This document includes a federal contract solicitation and related questions and responses file. The solicitation is for replacement of high voltage feed at the Eugene Towbin Veterans Hospital in North Little Rock, Arkansas. The contractor shall remove overhead transmission lines and install underground concrete-encased duct bank between two manholes. Work must minimize electrical power interruptions to the critical care hospital. The acquisition is set aside for Service-Disabled Veteran Owned Small Businesses and has an estimated value between $500,000 and $1 million. The NAICS code is 236220 with a size standard of $39.5 million. The solicitation is anticipated for release on June 9, 2021 through beta.sam.gov. The point of contact is Bradley Martin at the Department of Veterans Affairs Veterans Health Administration VISN 16.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replacement of 15kV Electrical Feeder RFIs

1. Please provide Geotech report and information for site and surrounding areas as it relates the project?

Geotechnical Information is not available for this site. A geotechnical report was not included in the Scope of Work for this project. General Contractor to assess site conditions as may be necessary to perform work within their scope and prepare bids accordingly.

2. Please provide survey maps of the CAVHS property and surrounding/adjacent lots and parcels as some of the lot lines shown on the RFQ documents do not align. Please include actual easement location and data as the existing utilities lines and pole are shown in a straight line but actual conditions very as much 10 to 20 feet.

The only topographical survey information MCE possesses is shown on the project Topographical Survey sheets. Parcel information was included on the plan that formed part of the Permanent Utility Easement agreement with the City of North Little Rock. We have attached a copy of this information to this RFI response. We are unaware of any further information.

3. Please provide water utilities underground as-builts and Central Arkansas Water Utility as- built, locations, and service entrances for coordination.

Underground utilities as-built information is not available for this site, especially given the age of potential utilities in this area. As-built assessments of existing utilities was not included in the Scope of Work for this project. General Contractor to assess site conditions as may be necessary to perform work within their scope and prepare bids accordingly.

4. The current “blast wall” configurations and location will not work as designed due to the overall clearances and existing conditions. Please review and advise of new design and/or relocation.

Addendum #1 (Issued 7/30/2021) to take the “blast wall” out of the project scope of work under the condition that the proper, less-flammable, oil found in the project specifications is used in the new transformer.

5. Can the transformer be relocated for future accessibility as the current location will required a multistep process for service and replacement if required.

Not at this time due to A/E design final submittals and solicitation process

6. Will the CAVHS coordinate and provide access to the local Electric Utility for use of their Right-of -Way for access to CAVHS easement for the duration of the project.

The local utility is City of North Little Rock Electric Department. Their contact number is 501-992-4073 (Greg Woodward). First contact will come from contractor and CAVHS will support as necessary, but the responsibility is on the contractor.

7. Will CAVHS allow the use of the existing/on-site stand-by generator for the duration of the of the changeover/tie-in of the new underground feeders? If so, will the contractor be required for the fuel replacement for the time of uses.

Contractor needs to bring their own generator and connect on the line side to the main disconnect. CAVHS generator can act as an emergency backup generator if contractor’s goes down for any reason.

8. The contractor will be required to construct a temporary staging area for equipment access and hoisting of materials to and from the elevated pump house and surrounding areas. Will the contractor be required to remove the temporary staging area, or could it remain in place upon completion?

Yes

9. “…After the site visit, there were conversations among the site visit attendees…”

Solicitors should not be talking among themselves per VA bidding requirements. Solicitor should make their individual estimation and bid on project if they think is feasible for them.

10. What is the actual footage from the northeast corner of the pit to where the utility easement narrows down?

713.5 feet (measured along the conduit route as drawn).

11. How wide is the utility easement on each side of the poles?

No known easement for the existing poles.

For the cable route:

The easement agreed with the City was 20 feet wide (10 feet on either side of the imaginary centerline of the cable route).

The cable route itself, with all four HDPE ducts installed, will have a minimum width of around 28” (see typical bore detail on sheet CS101 attached).

12. Can the bore be straightened out any from northeast corner of pit to where it 45s northwest and then 45s back to the north?

This is a matter for the boring contractor to decide on what they can safely achieve, though any large deviation from the bore route shown for the 20’ wide cable easement may necessitate a revision to the Permanent Utility Easement agreement already secured with the City of North Little Rock.

13. Is there possibly more easement on the east side where actual utility corridor starts?

There is no existing easement beyond that already secured with the City of North Little Rock back in August 2020.

14. Do we know what is in pit by where concrete wall is going and where do the components run?

These are the water lines connections/valves going from the pump house up the hill into the campus.

15. Which way does the inlet and outlet pipe run in the manhole by concrete wall?

Refer to question-14 picture and statement

16. Where does existing electrical come into existing transformer by concrete wall?

Existing conditions are that primary conductors go underground from the nearby dip pole and then up through the concrete pad into the primary compartment of the transformer. Please see Detail E3 Sheet ED101 Keyed Notes 1 and 2. New configuration is shown on Sheet ES101, where some existing primary conduit to the transformer is reused to route new primary conductors into the primary compartment of the transformer.

17. In the event existing pipes are in place where concrete electrical trench is going be, does there need to be a block out between concrete casing and pipes or can concrete butt to existing pipes.

There is only boring, no concrete trench.

image1.png