This document contains a federal contract opportunity solicitation for boiler maintenance services and a related document outlining requirements for RO water purification unit maintenance.

The federal contract opportunity solicitation is for boiler maintenance services for the Southeast Louisiana Veterans Health Care System located in New Orleans, Louisiana. Quotes are due by April 12, 2020 to Tiffany Conner at tiffany.conner@va.gov. The solicitation is set aside 100% for SDVOSB and has a $8 million business size standard.

The related document outlines monthly inspection and maintenance requirements for an RO water purification unit's membranes, filters, tanks, pumps and overall system. Checks include filter changes every three months or as needed, weekly tank inspections, semi-annual pressure checks when the tank is empty, annual float calibration, and monthly pump, control and system inspections. System cleaning is required with each filter change.

View the file

Other files

File Type Posted
36C25621Q0433 0005.docx DOCX document
36C25621Q0433 0004_1.docx DOCX document
Question and answer.docx DOCX document
36C25621Q0433 0003.docx DOCX document
Questions and answers.docx DOCX document
36C25621Q0433 0002.docx DOCX document
IMG_0508.jpg JPG image
36C25621Q0433 0001_1.docx DOCX document
36C25620P0087 P00001.pdf PDF
36C25621Q0433_1 Boiler RFQ.docx DOCX document
Wage Determination 2015-5189 Rev 17.pdf PDF
36C25621Q0433.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: A. RO Unit: Q: what specific PM requirements for RO Unit Correct answer for above question: This contract only requires two filter changes per year. That includes the prefilter and membranes.

The maintenance is covered by another contract that is in place.

Please Disregard this information Below A: RO Membranes

1. Membranes and filters are to be inspected monthly. One set is to be on stand by at all times. During a change out, the membranes may be used only twice, with a cleaning between each use, before they are no longer usable. Membranes should be changed out every three months or as needed, whichever occurs first

0. Membranes and filters that fall under this

0. Carbon filter

0. Prefilters (sediment filter)

0. Polishing filters

0. Standard membrane

0. Vent filter on tank

0. Membrane change out shall be verified using a TDS meter. If the rejection of output water TDS drops below 80%, the membrane must be changed out.

Tank

1. Tank shall be inspected weekly for content leaks.

1. Tank pressure shall be checked semi annually

1. Pressure check must, at a minimum occur when the vessel is empty or near empty

1. Additional checks can be conducted at various levels.

1. Float calibration shall be verified annually (low level float, high level float, etc.)

1. Controls shall be visually checked monthly to ensure there are no programming error present, the screen and buttons are fully functional and readings are being recorded

Pumps

1. Pumps shall be inspected monthly. At a minimum, the following must be checked/verified

0. No loose fittings or connectors

0. Visual inspection of pump case (checking for leaks etc.)

0. Signs of erosion or rusting from the water

0. Voltage and amperage check to verify design parameters and operability System Cleaning

1. System cleaning and sanitization shall occur with each filter replacement.

RO System Check

1. Full system check shall be completed monthly. At a minimum, the additional items below shall be checked and documented:

3. Test RO feed water TDS, chlorine and water hardness content

3. Check and set pretreatment filter and water softener clocks

3. Check all controls

3. Check pump pressures

3. Log RO pump pressure, flow rate and temperature

3. Test RO product water TDS and log flow rates

3. Test RO reject water TDS and log flow rates

3. Log Recovery %

3. Log Rejection %

3. Log pressure gauge readings.

3. Check salt/ chemical tank levels and add as needed. Repair any minor leaks.

Any additional maintenance recommendations as required by the manufacturer.