36C25622R0002 Pre-Award RFI Register .docx

DOCX document 22 KB Posted

Attached to
Z2DZ--Project 502-21-700 Repair of Elevators Nos. 1, 2, 3, 4, & 5 for Building 7
Solicitation number
36C25622R0002
Issued by

About this file

This document contains a pre-solicitation notice and questions and answers related to a federal contract opportunity to repair elevators at a Veterans Affairs health care facility. The pre-solicitation notice describes the requirement to repair five elevators at the Alexandria VA Health Care System located in Pineville, Louisiana. The contract is set aside 100% for Service-Disabled Veteran Owned Small Businesses and has an estimated value between $500,000 to $1,000,000. The solicitation will be issued on September 6, 2021 on beta.SAM.gov and questions must be submitted by the cutoff date listed in the final RFP. The questions and answers document provides additional relevant details to inform contractor questions, including information on emergency power systems, fire alarms, security requirements, and clarification around technical specifications.

View the file

Other files

File Type Posted
36C25622R0002 Revised SOW.docx DOCX document
36C25622R0002 0002.docx DOCX document
502 21 700 Sign in Sheet.pdf PDF
36C25622R0002 0001.docx DOCX document
36C25622R0002 Elevators 4 and 5 v4.pdf PDF
36C25622R0002 Elevator Layout 4 and 5.pdf PDF
36C25622R0002 Elevators 4 and 5 v3.pdf PDF
36C25622R0002 EXHIBIT F.docx DOCX document
36C25622R0002 WDLA20200051 Mod 2 06182021.pdf PDF
36C25622R0002 Elevators 4 and 5.pdf PDF
36C25622R0002 EXHIBIT C.docx DOCX document
36C25622R0002 EXHIBIT E.docx DOCX document
36C25622R0002 Elevators 4 and 5 v2.pdf PDF
36C25622R0002 Elevator 3.pdf PDF
36C25622R0002 Existing Conditions.pdf PDF
36C25622R0002 EXHIBIT D.docx DOCX document
36C25622R0002 RFP.docx DOCX document
36C25622R0002 SOW .docx DOCX document
36C25622R0002 EXHIBIT A.docx DOCX document
36C25622R0002 EXHIBIT B.docx DOCX document
36C25622R0002 Elevator 1 and 2.pdf PDF
36C25622R0002 Specifications Repair Elevators.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI

Answer

1. – The Statement of Work states replace car doors, car and hoist-way door rollers and interlocks. We recommend also replacing the door operators, car door header, track and hangers; car door clutch; and hoist-way door closers at each landing. The door operator consists of a motor and control board that controls the opening and closing of the doors. Can the door operator and above listed door parts be added to the scope of work? We recommend a linear door operator equivalent to a GAL MOVFE 2500-HL (Heavy-Duty Linear) door operator or equivalent be specified
The SOW ,Objective N states Replace car doors and shall be removed from the SOW. The existing car doors are to remain as-is.
2. – Do all or some of the elevators operate on emergency power / back-up generator? If so, which elevators operate on emergency power?
All the elevators listed are on emergency power.
3. - Who is the fire alarm vendor for the building? If possible, please provide contact information.
The current fire system installed is an Edward EST. The contractor shall employ any company certified to work on this system.
4. - Request change in RFP Contract Days to 450 days to reflect it shall take 15 weeks to submittals and secure materials, and approximately 10 weeks per elevator—50 weeks-- to modernize as there simply isn’t sufficient elevator modernization crews in the Central Louisiana area to support putting more than 1 crew on this project to successively modernize the elevators.
The period of performance will remain the same, but an additional 90 day will be added to contract for a RFI and Submittal review phase.
5. – Request 14 days after the VA publishes RFI answers to prepare bid? Gaps in identify key components, like the ESS, greatly complicate obtaining a subcontractor quote for the work. Further complicated by the ongoing COVID Pandemic, once we possess the requisite details, it will take up to 10 days to get a subcontractor’s quote.
An extension will be granted.
6. - What is the current brand and model number for the fire control panel in use and tied to the elevators? Are we required to update, expand or otherwise modernize as part of this elevator modernization?
The current fire control panel is an Edward EST and there is no required upgrade in this project.
7. - How many available slots are in the Fire control panel for additional relay modules to support this elevator modernization?
The fire control panel will not be upgraded in this project.
8. - Do the elevators currently operate on emergency power? If so, please provide the electrical “as built” drawing showing the service connections, Automatic Transfer Switch, and any shunts or other disconnects related to the elevators?
Yes, Elevators 1, 2, & 3 have a shunt trip,

breakers externally. Elevators 4 & 5 have shunt trip mounted inside controller.

Drawings provided in the RFP are the only known drawings.

9. – Is the Contractor to provide an Independent Qualified Elevator Inspector (QEI), or is the QEI provided by the VA?
VA will provide.
10. – Will a pit lighting schedule be provided?
This is no lighting replacement in this project.
11. - Will a machine room lighting schedule be provided?
This is no lighting replacement in this project.
12. - When was the last time emergency phones tested pertaining to the elevators that will be modernized? Did any elevators fail the test? If so which elevators? Are these phones analog or digital?
Elevator phones 1 thru 5 were tested in March 2021 and are working properly.

These phones are analog.Sec.

13. – Please identify the machine room doors to be replaced to meet the codes identified in Section 14 10 1.14 in door schedule format along with specified closure hardware?
No doors need to be replaced in machine rooms.
14. – Request clarification in the RFP as to the weighting and importance of past experience, technical approach and other performance factors relative to cost? Discussion: non-cost factors are discussed in detail absent identifying the importance of these factors relative to cost. We believe these factors are far more important than lowest cost due to the age of the elevators and building, as well as the exorbitant total life cycle cost the VA shall incur as a result of a poorly installed elevator.
Reference 36C25621R0002 Page 10. Section A6. Evaluations: Factor I (Technical Factor) is equal to Factor II (Past Performance). Factors I and Factor II, when combined are approximately equal to Factor III (Price).
15. - Section 28 identifies an extensive Electronic Security System (ESS) absent specific to just the Elevators, the building, and its integration with an existing ESS. Request plans sheet(s) identifying the ESS with schedule of items required under this contract? Please identify: a) the type badges it is to support? b. Where badge readers are to be located? The locations and required capability of security cameras—do they require recorded voice? C. If a remote monitoring and control capability is required? If so, where is it to be physically located within this building or another facility on the complex? D. Who is the existing ESS / Access Control Contractor supporting the current system? E. What badge format are readers to support?
Section 28 is not applicable to this project and will not be used.
16. - Will the contractor be allowed to work a 4 day-10-hour schedule to facilitate moving materials prior to, and after, normal workhours?
The contractor will not be allowed to work a 4-day 10-hour schedule.
17. Will the contractor be given access space within the basement or elsewhere within the building to store materials?
The loading dock or a section of the parking lot may be available. Containers will be needed.
18. Please identify the designated lay down yard adjacent to the building?
The successful contractor will be provided a lay down area at the project kickoff meeting
19. Specification Section 14 21 2.7 is ambiguous on whether or not a Regenerative Drive is required. Please clarify—yes or no—whether the VA requires a regenerative VVVF or basic VVVF?
Regenerative Drive is not required on this project
20. - Is the Machine Room Floor to be epoxy coated as part of the modernization?
No. There will be no coating required in the machine room.
21. – Is there any Wander Guard or other electronic patient constraint system installed or required on any of the elevators being modernized?
There is no patient constraint systems in this project
22. – When was the last time the smoke/heat detectors were tested that are integrated with the elevator control system? Are there any smoke/heat detectors that are non-functioning, and if so, please identify which ones and whether they are to be repaired as part of this contract?
Tested in October 2021. All working. There will be no smoke/heat detector repairs in this contract.
23. - Please identify the company currently services your fire system pertaining to the elevators? Are we required to use them?
The current fire system installed is an Edward EST. The contractor shall employ any company certified to work on this system.
24. - Will the VA be providing As built drawings (floor plans) (using AutoCAD 2007 or later) that show all existing conduit used for the fire alarm system?
Drawings provided in the RFP are the only known drawings.
25. - Will the VA be providing drawings showing device locations and wiring runs pertaining to the fully addressable fire alarm system?
Drawings provided in the RFP are the only known drawings.
26. - Are there Heat Detectors at the top of the hoist way shaft?
Yes
27. - Are there sprinkler heads located in the elevator pit?
No
28. - How many call stations are to be provided by type (wall mounted, free standing)?
Call stations are not part of this requirement.
29. - Will the VA be providing drawing for locations to add call stations?
Call stations are not part of this requirement.