A0001 Attch C _598-18-106_Constuct Main Entrance_Specifications 04232021.pdf

PDF 4 MB Posted

Attached to
Y1DA--Construct Main Entrance for JLM - 598-18-106 (VA-21-00038011)
Solicitation number
36C25621R0093
Issued by

About this file

This document provides details for a federal construction contract opportunity for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The solicitation will require a general contractor to construct a new main entrance at the John L. McClellan Memorial Veterans Hospital in Little Rock, Arkansas. Key project elements include creating the main entrance at the south canopy/drop-off location, improving patient entry, drop-off, and pick-up areas, providing covered walkways, and traffic and parking improvements. The contract is for general construction services with an estimated value between $5 million and $10 million. The North American Industry Classification System code 236220 for Commercial and Institutional Building Construction applies. The solicitation is anticipated to be released on or around May 5, 2021 on beta.SAM.gov. The point of contact for the pre-solicitation notice is provided.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C-256-18-D-0128

VA Project No. 598-18-106

Construct Main Entrance @JLM JLM Memorial Veterans Hospital

Little Rock, AR

SPECIFICATION MANUAL

CONSTRUCTION DOCUMENTS

2021.04.23

[Addendum 1]

JohnsonDanforth, Inc.

2200 N. Rodney Parham Road | Suite 210

Little Rock, AR 72212 P: (501) 404-4811 F: (501) 404-2411

JohnsonDanforth & Associates

Construct New Entrance for JLM 598-18-106 Construction Documents

JLM Memorial Veterans Hospital

2020.12.18

00 00 01

• 00 01 15

• 01 00 00

• 01 32 16.15

• 01 33 23

• 01 35 26

• 01 42 19

• 01 45 00

• 01 57 19

• 01 74 19

• 02 41 00

• 02 82 13.21

• 07 84 00

• 07 92 00

• 09 05 16

• 09 51 00

• 09 65 13

• 09 65 19

• 09 67 23.30

• 09 91 00

• 10 75 00

PROJECT MANUAL

SEAL PAGE 1 OF 10

ARCHITECT

JohnsonDanforth & Associates 2200 North Rodney Parham Road, Suite 210 Little Rock, AR 72212 Sections:

Date

Jim Matchett, AIA, NCARB Name & Title

Construction Documents

JLM Memorial Veterans Hospital

SEAL PAGE 2 OF 10

CIVIL ENGINEER

McClelland Consulting Engineers, Inc.

7302 Kanis Road Little Rock, AR 72204

• 03 15 00

• 03 20 01

• 03 30 00

• 10 14 00

• 31 00 00

• 31 10 00

• 31 11 00

• 31 23 10

• 32 01 16

• 32 11 13.16

• 32 11 23

• 32 12 16

• 32 13 13

• 32 16 23

• 32 17 13

• 32 17 23

• 32 92 00

• 32 92 23

• 33 05 13

• 33 41 00

• 33 42 10

Dan Beranek , P.E .

Construction Documents

JLM Memorial Veterans Hospital

SEAL PAGE_3 OF 10

STRUCTURAL ENGINEER

Bernhard TME, LLC 1 Allied Drive, Building II, Suite 2600 Little Rock, AR 72202

• 01 45 29

• 01 45 35

• 31 63 26

Kenneth L. Jones, PE

Construction Documents

JLM Memorial Veterans Hospital

SEAL PAGE_4 OF 10

STRUCTURAL ENGINEER

Maffeis Engineering Inc.

801 Second Avenue New York, NY 10017 United States of America

• 05 12 00

• 05 14 00

• 05 19 00

• 13 31 23

MATTHEW BYE, PE

Construction Documents

JLM Memorial Veterans Hospital

SEAL PAGE_5 OF 10

ELECTRICAL ENGINEER

Bernhard TME, LLC 1 Allied Drive, Building II, Suite 2600

• 26 09 23

• 26 56 00

Ali Honarmand, PE

Construction Documents

JLM Memorial Veterans Hospital

PROJECT MANUAL SEAL

Engineer Insight Engineering 201 S. Chester St., Suite 1 Little Rock, AR 72201

• 22 05 11

Kim Koch, PE

Construction Documents

JLM Memorial Veterans Hospital

201 S. Chester St., Suite 1

• 23 05 11

• 23 05 93

Kim Koch, PE

Construction Documents

JLM Memorial Veterans Hospital

• 26 05 11

• 26 05 19

• 26 05 26

• 26 05 33

• 26 05 41

• 26 27 26

• 28 05 00

• 28 05 13

• 28 05 26

• 28 05 28.33

• 28 23 00

SEAL PAGE_8 OF 10

201 S. Chester St., Suite 2

Mike Harkey, PE

Construction Documents

JLM Memorial Veterans Hospital

SEAL PAGE_9 OF 10

LANDSCAPE ARCHITECT

Landscape Architecture Inc.

221 West 2nd Street, Suite 510

• 32 84 00

• 32 90 00

Cinde L. Bauer, PLA

Construction Documents

JLM Memorial Veterans Hospital i.

'Ill

Jo. 11,818 l J

:""l.t3./Zb/ZO <f, ( p , '6 -- pl'

COMMISSIONING ENGINEER

Bernhard TME Building 2, l Allied Drive, Suite 2600

• 01 91 00

• 26 08 00

Michael P. Barnett, PE, HFDP, CEM Direct of Commissioning

Construct New Entrance for JLM JLM Memorial Veterans Hospital 598-18-106 12-01-20 Construction Documents – Addendum 1 2021.04.23

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 03-20 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 03-19 01 74 19 Construction Waste Management 09-13 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 13.21 Asbestos Roof Flashing Abatement 10-19

DIVISION 03 – CONCRETE

03 15 00 SITE CONCRETE EXPANSION, CONSTRUCTION, AND CONTRACTION

JOINTS

06-19

03 20 01 Site Concrete Reinforcing 09-27 03 30 00 Cast-in-Place Concrete 12-15

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 14 00 Structural Aluminum Framing 11-18 05 19 10 Steel Cables 12-19

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16

00 01 10-2

09 65 19 Resilient Tile Flooring 05-18 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3) 07-14 09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 ADA PARKING AND STOP SIGNS 06-19

10 75 00 Flagpoles 02-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 31 23 Tension Membrane Roof 12-19

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installation 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-16 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 27 26 Wiring Devices 01-18 26 56 00 Exterior Lighting 01-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 01-16 28 05 13 Conductors and Cables for Electronic Safety and Security 01-16 28 05 26 Grounding and Bonding for Electronic Safety and Security 09-11 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 01-16 28 23 00 Video Surveillance 01-16

DIVISION 31 – EARTHWORK

31 00 00 Earthwork 09-27 31 10 00 Site Clearing 09-27 31 11 00 Clearing and Grubbing 09-27 31 23 10 Trenching Excavation, Backfill, and Compacting 09-27 31 63 26 Drilled Caissons 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

00 01 10-3

32 01 16 Cold Milling of Asphalt Paving 09-27 32 11 13.16 Bituminous Pavement Rejuvenation 06-19 32 11 23 Aggregate Base Course 09-27 32 12 16 Asphalt Paving 09-15 32 13 13 Concrete Paving 09-27 32 16 23 Concrete Sidewalks 09-27 32 17 13 Parking Bumpers 06-19 32 17 23 Pavement Markings 08-16 32 84 00 Planting Irrigation 08-16 32 90 00 Planting 08-16

32 92 00 TEMPORARY SEEDING AND MULCHING 06-19

32 92 23 Sodding 09-27

DIVISION 33 – UTILITIES

33 05 13 Manhole and Structures 09-27 33 41 00 Storm Utility Drainage Piping 09-27 33 42 10 Stormwater Drainage Piping and Fittings Only 09-27

598-18-106 07-01-15 Construction Documents – Addendum 1 2021.04.23

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

ADDENDUM 1 [04.23.2021]

GENERAL

GI003 PHASING PLAN

GC111 GROUND FLOOR ICRA PLAN

GC112 ICRA MATRIX

ARCHITECTURAL

AD102 DEMOLITION PLAN

AD111 REFLECTED CEILING DEMOLITION PLAN

AE101 RENOVATION PLAN

AE111 NEW REFLECTED CEILING PLAN

IN101 FINISH FLOOR PLAN

PLUMBING

PD102 F POD FLOOR PLAN – MEDICAL GAS DEMOLITION

PL101 F POD AND ANIMAL RESEARCH AREA FLOOR PLAN –

DOMESTIC WATER

PG101 F POD FLOOR PLAN – MEDICAL GAS NEW

MECHANICAL

MH101 F POD FLOOR PLAN – HVAC NEW

ELECTRICAL

ED103 F POD FLOOR PLAN – POWER AND SYSTEMS DEMOLITION

EP202 F POD FLOOR PLAN – POWER AND SYSTEMS NEW

ORIGINAL [12.18.2020]

GENERAL

GI001 COVER SHEET

GI002 STANDARD ABBREVIATIONS

GI101 ICRA PLAN – CLASS II

GI102 ICRA PLAN – CLASS IV

Construction Documents – Addendum 1 2021.04.23

00 01 15 - 2

GI103 ICRA PLAN – LEGEND C

HAZARDOUS ABATEMENT

HA101 ASBESTOS ABATEMENT PLAN

CIVIL

CD101 DEMOLITION PLAN – SOUTH

CD102 DEMOLITION PLAN – NORTH

CD103 DEMOLITION – PAVEMENT REMOVAL PLAN – SOUTH

CD104 DEMOLITION – PAVEMENT REMOVAL PLAN – NOUTH

CD105 EROSION CONTROL PLAN – SOUTH

CD106 EROSION CONTROL PLAN – NOUTH

CS101 SITE PLAN – SOUTH

CS102 SITE PLAN – NORTH

CG101 GRADING PLAN SOUTH

CG102 GRADING PLAN NORTH

CG103 DRAINAGE PLAN – SOUTH

CG104 DRAINAGE PLAN – NORTH

CU101 UTILITY PLAN – SOUTH

CU102 UTILITY PLAN – NORTH

CJ501 MISCELLANEOUS DETAILS I

CJ502 MISCELLANEOUS DETAILS II

CJ503 MISCELLANEOUS DETAILS III

CJ504 MISCELLANEOUS DETAILS IV

CJ505 MISCELLANEOUS DETAILS V

LANDSCAPE

LI101 IRRIGATION PLAN

LI102 IRRIGATION PLAN

LI103 HEALING GARDEN

LP101 OVERALL LANDSCAPE PLAN

LP102 LANDSCAPE ENLARGEMENT 1

LP103 LANDSCAPE ENLARGEMENT 2

LP104 LANDSCAPE ENLARGEMENT 3

LP103 LANDSCAPE DETAILS AND NOTES

LP104 HEALING GARDEN DEDUCTIVE ALTERNATE 7

00 01 15 - 3

STRUCTURAL

S001 STRUCTURAL NOTES

SB101 CANOPY FOUNDATION PLAN

SB102 ENLARGED FOUNDATION PLAN

SB103 ENLARGED FOUNDATION PLAN

SB104 ENLARGED FOUNDATION PLAN

SB105 ENLARGED FOUNDATION PLAN

SJ501 FOUNDATIONS SECTIONS

SJ502 FOUNDATIONS SECTIONS

SJ503 FOUNDATIONS SECTIONS

SK000 GENERAL ARRANGEMENT GENERAL NOTES

SK100 GENERAL ARRANGEMENT CANOPY ARRANGEMENT PLAN

SK301 GENERAL ARRANGEMENT CANOPY ZONE CP101

SK302 GENERAL ARRANGEMENT CANOPY ZONE CP102

SK303 GENERAL ARRANGEMENT CANOPY ZONE CP103

SK304 GENERAL ARRANGEMENT CANOPY ZONE CP104

SK305 GENERAL ARRANGEMENT CANOPY ZONE CP105

SK306 GENERAL ARRANGEMENT CANOPY ZONE CP106

SK307 GENERAL ARRANGEMENT CANOPY ZONE CP107

SK308 GENERAL ARRANGEMENT CANOPY ZONE CP108

SK309 GENERAL ARRANGEMENT CANOPY TRANSITION

SK501 TYPICAL CLAMPING DETAIL

SK502 TYPICAL CONNECTION DETAILS

SK503 DRAINAGE AND GUTTER DETAILS

SK504 CANOPY 108 TYPICAL DETAILS

ARCHITECTURAL

AD101 DEMO PLANS

AS101 ARCHITECTURAL SITE PLAN

AS102 ENLARGED ARCHITECTURAL SITE PLAN

AS103 SITE SIGNAGE PLAN

AS104 PHASING PLAN PHASE 1

AS105 PHASING PLAN PHASE 2

AS106 PHASING PLAN PHASE 3

AS107 HEALING GARDEN PLAN

AS108 FORCE PROTECTION AND SIDEWALK PLAN

Construction Documents – Addendum 1 2021.04.23

00 01 15 - 4

AE201 CANOPY ELEVATIONS

AE202 ENTRY PORTAL ELEVATIONS

AE203 HEALING GARDEN SHADING STRUCTURES A & D

AE204 HEALING GARDEN SHADING STRUCTURES B & C

AE301 CANOPY SECTIONS

AE302 SOUTH ENTRANCE CANOPY 108 – SOFIT AND WALL

AE303 CANOPY 107 SECTION AND PLAN

AE304 CANOPY 106 SECTION AND PLAN

AE305 CANOPY 104 AND 105 ENLARGED SECTION AND PLAN

AE306 CANOPY 103 SECTION AND PLAN

AE307 CANOPY 102 SECTIONS

AE308 CANOPY 101 SECTION AND PLAN

AE309 FLAG PLAZA SECTION

AE310 NEW – PLANTER PLAN AND SECTIONS

AE311 COMTEMPLATIVE GARDEN SECTIONS AND ELEVATIONS

AE312 BENCH AND HACKETT STONE SECTION DETAIL

AE401 ENLARGED CANOPY ELEVATIONS

AE501 SIGNAGE DETAILS

AE502 SIGNAGE DETAILS

ELECTRICAL

ED101 SITE PLAN – LIGHTING GROUND - DEMOLITION

ED102 SITE PLAN – GROUND – POWER DEMOLITION

EJ401 SCHEDULES – LIGHTING

EJ402 DETAILS - LIGHTING

EP201 SITE PLAN – CANOPY POWER

EP301 SITE PLAN – GROUND – POWER

EP401 ONE-LINE DIAGRAM

EP402 MAIN ENTRANCE – CAMERA ONELINE

ES201 SITE PLAN – LIGHTING CANOPY

ES202 SITE PLAN – LIGHTING GROUND

ES203 CALCS – LIGHTING

ES204 HEALING GARDEN

- - - E N D - - -

598-18-106 12-01-18 Construction Documents – Addendum 1 2021.04.23 i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 WARRANTY MANAGEMENT

1.16 USE OF ROADWAYS

1.17 RESIDENT ENGINEER'S FIELD OFFICE

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.19 TEMPORARY USE OF EXISTING ELEVATORS

1.20 TEMPORARY USE OF NEW ELEVATORS

1.21 TEMPORARY TOILETS

1.22 AVAILABILITY AND USE OF UTILITY SERVICES

1.23 NEW TELEPHONE EQUIPMENT

1.24 TESTS

1.25 INSTRUCTIONS

1.26 GOVERNMENT-FURNISHED PROPERTY

1.27 RELOCATED // EQUIPMENT // ITEMS //

1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

1.29 CONSTRUCTION SIGN

1.30 SAFETY SIGN

1.31 PHOTOGRAPHIC DOCUMENTATION

1.32 FINAL ELEVATION Digital Images

1.33 HISTORIC PRESERVATION

1.34 VA TRIRIGA CPMS

Construction Documents – Addendum 1 2021.04.23

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Construct New Entrance for

JLM, JLM Memorial Veterans Hospital, Little Rock, Arkansas as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Medical Center COR.

C. Offices of JohnsonDanforth & Associates, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR .

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

Construction Documents – Addendum 1 2021.04.23

01 00 00 -2

1.3 STATEMENT OF BID ITEM(S)

A. BID ITEM 1, BASE BID: The contractor shall provide all necessary tools, labor, material, equipment, permits, license, and supervision for

“CONSTRUCT NEW MAIN ENTRANCE AT JLM” Project Number 598-18-106, located at the JLM MEMORIAL VETERANS HOSPITAL in Little Rock, AR in accordance with the Drawings and Specifications. Work includes, but not limited to: General demolition, construction, electrical, site grading, paving, landscaping, and lighting.

BID ITEM II, DEDUCT ALTERNATE #1: Deduct Canopy 107 between column line

#32 and #36 at the North Entrance.

BID ITEM III, DEDUCT ALTERNATE #2: Deduct window film.

BID ITEM IV, DEDUCT ALTERNATE #3: Deduct all supplemental lighting under the parking lot PV structures.

BID ITEM V, DEDUCT ALTERNATE #4: Deduct all RGB lighting and replace with white lights under canopy.

BID ITEM VI, DEDUCT ALTERNATE #5: Deduct Canopy 106 between column lines #26 and #31

BID ITEM VII, DEDUCT ALTERNATE #6: Deduct Teflon coated fabric for canopies. Replace with PVC fabric.

BID ITEM VIII, DEDUCT ALTERNATE #7: Deduct Healing Garden in its entirety as indicated on the Drawings Sheet AS 101 and AS 108.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

Construction Documents – Addendum 1 2021.04.23

01 00 00 -3

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This

Construction Documents – Addendum 1 2021.04.23

01 00 00 -4 information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Construction Documents – Addendum 1 2021.04.23

01 00 00 -5

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR .

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work

Construction Documents – Addendum 1 2021.04.23

01 00 00 -6 days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor, as shown on phasing drawings:

H. Building(s) No.(s) JLM will be occupied during performance of work; but immediate areas of alterations will be vacated.

1.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and

Construction Documents – Addendum 1 2021.04.23

01 00 00 -7 equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding Subparagraph

1 will be temporarily vacated while alterations are performed. H.

Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR .

I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

J. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .

Construction Documents – Addendum 1 2021.04.23

01 00 00 -8

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR [Chief Engineer][Chief of

Facilities Management]. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval.

Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS

INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC

SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR , in writing, 7 days n advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center . Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR .

5. In case of a contract construction emergency, service will be interrupted on approval of COR . Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be

Construction Documents – Addendum 1 2021.04.23

01 00 00 -9 removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

L. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. // Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval. //

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR .

M. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by area:

1. Existing condition and types of roofs, windows, walls and other surfaces not required to be altered throughout affected areas of construction.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

2. Shall note any discrepancies between drawings and existing conditions at site.

3. Shall designate areas for working space, materials storage and routes of access to areas within buildings and areas where alterations occur and which have been agreed upon by Contractor and

COR .

Construction Documents – Addendum 1 2021.04.23

01 00 00 -10

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE

CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR

852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

Construction Documents – Addendum 1 2021.04.23

01 00 00 -11

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract

Construction Documents – Addendum 1 2021.04.23

01 00 00 -12 or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.

Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the

Contractor's method of operations and operations planning and the

Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

- Designating areas for equipment maintenance and repair;

- Providing waste receptacles at convenient locations and provide regular collection of wastes;

- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

- Providing adequately maintained sanitary facilities.//

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, Construction Documents – Addendum 1 2021.04.23

01 00 00 -13 do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings.

C. A copy of the soil report is included in the specifications and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after

Construction Documents – Addendum 1 2021.04.23

01 00 00 -14 investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark column lines and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey

Construction Documents – Addendum 1 2021.04.23

01 00 00 -15 control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.

Furnish such certification to the COR before any major items of concrete work are placed.

E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR .

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the Resident Engineer's // COR // review, as often as requested.

C. Contractor shall deliver two approved completed sets ofas-built drawings in the electronic version (scanned PDF) to the COR [Chief

Engineer][Chief of Facilities Management] within 15 calendar days after

Construction Documents – Addendum 1 2021.04.23

01 00 00 -16 each completed phase and after the acceptance of the project by the

Resident Engineer //COR//.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

Construction Documents – Addendum 1 2021.04.23

01 00 00 -17

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance Bond: The Performance Bond must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

Construction Documents – Addendum 1 2021.04.23

01 00 00 -18

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the

Construction Documents – Addendum 1 2021.04.23

01 00 00 -19 timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated…

This is the start of the file's text. The full file is on GovTribe.