Revised SOW Elevator Testing and Inspection IDIQ.docx

DOCX document 257 KB Posted

Attached to
J035--629-21-3-690-0005, Elevator Testing and inspection Base Year April 1, 2021-March 31, 2022
Solicitation number
36C25621Q0152
Issued by

View the file

Other files

File Type Posted
36C25621Q0152 0002_1.docx DOCX document
Revised Schedule of Supplies - Elevator Testing and Inspection.xlsx XLSX spreadsheet
Questions and answers.docx DOCX document
36C25621Q0152 0001_1.docx DOCX document
36C25621Q0152.docx DOCX document
36C25621Q0152_1.pdf PDF
Schedule of Supplies - Elevator Testing and Inspection.xlsx XLSX spreadsheet
SOW Elevator Testing and Inspection IDIQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Orleans VA Elevator Testing PWS – New Orleans Replacement Facility Attachment 2

Department of Veterans Affairs

Performance Work Statement

New Orleans VA Elevator Testing IDIQ

Southeast Louisiana Veterans Health Care System

New Orleans Replacement Facility

Department of Veterans Affairs

November 23, 2020

General Information The purpose of this IDIQ is for the Contractor to provide the New Orleans VA Medical Campus with semi-annual, annual, and quintennial elevator inspections and testing. There will be a total of 15 buildings on the campus required under this contract.

1.1. Project Title

New Orleans VA Elevator Testing IDIQ

1.2. Maximum individual task order amount is $36,000. Guaranteed minimum is $10,000. Period of performance shall begin on or around April 1, 2021 through March 31, 2022.

2. Project Background The vertical transport system located at 2400 Canal St.consists of Kone and Thyssen Krupp elevators which were activated in April 2014, December 2015, January 2016, May 2016, and August 2021. These elevators are currently housed in the following buildings: Pan American Building (also designated as Building Q), Outpatient (H and J), Central Energy Plant (N), Patient Garage (L), Inpatient (B and C), Diagnostic and Treatment (D, E, F, G), Transitional Living (M), Staff Garage (K), Research (P), and Fisher House (X).

3. Scope of Work The contractor shall provide all parts, travel, labor and materials necessary to provide five year (quintennial), annual, and semi-annual inspections on the elevators located at 2400 Canal St., New Orleans, LA. Inspection and testing shall be done in accordance with ASME section A17 (all subsequent sections) and NFPA. The contractor will be responsible for providing all inspection reports (electronic and paper copy), cab certificates and a copy of services completed. The contractor shall provide all resources necessary to accomplish the deliverables described in this performance work statement (PWS), except as may otherwise be specified. The elevator types and estimated quantities over the life of the contract are as follows:

Electric Traction Elevators (Passenger) – 20 Electric Traction Elevators (Service) – 13 Electric Traction Elevator (Large Service) – 2 Hydraulic Elevator (Passenger) – 5 Hydraulic Elevator (Service) - 2 All work shall be performed by personnel specifically qualified and trained to test and inspect the vertical transport systems, specifically elevator cars, controls, equipment, etc. described herein. Evidence of all required licenses, as well as documentation of qualifications of personnel, shall be provided to the Contracting Officer (CO) prior to award of contract. The maintenance contractor for the elevators at this site is prohibited from perfroming indepdent elevator testing on the same units. This contract shall contain one (1) base year plus four (4) option year extensions.

The following testing intervals have been anticipated for the entire campus per listed elevators in Attachment 1:

Year in Contract
Base Year (APR 21 – MAR 22)
Option Year One (APR 22 – MAR 23)
Option Year Two (APR 23 – MAR 24)
Option Year Three (APR 24 – MAR 25)
Option Year Four (APR 25 – MAR 26)

Building

Administration – Q Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
CEP- N Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Inpatient – B and C Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Patient Garage – L Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Diagnostic and Treatment – D,E, F, and G Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Employee Garage – K Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Outpatient – H and J Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Transitional Living - M Elevators
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Research – P Elevators
Semi Annual & Annual
Semi-Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual
Fisher House - X Elevators
Semi Annual & Annual
Semi-Annual & Annual
Semi Annual & Annual
Semi Annual & Annual
Quinquennial, & Semi Annual

Anticipated Task Order Schedule. Below represents anticipated elevators covered under Task Orders #1 thru #7. This number and dates are subject to change:

TASK ORDER 1 - BASE YEAR MARCH 2021 - APRIL 2022

Elevator
Inspection
Testing Date
CLIN 0001
Inpatient BP-01
Semi Annual
April 2021
CLIN 0002
Inpatient BP-01
Annual
October 2021
CLIN 0003
Inpatient BP-02
Semi Annual
April 2021
CLIN 0004
Inpatient BP-02
Annual
October 2021
CLIN 0005
Inpatient BP-03
Semi Annual
April 2021
CLIN 0006
Inpatient BP-03
Annual
October 2021
CLIN 0007
Inpatient BS-04
Semi Annual
April 2021
CLIN 0008
Inpatient BS-04
Annual
October 2021
CLIN 0009
Inpatient BS-05
Semi Annual
April 2021
CLIN 0010
Inpatient BS-05
Annual
October 2021
CLIN 0011
Inpatient BS-06
Semi Annual
April 2021
CLIN 0012
Inpatient BS-06
Annual
October 2021
CLIN 0013
Diagnostic and Testing DP-07
Semi Annual
April 2021
CLIN 0014
Diagnostic and Testing DP-07
Annual
October 2021
CLIN 0015
Diagnostic and Testing DP-08
Semi Annual
April 2021
CLIN 0016
Diagnostic and Testing DP-08
Annual
October 2021
CLIN 0017
Diagnostic and Testing DS-09
Semi Annual
April 2021
CLIN 0018
Diagnostic and Testing DS-09
Annual
October 2021
CLIN 0019
Diagnostic and Testing DS-10
Semi Annual
April 2021
CLIN 0020
Diagnostic and Testing DS-10
Annual
October 2021
CLIN 0021
Diagnostic and Testing DS-11
Semi Annual
April 2021
CLIN 0022
Diagnostic and Testing DS-11
Annual
October 2021
CLIN 0023
Diagnostic and Testing DS-12
Semi Annual
April 2021
CLIN 0024
Diagnostic and Testing DS-12
Annual
October 2021
CLIN 0025
Diagnostic and Testing FP-13
Semi Annual
April 2021
CLIN 0026
Diagnostic and Testing FP-13
Annual
October 2021
CLIN 0027
Diagnostic and Testing FP-14
Semi Annual
April 2021
CLIN 0028
Diagnostic and Testing FP-14
Annual
October 2021
CLIN 0029
Diagnostic and Testing FP-15
Semi Annual
April 2021
CLIN 0030
Diagnostic and Testing FP-15
Annual
October 2021
CLIN 0031
Diagnostic and Testing FS-16
Semi Annual
April 2021
CLIN 0032
Diagnostic and Testing FS-16
Annual
October 2021
CLIN 0033
Diagnostic and Testing FS-17
Semi Annual
April 2021
CLIN 0034
Diagnostic and Testing FS-17
Annual
October 2021
CLIN 0035
Diagnostic and Testing FS-18
Semi Annual
April 2021
CLIN 0036
Diagnostic and Testing FS-18
Annual
October 2021
CLIN 0037
Outpatient JP-19
Semi Annual
April 2021
CLIN 0038
Outpatient JP-19
Annual
October 2021
CLIN 0039
Outpatient JP-20
Semi Annual
April 2021
CLIN 0040
Outpatient JP-20
Annual
October 2021
CLIN 0041
Outpatient JP-21
Semi Annual
April 2021
CLIN 0042
Outpatient JP-21
Annual
October 2021
CLIN 0043
Outpatient JP-22
Semi Annual
April 2021
CLIN 0044
Outpatient JP-22
Annual
October 2021
CLIN 0045
Outpatient JS-23
Semi Annual
April 2021
CLIN 0046
Outpatient JS-23
Annual
October 2021
CLIN 0047
Outpatient JS-24
Semi Annual
April 2021
CLIN 0048
Outpatient JS-24
Annual
October 2021
CLIN 0049
Staff Garage KP-24
Semi Annual
April 2021
CLIN 0050
Staff Garage KP-24
Annual
October 2021
CLIN 0051
Staff Garage KP-25
Semi Annual
April 2021
CLIN 0052
Staff Garage KP-25
Annual
October 2021
CLIN 0053
Staff Garage KS-27
Semi Annual
April 2021
CLIN 0054
Staff Garage KS-27
Annual
October 2021
CLIN 0055
Patient Garage LP-28
Semi Annual
April 2021
CLIN 0056
Patient Garage LP-28
Annual
October 2021
CLIN 0057
Patient Garage LP-29
Semi Annual
April 2021
CLIN 0058
Patient Garage LP-29
Annual
October 2021
CLIN 0059
Patient Garage LP-30
Semi Annual
April 2021
CLIN 0060
Patient Garage LP-30
Annual
October 2021
CLIN 0061
Patient Garage LP-31
Semi Annual
April 2021
CLIN 0062
Patient Garage LP-31
Annual
October 2021
CLIN 0063
Transitional Living MP-32
Semi Annual
April 2021
CLIN 0064
Transitional Living MP-32
Annual
October 2021
CLIN 0065
Transitional Living MP-33
Semi Annual
April 2021
CLIN 0066
Transitional Living MP-33
Annual
October 2021
CLIN 0067
Transitional Living MS-34
Semi Annual
April 2021
CLIN 0068
Transitional Living MS-34
Annual
October 2021
CLIN 0069
Central Energy Plant NS-35
Semi Annual
April 2021
CLIN 0070
Central Energy Plant NS-35
Annual
October 2021
CLIN 0071
Central Energy Plant NS-36
Semi Annual
April 2021
CLIN 0072
Central Energy Plant NS-36
Annual
October 2021
CLIN 0073
Research PS-37
Semi Annual
April 2021
CLIN 0074
Research PS-37
Annual
October 2021
CLIN 0075
Research PS-38
Semi Annual
April 2021
CLIN 0076
Research PS-38
Annual
October 2021
CLIN 0077
Administration QP-39
Semi Annual
April 2021
CLIN 0078
Administration QP-39
Annual
October 2021
CLIN 0079
Administration QP-40
Semi Annual
April 2021
CLIN 0080
Administration QP-40
Annual
October 2021
CLIN 0081
Administration QP-41
Semi Annual
April 2021
CLIN 0082
Administration QP-41
Annual
October 2021
CLIN 0083
Fisher House XP-42
Semi Annual
April 2021
CLIN 0084
Fisher House XP-42
Annual
October 2021

TASK ORDER 2: OPTION YEAR 1, MARCH 2022 - APRIL 2023

Elevator
Inspection
Testing Date
CLIN 1001
Inpatient BP-01
Semi Annual
April 2022
CLIN 1002
Inpatient BP-01
Annual
October 2022
CLIN 1003
Inpatient BP-02
Semi Annual
April 2022
CLIN 1004
Inpatient BP-02
Annual
October 2022
CLIN 1005
Inpatient BP-03
Semi Annual
April 2022
CLIN 1006
Inpatient BP-03
Annual
October 2022
CLIN 1007
Inpatient BS-04
Semi Annual
April 2022
CLIN 1008
Inpatient BS-04
Annual
October 2022
CLIN 1009
Inpatient BS-05
Semi Annual
April 2022
CLIN 1010
Inpatient BS-05
Annual
October 2022
CLIN 1011
Inpatient BS-06
Semi Annual
April 2022
CLIN 1012
Inpatient BS-06
Annual
October 2022
CLIN 1013
Diagnostic and Testing DP-07
Semi Annual
April 2022
CLIN 1014
Diagnostic and Testing DP-07
Annual
October 2022
CLIN 1015
Diagnostic and Testing DP-08
Semi Annual
April 2022
CLIN 1016
Diagnostic and Testing DP-08
Annual
October 2022
CLIN 1017
Diagnostic and Testing DS-09
Semi Annual
April 2022
CLIN 1018
Diagnostic and Testing DS-09
Annual
October 2022
CLIN 1019
Diagnostic and Testing DS-10
Semi Annual
April 2022
CLIN 1020
Diagnostic and Testing DS-10
Annual
October 2022
CLIN 1021
Diagnostic and Testing DS-11
Semi Annual
April 2022
CLIN 1022
Diagnostic and Testing DS-11
Annual
October 2022
CLIN 1023
Diagnostic and Testing DS-12
Semi Annual
April 2022
CLIN 1024
Diagnostic and Testing DS-12
Annual
October 2022
CLIN 1025
Diagnostic and Testing FP-13
Semi Annual
April 2022
CLIN 1026
Diagnostic and Testing FP-13
Annual
October 2022
CLIN 1027
Diagnostic and Testing FP-14
Semi Annual
April 2022
CLIN 1028
Diagnostic and Testing FP-14
Annual
October 2022
CLIN 1029
Diagnostic and Testing FP-15
Semi Annual
April 2022
CLIN 1030
Diagnostic and Testing FP-15
Annual
October 2022
CLIN 1031
Diagnostic and Testing FS-16
Semi Annual
April 2022
CLIN 1032
Diagnostic and Testing FS-16
Annual
October 2022
CLIN 1033
Diagnostic and Testing FS-17
Semi Annual
April 2022
CLIN 1034
Diagnostic and Testing FS-17
Annual
October 2022
CLIN 1035
Diagnostic and Testing FS-18
Semi Annual
April 2022
CLIN 1036
Diagnostic and Testing FS-18
Annual
October 2022
CLIN 1037
Outpatient JP-19
Semi Annual
April 2022
CLIN 1038
Outpatient JP-19
Annual
October 2022
CLIN 1039
Outpatient JP-20
Semi Annual
April 2022
CLIN 1040
Outpatient JP-20
Annual
October 2022
CLIN 1041
Outpatient JP-21
Semi Annual
April 2022
CLIN 1042
Outpatient JP-21
Annual
October 2022
CLIN 1043
Outpatient JP-22
Semi Annual
April 2022
CLIN 1044
Outpatient JP-22
Annual
October 2022
CLIN 1045
Outpatient JS-23
Semi Annual
April 2022
CLIN 1046
Outpatient JS-23
Annual
October 2022
CLIN 1047
Outpatient JS-24
Semi Annual
April 2022
CLIN 1048
Outpatient JS-24
Annual
October 2022
CLIN 1049
Staff Garage KP-24
Semi Annual
April 2022
CLIN 1050
Staff Garage KP-24
Annual
October 2022
CLIN 1051
Staff Garage KP-25
Semi Annual
April 2022
CLIN 1052
Staff Garage KP-25
Annual
October 2022
CLIN 1053
Staff Garage KS-27
Semi Annual
April 2022
CLIN 1054
Staff Garage KS-27
Annual
October 2022
CLIN 1055
Patient Garage LP-28
Semi Annual
April 2022
CLIN 1056
Patient Garage LP-28
Annual
October 2022
CLIN 1057
Patient Garage LP-29
Semi Annual
April 2022
CLIN 1058
Patient Garage LP-29
Annual
October 2022
CLIN 1059
Patient Garage LP-30
Semi Annual
April 2022
CLIN 1060
Patient Garage LP-30
Annual
October 2022
CLIN 1061
Patient Garage LP-31
Semi Annual
April 2022
CLIN 1062
Patient Garage LP-31
Annual
October 2022
CLIN 1063
Transitional Living MP-32
Semi Annual
April 2022
CLIN 1064
Transitional Living MP-32
Annual
October 2022
CLIN 1065
Transitional Living MP-33
Semi Annual
April 2022
CLIN 1066
Transitional Living MP-33
Annual
October 2022
CLIN 1067
Transitional Living MS-34
Semi Annual
April 2022
CLIN 1068
Transitional Living MS-34
Annual
October 2022
CLIN 1069
Central Energy Plant NS-35
Semi Annual
April 2022
CLIN 1070
Central Energy Plant NS-35
Annual
October 2022
CLIN 1071
Central Energy Plant NS-36
Semi Annual
April 2022
CLIN 1072
Central Energy Plant NS-36
Annual
October 2022
CLIN 1073
Research PS-37
Semi Annual
April 2022
CLIN 1074
Research PS-37
Annual
October 2022
CLIN 1075
Research PS-38
Semi Annual
April 2022
CLIN 1076
Research PS-38
Annual
October 2022
CLIN 1077
Administration QP-39
Semi Annual
April 2022
CLIN 1078
Administration QP-39
Annual
October 2022
CLIN 1079
Administration QP-40
Semi Annual
April 2022
CLIN 1080
Administration QP-40
Annual
October 2022
CLIN 1081
Administration QP-41
Semi Annual
April 2022
CLIN 1082
Administration QP-41
Annual
October 2022
CLIN 1083
Fisher House XP-42
Semi Annual
April 2022
CLIN 1084
Fisher House XP-42
Annual
October 2022

TASK ORDER 3: OPTION YEAR 2, APRIL 2023 – MARCH 2024

Elevator
Inspection
Testing Date
CLIN 2001
Inpatient BP-01
Semi Annual
April 2023
CLIN 2002
Inpatient BP-01
Annual
October 2023
CLIN 2003
Inpatient BP-02
Semi Annual
April 2023
CLIN 2004
Inpatient BP-02
Annual
October 2023
CLIN 2005
Inpatient BP-03
Semi Annual
April 2023
CLIN 2006
Inpatient BP-03
Annual
October 2023
CLIN 2007
Inpatient BS-04
Semi Annual
April 2023
CLIN 2008
Inpatient BS-04
Annual
October 2023
CLIN 2009
Inpatient BS-05
Semi Annual
April 2023
CLIN 2010
Inpatient BS-05
Annual
October 2023
CLIN 2011
Inpatient BS-06
Semi Annual
April 2023
CLIN 2012
Inpatient BS-06
Annual
October 2023
CLIN 2013
Diagnostic and Testing DP-07
Semi Annual
April 2023
CLIN 2014
Diagnostic and Testing DP-07
Annual
October 2023
CLIN 2015
Diagnostic and Testing DP-08
Semi Annual
April 2023
CLIN 2016
Diagnostic and Testing DP-08
Annual
October 2023
CLIN 2017
Diagnostic and Testing DS-09
Semi Annual
April 2023
CLIN 2018
Diagnostic and Testing DS-09
Annual
October 2023
CLIN 2019
Diagnostic and Testing DS-10
Semi Annual
April 2023
CLIN 2020
Diagnostic and Testing DS-10
Annual
October 2023
CLIN 2021
Diagnostic and Testing DS-11
Semi Annual
April 2023
CLIN 2022
Diagnostic and Testing DS-11
Annual
October 2023
CLIN 2023
Diagnostic and Testing DS-12
Semi Annual
April 2023
CLIN 2024
Diagnostic and Testing DS-12
Annual
October 2023
CLIN 2025
Diagnostic and Testing FP-13
Semi Annual
April 2023
CLIN 2026
Diagnostic and Testing FP-13
Annual
October 2023
CLIN 2027
Diagnostic and Testing FP-14
Semi Annual
April 2023
CLIN 2028
Diagnostic and Testing FP-14
Annual
October 2023
CLIN 2029
Diagnostic and Testing FP-15
Semi Annual
April 2023
CLIN 2030
Diagnostic and Testing FP-15
Annual
October 2023
CLIN 2031
Diagnostic and Testing FS-16
Semi Annual
April 2023
CLIN 2032
Diagnostic and Testing FS-16
Annual
October 2023
CLIN 2033
Diagnostic and Testing FS-17
Semi Annual
April 2023
CLIN 2034
Diagnostic and Testing FS-17
Annual
October 2023
CLIN 2035
Diagnostic and Testing FS-18
Semi Annual
April 2023
CLIN 2036
Diagnostic and Testing FS-18
Annual
October 2023
CLIN 2037
Outpatient JP-19
Semi Annual
April 2023
CLIN 2038
Outpatient JP-19
Annual
October 2023
CLIN 2039
Outpatient JP-20
Semi Annual
April 2023
CLIN 2040
Outpatient JP-20
Annual
October 2023
CLIN 2041
Outpatient JP-21
Semi Annual
April 2023
CLIN 2042
Outpatient JP-21
Annual
October 2023
CLIN 2043
Outpatient JP-22
Semi Annual
April 2023
CLIN 2044
Outpatient JP-22
Annual
October 2023
CLIN 2045
Outpatient JS-23
Semi Annual
April 2023
CLIN 2046
Outpatient JS-23
Annual
October 2023
CLIN 2047
Outpatient JS-24
Semi Annual
April 2023
CLIN 2048
Outpatient JS-24
Annual
October 2023
CLIN 2049
Staff Garage KP-24
Semi Annual
April 2023
CLIN 2050
Staff Garage KP-24
Annual
October 2023
CLIN 2051
Staff Garage KP-25
Semi Annual
April 2023
CLIN 2052
Staff Garage KP-25
Annual
October 2023
CLIN 2053
Staff Garage KS-27
Semi Annual
April 2023
CLIN 2054
Staff Garage KS-27
Annual
October 2023
CLIN 2055
Patient Garage LP-28
Semi Annual
April 2023
CLIN 2056
Patient Garage LP-28
Annual
October 2023
CLIN 2057
Patient Garage LP-29
Semi Annual
April 2023
CLIN 2058
Patient Garage LP-29
Annual
October 2023
CLIN 2059
Patient Garage LP-30
Semi Annual
April 2023
CLIN 2060
Patient Garage LP-30
Annual
October 2023
CLIN 2061
Patient Garage LP-31
Semi Annual
April 2023
CLIN 2062
Patient Garage LP-31
Annual
October 2023
CLIN 2063
Transitional Living MP-32
Semi Annual
April 2023
CLIN 2064
Transitional Living MP-32
Annual
October 2023
CLIN 2065
Transitional Living MP-33
Semi Annual
April 2023
CLIN 2066
Transitional Living MP-33
Annual
October 2023
CLIN 2067
Transitional Living MS-34
Semi Annual
April 2023
CLIN 2068
Transitional Living MS-34
Annual
October 2023
CLIN 2069
Central Energy Plant NS-35
Semi Annual
April 2023
CLIN 2070
Central Energy Plant NS-35
Annual
October 2023
CLIN 2071
Central Energy Plant NS-36
Semi Annual
April 2023
CLIN 2072
Central Energy Plant NS-36
Annual
October 2023
CLIN 2073
Research PS-37
Semi Annual
April 2023
CLIN 2074
Research PS-37
Annual
October 2023
CLIN 2075
Research PS-38
Semi Annual
April 2023
CLIN 2076
Research PS-38
Annual
October 2023
CLIN 2077
Administration QP-39
Semi Annual
April 2023
CLIN 2078
Administration QP-39
Annual
October 2023
CLIN 2079
Administration QP-40
Semi Annual
April 2023
CLIN 2080
Administration QP-40
Annual
October 2023
CLIN 2081
Administration QP-41
Semi Annual
April 2023
CLIN 2082
Administration QP-41
Annual
October 2023
CLIN 2083
Fisher House XP-42
Semi Annual
April 2023
CLIN 2084
Fisher House XP-42
Annual
October 2023

TASK ORDER 4: OPTION YEAR 3, APRIL 2024 – MARCH 2025

Elevator
Inspection
Testing Date
CLIN 3001
Inpatient BP-01
Semi Annual
April 2024
CLIN 3002
Inpatient BP-01
Annual
October 2024
CLIN 3003
Inpatient BP-02
Semi Annual
April 2024
CLIN 3004
Inpatient BP-02
Annual
October 2024
CLIN 3005
Inpatient BP-03
Semi Annual
April 2024
CLIN 3006
Inpatient BP-03
Annual
October 2024
CLIN 3007
Inpatient BS-04
Semi Annual
April 2024
CLIN 3008
Inpatient BS-04
Annual
October 2024
CLIN 3009
Inpatient BS-05
Semi Annual
April 2024
CLIN 3010
Inpatient BS-05
Annual
October 2024
CLIN 3011
Inpatient BS-06
Semi Annual
April 2024
CLIN 3012
Inpatient BS-06
Annual
October 2024
CLIN 3013
Diagnostic and Testing DP-07
Semi Annual
April 2024
CLIN 3014
Diagnostic and Testing DP-07
Annual
October 2024
CLIN 3015
Diagnostic and Testing DP-08
Semi Annual
April 2024
CLIN 3016
Diagnostic and Testing DP-08
Annual
October 2024
CLIN 3017
Diagnostic and Testing DS-09
Semi Annual
April 2024
CLIN 3018
Diagnostic and Testing DS-09
Annual
October 2024
CLIN 3019
Diagnostic and Testing DS-10
Semi Annual
April 2024
CLIN 3020
Diagnostic and Testing DS-10
Annual
October 2024
CLIN 3021
Diagnostic and Testing DS-11
Semi Annual
April 2024
CLIN 3022
Diagnostic and Testing DS-11
Annual
October 2024
CLIN 3023
Diagnostic and Testing DS-12
Semi Annual
April 2024
CLIN 3024
Diagnostic and Testing DS-12
Annual
October 2024
CLIN 3025
Diagnostic and Testing FP-13
Semi Annual
April 2024
CLIN 3026
Diagnostic and Testing FP-13
Annual
October 2024
CLIN 3027
Diagnostic and Testing FP-14
Semi Annual
April 2024
CLIN 3028
Diagnostic and Testing FP-14
Annual
October 2024
CLIN 3029
Diagnostic and Testing FP-15
Semi Annual
April 2024
CLIN 3030
Diagnostic and Testing FP-15
Annual
October 2024
CLIN 3031
Diagnostic and Testing FS-16
Semi Annual
April 2024
CLIN 3032
Diagnostic and Testing FS-16
Annual
October 2024
CLIN 3033
Diagnostic and Testing FS-17
Semi Annual
April 2024
CLIN 3034
Diagnostic and Testing FS-17
Annual
October 2024
CLIN 3035
Diagnostic and Testing FS-18
Semi Annual
April 2024
CLIN 3036
Diagnostic and Testing FS-18
Annual
October 2024
CLIN 3037
Outpatient JP-19
Semi Annual
April 2024
CLIN 3038
Outpatient JP-19
Annual
October 2024
CLIN 3039
Outpatient JP-20
Semi Annual
April 2024
CLIN 3040
Outpatient JP-20
Annual
October 2024
CLIN 3041
Outpatient JP-21
Semi Annual
April 2024
CLIN 3042
Outpatient JP-21
Annual
October 2024
CLIN 3043
Outpatient JP-22
Semi Annual
April 2024
CLIN 3044
Outpatient JP-22
Annual
October 2024
CLIN 3045
Outpatient JS-23
Semi Annual
April 2024
CLIN 3046
Outpatient JS-23
Annual
October 2024
CLIN 3047
Outpatient JS-24
Semi Annual
April 2024
CLIN 3048
Outpatient JS-24
Annual
October 2024
CLIN 3049
Staff Garage KP-24
Semi Annual
April 2024
CLIN 3050
Staff Garage KP-24
Annual
October 2024
CLIN 3051
Staff Garage KP-25
Semi Annual
April 2024
CLIN 3052
Staff Garage KP-25
Annual
October 2024
CLIN 3053
Staff Garage KS-27
Semi Annual
April 2024
CLIN 3054
Staff Garage KS-27
Annual
October 2024
CLIN 3055
Patient Garage LP-28
Semi Annual
April 2024
CLIN 3056
Patient Garage LP-28
Annual
October 2024
CLIN 3057
Patient Garage LP-29
Semi Annual
April 2024
CLIN 3058
Patient Garage LP-29
Annual
October 2024
CLIN 3059
Patient Garage LP-30
Semi Annual
April 2024
CLIN 3060
Patient Garage LP-30
Annual
October 2024
CLIN 3061
Patient Garage LP-31
Semi Annual
April 2024
CLIN 3062
Patient Garage LP-31
Annual
October 2024
CLIN 3063
Transitional Living MP-32
Semi Annual
April 2024
CLIN 3064
Transitional Living MP-32
Annual
October 2024
CLIN 3065
Transitional Living MP-33
Semi Annual
April 2024
CLIN 3066
Transitional Living MP-33
Annual
October 2024
CLIN 3067
Transitional Living MS-34
Semi Annual
April 2024
CLIN 3068
Transitional Living MS-34
Annual
October 2024
CLIN 3069
Central Energy Plant NS-35
Semi Annual
April 2024
CLIN 3070
Central Energy Plant NS-35
Annual
October 2024
CLIN 3071
Central Energy Plant NS-36
Semi Annual
April 2024
CLIN 3072
Central Energy Plant NS-36
Annual
October 2024
CLIN 3073
Research PS-37
Semi Annual
April 2024
CLIN 3074
Research PS-37
Annual
October 2024
CLIN 3075
Research PS-38
Semi Annual
April 2024
CLIN 3076
Research PS-38
Annual
October 2024
CLIN 3077
Administration QP-39
Semi Annual
April 2024
CLIN 3078
Administration QP-39
Annual
October 2024
CLIN 3079
Administration QP-40
Semi Annual
April 2024
CLIN 3080
Administration QP-40
Annual
October 2024
CLIN 3081
Administration QP-41
Semi Annual
April 2024
CLIN 3082
Administration QP-41
Annual
October 2024
CLIN 3083
Fisher House XP-42
Semi Annual
April 2024
CLIN 3084
Fisher House XP-42
Annual
October 2024

TASK ORDER 5: OPTION YEAR 4, APRIL 2025 – MARCH 2026

Elevator
Inspection
Testing Date
CLIN 4001
Inpatient BP-01
Semi Annual
April 2025
CLIN 4002
Inpatient BP-01
Quintennial
October 2025
CLIN 4003
Inpatient BP-02
Semi Annual
April 2025
CLIN 4004
Inpatient BP-02
Quintennial
October 2025
CLIN 4005
Inpatient BP-03
Semi Annual
April 2025
CLIN 4006
Inpatient BP-03
Quintennial
October 2025
CLIN 4007
Inpatient BS-04
Semi Annual
April 2025
CLIN 4008
Inpatient BS-04
Quintennial
October 2025
CLIN 4009
Inpatient BS-05
Semi Annual
April 2025
CLIN 4010
Inpatient BS-05
Quintennial
October 2025
CLIN 4011
Inpatient BS-06
Semi Annual
April 2025
CLIN 4012
Inpatient BS-06
Quintennial
October 2025
CLIN 4013
Diagnostic and Testing DP-07
Semi Annual
April 2025
CLIN 4014
Diagnostic and Testing DP-07
Quintennial
October 2025
CLIN 4015
Diagnostic and Testing DP-08
Semi Annual
April 2025
CLIN 4016
Diagnostic and Testing DP-08
Quintennial
October 2025
CLIN 4017
Diagnostic and Testing DS-09
Semi Annual
April 2025
CLIN 4018
Diagnostic and Testing DS-09
Quintennial
October 2025
CLIN 4019
Diagnostic and Testing DS-10
Semi Annual
April 2025
CLIN 4020
Diagnostic and Testing DS-10
Quintennial
October 2025
CLIN 4021
Diagnostic and Testing DS-11
Semi Annual
April 2025
CLIN 4022
Diagnostic and Testing DS-11
Quintennial
October 2025
CLIN 4023
Diagnostic and Testing DS-12
Semi Annual
April 2025
CLIN 4024
Diagnostic and Testing DS-12
Quintennial
October 2025
CLIN 4025
Diagnostic and Testing FP-13
Semi Annual
April 2025
CLIN 4026
Diagnostic and Testing FP-13
Quintennial
October 2025
CLIN 4027
Diagnostic and Testing FP-14
Semi Annual
April 2025
CLIN 4028
Diagnostic and Testing FP-14
Quintennial
October 2025
CLIN 4029
Diagnostic and Testing FP-15
Semi Annual
April 2025
CLIN 4030
Diagnostic and Testing FP-15
Quintennial
October 2025
CLIN 4031
Diagnostic and Testing FS-16
Semi Annual
April 2025
CLIN 4032
Diagnostic and Testing FS-16
Quintennial
October 2025
CLIN 4033
Diagnostic and Testing FS-17
Semi Annual
April 2025
CLIN 4034
Diagnostic and Testing FS-17
Quintennial
October 2025
CLIN 4035
Diagnostic and Testing FS-18
Semi Annual
April 2025
CLIN 4036
Diagnostic and Testing FS-18
Quintennial
October 2025
CLIN 4037
Outpatient JP-19
Semi Annual
April 2025
CLIN 4038
Outpatient JP-19
Quintennial
October 2025
CLIN 4039
Outpatient JP-20
Semi Annual
April 2025
CLIN 4040
Outpatient JP-20
Quintennial
October 2025
CLIN 4041
Outpatient JP-21
Semi Annual
April 2025
CLIN 4042
Outpatient JP-21
Quintennial
October 2025
CLIN 4043
Outpatient JP-22
Semi Annual
April 2025
CLIN 4044
Outpatient JP-22
Quintennial
October 2025
CLIN 4045
Outpatient JS-23
Semi Annual
April 2025
CLIN 4046
Outpatient JS-23
Quintennial
October 2025
CLIN 4047
Outpatient JS-24
Semi Annual
April 2025
CLIN 4048
Outpatient JS-24
Quintennial
October 2025
CLIN 4049
Staff Garage KP-24
Semi Annual
April 2025
CLIN 4050
Staff Garage KP-24
Quintennial
October 2025
CLIN 4051
Staff Garage KP-25
Semi Annual
April 2025
CLIN 4052
Staff Garage KP-25
Quintennial
October 2025
CLIN 4053
Staff Garage KS-27
Semi Annual
April 2025
CLIN 4054
Staff Garage KS-27
Quintennial
October 2025
CLIN 4055
Patient Garage LP-28
Semi Annual
April 2025
CLIN 4056
Patient Garage LP-28
Quintennial
October 2025
CLIN 4057
Patient Garage LP-29
Semi Annual
April 2025
CLIN 4058
Patient Garage LP-29
Quintennial
October 2025
CLIN 4059
Patient Garage LP-30
Semi Annual
April 2025
CLIN 4060
Patient Garage LP-30
Quintennial
October 2025
CLIN 4061
Patient Garage LP-31
Semi Annual
April 2025
CLIN 4062
Patient Garage LP-31
Quintennial
October 2025
CLIN 4063
Transitional Living MP-32
Semi Annual
April 2025
CLIN 4064
Transitional Living MP-32
Quintennial
October 2025
CLIN 4065
Transitional Living MP-33
Semi Annual
April 2025
CLIN 4066
Transitional Living MP-33
Quintennial
October 2025
CLIN 4067
Transitional Living MS-34
Semi Annual
April 2025
CLIN 4068
Transitional Living MS-34
Quintennial
October 2025
CLIN 4069
Central Energy Plant NS-35
Semi Annual
April 2025
CLIN 4070
Central Energy Plant NS-35
Quintennial
October 2025
CLIN 4071
Central Energy Plant NS-36
Semi Annual
April 2025
CLIN 4072
Central Energy Plant NS-36
Quintennial
October 2025
CLIN 4073
Research PS-37
Semi Annual
April 2025
CLIN 4074
Research PS-37
Quintennial
October 2025
CLIN 4075
Research PS-38
Semi Annual
April 2025
CLIN 4076
Research PS-38
Quintennial
October 2025
CLIN 4077
Administration QP-39
Semi Annual
April 2025
CLIN 4078
Administration QP-39
Quintennial
October 2025
CLIN 4079
Administration QP-40
Semi Annual
April 2025
CLIN 4080
Administration QP-40
Quintennial
October 2025
CLIN 4081
Administration QP-41
Semi Annual
April 2025
CLIN 4082
Administration QP-41
Quintennial
October 2025
CLIN 4083
Fisher House XP-42
Semi Annual
April 2025
CLIN 4084
Fisher House XP-42
Quintennial
October 2025

TASK ORDER 6: SEMI ANNUAL REINSPECTION OF A SINGLE UNIT

CLIN 411
Any of the Listed Elevators
Semi Annual
TBD

TASK ORDER 7: WEIGHT TESTING OF A SINGLE UNIT

CLIN 412
Any of the Listed Elevators
Quintennial
TBD

4. Performance Objectives

Contracted elevator inspector shall perform all independent testing of the facility’s elevators and shall report elevator compliance. Reporting shall be per the most current edition of National Fire Protection Association (NFPA) Life Safety Code, National Electric Code (NEC), American Society of Mechnical Engineers (ASME), American National Standard Institute (ANSI), and other Federal Regulations pertaining to Vertrical Transport systems in medical and Federal facilities.

Deliverables Schedule

Item #
Task Name
Schedule
Item 1
Contact Information/Key Personnel
Five (5) calendar days after contract award
Item 2
Contract Performance Management
Minimum of three (3) meetings (Contract Award, Semi-Annually, Contract Anniversary)
Item 3
Testing Schedule and Plan
Five (5) calendar days after contract award
Item 4
Inspection and Testing
Two (2) tests and two (2) inspections approximately six-months apart. One shall be considered the “semi-annual”; the other shall be considered “annual” test. One annual test/inspection will be considered the “5-Year Test” at the intervals specified (not included in this task order).
Item 5
Testing and Inspection Reports
Fourteen (14) calendar days after services are rendered unless noted otherwise
Item 6
Company/Technician Certification
Company: Prior to contract award Inspector for the specific test: No later than fourteen (14) calendar days prior to scheduled inspection
Item 7
Travel Provision
Every inspection

5. Period of Performance The period of performance shall be the following: Base Year – April 2021 thru March 2022; Option Year One – April 2022 thru March 2023; Option Year Two – April 2023 thru March 2024; Option Year Three – April 2024 thru March 2025; Option year 4 - April 2025 thru March 2026. Should these dates change, the Contracting Officer will issue a modification to the contract reflecting the corrected date. The Contractor is required to proceed as originally scheduled until such modification is issued. The Contracting Officer is the only official authorized to make changes to the contract.

6. Key Personnel The Contractor shall submit a list of the points of contact for VA’s account pertaining to testing and inspections. Submission shall include the person’s name, phone number, email and address for correspondence. For all work completed, the Contractor shall submit proof of elevator inspection and testing certification for the inspector completing the work.

7. Place of Performance The work under this IDIQ shall be performed at the New Orleans VA Medical Center buildings listed that are located at 2400 Canal St. New Orleans, Louisiana.

8. COR Authority In no event is the Contracting Officer’s Representative (COR) empowered to change any of the terms and conditions of the contract. All changes, to any section of this contract, shall be made only by the Contracting Officer pursuant to a properly executed modification. The types of actions within the purview of the COR’s authority are to ensure that the Contractor performs the technical requirements of the contract, and to notify the Contracting Officer of any deficiencies observed. A Letter of Designation shall be issued to the COR and a copy shall be sent to the Contractor at the time of contract kickoff meeting or post-award conference setting forth in full the responsibilities and limitations of the COR.

9. Hours of Work Normal operational hours for the VA facilities are from 7:30 a. m. – 4:30 p. m, Monday through Friday, exclusive of Federal Holidays. Federal holidays are listed in Section 25.2. Services performed during all other times shall be considered to be overtime emergency call-back service.

10. Contract Award Meeting The Contractor shall not commence performance on this contract until the Government has conducted a contract kickoff meeting/post-award conference or the COR has advised the Contractor that a kickoff meeting is waived. The following item shall be delivered as part of the initial contract kickoff and submitted either at the kickoff meeting (one electronic and one hard copy) or emailed to the CO should the meeting be waived: Quality Assurance Surveillance Plan (QASP)

11. General Requirements

11.1. The contractor must be prepared to provide an inspector for no fewer than 3 weeks for each inspection All written deliverables shall be phrased in layperson language. Statistical and other technical terminology shall not be used without providing a glossary of terms.

Due to COVID-19, contractors may have to submit to COVID testing in order to enter specific building in order to protect the patients in the building. Testing must be completed no fewer than two weeks prior to coming on site. Negative test results must be received in order to access the necessary building. Should the contractor elect to be tested elsewhere, proof of negative results must be presented to the VA no fewer than 72 business hours prior to arriving on site to begin the inspection Testing will be completed at the New Orleans VA at no cost to the contractor. The contractor shall be responsible for all travel, per diem etc. necessary in order to complete this testing.

A daily briefing for each day of testing shall occur the following morning. The following at a minimum shall be reported:

Expected failures Issues that arose during inspection Access issues Update on the inspection schedule The Contractors shall furnish all labor, transportation, equipment, materials, tools, supplies, supervision, incidental engineering, and management required to test and inspect the elevators listed in accordance with ANSI, ASME and NFPA requirements. Equipment systems covered under this contract are listed in Attachment #1. For the purposes of this task order, this task order shall be applicable solely to the established Base Year.

A testing and inspection schedule shall be submitted by the contractor prior to beginning work. The contractor shall also submit in writing, one (1) hard copy and one (1) electronic copy, of the testing and inspection schedule and testing method to COR and CO at contract award, no later than the initial testing.

Licensing and Supervision. The Contractor shall be licensed and certified to provide the testing and inspection services specified in this contract. All work shall be performed by vertical transport inspectors specifically qualified and trained to inspect and conduct tests on elevators, escalators, dumbwaiters, cart lift systems and equipment. Evidence of all required licenses, as well as documentation of the qualifications of personnel, shall be provided to the CO and COR prior to award of the contract.

12. Definitions - Technical As used throughout this contract, the following terms shall have the meaning set forth below. Additional definitions are in the "DEFINITIONS" clause.

Where “ as shown”, “as indicated”, “as detailed”’ or words of similar import are used, it shall be understood that reference is made to this specification and the drawings accompanying this specification unless stated otherwise.

Where “ as directed”, “as required”, "as permitted”, “approval”, “acceptance”, or words of similar import are used, it shall be understood that direction, requirement, permission, approval, or acceptance of the COR is intended unless stated otherwise.

ANSI. The abbreviation of the American National Standard Institute.

ASME. The abbreviation of the American Society of Mechanical Engineers.

ASTM. The abbreviation of the American Society for Testing and Materials Adjust. To regulate, settle, bring to a more satisfactory state of normal operating condition.

Check. Examine, inspect, test, or verify by trail.

12.1.1. Component Part. Any part of any item or system which is detachable or removable from the main body or main assembly of the item or system; a constituent part or an essential part necessary to the performance of the system.

12.1.2. Contractor. The term contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of this contract.

12.1.3. Contractor Representative. A foreman or superintendent assigned in accordance with the “CONTRACTOR EMPLOYERS”.

12.1.4. Control. A mechanism used to regulate or guide the operation of a machine, apparatus, or system.

Frequency of Service.

12.1.5. Quinquennial (Q) – Services performed once during each 60 month period of contract. May also include testing designation by which certain tasks are completed once in a five year cycle. Due to planned turnover, events and tasks designated for the quinquennial testing may be requested in instances that do not follow the 60 month interval. For all instances of quinquennial testing, they shall be outlined and determined based on the schedule and tasks noted in this SOW. Five year testing is expected to occur once in a contract period per building elevator set.

12.1.6. Annual (A) – Services performed once during each 12 month period of the contract. Due to the anticipated building turnover, this contract may include additional annual testing as a means of placing all elevators on the same testing schedule.

12.1.7. Semi-annual (SA) – Services performed twice during each 12 month period of the contract at intervals of 160 to 200 calendar days.

Inspect. To examine thoroughly, to view closely in critical appraisal.

NEC. The abberviation of the National Electric Code NFPA. The abbreviation of the National Fire Protection Association Quality Assurance (QA). A method used by the Government to provided some measure of control over the quality of purchase foods and services received.

Quality Control (QC). A method used by the Contractor to control the quality of goods and services produced.

Regular Working Hours. The Government's regular (normal) working hours are from 7:30am to 4:30 pm local time, Mondays through Fridays except (a) Federal Holidays and (b) other days specifically designated by the COR.

GOVERNMENT FURNISHED ITEMS.

The Government will not provide office space and operational facilities to the Contractor. The Contractor shall secure and maintain the necessary office space and other facilities required for the performance of this contract at his/her own expense.

Government Furnished Equipment. The Contractor shall furnish all tools and equipment required for the performance of this contract. The Government will not provide tools or equipment to the Contractor.

Government Furnished Material. The Government will not provide any materials to the Contractor.

Availability of Utilities. The Government will furnish the following utility services at existing outlets, for use in those facilities provided by the Government and as may be required the work to be performed under the contract: electricity, natural gas, fresh water, sewage service, and refuse collection (from existing collection points). Information concerning the location of existing outlets may be obtained from the COR. The Contractor shall provide and maintain, at his/her expense, the necessary service lines from existing Government outlets to the site of work.

Utilities specified above will be furnished at no cost to the Contractor.

CONTRACTOR FURNISHED ITEMS. Except for the items listed in previous clauses, the Contractor shall provide all facilities, equipment, tools, components materials, and services to perform the requirements of this contract.

WORK OUTSIDE REGULAR HOURS. Except as may otherwise be specified, all work shall be performed during regular working hours. If the Contractor desires to carry out work on Saturday, Sunday, holidays , or outside regular working hours, he/she must submit application to the COR for approval. The COR reserves the right to request scheduling around Federal holidays. Work may only occur under a bilateral agreement between Government and Contractor.

MANAGEMENT. The Contractor shall manage the total work effort associated with all services required herein to assure fully adequate and timely completion of these services. Included in the function are a full range of management duties including, but not limited to scheduling, report preparation, establishing and maintaining records, and quality control. The Contractor shall provide an adequate staff of personnel with the necessary management expertise to assure the performance of the work in accordance with sound and efficient management practices.

The Contractor shall submit a testing and inspection plan to the VA for review no more than fourteen (14) calendar days after award. Testing plan shall include at a minimum: number of technicians to complete testing, anticipated testing and inspection methods, anticipated down time per elevator, a copy of the checklists to be used per inspection type, and a copy of the certificates to be submitted upon successful elevator testing completion.

Work Control. The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor shall plan and complete work requirements within the specified time limits and in conformance with the quality standards established herein.

Work Schedule. The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission. In those cases where some interference may be essentially unavoidable, the Contractor shall make every effort to minimize the impact of interference, inconvenience, equipment downtime, interrupted service, customer discomfort, etc.

Records. Cumulative testing records shall be kept for each elevator in the inventory shown in Attachment #1. A separate record file shall be established and kept up to date for each elevator for each test and inspection conducted on the unit. The Contractor shall submit proposed formats for each of the required records listed below for the COR's approval at least fifteen (15) calendar days prior to the start date of the contract.

12.1.8. The records shall cover the following areas of work:

12.1.8.1. Nature and means of inspection conducted including but not limited to: means and method of inspection, code associated with the specific inspection;

12.1.8.2. Nature of testing conducted including, but not limited to: test calssification with respect to either Category 1 or Category 5 as defined by ASME A17.2, means and methods, the related ASME code, results;

12.1.8.3. Equipment deficiencies related to maintenance or equipment conditions including, but not limited to: parts, assemblies, items or adjustments which are approaching the end of their useful service life, evidence of improper or lack of maintenance, abnormal wear due to faulty adjustments, and general condition of the equipment;

12.1.8.4. Certification of each unit tested inspected.

12.1.8.5. The Contractor shall include the following data in the appropriate record within two (2) working days from the completion of the associated work items:

12.1.8.6. The date(s) when the testing/inspection(s) were scheduled, started and completed;

12.1.8.7. Specific test and inspection conducted;

12.1.8.8. General inspection location and specific location of item being inspected and/or tested;

12.1.8.9. Name of the individual(s) who performed the services;

12.1.8.10. Any other information the Contractor chooses to include in the records, at no additional cost to the Government.

12.1.8.11. All ASME A17 code inspections shall be documented using the latest version of inspection and re-inspection ASME A17 checklist forms.

12.1.8.12. All required records shall be made available to the Government for examination and reproduction upon request, and the original records shall be submitted to the COR within five (5) calendar days of expiration of the contract. All required records shall be maintained in a readable, complete, orderly, timely and accurate manner.

12.1.9. Staffing. The contractor shall continuously maintain an adequate staff with suitable management expertise to assure work is scheduled and completed in accordance with these specifications. The Contractor shall maintain an adequate craft work force to complete work in accordance with the time and quality standards specified.

INSPECTIONS, TESTING AND CERTIFICATION. All inspection and testing shall be performed in accordance with ASME A17.1, ASME A17.2, ANSI, ASTM, IEEE, NFPA except as modified herein.

12.1.10. Areas to be inspected and/or tested include the following:

12.1.10.1. Inside of elevator car

12.1.10.2. Machine room

12.1.10.3. Top of Car

12.1.10.4. Outside Hoistway

12.1.10.5. Pit

12.1.10.6. Firefighters’ Service

12.1.11. Systems subject to inspection and testing include, but are not limited to:

12.1.11.1. All maintenance practices, cleanliness and maintenance compliance

12.1.11.2. Hoistway and car doors, hangers, guides and operating devices

12.1.11.3. Hoisting machines, sheaves, and brakes

12.1.11.4. Closing and reopening devices

12.1.11.5. Motors and motor generator sets

12.1.11.6. Hoisting, governor, safety, compensation and operating cables

12.1.11.7. Controllers (including contacts, switches, etc.)

12.1.11.8. Signal systems, controls, and traveling cables

12.1.11.9. Governors, safeties, interlocks, and contacts

12.1.11.10. Counterweights and counterweight safeties

12.1.11.11. Guide rails and oiling devices

12.1.11.12. Terminal, slowdown and leveling devices

12.1.11.13. Auxilary equipment guards

12.1.11.14. Elevator cars, counterweights, and buffers

12.1.11.15. Machine rooms, hoistways and pits

12.1.11.16. Ventilation

12.1.11.17. Space clearances, spaces of refuge

12.1.11.18. Lighting adequacy

12.1.11.19. Automatic and manual emergency fire services (Phase I & Phase II)

12.1.11.20. Emergency Power Operations

12.1.11.21. Pit Flood Monitoring Device (if present)

12.1.11.22. Maintenance Records

12.1.12. Inspection shall include all items cited in ASME A17.2 Section Appendices, Part A Inspection Checklists.

12.1.13. Deficiencies discovered during testing shall be thoroughly documented and the government notified. The COR and/or Contracting Officer shall receive a verbal and written notificaiton of any deficiencies discovered per the following:

12.1.13.1. Imminent Danger to Life and Safety – Within 30 minutes of discovery

12.1.13.2. Service removing deficiency with no immediate life threat – Within 1 hour of discovery

12.1.13.3. All others – During closeout meeting.

12.1.14. Testing Schedule

12.1.14.1. Contractor shall provide the VA, at point of award, a proposed testing schedule for the elevator sets based on

12.1.14.1.1. Information provided in this IDIQ

12.1.14.1.2. Turn over dates of buildings as they become available.

12.1.14.2. VA COR shall be allowed a minimum of seven (7) business days, no more than fourteen (14) days to review the schedule for VA staff and Elevator Maintenance Contractor availability. VA reserves the right to reject the schedule. Upon rejection, the VA must supply alternate dates for contractor consdieration.

12.1.14.2.1. Final schedule must be agreed upon no further than one (1) month from the earliest test date unless other arrangements are made.

12.1.15. Service Records and Reports. See the "MANAGEMENT" clause of this Section for service work record keeping and work completion reporting requirements.

12.1.16. Service Work Quality Standards. The contractor shall meet the following service work quality standards:

12.1.16.1. All work satisfies the recommendations and requirements of the most current edition of ASME 17.1, ASME 17.2, ASME 17.3

12.1.16.2. Continuous progress and completion of the work resulting in safe, efficient, and reliable system condition that permits accurate record of state of elevator systems.

12.1.16.3. Safe job site during progress of work. Clean job site upon completion of work.

12.1.16.4. The contractor shall conduct all research and provide all resources required to ensure a smooth transition from the incumbent testing and inspection contracor in accordance with the contract requirements should this occur.

INSPECTOR QUALIFICATIONS

12.1.17. Per ASME 17.2 Introduction, Section 3, all inspectors and testers shall be certified by an organization accredited by ASME Qualifications for Elevator Inspectors, ASME QEI-1.

12.1.18. Per ASME 17.2 Introductions, Section 4, inspectors shall have knowledge of the safety practices cited in the The Elevator Industry Field Employees’ Safety Handbook.

13. Changes to Requirement

13.1. In the event that VA modifies the elevator system, in part or in whole, during the inspection and testing period, Contractor shall be required to verify that the system, as newly modified or added, is consistent with the manufacturer’s requirements; any verification performed will be equitably adjusted under the Changes clause. The post contract modification or addition to the elevator system shall not void the continuing requirements under this contract. The contract will be equitably adjusted under the Changes clause for such additional performance.

13.2. Any changes to this IDIQ shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.

14. Travel The contractor is responsible for providing transportation/travel for all materials, supplies, personnel and all items needed for the duration of this contract unless stated otherwise elsewhere.

15. Government Responsibilities

15.1. The Government shall provide access to the facilities as necessary for services to commence. The VA Engineering, Safety or Police Services will also provide notification of any systems outages, testing or downtime to affected VA staff.

15.2. Removing Employees for Misconduct or Security Reasons. The Government may, at its sole discretion, direct the contractor to remove any contractor employee from U.S. VA/VHA facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under any Contract awarded. The Contracting Officer will provide the contractor with a written explanation to support any request to remove an employee.

16. Contractor Personnel Requirements All qualified, experience, and license personnel for the service will be provided by the contractor. All elevator inspectors shall be certified to perform testing and inspections on vertical transport systems per ASME 17.2 requirements for certified elevator inspectors.

Proof of personnel experience shall be provided by the Contractor to the VA to include, but is not limited to:

Certification for independent elevator testing and inspection;

State certification (showing categories);

Past experience of no fewer than three (3) years inspecting vertical transport systems. Past experience shall be comparable in elevator types.

16.1. No portion of the work shall be subcontracted without prior written consent of the Contracting Officer. In the event that the contractor desires to subcontract some part of the work specified herein, the contractor shall furnish the Contracting Officer with the names, qualifications and experience of their proposed subcontractor(s). The contractor shall, however, remain fully liable and responsible for the work to be done by his subcontractor(s) and shall assure compliance with all requirements of the contract.

16.2. Contractor employees shall present a professional appearance at all times and their conduct shall not reflect discredit upon the United States and or the VA/Veterans Health Administration (VHA).

16.3. Conflict of…