32 39 13 - Manufactured Metal Bollards.pdf

PDF 129 KB Posted

Attached to
Z1LZ--Project No. 629-18-107 Construct Surface Level Parking Lot New Orleans, LA
Solicitation number
36C25621R0172
Issued by

About this file

This document provides details for a federal construction contract opportunity issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The solicitation is for Project No. 629-18-107 to construct a surface level parking lot at the Southeast Louisiana Veterans Health Care System in New Orleans, with an estimated construction cost between $1,000,000 and $2,000,000. Interested offerors must be verified as Service-Disabled Veteran-Owned Small Businesses. The request for proposals will be issued on or around September 24, 2021, with proposals due by October 26, 2021. The contract is expected to be awarded within 30 days of receipt of proposals. The contract performance period is 180 days from the notice to proceed. The work location is at the Gulf Coast Veterans Health Care System in Biloxi, Mississippi.

View the file

Other files

File Type Posted
36C25621R0172 0004.docx DOCX document
36C25621R0172 0003.docx DOCX document
36C25621R0172 0002.docx DOCX document
09 91 00 - Painting.pdf PDF
03072-3EP101-H - Panels L3411 and R32111A.pdf PDF
Register containing all RFI Inquiries _ Responses.pdf PDF
00 31 00.01 - Soils Report with Maps and Boring Logs.pdf PDF
Site Visit Sign-In Sheet - Proj 629-18-107.pdf PDF
36C25621R0172 0001.docx DOCX document
FAR 52.223-99 COVID-19 Safety Protolcols for Federal Contractors.pdf PDF
Site Map for Site Visit.pdf PDF
DB Wage Determination - General Decision No LA20210041 06-18-2021.pdf PDF
Exhibit B - Past _ Present Past Performance Questionaire.docx DOCX document
Exhibit E - Surety Form.docx DOCX document
Exhibit D - Contractor Evaluation Form Construction Safety.docx DOCX document
Drawings - Project No 629-18-107 Construct Surface Level Parking.pdf PDF
Exhibit A - Performance Relevancy Survey.docx DOCX document
ICRA - Project No 629-18-107 Construct Surface Level Parking Lot.xlsx XLSX spreadsheet
Exhibit C - Subcontractor Information _ Consent Form.docx DOCX document
36C25621R0172.docx DOCX document
Exhibit F - Request for Information Form.docx DOCX document
Specifications - Project No 629-18-107 Construct Surface Level Parking.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Southeast Louisiana Veterans Health Care System, New Orleans, LA 12-17 Project No. 629-18-107 Construct Surface Level Parking Lot LACHIN Architects, apc

Manufactured Metal Bollards Removable Bollards 32 39 13-1

SECTION 32 39 13

Manufactured Metal Bollards

Removable Bollards

PART 1 - GENERAL

1.1 CONDITIONS AND REQUIREMENTS

A. The General Conditions, Supplementary Conditions, and Division 01 – General Requirements apply.

1.2 SECTION INCLUDES

A. Section 32 39 13 – Manufactured Metal Bollards: Removable Manufactured Metal Bollards of the following types:

1. 8 inch Removable Schedule 80 Bollards.

2. Embedment Sleeve for Removable Bollards.

1.3 RELATED SECTIONS

A. Section 05 50 00 – Metal Fabrications.

1.4 REFERENCES

A. ASTM International (ASTM):

1. ASTM A53: Standard Specification for Pipe, Steel, Black and Hot-

Dipped Zinc-Coated, Welded and Seamless.

1.5 SUBMITTALS

A. Submit under provisions of Section 01 30 00 - Administrative Requirements.

B. Product Data:

1. Manufacturer's printed product literature, specifications, and data sheet.

2. Storage and handling requirements and recommendations.

3. Installation methods.

4. Maintenance and service instructions.

C. Shop Drawings: Submit installation drawings indicating bollard locations, materials, dimensions, weights, sizes, and finishes. Include plans, elevations, sections, foundation drawings, and details of anchorage.

1.6 DELIVERY, STORAGE AND HANDLING

A. Storage and Protection: Store bollards indoors until installation to protect from weather.

1.7 SEQUENCING AND SCHEDULING

A. Sequencing and Scheduling, General: Refer to sequence requirements specified in Section 01 11 00 - Summary of Work and Section 01 32 16 - Construction Progress Schedule requirements specified in Section 01 33 00 - Submittals Procedures.

Manufactured Metal Bollards Removable Bollards 32 39 13-2

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Specified Manufacturer: 1-800-Bollards, 23392 Madero Road, Suite L, Mission Viejo, CA, 92691-2737, 1-866-748-4676. Email:

info@1800bollards.com; Web: www.1800bollards.com.

B. Requests for substitutions will be considered in accordance with provisions specified in Section 01 62 00 – Product Options.

2.2 MATERIALS

A. 8 inch Removable Schedule 80 Bollards.

1. Lock type: Internal Locking.

2. Height: 30 inches.

3. Depth: 34-5/16 inches.

4. Pipe diameter: 8 inches.

5. Material: Carbon steel: Schedule 80.

6. Outside diameter: 8.62 inches.

7. Wall thickness 0.500 inches.

8. Security level: High.

9. Weight: 238 pounds.

10. Cap style: Flat.

B. Embedment Sleeve for Removable Bollards.

1. Size: 12 inch.

2. Material: Type 304 stainless steel with attached lid. The lid will lock down when the bollard is removed.

3. Lock: Inside embedment sleeve, underground.

2.3 FINISH

A. Powder coated carbon steel. RAL# 9023 B. Stainless steel type 304, polished to a #4 satin finish.

C. Stainless steel type 316, polished to a #4 satin finish.

2.4 ACCESSORIES

A. Storage sleeves.

B. Chain eyes.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine Project conditions and completed Work with Installer present and verify compliance for level finished grade, mounting surfaces, installation tolerances, and other conditions impacting performance of the Work.

B. Immediately correct all deficiencies and conditions which would cause improper execution of Work specified in this Section and subsequent Work.

C. If substrate preparation is the responsibility of another installer, notify Architect in writing of unsatisfactory preparation.

mailto:info@1800bollards.com http://www.1800bollards.com/

Manufactured Metal Bollards Removable Bollards 32 39 13-3

D. Proceeding with Work specified in this Section shall be interpreted to mean that all conditions were determined to be acceptable prior to start of Work.

3.2 PREPARATION

A. Clean surfaces thoroughly prior to installation. Ensure all surfaces are clear of dirt and debris.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

C. Store bollards indoors until installation to protect from weather.

3.3 INSTALLATION

A. Install 1-800-Bollards Removable Bollards in accordance with manufacturers instructions and recommendations and the authorities having jurisdiction.

B. Ensure all bollard equipment to be installed is located at the site.

C. Install in accordance with approved submittals and in proper relationship with adjacent construction.

D. Protect all surfaces from debris, dirt, and concrete pour during installation.

E. Install 1-800-Bollards Removable Bollards level and plumb.

F. Anchor bollards securely.

3.4 PROTECTION AND MAINTENANCE

A. Protection, General: Comply with the following requirements.

1. Store bollards indoors until installation to protect from weather.

2. Protect installed products until completion of the project.

3. Protect adjacent work areas and finish surfaces from damage during product installation.

4. Clean products in accordance with the manufacturer’s recommendations.

5. Touch-up, repair, or replace damage products prior to

Substantial Completion.

B. Maintenance: Wipe down stainless steel bollards at least once per month to remove oxidants.

END OF SECTION

PART 1 - GENERAL
1.1 CONDITIONS AND REQUIREMENTS
A. The General Conditions, Supplementary Conditions, and Division 01 – General Requirements apply.
1.2 SECTION INCLUDES
A.
A.
A. Section 32 39 13 – Manufactured Metal Bollards: Removable Manufactured Metal Bollards of the following types:
1.
1.
1.
1.
1. 8 inch Removable Schedule 80 Bollards.
1.
1.
2. Embedment Sleeve for Removable Bollards.
1.3 RELATED SECTIONS
A. Section 05 50 00 – Metal Fabrications.
A.
1.4 REFERENCES
A. ASTM International (ASTM):
1. ASTM A53: Standard Specification for Pipe, Steel, Black and Hot-Dipped Zinc-Coated, Welded and Seamless.
1.
1.5 SUBMITTALS
B. Product Data:
1. Manufacturer's printed product literature, specifications, and data sheet.
2. Storage and handling requirements and recommendations.
3. Installation methods.
4. Maintenance and service instructions.

C. Shop Drawings: Submit installation drawings indicating bollard locations, materials, dimensions, weights, sizes, and finishes. Include plans, elevations, sections, foundation drawings, and details of anchorage.

1.6 DELIVERY, STORAGE AND HANDLING
A. Storage and Protection: Store bollards indoors until installation to protect from weather.
1.7 SEQUENCING AND SCHEDULING
A. Sequencing and Scheduling, General: Refer to sequence requirements specified in Section 01 11 00 - Summary of Work and Section 01 32 16 - Construction Progress Schedule requirements specified in Section 01 33 00 - Submittals Procedures.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Specified Manufacturer: 1-800-Bollards, 23392 Madero Road, Suite L, Mission Viejo, CA, 92691-2737, 1-866-748-4676. Email: info@1800bollards.com; Web: www.1800bollards.com.
A.
A.
A.
A.
A.
B. Requests for substitutions will be considered in accordance with provisions specified in Section 01 62 00 – Product Options.
2.2 MATERIALS
A. 8 inch Removable Schedule 80 Bollards.
1. Lock type: Internal Locking.
2. Height: 30 inches.
3. Depth: 34-5/16 inches.
4. Pipe diameter: 8 inches.
5. Material: Carbon steel: Schedule 80.
6. Outside diameter: 8.62 inches.
7. Wall thickness 0.500 inches.
8. Security level: High.
9. Weight: 238 pounds.
10. Cap style: Flat.
B. Embedment Sleeve for Removable Bollards.
1. Size: 12 inch.
2. Material: Type 304 stainless steel with attached lid. The lid will lock down when the bollard is removed.
3. Lock: Inside embedment sleeve, underground.
2.1
2.1
2.1
2.1
2.3 FINISH
A. Powder coated carbon steel. RAL# 9023
B. Stainless steel type 304, polished to a #4 satin finish.
A. Stainless steel type 316, polished to a #4 satin finish.
C.
2.4 ACCESSORIES
A. Storage sleeves.
B. Chain eyes.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine Project conditions and completed Work with Installer present and verify compliance for level finished grade, mounting surfaces, installation tolerances, and other conditions impacting performance of the Work.
B. Immediately correct all deficiencies and conditions which would cause improper execution of Work specified in this Section and subsequent Work.
C. If substrate preparation is the responsibility of another installer, notify Architect in writing of unsatisfactory preparation.
D. Proceeding with Work specified in this Section shall be interpreted to mean that all conditions were determined to be acceptable prior to start of Work.
3.2 PREPARATION
A. Clean surfaces thoroughly prior to installation. Ensure all surfaces are clear of dirt and debris.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
C. Store bollards indoors until installation to protect from weather.
3.3 INSTALLATION
A. Install 1-800-Bollards Removable Bollards in accordance with manufacturers instructions and recommendations and the authorities having jurisdiction.
B. Ensure all bollard equipment to be installed is located at the site.
C. Install in accordance with approved submittals and in proper relationship with adjacent construction.
D. Protect all surfaces from debris, dirt, and concrete pour during installation.
E. Install 1-800-Bollards Removable Bollards level and plumb.
F. Anchor bollards securely.
3.4 PROTECTION AND MAINTENANCE
A. Protection, General: Comply with the following requirements.
1. Store bollards indoors until installation to protect from weather.
2. Protect installed products until completion of the project.
3. Protect adjacent work areas and finish surfaces from damage during product installation.
4. Clean products in accordance with the manufacturer’s recommendations.
5. Touch-up, repair, or replace damage products prior to Substantial Completion.
B. Maintenance: Wipe down stainless steel bollards at least once per month to remove oxidants.