS OF 3 PHASES
TO BE APPROVED BY VA HOUSTON COR, FOR THE
NECESSARY OPERATIONAL AND LOGISTICAL
ARRANGEMENTS TO ACCOMMODATE STAFF AND
VISITOR ACCESS DURING CONSTRUCTION.
B. CONTRACTOR TO VERIFY AND COORDINATE FINAL
AND APPROVED ICRA MEASURES WITH THE
HOUSTON VA MEDICAL CENTER'S ICRA
PERSONNEL, PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITY IN EACH PHASE. AREAS
OF WORK IN EACH PHASE MUST BE COMPLETED
AND OPERATIONAL PRIOR TO COMMENCING THE
NEXT PHASE.
C. AT THE START OF EACH PHASE, PROVIDE
INFECTION CONTROL MEASURES INCLUDING
TEMPORARY PARTITIONS, CONSTRUCTION ACCESS,
ANTE ROOMS, HEPA-FILTERED EXHAUST, AND USE
OF MOBILE CONTAINMENT CARTS PER ICRA
REQUIREMENTS TO PREVENT THE SPREAD OF
DUST AND CONTAMINANTS TO ADJACENT
OCCUPIED AREAS. MAINTAIN INFECTION CONTROL
MEASURES AT ALL TIMES THROUGH THE
COMPLETE LIFE OF PROJECT. REFER TO SHEETS
G-100 AND G-101 FOR STANDARD INFECTION
CONTROL MEASURES.
D. RENOVATION OF INTERIOR FINISHES NOT FULLY
WITHIN A ICRA BARRIER OF A PHASE MUST BE
PERFORMED OUTSIDE NORMAL OPERATING
HOURS, AND COORDINATED WITH THE VA COR.
THESE AREAS MUST BE READY FOR USE BY THE
START OF OPERATIONS THE NEXT DAY.
E. EXISTING WALLS AND DOORS TO SERVE AS PART
OF 1 HR ICRA BARRIER SYSTEM WHERE NOTED.
CONTRACTOR TO UPGRADE TO 1 HR WALLS AND 45
MIN FRAMES AND DOORS WITH CLOSER, IF
EXISTING WALL, DOOR, FRAME AND HARDWARE DO
NOT MEET REQUIRED ICRA BARRIER RATING.
REMOVE DOORS, FRAMES AND HARDWARE AFTER
CONSTRUCTION.
F. THE PHASES ARE AS FOLLOWS:
PHASE 1A (670 SF):
RENOVATE EXISTING ADMINISTRATION AREA FOR
STAFF LOCKER/BREAK AND UNISEX TOILET ROOM.
PHASE 1B (1,110 SF):
RENOVATE EXISTING ADMINISTRATIVE AREA FOR
OFFICES AND WORKSTATIONS.
PHASE 2 (2,383 SF):
RENOVATE EXISTING ADMINISTRATIVE AREA FOR
TREATMENT, FAST TRACK EXAM ROOMS AND
RELATED SUPPORT.
ICRA LEGEND
CONSTRUCTION ROUTE
TYPE 'A' ICRA BARRIER
AREA OF WORK
TEMPORARY 1 HOUR DOOR
ZIPPER BARRIER
AREA NOT IN SCOPE
EXISTING DOOR TO SERVE AS
PART OF ICRA BARRIER
EXISTING WALL TO SERVE AS
PART OF ICRA BARRIER
SEQUENCING NOTES
CONTRACTOR TO COORDINATE CONSTRUCTION ROUTE AND REQUIRED STAGING AREAS INSIDE OF THE BUILDING OR PARKING LOT WITH COR AND
ARCHITECT BEFORE BEGINNING OF CONSTRUCTION.
THE PROJECT SHALL CONSIST OF 3 PHASES. EACH PHASE MUST BE COMPLETED AND READY FOR VA OCCUPANCY AND OPERATION PRIOR TO BEGINNING THE NEXT PHASE. ALL PHASES MUST BE REVIEWED AND COORDINATED WITH THE COR PRIOR TO BEGINNING WORK.
THE SEQUENCED PHASES ARE AS FOLLOWS:
PHASE 1A (670 SF):
INSTALL SITE STAGING AREAS. INSTALLATION OF OUTSIDE ICRA BARRIER AND FINAL CONNECTIONS SHALL OCCUR OUTSIDE NORMAL OPERATING HOURS.
REMOVE SPACES AS INDICATED. REMOVE OFFICES 1A-190, 1A190A, 1A-190B, 1A-190C, AND 1A-190D. RENOVATE EXISTING ADMINISTRATION AREA FOR STAFF
LOCKER/BREAK AND UNISEX TOILET ROOM.
PHASE 1B (1,110 SF):
INSTALL SITE STAGING AREAS. INSTALLATION OF OUTSIDE ICRA BARRIER AND FINAL CONNECTIONS SHALL OCCUR OUTSIDE NORMAL OPERATING HOURS.
REMOVE SPACES AS INDICATED. REMOVE WAITING 1A-833, LINEN 1A-835, PAT EFFECTS 1A-836, WAITING 1A-833, SOILED UTILITY 1A-838, STAFF LOUNGE 1A-839, CLEAN STORAGE 1A-841 AND CORRIDOR C1A-711. REMOVE EXISTING TOILET 1A-768. RENOVATE EXISTING ADMINISTRATIVE AREA FOR OFFICES AND WORKSTATIONS. CHANGE DOOR HARDWARE OF PATIENT TOILET 1A-832 TO CREATE STAFF TOILET.
PHASE 2 (2,383 SF):
OCCUPANTS MUST RELOCATE FROM CURRENT FAST TRACK AREA TO THE NEW ADMIN SUITE COMPLETED IN PHASE 1B BEFORE DEMOLITION IN PHASE 2 BEGINS. INSTALL SITE STAGING AREAS. INSTALLATION OF OUTSIDE ICRA BARRIER AND FINAL CONNECTIONS SHALL OCCUR OUTSIDE NORMAL OPERATING HOURS. REMOVE SPACE AS INDICATED. REMOVE BED CONTROL 1A-710 AND 1A-711. REMOVE CONFERENCE ROOM 1A-746. REMOVE COPY ROOM 1A-747.
REMOVE EXISTING TOILET 1A-745. REMOVE STORAGE ROOM 1A-744 AND 1A-751A. REMOVE OFFICES 1A-742, 1A-743, 1A-748, 1A-749, 1A-751. RENOVATE EXISTING ADMINISTRATIVE AREA FOR TREATMENT, FAST TRACK EXAM ROOMS AND RELATED SUPPORT.
RENOVATION OF INTERIOR FINISHES NOT FULLY WITHIN AN ICRA BARRIER OF A PHASE MUST BE PERFORMED OUTSIDE NORMAL OPERATING HOURS AND COORDINATED WITH THE VA COR. THESE CORRIDORS MUST BE READY FOR OPERATIONS BY THE START OF OPERATIONS THE NEXT DAY.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:5
:1
A
M C
U s e rs
\a p u lle n
\D o c u m e n ts
\A
V A
H o u s to n E
R F a s t
T ra c k -T
X -2
-2 a p u lle n V
D X
T
.r v t
G-102
FIRST FLOOR PHASING AND ICRA PLAN
4 6ANP
RENOVATE ER FAST TRACK
SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 AUGUST 15, 2022
100% CONSTRUCTION DOCUMENTS
580-20-11820-252
HED
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1" = 10'-0"
FIRST FLOOR PHASING AND ICRA PLAN
1 TEMPORARY 1 HR ICRA BARRIER TO THE
UNDERSIDE OF DECK. CONTRACTOR TO
COORDINATE FINAL ICRA MEASURES WITH
HOUSTON VA PERSONNEL, AND MAINTAIN MIN.
REQUIRED CLEARANCE IN CORRIDOR.
2 PROVIDE SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER TO THE UNDERSIDE OF
CEILING WITH ZIPPER ENTRY.
3 EXISTING WALL, DESIGNATED AS NON-RATED
CONSTRUCTION IN PROVIDED LIFE SAFETY
PLAN, TO BE USED AS ICRA BARRIER.
4 EXISTING DOOR, DESIGNATED AS NON-RATED
CONSTRUCTION IN PROVIDED LIFE SAFETY
PLAN, TO SERVE AS PART OF ICRA BARRIER
SYSTEM.
5 PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT.
6 USE A PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM.
7 THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT
AREAS. USE OF THE NEGATIVE AIR PRESSURE
SYSTEM WITHIN THE ENCLOSURE TO REMOVE
DUST SHALL PASS AIR THROUGH AN
INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800
CUBIC FEET PER MINUTE (FT3/MIN), OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY VAMC. IF EXHAUST INTO A ROOM,
A PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST.
NORTH
0 4 8 16
AT
T S
XETE FO
SA
C
UL
LEN S. KEEN
2 6 112
R
EG
IS
TE
RED ARCHITEC
T
FD
w c wc wc
E
D C C
AWAY FROM DIRECT
SUNLIGHT
FOR USE IN
AC ENVIRONMENT
ONLY
T-5
M7250
R7000 M3150 M3150 R7000
M
M
F0535 F0535
C1A-101
VEST
C
RASH C
ART
STRETC
HER
TRASHCONDUMENTS
COUNTER CABINET
COUNTERPASTRY
CJ
FFC
CJ FFC
FFC
CRCR
FFC
CJ
CJCJCJCJCJCJCJ
FFC
CJ
CJ
CJ
FFC
CJ
CJ
CJ
CJ
CJ
CJ
FFC
CJFFC
FFC
CJ
CJ
CJ
CJ
FFC FFC
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ CJ CJ CJ CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
FFC
CJ
FFC
EXAM TABLE
EXAM TABLE
EXAM TABLE
EXAM TABLE
ADMIN ASST
MEDICATION RM.
CONS
1A-276A
DIETICIAN
SECY.
TMT/WAIST
MED & TMT
PROCPROC
EKG
COPY RM.
CONS
FD
FD
FD FD
BELOW
FD
BELOW
BELOWBELOW
FD
FD
FDFD
FD
FD FD
FDFD
FD
FD
FDFD
FD FD
FDFDFD
FD FD FD
FD
FD FD
FD
FD
4" CONC PAD
FD FD FD
FD
FD FD
FD
FDFD FD
FD FD
FD
FD FD
FDFDFD
FD
FD
FD
FD
FDFD
FD FD
FD FDFD
FD
FD
FDFDFD
FD FD FD
FD
FD
FD
FD
FD
FD
FDFD
FD
FD
FD
4" CONC PAD
4" CONC PAD
T37(3)
DISPLAY CAB
CSWK41
T22E
FIAO4(VV)
T6(4)
VL3-24
GMA151
TOP 10B
FIN ENDS
VL31-36(3)(L)
VL4-36(3)(L)
TOP 10B
FIA01 (VV)
FTG38
TC (12)
FIN END
4" RAD.
CSWH4
GPB
4" CONC PAD
TC14
TB(3)
TB(8)
CSWK 51
CABINET
ROLLING
CART
T7B(2)
TD(17)
TD(6)
CSWK 51
CSWK 2
SIM FIN END
T6B(2)
T35 (2)
4" CONC PAD
CSWK 52
FHVEC
VL4-30 T5C(2)
T6AT6B (2)
T6A
T18C3
CSWK 52
4" CONC. PAD
4" CONC PAD
GP17
TB(3)
TB(22)
T7 T-10
4" CONC PAD
TD(22)TD(22)
1 1
TV
PAC
MAN
TV FOR
GAMES
TV FOR
MOVIES
REF
PRINTER
COPIER
GP35
GP35
GP35
GP26
W
AL
L
UPS FEDX
S
S
S
S
S
S
S
S
S S S
S
S
S
S
S S S
S
S
S
S
S
S
S
S
S
S S
S
SS
S
S
S S
SS
SS
S
S
S
SS
S S
SS
S
S
S
S S
S
SS
S S
S S
S
S
S
SS
S
SS
S S
S S
S
S S
S
SS
S S
S S
S
S S
SS
S S S
S
S
S
S
S
S
S
S
S
SS S S SS
SS
SS
SS
EXISTING AMBULATORY HEALTH CARE
OCCUPANCY
EXISTING BUSINESS OCCUPANCY
EXISTING SMOKE COMPARTMENT
EXISTING SMOKE COMPARTMENT A
EXISTING SMOKE COMPARTMENT B
EXISTING SMOKE COMPARTMENT C
EXISTING SMOKE COMPARTMENT D
EXISTING SMOKE COMPARTMENT H
EXISTING SMOKE COMPARTMENT L
EXISTING SMOKE COMPARTMENT M
AREAS OF WORK
EXISTING SMOKE
COMPARTMENT M
11933 SF
EXISTING SMOKE
COMPARTMENT H
21025 SF
EXISTING SMOKE
COMPARTMENT L
7687 SF SF
EXISTING
AMBULATORY
HEALTH CARE
OCCUPANCY
24238 SF
EXISTING
BUSINESS
OCCUPANCY
135445 SF
EXISTING SMOKE
COMPARTMENT
13837 SF
EXISTING SMOKE
COMPARTMENT D
22885 SF
EXISTING SMOKE
COMPARTMENT C
21859 SF
EXISTING SMOKE
COMPARTMENT B
23541 SF
EXISTING SMOKE
COMPARTMENT A
21837 SF
ADMINISTRATIVE
SUITE
RENOVATION
EXAM ROOM
RENOVATION
BREAK ROOM
RENOVATION
S
S
S
S
LS102
2 HOUR SMOKE SEPARATION
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
1 HOUR SMOKE RATED
SMOKE RATED
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
XXX
XXX
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:5
:2
A
M C
U s e rs
\a p u lle n
\D o c u m e n ts
\A
V A
H o u s to n E
R F a s t
T ra c k -T
X -2
-2 a p u lle n V
D X
T
.r v t
LS101
OVERALL FIRST FLOOR LIFE SAFETY
PLAN
5 6ANP
RENOVATE ER FAST TRACK
SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 AUGUST 15, 2022
100% CONSTRUCTION DOCUMENTS
580-20-11820-252
HED
COMPARTMENT LEGEND
Scale: 1/32" = 1'-0"
OVERALL FIRST FLOOR LIFE SAFETY PLAN N
O
R
TH
0 4 8 16
SEE SHEET LS102 FOR ENLARGED LIFE SAFETY PLAN
LIFE SAFETY LEGEND
AT
T S
XETE FO
SA
C
UL
LEN S. KEEN
2 6 112
R
EG
IS
TE
RED ARCHITEC
T
CJ
CJCJCJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
FD
FDFD
FD
FD FD FD
FD
FD
FD
FD
FD
FDFD
4" CONC PAD
GP17
TB(3)
TB(22)
Z1K02
Z1K03
Z 1G
UPS FEDX
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S S
S
S
SS
S
S
S
S
S
S
SS
S S
S
S
S S
S
SS
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S S S S
S
S
S
S S
S
S SS S SS S
SS
SS
SS
20.5
E
20 19 18 17 16 15
E.5
E.8
F.5
F.8
G
G.3
H
I
J
15.818.8
CHIEF
OFFICE
1A-314
OD EXAM
1C-312
STAFF
OFFICE
1A-847
STAFF
OFFICE
1A-846
REPROCESS
LAB
ROOM
1A-310
PAT TLT
1A-308
OFFICE
1A-306
WORK
ROOM
1A-843
COPY
WORK
ROOM
1A-848
SEC
OFFICE
1C-316B
AO
OFFICE
1A-758
STAFF
OFFICE
1A-849
CORRIDOR
C1A-843STAFF
TOILET
1A-852
OFFICE
1A-851
STAFF
OFFICE
1A-850TOILET
1A-829
ON CALL
1A-828
READING
1A-831
CORRIDOR
C1A-848
FILE
CLERK
1A-776
VEST
1A-690
FOOD
STORAGE
1A-690A
MEN'S
TLT &
LOCKER
ROOM
1A-680
WOMEN'S
LOCKER
ROOM
1A-680C
WOMEN'S
TLT
1A-680D
ASST CH
1A-610E
SECY/TRING
1A-610
ASST CH
1A-610A
FIRE
CONT
1A-100
BMS
STOR
1A-102
ELEVATOR
P-16
ELEVATOR
P-15
SERV
1A-186
MECHANICAL
BAY-11
1A-755
ISOLATION
1A-813
MEDS
1A-814
ASSISTED
CARE
1A-812
CORRIDOR
C1A-810
AMBULANCE
VESTIBULE
C1A-811
STRETCHER
C1A-809
WHEELCHAIR
SHOWER
1A-808
RESUS
1A-807
RESUS
1A-805
SCAN
ROOM
1A-822F
EXAM 24
1A-795
EQUIP
STORAGE
1A-773
CORRIDOR
C1A-774
WORK
ROOM
1A-772
TLT
1A-768A
EXAM 3
1A-768
EXAM 4
1A-767
EXAM 5
1A-766
TRIAGE
1A-761
TRIAGE
1A-762
TRIAGE
1A-763
CORRIDOR
C1A-764ACORRIDOR
C1A-764
TRIAGE
WORK
1A-760
TRIAGE
1A-759
TRIAGE
1A-758
POLICE
1A-756
RECEPTION
1A-757
WALK-IN
VESTIBULE
1A-754
SOILED
1A-804
CARE
STATION
1A-799
CARE
STATION
1A-798
CARE
STATION
1A-797
PSYCH
EXAM 23
1A-796
ANTE
1A-795
ISOL
NEG
EXAM 22
1A-794
TOILET
ROOM
1A-793
TOILET
ROOM
1A-792
ISOL
POS
EXAM 21
1A-791
ANTE
1A-790A
CORRIDOR
C1A-720
CORRIDOR
C1A-721
CORRIDOR
C1A-719
CORRIDOR
C1A-718
ADMISSIONS
CLERK
1A-775
EXAM 7
1A-777
EXAM 8
1A-806
EXAM 9
1A-803
EXAM 10
1A-801
EXAM 11
1A-813
EXAM 12
1A-815
EXAM 13
1A-816
EXAM 14
1A-785
MEDICATION
ROOM
1A-731
EXAM 12
1A-732
EXAM 11
1A-733
EXAM 18
1A-790
PAT TLT
1A-786
EXAM 15
1A-811
EXAM 16
1A-810
EXAM 17
1A-809
ALCOVE
1A-734A
CLEAN
1A-734
INTERVIEW
1A-765
STAFF
TOILET
1A-764A
OFFICE
1A-200E ER/URGENT
WAITING
C1A-703
CORRIDOR
C1A-711
CORRIDOR
C1A-713
ELEVATOR
S-12
EQUIPMENT
1A-725
EXAM 1
1A-724
EXAM 2
1A-723
EXAM 3
1A-722
TRANSFER
COORDINATORS
1A-802
BED
CONTROL
1A-802A
CORRIDOR
1A-715STAFF
WORK
1A-730
CARE
STATION
1A-729
EXAM 4
1A-726
EXAM 5
1A-727
EXAM 6
1A-728EXAM 10
1A-735
EXAM 9
1A-736
EXAM 8
1A-737
CORRIDOR
C1A-712
CORRIDOR
1A-714
EXAM 7
1A-738
SOILED
1A-739
NOURSHMENT
1A-740A
EQUIPMENT
1A-740
ALC
1A-721
VISC
ESCORT
1A-800
CLERK
WORKROOM
1A-704
VIC
1A-705
OFFICE
1A-706
MEAN'S
TEST
1A-707
MEAN'S
TEST
1A-708
TOILET
1A-764B
BARIATRIC
TLT
1A-764C
TOILET
1A-755
TOILET
1A-754
BARIATRIC
TLT
1A-753
506 SF
1A-190
BREAK ROOM
STAFF
TOILET
1A-190A
283 SF
1A-744
CONFERENCE60 SF
1A-743
STAFF TOILET
161 SF
1A-742
SOCIAL
WORKER
556 SF
C1A-741
CORRIDOR
221 SF
1A-753
TREATMENT
125 SF
1A-752
CARE STATION
117 SF
1A-751
EXAM 1
117 SF
1A-750
EXAM 2
117 SF
1A-749
EXAM 3
117 SF
1A-748
EXAM 4
117 SF
1A-747
EXAM 5
146 SF
1A-746
EXAM 6
206 SF
1A-841
SHARED OFFICE
89 SF
1A-840
A.O. OFFICE
113 SF
1A-838
OFFICE
103 SF
1A-837
OFFICE
38 SF
1A-839C
WORK 3
40 SF
1A-839B
WORK 2
40 SF
1A-839A
WORK 1
C R
CR
TRAVEL DISTANCE
126'-7"
F
CORRIDOR
C1A-827
TOILET
1A-830
STAFF
TOILET
1A-832
PET
1A-822
CONTROL
1A-822G
C R
FEC
FEC
FEC
FEC
FEC
C R
PB
PB
TRAVEL DISTANCE
223' - 10"
VESTIBULE
C1A-101
VESTIBULE
C1A-100
FEC
FEC
STAFF
TOILET
1A-190B
RESIDENTS
1C-316C
DIAGNOSTIC
ROOM
1A-574A
OFFICE
1C-322
EXAM
1C-339
EXAM
1C-340
EXAM
1C-342
TRAVEL DISTANCE: 215'-3"
TR
AV
EL
D
IS
TAN
C E:
9' -1
TR
AV
EL D
IS
TAN
C E
278'-11"
TRAVEL DISTANCE
275'-6"
FEC
91'-1 1/2"
51'-2"
CAPACITYCLR
EXIT
68" 340
CAPACITYCLR
EXIT
55" 275
CAPACITYCLR
EXIT
55" 275
CR
CAPACITYCLR
EXIT
55" 275
C O M
M O N
PA
TH
O
F TR
AV
EL
71'-0"
TR
AV
EL D
IS
TA
N C E
298'-0"
S
S
S
S
2 HOUR SMOKE SEPARATION
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
1 HOUR SMOKE RATED
SMOKE RATED
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
CR
XXX
XXX
FEC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
PB
EGRESS IDENTIFICATION
FIRE EXTINGUISHER CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS UNLOCKED IN
DIRECTION OF EGRESS
PUSH BUTTON
EXISTING CEILING MOUNTED EXIT SIGN
NEW CEILING MOUNTED EXIT SIGN
A. SEE SHEETS A-001 FOR SYMBOLS AND
ABBREVIATIONS.
B. REFER TO PLUMBING DRAWINGS FOR INFORMATION
CONCERNING PLUMBING FIXTURES AND PIPING
SYSTEM(S).
C. REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
D. REFER TO ELECTRICAL DRAWINGS FOR INFORMATION
CONCERNING POWER, LIGHTING AND
COMMUNICATION SYSTEM(S).
E. REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
F. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
G. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING
NECESSARY FOR ALL OPENINGS AND SUPPLEMENTAL
FRAMING ABOVE PARTITIONS.
H. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN
STRICT ACCORDANCE WITH TESTED ASSEMBLIES
INDICATED.
I. EXTEND FIRE RATED PARTITIONS, BARRIERS, AND
OTHER SEPARATIONS TO BOTTOM OF ROOF/FLOOR
DECK ABOVE (OR AS DIRECTED BY UL ASSEMBLY)
AND TO EXTERIOR WALL. SEAL JOINT BETWEEN
EDGES OF PARTITION WITH FIRE RATED SEALANT
AND/OR INTUMESCENT ASSEMBLY.
J. ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR LOCATION,
TYPE OF CONSTRUCTION, PENETRATING ITEM AND
RATING REQUIRED.
K. ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED AND
THE FIRE/SMOKE RATING REQUIRED.
L. ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE UL-
LISTED FOR INSTALLATION IN THE ASSEMBLY OR
SHALL BE INSTALLED SUCH THAT THE FIRE-RATING IS
NOT COMPROMISED.
M. SMOKE RESISTANT CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF ALL APPLICABLE CODES. AREA
SHALL BE SEPARATED FROM THE REMAINDER OF THE
BUILDING BE CONSTRUCTION CAPABLE OF RESISTING
THE PASSAGE OF SMOKE. THE PARTITIONS SHALL
EXTEND FROM THE FLOOR TO THE UNDERSIDE OF
THE FLOOR OR ROOF ASSEMBLY ABOVE. DOORS
SHALL BE SELF OR AUTOMATIC CLOSING. DOORS
SHALL NOT HAVE AIR TRANSFER OPENINGS AND
SHALL NOT BE UNDERCUT IN EXCESS OF CLEARANCE
PERMITTED WITH ACCORDANCE TO NFPA 80.
N. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE
LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE
BUILDING. STORAGE OF ANY MATERIAL IS TO BE IN
COMPLIANCE WITH ALL APPLICABLE CODES AND
AUTHORITIES HAVING JURISDICTION.
EGRESS WIDTH
(per NFPA 21.2.3)
COMMON PATH OF
TRAVEL
(per NFPA 39.2.5.3.1)
TRAVEL DISTANCE
(per NFPA 39.2.6.2, 39.2.6.3)
DEAD-END CORRIDOR
(per NFPA 39.2.5.2)
EXIT DOORS = 55"/(0.20) = 275 PPL
EXIT DOORS = 55"/(0.20) = 275 PPL
EXIT DOORS = 68"/(0.20) = 340 PPL
100'-0" MAXIMUM
200'-0" MAXIMUM DISTANCE NON-SPRINKLERED
300'-0" MAXIMUM DISTANCE SPRINKLERED
50'-0" MAXIMUM
OCCUP. 1 (PHASE 1A) = 670 GSF/150 = 5 PPL
OCCUP. 2 (PHASE 1B) = 1,100 GSF/150 = 8 PPL
OCCUP. 3 (PHASE 2) = 2,383 GSF/150 = 16 PPL
OCCUP. 4 (EXISTING ED) = 21,855 GSF/150 = 146 PPL
TOTAL OCCUPANCY = 175 PEOPLE
GROSS FIRST FLOOR
AREA
303,122 SF
GROSS EXISTING
SMOKE
COMPARTMENT AND
AREA OF WORK
32,134 SF
OCCUPANT LOAD
(per NFPA 7.3.1.2)
REQUIRED # OF EXITS
(per NFPA 21.2.4)
2 EXITS FROM EVERY PART OF THE LEVEL
REQUIRED DISTANCE
BETWEEN EXITS
51'-2" MINIMUM
FLOOR
AGGREGATE FLOOR AREAS (per TABLE 503):
EXISTING NEW TOTAL
FIRST N/A
AREA TOTAL = 303,122 SF
AREA ALLOWED = N/A, EXISTING
4,153 SF
EGRESS INFORMATION
BUILDING HEIGHT = 132'-0"
ALLOWABLE HEIGHT = N/A, EXISTING"
AREA AND HEIGHT REQUIREMENTS:
4,153 SF SF
PHASE
AGGREGATE FLOOR AREAS BY PHASE
EXISTING TOTAL
1A
1B 4,153 SF
670 SF
1,100 SF
2,383 SF
4,153 SF
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:5
:2
A
M C
U s e rs
\a p u lle n
\D o c u m e n ts
\A
V A
H o u s to n E
R F a s t
T ra c k -T
X -2
-2 a p u lle n V
D X
T
.r v t
LS102
FIRST FLOOR LIFE SAFETY PLAN -
PHASE 1A, 1B, AND 2
6 6ANP
RENOVATE ER FAST TRACK
SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030 AUGUST 15, 2022
100% CONSTRUCTION DOCUMENTS
580-20-11820-252
HED
PROPOSED USE:
OWNED BY: PRIVATE
LOCAL GOVERNMENT
FEDERAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: CITY
COUNTY
VETERAN AFFAIRS
APPLICABLE CODES:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
VA VHA Directive 1061, February 2021 VA Fire Protection Design Manual, 2021 VA Plumbing Design Manual, May 2021 VA HVAC Design Manual, March 2022 VA Architectural Design Manual, August 2014 VA Physical Security and Resiliency Design Manual, 2022 VA Lighting Design Manual, December 2022 VA Electrical Design Manual, December 2019 VA Interior Design Manual, November 2020 VA Infrastructure Standard for Telecommunications Spaces Design Guide, July 2021 PG 18-13 VA Barrier Free Design Standard, February 2022 PG 18-4 VA Standard Details and Specifications NFPA 99, Health Care Facilities Code, 2021 NFPA 90A, Installation of Air Conditioning and Ventilating Systems, 2021 NFPA 72, National Fire Alarm Code, 2022 NFPA 13, Installation of Sprinkler Systems, 2022
HEALTHCARE / ADMIN
RENOVATE ER FAST TRACK SPACE
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BOULEVARD
HOUSTON, TX 77030
MICHAEL E. DEBAKEY VETERANS
AFFAIRS MEDICAL CENTER (MEDVAMC)
RENOVATION
NFPA 101: 6.1.5 HEALTHCARE
NFPA 101: 6.1.11 BUSINESS
International Building Code IBC 2021
International Plumbing Code, 2021
International Mechanical Code, 2021 International Fire Code, 2021 NFPA 70, National Electrical Code (NEC), 2020
American with Disabilities Act (ADA) Standards, 2010 NFPA 101, Life Safety Code, 2021
CODE INFORMATION
NORTH
0 4 8 16
Scale: 3/32" = 1'-0"
ENLARGED FIRST FLOOR LIFE SAFETY PLAN - PHASE 1A, 1B, AND 2
LIFE SAFETY LEGEND
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
CODE INFORMATION
1 ASSUMED EXISTING EXIT SIGN
2 NEW EXIT SIGN
AT
T S
XETE FO
SA
C
UL
LEN S. KEEN
2 6 112
R
EG
IS
TE
RED ARCHITEC
T
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE
ROOF PITCH SYMBOLDOOR NUMBERTYPICAL KEYNOTE
CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
# BID ALTERNATE
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR
RECESSED OR SEMI-RECESSED PRODUCT(S) AND IS RESPONSIBLE FOR ACCOMMODATING AND
COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE
DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR CONSTRUCTING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL FURNISH ALL
NECESSARY PERMITS.
11. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
12. PROVIDE METAL BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK. PROVIDE TWO STRIPS OF 16 GAUGE STEEL SHEET, 8" WIDE AT
WALL CABINET.
13. COORDINATE THE WORK OF TRADES PRIOR TO THE START OF CONSTRUCTION.
14. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK FOR EACH PHASE.
15. NOTIFY VA COR OF DISCREPANCIES IN THE DRAWINGS AND SPECS PRIOR TO THE START OF WORK.
16. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
17. PROVIDE 16 GAUGE X 8" WIDE CONTINUOUS SHEET METAL BLOCKING AT ALL 40" AFF AT ALL NEW ROOMS.
18. INSTALL ALL WORK IN ACCORDANCE WITH CURRENT APPLICABLE CODES AND PUBLISHED STANDARDS.
19. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE…