02.14.2022 ADDENDUM - AE101 - FLOOR PLAN - NEW CONSTRUCTION.pdf
PDF 489 KB Posted
- Attached to
- 598-19-125 Relocate Medical Media
- Solicitation number
- 36C25622R0041
About this file
This document package includes construction documents and a federal contract opportunity notice for renovations to create a new Medical Media space. The project involves renovating approximately 2,800 square feet of unfinished storage space on the seventh floor of Building E at the JLM Memorial Veterans Hospital to accommodate relocated Medical Media services. Work under the firm-fixed price contract includes architectural, mechanical, electrical, plumbing, fire protection, and interior finishes construction and supervision. The period of performance is 120 calendar days from notice to proceed. The solicitation was released by the Department of Veterans Affairs Veterans Health Administration VISN 16. Required construction work is detailed on the provided plans, including demolition of existing partitions and construction of new walls, doors, windows and finishes to create the planned rooms and spaces.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIR AR-GEMS
7E-129
INSTR DVLPMNT
7E-127
GRECC ED SPEC
7E-125
PHYSICIAN
7E-123
GERIATRIC
CONSLT
7E-121
GRECC
PROGRAM
7E-120
A/V ROOM
7E-105
EDUCATION/TRAINING
7E-101
CORRIDOR
C7-37
JANITOR
7E-107
ELECTRIC
7E-108
STAIR
S-74
CONFERENCE
ROOM
7E-119
ART OFFICE
7E-118B
ART WORK AREA
7E-118
SPRAY ROOM
7E-118A
RECEPTION
/WAITING
7E-116
PHOTO/VIDEO
WORK STATION
7E-116A
STORAGE
7E-114A
COMMUNAL
WORK AREA
7E-114
VIDEO ROOM
7E-112
PHOTO ROOM
7E-111
STORAGE
7E-111A
7E-111B
TOILET/
CHANGING
ROOM
WOMENS RR
7E-110
CORRIDOR
C7-35
TELEPHONE
7E-102 MENS RR
7E-136
SIGNAGE WORK
AREA
7E-115
STORAGE
7E-103
KITCHEN
7E-104
CORRIDOR
C7-36
STORAGE
7E-117
RAISED PLATFORM
18 191715 21
H
G
J
L
E14bE14b
L_4
J_4
J_4b J_4b
J_4
111B
1-
111A
111-2
114-1
114A
3 1/4" LW
Concrete on 3"
Metal Deck
8' - 3 1/4"
F.
V.
3'
1/
4"
8' - 6"
/4 " F
.V
28' - 8 3/8" 17' - 5" 28' - 9 1/2"
9'
3/
4"
/4
W2 W2
W
W
N1
N2 N2
N2
N2
D4
AE20
B4
AE201
F4
AE201
N3
N4
N3
W
W
118A
N5N6 N5
N7
N7
AE401
D1
B4
AE40
L_4L_4
J_4
N8
N9
AE501
B2
AE501
B2
AE501
B2
AL
IG
N
AL
IG
N
ALIGN
N10
N10
N11
N11
N11
N11
N12
D4
AE401
D4
AE401
K
E14bE14b
B7
AE401
DEDUCT ALTERNATE #3
DEDUCT ALT
ERNATE #3
DEDUCT
ALTERNATE #3
DEDUCT ALTERNATE #1 DEDUCT
ALTERNATE #2
DEDUCT
ALTERNATE #2
114-2
NEW UNRATED PARTITION
NEW / EXISTING 1 HOUR BARRIER
EXISTING PARTITION TO BE REMOVED
EXISTING PARTITION
INDICATES PROJECT BOUNDARY
NEW / EXISTING 2 HOUR BARRIER
INDICATES ICRA BARRIER
U.S. Department of Veterans Affairs
CONSULTANTS ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
Drawing Title
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
Revisions: Date:
VA FORM 08 - 6231
FULLY SPRINKLERED
3 4
MISSION CRITICAL
CONSTRUCTION DOCUMENTS
2/
/2
:1 8:
A
M C
:\U se rs \ts te ve ns \R ev it
Lo ca l\5
-1 9-
5_
M ed ic al
M ed ia _A rc h_ to dd
.s te ve ns
.rv t
FLOOR PLAN - NEW
CONSTRUCTION
CONSTRUCTION
DOCUMENTS
RELOCATE MEDICAL MEDIA
VAMC LITTLE ROCK
2020.08.10 JMc JDB
598-19-125
AE101
JLM
JDA PROJECT #: 598-19-125
2200 N. RODNEY PARHAM ROAD
SUITE 210
LITTLE ROCK, AR 72212
501-404-4811 jda@JohnsonDanforth.com
JohnsonDanforth & Associates
KEY PLAN
NEW CONSTRUCT GEN. NOTES
A DEPICTION OF EXISTING CONDITIONS BASED ON OWNER-FURNISHED
DOCUMENTS AND LIMITED FIELD OBSERVATIONS. EXISTING ELEMENTS AND
CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT
OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE DEMOLITION
WORK IS COMPLETE, REPORT ANY CONFLICTS TO DESIGNER. THE
CONTRACTOR SHALL MAKE ADJUSTMENTS AND/OR ALTERATIONS AS
NECESSARY TO INSTALL COMPLETE AND OPERABLE SYSTEMS IN
ACCORDANCE WITH THE CODES HAVING JURISDICTION AT NO ADDITIONAL
COST TO THE GOVERNMENT.
B REFER TO SHEET GI003 ABBREVIATIONS AND EQUIPMENT SCHEDULE FOR
EQUIPMENT PROCUREMENT AND INSTALLATION RESPONSIBILITY
DESIGNATIONS.
C UNLESS NOTED OTHERWISE, DIMENSIONS ARE TO FACE OF STUDS, CMU, OR
COLUMN CENTER LINES.
D CONTRACTOR SHALL PROVIDE ALL BLOCKING REQUIRED TO ANCHOR ALL
WALL AND CLG MOUNTED ITEMS, INCLUDING BUT NOT LIMITED TO TOILET
ROOM ACCESSORIES, MILLWORK, CASEWORK, HANDRAILS, DOOR STOPS
ETC.
E IN NEW GYPSUM WALL BOARD PARTITIONS, PROVIDE CONTROL JOINTS AT
30'-0" O.C. MAX.
F REFER TO SHEET GI002 FOR PARTITION SCHEDULE AND GENERAL PARTITION
TYPE NOTES.
G REFER TO QH SERIES FOR ENLARGED FLOOR PLAN VIEWS INCLUDING
MEDICAL EQUIPMENT.
H REFER TO FIRE PROTECTION LIFE SAFETY DRAWINGS (GI100 SERIES) FOR
SCOPE OF RATED WALL CONSTRUCTION, SMOKE PARTITIONS, EGRESS AND
EXIT DISCHARGE INFORMATION.
I PARTITION TYPES AS NOTED BY THE SYMBOL CONTINUE BETWEEN
ROOM/SPACE CORNERS OR ANY INTERSECTING PARTITION.
J DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES
CONTINUE UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.
K REFER TO AE600 SERIES DRAWINGS FOR DOOR & WINDOW TYPES AND
SCHEDULES.
L DISTANCE FROM HINGE SIDE OF DOOR TO INTERSECTING STUD WALL SHALL
BE 4” UNLESS NOTED OR DETAILED OTHERWISE (MEASURED FROM OUTSIDE
OF FRAME).
M CONTRACTOR SHALL VERIFY ALL DIMENSIONS NOTED AS “CLEAR” OR “MIN.
DIMENSIONS NOTED AS “HOLD” ARE CRITICAL TO COORDINATE OTHER WORK
(E.G. CEILING GRIDS, LIGHTING, FINISHES).
N CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO INITIATING
CONSTRUCTION AND REPORT DISCREPANCIES TO CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO COMMENCING WORK.
O ALL PENETRATIONS THROUGH RATED FLOOR/CEILING ASSEMBLIES AND
THROUGH FIRE RATED WALL AND SMOKE BARRIER ASSEMBLIES - THOSE
CREATED BY REMOVAL OF DEMOLISHED ITEMS UNDER THIS CONTRACT AND
THOSE DISCOVERED DURING CONSTRUCTION UNDER THIS CONTRACT AS A
RESULT OF PREVIOUS WORK AND THOSE CREATED BY NEW WORK UNDER
THIS CONTRACT - MUST BE SEALED AS PART OF THIS CONTRACT. ALL RATED
SEPARATIONS MUST MEET CURRENT CODE REQUIREMENTS.
P CONTRACTOR TO PROVIDE 1" MINIMUM CLEARANCE BETWEEN NEW
CONSTRUCTION AND EXISTING CONSTRUCTION AND/OR STRUCTURAL
COLUMNS - TYPICAL.
FIRE PROTECTION
FP&C CONSULTANTS KC, LLC
1330 Burlington Street, Ste. 200 North Kansas City, MO 64116
MEP ENGINEER
INSIGHT ENGINEERING, PLLC
201 S. CHESTER, SUITE B
LITTLE ROCK, AR 72201
3/16" = 1'-0"F3 FLOOR PLAN - NEW CONSTRUCTION
F
B A
D
C
E
PROJECT
AREAS
N
PARTITION LEGEND
SCALE: 3/16" = 1'-0"
0 2'-8" 5'-4" 10'-8"
KEYED NOTES
N1 IN DEMOLISHED AREA OF CORRIDOR INFILL & MATCH EXISTING FLOORING TILES.
ON CORRIDOR SIDE OF NEW WALL MATCH EXISTING CORRIDOR WALL FINISH,
PAINT COLOR, AND BASE TRIM.
N2 NEW STOREFRONT WINDOW SYSTEM. SEE WINDOW AND DOOR SCHEDULE
N3 RELOCATED PIPING IN WALL. SEE PLUMBING DRAWINGS
N4 EXISTING PIPING TO REMAIN. SEE PLUMBING DRAWINGS
N5 MATCH EXISTING WALL FIRE RATING, WALL FINISH, PAINT COLOR, AND BASE
TRIM
N6 PROVIDE CONTINUOUS BLOCKING FOR EQUIPMENT TO BE MOUNTED @ 10"-0"
THIS WALL.
N7 PATCH AND REPAIR WALL WHERE PARTITIONS MEET THE STOREFRONT AT ALL
SIMILAR CONDITIONS
N8 NEW FRP FINISH ON ALL INTERIOR WALLS
N9 WALL TYPE J_4b: TO ACHIEVE STC 45 WALLS TO BE FLOOR TO DECK; CAULK
PERIMETER OF GYP. BD. BOTH SIDES; CAULK ALL PIPE, DUCT, AND CONDUIT
PENETRATIONS BOTH SIDES OF WALL; SOUND BATT FLOOR TO DECK
N10 G.C. TO COORDINATE PHASING OF WINDOW INSTALLATION WITH THE VA COR.
N11 G.C. TO PROVIDE BATT INSULATION & LEVEL 5 GYP BD FINISH AT UNFINISHED
WINDOW SURROUND - PAINT
N12 G.C. TO VERIFY EXISTING INSULATION; IF NO INSULATION @ VIDEO ROOM
PORTION OF CORRIDOR WALL EACH STUD CAVITY TO BE FILLED FROM ABOVE
CEILING FROM FLOOR TO DECK WITH SPRAY-IN SOUND BATT MATERIAL.
7TH FLOOR SLAB ELEVATION = 492.67'
1 DOOR SCHEDULE 2.14.2022
| Sheets |
| AD101 - FLOOR PLAN - DEMO |
| AE101 - FLOOR PLAN - NEW CONSTRUCTION |
| AE601 - WINDOW & DOOR SCHEDULES |
File details come from the government source that posted it. Updated .