Updated RFI Register 12 July 2022.docx

DOCX document 20 KB Posted

Attached to
Z1DZ--Project# 502-20-113 Building 9 - 3rd Floor Anti-Ligature Renovations - Construction
Solicitation number
36C25622R0073
Issued by

About this file

This document contains questions and answers regarding Solicitation Number 36C25622R0073 for the Z1DZ--Project# 502-20-113 Building 9 - 3rd Floor Anti-Ligature Renovations construction project for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The questions and answers provide clarification on security and access control systems to use, window and door specifications, guard requirements, and allowance details. Open Options software is to be used for access control, stainless steel patient stations with security bolts are recommended, existing hardware is to be reused where possible including products from The Door Switch Company, interior windows are to be re-glazed only, and the allowance on Sheet P-101 has been removed.

View the file

Other files

File Type Posted
36C25622R0073 AL 9500.pdf PDF
36C25622R0073 Updated RFI Register 14 July 2022.docx DOCX document
36C25622R0073 0005.docx DOCX document
P-101 v2.pdf PDF
36C25622R0073 0004.docx DOCX document
36C25622R0073 0003.docx DOCX document
RFI Register 28 June 2022 v2.docx DOCX document
36C25622R0073 0002.docx DOCX document
Site Visit Sign in Sheet.pdf PDF
36C25622R0073 0001.docx DOCX document
36C25622R0073 EXHIBIT C.docx DOCX document
36C25622R0073 EXHIBIT E.docx DOCX document
36C25622R0073 EXHIBIT A.docx DOCX document
36C25622R0073 Brand Name JA 502-20-113_Redacted v2.pdf PDF
36C25622R0073 RFP.docx DOCX document
36C25622R0073 Drawings Volume 1 .pdf PDF
36C25622R0073 WD LA 20220051 Mod 2 02252022 .docx DOCX document
36C25622R0073 Drawings Volume 2 .pdf PDF
36C25622R0073 Specifications Rev 2 .pdf PDF
36C25622R0073 Revised SOW 04012022 .docx DOCX document
36C25622R0073 EXHIBIT F.docx DOCX document
36C25622R0073 Revised ICRA .pdf PDF
36C25622R0073 EXHIBIT D.docx DOCX document
36C25622R0073 EXHIBIT B.docx DOCX document
36C25622R0073 COVID-19 Safety Protocols for Federal Contractors rev2.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

502-20-113 RFI Register

Questions
Answers

1. Reference Brand Name J&A:

Our Company is currently working at a different location at VA Pineville. On this particular project, we were told to use Open Options Access Control as opposed to Lenel. It was stated that the Campus is migrating from Lenel. Which product should be used for this project? The old Lenel platform? Or the newer Open Options platform?

Open Options software is to be used

2. Reference SECTION 275223, Subsection 2.2, Number 4 - Patient Stations:

Current design has the patient station listed as high-impact ABS Plastic. Aiphone also offers a stainless-steel patient station option. (NI-BA and NI-JA) As we are moving to a more secure environment, would not the stainless-steel options with security bolts be the more secure option for this particular renovation?

Stainless-steel with security bolts would be the recommended approach.

3. I am trying to clarify the top of the door alarm required for this project. – We provided a top of the door alarm in 2021. However, this solicitation is calling out for our competitors product, adding to our system. Or does your facility have a different system in place?
Existing hardware will be reused where possible. Any damaged/non-functional hardware is to be replaced to match current system which was supplied by The Door Switch company. The supplier’s (The Door Switch company), contact information is: pat@thedoorswitch.com, 314-298-3433. The installer’s (Piedmont) contact information is: Michael Deese; mdeese@piedmontds.com, 704-609-9543. Submittals from installation of products are available upon request.
4. In regards to the requirement to provide unarmed guards. Would it be acceptable to instead, secure the constructing entrance outside Sally Port on the elevator side with secured double doors?
Unarmed guards are not applicable to this requirement. We have the locking sally port with the visual coverage from the nurse’s station, that should meet any requirements. We also have a phone in the elevator lobby and between the doors in the sally port
5. Can you verify if the window type W-4 is to be replaced with a new window, or will it just need to be re-glazed? On the window schedule on elevation, the new Hollow Metal on a couple of details and plans has a note #13 stating to reglaze. Can you please clarify as to whether these windows are to be reglazed or replaced ?
This is an interior window type that is existing and is to be re-glazed. only exterior windows and the glazing around the sallyport is new.
6. We have gotten word from a supplier that the Mark #D window may have to be changed to an aluminum storefront curtain wall to get the window that is requested. Is that acceptable?
This is acceptable as long as the frame color, material, and size profile match the other windows on the project.
7. Sheet P-101 note: Allowance Allowed for unforeseen conditions during demolition phase: $40,000, how should the allowance handled, the pricing sheet does not have a line, if in the base bid how is the allowance tracked
The allowance annotated in Sheet P-101 has been removed. Please see the revised Sheet P-101.