PRE-BID RFIs - COMPLETE.pdf

PDF 126 KB Posted

Attached to
Z1DA--CON | 586-20-110 | 586-23-1-1579-0001 | Exterior Weatherproofing Main Hospital
Solicitation number
36C25623R0004
Issued by

About this file

This document contains pre-bid requests for information (RFIs) related to solicitation number 36C25623R0004 for exterior weatherproofing services at the Jackson VA Medical Center. The RFI responses clarify that sealing is required around all windows and glazing, including mullions, and that inaccessible windows above ground level must also be cleaned and caulked. No drawings or additional specifications are anticipated. The opportunity does not involve replacement of any metal roofing.

View the file

Other files

File Type Posted
Project Addendum 2 page.pdf PDF
AMENDMENT 0002 - 36C25623R0004 0002.docx DOCX document
SITE VISIT SIGN IN SHEET.pdf PDF
AMENDMENT 0001 - 36C25623R0004 0001.docx DOCX document
WAGE DETERMINATION MS20220051 02-25-2022.txt TXT text file
Past and Present Performance Questionnaire.docx DOCX document
EXHIBIT B CONTRACTOR EVALUATION FORM.docx DOCX document
SOLICITATION 36C25623R0004_1.docx DOCX document
Binder1 Specifications.pdf PDF
Scope of work 586-20-110.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT # 586-20-110

Exterior Weatherproofing Jackson, MS

DATE: January 23, 2023

ITEM 1 – Bidding Requests For Information

# Reference Question Answer

1. Is sealant or work required at window mullions, glazing etc.? If no, will this be confirmed by an addendum to the specifications?

Yes, sealing on all and glazing on broken or damaged windows, per Scope of Work.

2. A significant portion of the windows are inaccessible from the ground or from lifts on the ground. There are no anchorages for use of swinging scaffolds built into the existing structure. Would you consider limiting the cleaning and caulking of the windows to those accessible from manlifts located on the ground?

No.

3. Are there going to be any drawings or other specifications released on the project?

None anticipated at this time.

4. Please clarify the requirement for the replacement of the metal roof.

No metal roof replacement on this project.