PWS for TAB Certification 04-20-2022 Revised.docx

DOCX document 202 KB Posted

Attached to
H241--629-22-3-690-0168 Room Balance Certification Contract
Solicitation number
36C25622Q0908
Issued by

About this file

This performance work statement and federal contract opportunity notice seek quotes for annual testing, adjusting, and balancing of HVAC systems at the Southeast Louisiana Veterans Health Care System replacement medical center campus in New Orleans, Louisiana. The solicitation is set aside 100% for SDVOSB and offers a base period of performance from August 1, 2022 through July 31, 2023, with four optional one-year extensions. Quotes are due by June 22, 2022 and the pre-bid site visit will be held on June 7, 2022. The NAICS code is 541330 for engineering services and the size standard is $16.5 million.

View the file

Other files

File Type Posted
36C25622Q0908 0002.docx DOCX document
36C25622Q0908 0001_1.docx DOCX document
Question and answers (1).docx DOCX document
WD 2015-5189 Revision 22.pdf PDF
PWS.docx DOCX document
36C25622Q0908_2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Southeast Louisiana Veterans Health Care System

629-17-2-XX-XXXX

Performance Work Statement

For Testing-Adjusting-Balancing Services of HVAC Systems at Southeast Louisiana Veterans Health Care System New Orleans Replacement Facility Department of Veterans Affairs

April 20, 2022

Performance Work Statement for Testing-Adjusting-Balancing (TAB) Of Heating, Ventilation and Air Conditioning (HVAC) Systems at The Southeast Louisiana Veterans Health Care System, New Orleans, LA

1.0. INTRODUCTION

1.1. The Department of Veteran Affairs, Southeast Louisiana Veterans Health Care System, New Orleans, LA (SLVHCS) requires on-site professional to accomplish annual Testing-Adjusting-Balancing (TAB) of the Heating, Ventilation and Air Conditioning (HVAC) Systems at the Replacement Medical Center.

1.2. The TAB effort shall include the following buildings and areas on the medical center campus:

· Pan Am (Administration)

· Central Energy Plant

· Diagnostic and Treatment

· Inpatient

· Outpatient

· Research (Dixie)

· Transitional Living

· Concourse A

2.0 SCOPE

2.1. The contractor shall perform annual testing, adjusting and balancing in accordance with ANSI/ASHRAE Standard 111-1988 – “Practices for Measurement, Testing, Adjusting, and Balancing of Building Ventilation, Air-Conditioning, and Refrigeration Systems.” See Appendix A for a compilation of definitions used in this Performance Work Statement (PWS). Balancing and Testing should terminate at the Chilled Water Loop for each building.

2.2. Facility drawings and equipment schedules may be furnished to the contractor by Facilities Management Service (FMS) after award.

2.3. The Contractor shall conduct TAB procedures in this PWS to ensure HVAC design specifications for the facility are met and met manufacturer’s specifications for optimal performance. These shall include the following:

2.3.1. Balancing airflow and water flow at source equipment and/or within distribution systems,including sub-mains, branches, and terminals, to indicated quantities according to specifiedtolerances. This applies only to rooms that do meet meet the standards for certification. Thisshall be used as a basis for rectification of deficiencies if needed.
2.3.2. Adjusting total HVAC systems to provide indicated quantities. If air flow and/or pressurediscrepancies are found within the adjustments to achieve standards set forth by ASHRAE, USP797/800 (if applicable), AALAC (if applicable), and VA design guide standards, on the spotcorrections shall be made. If the discrepancies are due to failed equipment or hardware, thecontractor shall notify the COR immediately.
2.3.3. Measuring electrical performance of HVAC equipment. This shall be a field verification ofoperational and fully air flow control devices particularly where rooms are initially founddeficient from achieving certification standards.

2.3.4. Verifying that automatic control devices are functioning properly.

2.3.5. Reporting results of the activities and procedures specified in Appendix B.

2.3.6. The contractor shall plug all holes that have been made in the ducts for taking test readings, in order to prevent air leakage. Disruption of duct, pipe, and/or equipment insulation shall also be appropriately repaired by the contractor in a professional work like manner.

2.3.7 The certifying contractor shall be a current certified test and balance professional working for a certified test and balance firm.

3.0 PERIOD OF PERFORMANCE – Base year to commence on/or about August 1, 2022 with four (4) one year option periods.

3.1. PLACE OF PERFORMANCE – SLVHCS, 2400 Canal Street, New Orleans, LA 70119.

3.2 WORK SCHEDULE - 6.1. All inspections will be conducted during normal business hours between the hours 8:00a.m. to 4:00p.m. Arrangements shall be made 5 workdays in advance with the COR or designee prior to starting work.

3.3. All systems shall maintain operation during the course of the work. If shut down or stoppage of the equipment is warranted to complete the work, an outage request will be made to the COR or designee in writing. Contractor shall furnish information on impact to the hospital equipment, staff and patients. Note that some shutdowns require at minimum 2 weeks advance notice to minimize impact to hospital mission and patients. The work areas will be restored upon inspection completion.

3.4. At times, due to possible emergency situations, work may be stopped or delayed, as approved by the COR or designee.

3.5. Performance of work may be required on Government holidays. Below is a list of approved observances. The dates provided are for 2022. Subsequent annual list of holidays and observances will be provided in advance of option year renewal.

2017 Holiday Schedule

Holiday

New Year’s Day

Birthday of Martin Luther King, Jr.

Washington’s Birthday

Memorial Day

Independence Day

Labor Day

Columbus Day

Veterans Day

Thanksgiving Day

Christmas Day

4.0 DELIVERABLES

4.1. The contractor shall provide the following deliverables to the Government as specified:

4.1.1. Work and Testing Plan. The contractor shall provide a work and testing plan to the government for review and approval prior to the departure of the on-site testing team to the work site.

4.1.1.1. Work and Testing Plan should meet or exceed industry standards and align with ANSI/ASHRAE Standard 111-1988 – “Practices for Measurement, Testing, Adjusting, and Balancing of Building Ventilation, Air-Conditioning, and Refrigeration Systems.

4.1.2. System Labelling. See discussion of system labelling requirements on page 3 of Appendix B to this PWS.

4.1.2.1. The contractor shall put a small sticker on the frame of the Supply Air Diffuser, in a readily accessible space located above the ceiling indicating:

· source of air

· designed quantity of air

· actual quantity of air.

For example: “AHU-1 Design: 200 CFM Actual: 180 CFM”

4.1.2.2. Contractor shall mark air damper positions, fully open/fully close, especially where the duct is wrapped around with insulation.

4.2. Testing, Adjusting, and Balancing Reports.

4.2.1. The contractor shall summarize the findings and results of the TAB in a narrative sectionat the front of the report. This shall be offered in PDF format that is non-editable. This sectionshall address the following issues:
4.2.2. Summary of the overall TAB effort, to include the TAB crew, the methods used, and thedates/duration of the effort.

4.2.2.1. Overall results of the TAB effort.

4.2.2.2. Equipment items that are not in compliance and could not be brought intoadjustment.
4.2.2.3. Recommendations for further modifications and for any repairs or replacementsrequired to bring the systems into compliance with the design.
4.2.2.4. The contractor shall use standard forms from AABC's "National Standards for Testing,Adjusting, and Balancing" or NEBB's "Procedural Standards for Testing, Adjusting, andBalancing of Environmental Systems" each time a testing, adjusting, and balancing report iscreated.

Upon conclusion of the performance TAB Services, the Contractor shall provide the Government with an Excel report (“Report”), which is intended for the owner to provide for submission to applicable agencies, such as the local authority having jurisdiction (AHJ), Insurance Agencies and/or the Joint Commission. Proper TAB reports shall be furnished with the stamp of the accrediting agency (i.e. AABC or NEBB) to the certified TAB firm, clearly on the reports.

5.0. QUALIFICATIONS AND SECURITY REQUIREMENTS.

5.1. Qualifications and Equipment Requirements for the Contractor’s Field Staff

5.1.1. Technical.

5.1.1.1. The contractor shall engage a testing, adjusting, and balancing agent certified by either AABC or NEBB. Qualification Data and shall submit evidence, to the COR not later than 15 calendar days prior to the site work, that testing, adjusting, and balancing agent meets the qualifications specified in “Quality Assurance” ..

5.2. The contractor shall be equipped with all necessary special tools, hardware, computer, and communications equipment to perform technical inspections on the specific equipment undergoing TAB.

5.3. Instrumentation Type, Quantity, and Accuracy: As described in AABC national standards if AABC report form is used or as described in NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems," Section II, "Required Instrumentation for NEBB Certification" if NEBB report form is used.

5.4. Instrumentation Calibration: The contractor shall use instruments that have been calibrated within the 6 months by a certified calibration facility, or shall have been calibrated within a shorter period of time if required by the instrument manufacturer.

6.0. COORDINATION

6.1. Service Interruptions. The engineers and technicians shall plan, coordinate, and schedule all site work with the post Facility Manager. Any and all service interruptions, such as shut off of air handling equipment, shall be subject to approval by the post Facility Manager.

6.2. Site Restoration. The contractor shall ensure that all facilities receiving this work shall be left in a condition acceptable to the Facility Manager at post, upon completion of the work.

6.3. Disposal Of Materials Removed. The Contractor shall be responsible for the disposal of all trash created while performing this work. The contractor shall transport all materials to be disposed of from the job site, and shall ensure that all items removed through this work are disposed of responsibly.

6.4. Equipment. The contractor shall furnish all tools and equipment required to execute this work.

6.5. Safety. The contractor, contract employees or sub-contractors shall comply all safety requirements of the medical center.

7.0 GENERAL TESTING AND BALANCING PROCEDURES

7.1. TAB procedures for each building should following industry standards, manufacturer’s recommendations and best practices terminating at the chilled water loop for each building.

8.0 GENERAL INFORMATION

8.1. Contractor Personnel.

8.1.1. Contractor Employees. Contractor personnel shall present a neat appearance and in uniform. The uniform shall have the prime Contractor’s name easily identifiable, affixed thereon in a permanent or semi-permanent manner such as a badge or monogram. Any color combination, as appropriate, may be used for the uniforms as long as they are distinct from that used by Facilities Management Service (VA Engineering).
8.1.1. The uniform shall have the prime Contractor’s name easily identifiable, affixed thereon in a permanent or semi-permanent manner such as a badge or monogram. Any color combination, as appropriate, may be used for the uniforms as long as they are distinct from that used by Facilities Management Service (VA Engineering).
8.1.2. These uniforms must be supplied and maintained by the Contractor at no cost to the Government. As part of their uniform, the Contractor’s employees shall conspicuously display the following identification:

· Personnel Identification Verification (PIV) Badge issued by the Government.

· Photo Identification Badge issued by the employee’s respective employer.

8.2. Key Personnel. All services covered by this contract will be performed by fully qualified and trained TAB Technicians. TAB Supervisor shall possess the necessary skills and experience to perform the work as identified in the PWS for specialized TAB or supplement services Air Handling Units and associated and ancillary equipment.

8.3. All services covered by this contract will be performed by fully qualified and TAB Technicians. TAB Supervisor shall possess the necessary skills and experience to perform the work as identified in the PWS for specialized preventive maintenance, repair or supplement services HVAC related.

8.4. The Contractor’s Staff will include, when required, technicians or subcontractors specifically qualified and trained to perform the tasks identified in the PWS. All Contractor personnel will also be capable of reviewing and analyzing the equipment’s logs and operating history. The Contractor will provide an onsite lead Supervisor person in their Key Personnel Staffing during the execution of all work or as directed by this PWS and monitored by the COR.

8.5. The Contractor shall provide a qualified and experienced Project Manager (PM) for this contract. The Project Manager shall have full authority to act for the Contractor and serve at all times to carry out all the provisions of the contract. The PM shall be in charge of and have overall responsibility for the work to be carried out under this contract.

8.6. The Contractor’s PM’s work hours shall coincide with the Medical Center’s business hours which are defined as 7:30 AM – 4:00 PM, Monday through Friday, with the exceptions of all holidays observed by the Government. The PM or approved responsible alternate authorized by the COR will be identified and available for receiving calls 24 hours a day, seven (7) days a week.

8.7. The Contractor’s project manager’s work hours shall coincide with the Medical Center’s business hours which are defined as 7:30 AM – 4:00 PM, Monday through Friday, with the exceptions of all holidays observed by the Government. The Project Manager or approved responsible alternate authorized by the COR will be identified and available for receiving calls 24 hours a day, seven (7) days a week.

8.8. The Contractor shall submit within five (5) working days (M-F) after the award of the contract a list of its Key Personnel, PM and an alternate or equally responsible Supervisor person who when approved by the COR shall assume the PM’s duties when the primary project manager is absent. The key personnel list shall also identify the names of the certified refrigeration mechanics that will perform the Base Services of this PWS. A resume shall be included with all names on the Contractors Key Personnel List. The Contractor shall include with the Key Personnel List contact numbers and email addresses for all employees performing services under this contract.

8.9. When Staffing changes are made the Contractor shall comply with updating the Key Personnel List prior to processing for a security badge providing the supporting documentation of a resume and submitting the list to the COR. Any change in lead level Staffing shall require 15 days’ notice to the COR.

8.10. The Government shall have the right in its sole discretion to approve or reject any Project Manager selected by the Contractor at any time.

9.0. Conduct

9.1. The Contractor’s employees at all times while on the job site, whether on or off duty, shall conduct themselves in a professional, orderly and safe manner. Rudeness, fighting, being under the influence of alcohol and/or drugs or possessing and/or consuming alcohol and/or drugs, gambling, soliciting, stealing, and any other conduct that interferes or has the potential to interfere with the Contractor’s performance of its duties under this contract, shall not be permitted on the job site and shall result in immediate and permanent removal from the job site of any employee engaging in such conduct from work.

9.2. The contractor and its personnel shall review and agree to comply with the Government’s Information Security System (ISS), and network policy.

9.3. This is a non-smoking facility. This includes e-cigarettes.

9.4. Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

9.5. Physical Security. The contractor shall safeguard all government property.

10.0 CONTRACTOR FURNISHED RESOURCES

10.1. GENERAL

The Contractor shall furnish all supervision, labor, administrative support, materials, tools, parts, supplies, equipment, and transportation necessary to fulfill all the requirements and satisfactorily perform all services described in this PWS in a safe, orderly, timely, efficient and workmanlike manner. The contractor shall provide any additional resources

10.2. PROPERTY AND PERSONNEL PROTECTION

10.2.1. The contractor shall use clean drop cloths or other suitable covering to fully protect furniture and equipment where work is being performed.

10.2.2. Proper protective signs such as “MEN WORKING ABOVE, DANGER” Etc. to alert other working personnel shall be used. All OSHA guidelines must be followed.

10.2.3. The contractor will leave all work areas in a clean and sanitary condition. Extreme care must be taken to protect all V.A. equipment.

10.2.4. The Contractor shall provide all safety equipment/devices, personal protective equipment and clothing as required for its employees.

10.3. SUPERVISION

A thoroughly trained and experienced supervisor and staff will perform all work under the strict supervision of the contractor. The supervisor must be able to read and understand blueprints.

11.0 SAFETY PRECAUTIONS

11.1. The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthful working conditions for its employees.

11.2. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property.

11.3 The Contractor shall perform the work in a manner consistent with industry standards and best practices.

11.4. No flammable liquids shall be stored or used in the medical center.

11.5. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Agency (NFPA) 10 and NFPA 241. Contractor shall keep certification on site at all times of extinguisher inspections.

11.6 The Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction.

11.7. All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.

11.8. The Contractor shall comply with an Infection Control Risk Assessment (ICRA) which will be developed with the COTR and the Infection Control Practitioner. Multiple ICRA’s may be necessary to address specific risks at various stages of the project and must be approved prior to proceeding on each phase.

12.0 HAZARDOUS MATERIAL REPORTING

12.1. The Contractor shall maintain hazardous material inventories and material safety data sheets (MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR’s 355, 370, & 372) to be stored and used on this Medical Center. Hazardous materials must be inventoried when received and at the project’s completion. The amounts used shall be maintained for the project duration, and for the calendar year (ending 31 December).

12.2. Hazardous Materials Inventories, Material Safety Data Sheets and material quantities used shall be submitted to the Contracting Officer for approval.

12.3. In the event of a spill, Contractor shall immediately notify the Contracting Officer’s Technical Representative (extension 5138) as well as the Contracting Officer. The Contractor shall be solely responsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provisions of 40 CFR Part 761.

12.4. Asbestos Containing Material (ACM) is not present in the workspace. If contractor locates suspected ACM, they shall contact the COR immediately for further direction.

13.0 ENVIRONMENTAL PROTECTION

13.1. In order to provide for abatement and control of all environmentally hazardous materials arising Inspection activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable as specifically required by state, local, federal, VHA and TJC.

13.2. The Contractor is responsible for daily cleanup of all areas affected by its work. Areas in use or affected shall be returned to condition in which they were turned over or initially found. VA Housekeeping shall not be dispatched for cleaning associated with contractor work.

13.3. The Contractor shall take every precaution in preserving flooring, finishes, equipment, and furniture in areas of work. The Contractor shall repair or replace any damage incurred during its work at their expense.

13.4. Contractor shall use freight elevators for transmission of materials and personnel. Contractor shall take every precaution in preserving the elevators, including the hoist way and lobby doors, interior finishes, and shall conduct all good practices in observing lifting and motor components tolerances. Any damage incurred to any elevator component due to negligence will be repaired at expense of the contractor, within the work day of incurred damage.

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement.

14.0 DELIVERABLES

14.1. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) - shall be delivered as part of the initial contract kickoff and submitted either at the kickoff meeting (one electronic and one hard copy) or emailed to the CO should the meeting be waived: Quality Assurance Surveillance Plan (QASP).

14.2. LIST OF PERSONNEL REQUIRING SECURITY BADGING - The Contractor shall provide the COR with a list of employees who will be applying for security badges five (5) days after the contract award date.

14.3. RESUMES OF ALL KEY PERSONNEL - The Contractor shall provide the resumes for all personnel proposed to perform work on this contract for approval five (5) days after the contract award date.

14.4. TELEPHONE, CELL, FAX NUMBERS, EMAIL ADDRESSES, SCHEDULES - The Contractor shall identify and provide the COR with a list of names, and telephone numbers of the key personnel who shall be responsible for fulfilling all the requirements of this PWS including their work schedules.

14.5. QUALITY CONTROL PLAN - The Contractor shall, within fifteen (15) days of contract start date, submit a quality control plan that details how the Contractor will insure all requirements of the contract will be fulfilled. The plan shall include but not be limited to all elements of the quality control program described in the technical proposal that the contractor submitted in response to the Government's solicitation for this contract.

14.6. PREVENTIVE MAINTENANCE PLAN - The Contractor shall, within fifteen (15) days of contract start date, submit a preventive maintenance plan that details how the Contractor will insure all requirements of the contract will be fulfilled.

14.7. SAFETY PLAN - The Contractor shall, within fifteen (15) days of contract award, submit its own detailed safety and protection plan that shall comply with all safety, environmental protection, property protection and health provisions of the contract.

14.8. SERVICE REPORTS (format) – The Contractor shall complete service reports for every service call.

14.9. TESTING AND INSPECTION REPORTS - The Contractor shall, within fourteen (14) days after services are rendered, submit (1) original and two (2) copies, inspection and testing reports.

14.10. COMPANY/TECHNICIAN CERTIFICATION – The Contractor shall, after any work is completed on the system (submitted with service ticket, testing and inspection reports), and prior to contract award furnish to the Government all certifications.

14.11. RECORDS - Cumulative service records shall be kept for Dampers by location. A separate record file shall be established and kept up to date for each unit. The Contractor shall submit proposed formats for each of the required records listed below for the COR's approval at least 15 calendar days prior to the start date of the contract.

APPENDIX A - DEFINITIONS

The following definitions are used throughout this PWS and the TAB procedures.

1. AABC: Associated Air Balance Council.

2. AMCA: Air Movement and Control Association.

3. NEBB: National Environmental Balancing Bureau.

4. ASHRAE. American Society of Heating, Refrigerating and Air Conditioning Engineers.

5. ANSI. American National Standards Institute

6. SMACNA: Sheet Metal and Air Conditioning Contractors' National Association.

7. CTI: Cooling Tower Institute.

8. Adjust: The final setting of balancing devices such as dampers and valves, adjusting fan speeds, in addition to automatic control devices such as thermostats and pressure controllers to achieve maximum specified system performance and efficiency during normal operation.

9. Building Automation System (BAS). The digital distributed control system that operates the HVAC equipment. There are generally two separate systems in new embassy compounds.

10. Balance: To proportion flows within the distribution system, including sub-mains, branches, and terminals, according to design quantities.

11. Draft: A current of air, when referring to localized effect caused by one or more factors of high air velocity, low ambient temperature, or direction of airflow, whereby more heat is withdrawn from a person's skin than is normally dissipated.

12. Dynamic (velocity) Pressure: In a moving fluid, the pressure that would induce an equivalent velocity if applied to move the same fluid through an orifice, so that all pressure energy is converted into kinetic energy. Velocity pressure is always a positive value. The difference between the total pressure and static pressure (relative to the same datum).

13. HVAC: Heating, Ventilation and Air Conditioning.

14. Procedure: An approach to and execution of a sequence of work operations to yield repeatable results.

15. Report Forms: Test data sheets for recording test data in logical order.

16. Sheave: A grooved wheel or pulley for belt-driven equipment.

17. Static Head: The pressure due to the weight of the fluid above the point of measurement. In a closed system, static head is equal on both sides of the pump.

The following definitions are used throughout this PWS and the TAB procedures.

1. AABC: Associated Air Balance Council.

2. AMCA: Air Movement and Control Association.

3. NEBB: National Environmental Balancing Bureau.

4. ASHRAE. American Society of Heating, Refrigerating and Air Conditioning Engineers.

5. ANSI. American National Standards Institute

6. SMACNA: Sheet Metal and Air Conditioning Contractors' National Association.

7. CTI: Cooling Tower Institute.

8. Adjust: The final setting of balancing devices such as dampers and valves, adjusting fan speeds, in addition to automatic control devices such as thermostats and pressure controllers to achieve maximum specified system performance and efficiency during normal operation.

9. Building Automation System (BAS). The digital distributed control system that operates the HVAC equipment. There are generally two separate systems in new embassy compounds.

10. Balance: To proportion flows within the distribution system, including sub-mains, branches, and terminals, according to design quantities.

11. Draft: A current of air, when referring to localized effect caused by one or more factors of high air velocity, low ambient temperature, or direction of airflow, whereby more heat is withdrawn from a person's skin than is normally dissipated.

12. Dynamic (velocity) Pressure: In a moving fluid, the pressure that would induce an equivalent velocity if applied to move the same fluid through an orifice, so that all pressure energy is converted into kinetic energy. Velocity pressure is always a positive value. The difference between the total pressure and static pressure (relative to the same datum).

13. HVAC: Heating, Ventilation and Air Conditioning.

14. Procedure: An approach to and execution of a sequence of work operations to yield repeatable results.

15. Report Forms: Test data sheets for recording test data in logical order.

16. Sheave: A grooved wheel or pulley for belt-driven equipment.

17. Static Head: The pressure due to the weight of the fluid above the point of measurement. In a closed system, static head is equal on both sides of the pump.

18. Static Pressure: The measure of potential energy of a unit of air in a particular cross section of duct. Air pressure on a duct or plenum wall is considered static.

19. Suction Head: The height of fluid surface above the centerline of the pump on the suction side.

20. System Effect: A phenomenon that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.

21. System Effect Factors: Allowances used to calculate a reduction of the performance ratings of a fan when installed under conditions different from those presented when the fan was performance tested.

22. Testing, Adjusting and Balancing (TAB): The three major steps used to achieve proper operation of HVAC systems.

23. Terminal: A point where the controlled medium, such as fluid or energy, enters or leaves the distribution system.

24. Test: A procedure to determine quantitative performance of a system or equipment; the use of specialized and calibrated instruments to measure temperatures, pressures, rotational speeds, electrical characteristics, velocities and air and water quantities for an evaluation of equipment and system performance.

25. Testing, Adjusting, and Balancing Agent: The entity responsible for performing and reporting the testing, adjusting, and balancing procedures.

26. Total Pressure: The pressure the air exerts in the direction of flow (dynamic/velocity pressure) plus the pressure the air exerts perpendicular to the plenum or container through which the air moves (static pressure). In other words, total pressure is the sum of dynamic/velocity pressure plus static pressure.

Appendix B– Equipment Schedule Air Testing, Balance and Certification Contract

Building
Room number
Room name/function
Room pressure monitor y/n
Annual Certification
Semi Annual Certification
Testing and verification
1
4B141
Patient Isolation
y
X
1
4B143
Patient Isolation
y
X
1
4B157
Medication Room

X

1
4B159
Clean utility

X

1
4B161
Soiled utility

X

1
4B171
Positive isolation
y
X
1
4B173
Positive Isolation
y
X
1
4B107
Housekeeping

X

1
3B105
Soiled utility

X

1
3B139
Clean utility

X

1
3B141
Patient Isolation
y
X
1
3B143
Patient Isolation
y
X
1
3B157
Medication Room

X

1
3B159
Clean Utility

X

1
3B161
Soiled Utility

X

1
1B171
Positive isolation
y
X
1
3B173
Positive Ante room
y
X
1
2B106
Housekeeping

X

1
2B105
Soiled Utility

X

1
2B139
Clean Utility

X

1
2B141
Patient Isolation
y
X
1
2B143
Patient Isolation
y
X
1
2B157
Medication Room

X

1
2B159
Clean utility

X

1
2B161
Soiled utility

X

1
2B171
Positive isolation
y
X
1
2B173
Positive isolation
y
X
1
1B185
Housekeeping

X

1
4C109
Clean Equipment

X

1
4C131
Vendor Storage

X

1
4C128
Sterile Storage

X

1
4C126
Medication Room

X

1
4C115
Clean Storage

X

1
4C114
Clean Utility

X

1
4C110
Soiled utility

X

1
4C117
Patient Isolation

X

1
3C104
Equipment Storage

X

1
3C108
Blood Gas Lab

X

1
3C116
Housekeeping

X

1
3C130
Clean Utility

X

1
3C140
Patient Isolation
y
X
1
3C142
Patient Isolation
y
X
1
3C156
Medication Room

X

1
3C154
Clean Utility

X

1
3C152
Soiled Utility

X

1
3C169
Positive isolation Ante
y
X
1
3C171
Positive isolation room
y
X
1
2C116
Housekeeping

X

1
2C130
Clean Utility

X

1
2C140
Patient Isolation
y
X
1
2C142
Patient Isolation
y
X
1
2C156
Medication Room

X

1
2C154
Clean Utility

X

1
2C152
Soiled Utility

X

1
2C169
Positive Patient Isolation Ante

X

1
2C171
Positive Patient Isolation

X

1
1B185
Housekeeping

X

1
1C106
Housekeeping

X

1C133
Clean Utility

X

1
1C135
Soiled Utility

X

2
1D106
Housekeeping

X

2
1D136
Industrial Hygienist Lab

X

2
1D133
Housekeeping

X

2
1D134E
Clean Storage

X

2
1D134B
Soiled Utility

X

2
2D239
Soiled Utility

XX

2
2D119
Medication Room

X

2
2D232
Equipment/RME

X

2
2D233
Clean Storage

XX

2
2D104
Soiled Utility

X

2
3D102
Soiled linen

X

2
3D100
Housekeeping

X

2
3D122
Housekeeping

X

2
3D141
Soiled Utility

X

2
3D127
Housekeeping

X

2
3D129
Specimen Holding

X

2
3D135
Gas cylinder Storage

X

2
3D166
Tissue Storage

X

2
3D238
Procedure Room

X

2
3D234
Procedure Room

X

2
3D231
Procedure Room

X

2
3D235
Procedure Room

X

2
4D102
Pharmacy Waste

X

2
4D100
Housekeeping

X

2
4D221
SPS

X

2
4D221A2
Housekeeping

X

2
4D221B
SPS

X

2
4D221C
SPS

X

2
4D222
SPS

X

2
4D203
SPS

X

2
4D203A
SPS

X

2
4D203B
SPS

X

2
4D203C
SPS

X

2
4D203D
SPS

X

2
4D203E
SPS

X

2
4D201
SPS

X

2
Corridor
SPS

X

2
corridor
SPS

X

2
4D121D
SPS

X

2
4D121E
SPS

X

2
4D121F
SPS

X

2
4D101C
Pharmacy

X

2
4D101E
Pharmacy

X

2
4D101D
Pharmacy

X

2
5D152
Housekeeping

X

2
5D100
Soiled utility

X

2
5D204
Medication Room

X

2
4D123E
Lab
y
X
2
4D122
Lab
y
X
2
4 E125
Housekeeping

X

2
4 E135
Gas cylinder Storage

X

2
4 E137
Clean Storage
y
X
2
4 E138
Lab
y
X
2
3 E222
Equipment Storage

X

2
3 E136
Patient Isolation
y
X
2
3 E220
Clean Storage

X

2
3 E134
Patient Isolation
y
X
2
3 E125
Clean Storage

X

2
3 E120
Soiled Utility

X

2
2 E249
Patient Isolation
y
X
2
2 E104
Clean Storage

X

2
2 E103
Housekeeping

X

2
2 E137
Housekeeping

X

2
2 E242
Medication Room

X

2
3 E241
Clean Storage

X

2
2 E247
Procedure Room
y
X
2
2 E243
Patient Isolation
y
X
2
2 E258
Patient Isolation
y
X
2
2 E203
Lab

X

2
2 E201
Patient Isolation
y
X
2
4F122
Lab
y
X
2
4F123
Lab
y
X
2
4F123A
Lab
y
X
2
4F123B
Lab
y
X
2
4F123C
Lab
y
X
2
4F123D
Lab
y
X
2
4F139
Lab
y
X
2
4F139A
Lab
y
X
2
4F133A
Lab
y
X
2
3F133
Lab
y
X
2
4F311
Clean Storage

X

2
4F302
Soiled Utility

X

2
3F201
Procedure Room
y
X
2
3F302
Procedure Room
y
X
2
3F303
Procedure Room
y
X
2
3F304
Procedure Room
y
X
2
3F305
Procedure Room
y
X
2
3F306
Procedure Room
y
X
2
2F202
Clean Utility

X

2
2F204
Soiled Utility

X

2
2F160
Medication Room

X

2
2F224
Radioactive Storage

X

2
2F247
Housekeeping

X

2
2F140
Clean Storage

X

2
2F101
Clean Storage

X

2
2F155
Clean Storage

X

2
2F202
Clean Storage

X

2
1F104
Housekeeping

X

2
1F135
Housekeeping

X

2
3G200
Gas cylinder Storage

X

2
3G202
Gas cylinder Storage

X

2
3G140
Lab

X

2
3G108
Lab
y
X
2
3G106
Lab
y
X
2
3G102
lab

X

2
3G111
lab

X

2
3G113
Soiled Utility

X

2
3G112
Gas cylinder Storage

X

2
3G115
Clean Storage

X

2
3G241
Soiled Utility

X

2
3G243
Clean Storage

X

2
3G246
Housekeeping

X

2
3G232
Procedure Room
y
X
2
3G230
Clean Storage

X

2
3G224
Soiled Equipment

X

2
3G228
Clean Equipment

X

2
3G229
Procedure Room

X

2
3G227
Medication Room

X

2
3G225
Procedure Room

X

2
3G125
Clean Storage

X

2
2G170
Gas cylinder Storage

X

2
2G172
Housekeeping

X

2
2G174
Scrub room

X

2
2G216
Nuclear Medicine
y

X

2
2G306
Housekeeping

X

2
2G310
Pet Scan

X

2
2G215
Nuclear Medicine
y

X

2
2G224
Nuclear Medicine
y

X

2
2G221
Nuclear Medicine
y

X

2
2G114
Clean Storage

X

2
1G108
Housekeeping

X

3
5J438
Clean Storage

X

3
5J440
Clean Storage

X

3
3J276D
Clean Storage

X

3
3J279
Clean Storage

X

3
4J249
Clean Storage

X

3
4J453
Clean Storage

X

3
4J456
Clean Storage

X

3
6J259
Clean Storage

X

3
6J419
Clean Storage

X

3
7J214
Clean Storage

X

3
7J419
Clean Storage

X

3
3J259
Clean Storage

X

3
4J448
Clean Storage

X

3
5J213
Clean Storage

X

3
5J315
Clean Storage

X

3
5J317
Clean Storage

X

3
7J258
Clean Storage

X

3
1J303
Soiled Utility

X

3
1J307
Housekeeping

X

3
1J236
Gas cylinder Storage

X

3
1J313
Clean Storage

X

3
1J329
Housekeeping

X

3
2J303
Soiled Utility

X

3
2J288
Gas cylinder Storage

X

3
2J286
Medication Room

X

3
4J453
Gas cylinder Storage

X

3
4J449
Procedure Room

X

3
4J447
Procedure Room

X

3
4J445
Procedure Room

X

3
4J443
Procedure Room

X

3
4J441
Procedure Room

X

3
4J439
Procedure Room

X

3
4J458
Procedure Room

X

3
4J325
Housekeeping

X

3
4J307
Housekeeping

X

3
4J238
Medication Room

X

3
4J303
Soiled Utility

X

3
5J303
Soiled Utility

X

3
5J236
Patient Isolation

X

3
5J259
Procedure Room

X

3
5J257
Procedure Room

X

3
5J314
Lab

X

3
2J297
Soiled Utility

X

3
2J331
Housekeeping

X

3
6J248
Medication Room

X

3
6J303
Soiled Utility

X

3
6J439
Medication Room

X

3
6J331
Housekeeping

X

3
6J490
Gas cylinder Storage

X

3
6J418
Soiled Utility

X

3
7J303
Soiled Utility

X

3
7J261
Medication Room

X

3
7J307
Housekeeping

X

3
7J439
Medication Room

X

3
7J419
Clean Storage

X

3
7J331
Housekeeping

X

3
6J307
Housekeeping

X

3
1H158
Clean Storage

X

3
4H130
Clean Storage

X

3
3H139
Housekeeping

X

3
2H100
Housekeeping

X

3
1H133
Housekeeping

X

3
3J303
Soiled Utility

X

3
3J248
Medication Room

X

3
3J246
Patient Isolation

X

3
3J269
Procedure Room

X

3
3J278
Procedure Room

X

3
3J280
Procedure Room

X

3
3J331
Housekeeping

X

3
3J290
Gas cylinder Storage

X

3
3J299
Medication Room

X

3
3J297
Patient Isolation

X

6
1M145
Clean Storage

X

6
2M169
Clean Storage

X

6
2M213
Patient Isolation
y
X
6
2M132
Patient Isolation
y
X
6
2M162
Patient Isolation
y
X
6
2M249
Patient Isolation
y
X
6
3M249
Patient Isolation
y
X
6
3M213
Patient Isolation
y
X
6
4M117
Housekeeping

X

6
3M250
Clean Storage

X

6
3M247
Housekeeping

X

6
3M240
Medication Room

X

6
3M201
Clean Storage

X

6
3M203
Housekeeping

X

6
3M218
Medication Room

X

6
2M250
Clean Storage

X

6
2M247
Housekeeping

X

6
2M240
Medication Room

X

6
2M218
Medication Room

X

6
2M203
Housekeeping

X

6
2M122
Clean Storage

X

6
2M135
Medication Room

X

6
2M159
Medication Room

X

6
2M169
Clean Storage

X

6
2M170
Housekeeping

X

6
2M171
Soiled Utility

X

6
1M111
Housekeeping

X

6
1M109
Clean Storage

X

6
1M107
Soiled Utility

X

6
1M121
Soiled Utility

X

6
1M125
Housekeeping

X

6
1M134
Fume Room

X

6
1M153
Medication Room

X

6
1M236
Clean Storage

X

6
1M233
Housekeeping

X

6
1M222
Soiled Utility

X

7
1N408
Clean Storage

X

7
4N101
Clean Storage

X

7
4N105
Clean Storage

X

7
4N107
Clean Storage

X

7
3N105
Housekeeping

X

7
1N104
Soiled Utility

X

7
1N106
Soiled Utility

X

7
1N111
Gas cylinder Storage

X

7
1N
Housekeeping

X

8
1P121
Housekeeping

X

1P111
Soiled Utility

X

2P159
Housekeeping
Y

X

3P153
Flammable Storage

X

3P155
Acid Storage

X

3P161
Housekeeping

X

4P159
Necro

X

4P160
Holding

X

4P161
Carc Holding

X

4P162
Quarantine Holding
Y

X

4P163
ENV Holding

X

4P163A
Enviro Porc

X

4P164
Diagnostic Hold
Y

X

4P165
Water Sys

X

4P166
Soiled Cage Wash

X

4P169
Holding
Y

X

4P170
Clean Cage Storage

X

4P170A
Clean Cage Wash

X

4P172
Holding
Y

X

4P173
Treatment

X

4P174
Gown Prep

X

4P174A
Operating Room

X

4P175
Holding
Y

X

4P176
X-Ray

X

4P180
Isolation Hold Ante

X

4P180A
Isolation Hold

X

4P181
Hold Rabbit
Y

X

4P183
Hold Rabbit
Y

X

4P185
Treatment

X

4P187
Treatment

X

4P188
Treatment

X

4P189
Holding
Y

X

4P190
Holding
Y

X image1.png image2.png

File details come from the government source that posted it. Updated .