36C25620R0069-070.docx

DOCX document Posted

Attached to
Z1DA--CFM - Complete Sanipak Site Prep Federal contract opportunity
Solicitation number
36C25620R0069
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

36C25620R0069 4. VA Master Specs Table of Contents.docx

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CFM - Complete Sanipak Site Prep, newest first.
File Type Posted
171-7EP101-N1 CEP First Floor Power Plan N-1 Drawings.pdf PDF
00473-7AS207 CEP Loading Dock Elevations at Ramp Drawings.pdf PDF
035-7PL100-N1 CEP Underground Plumbing N-1 Drawings.pdf PDF
VA SE Louisiana Drawings.pdf PDF
00494-7AS314 CEP Dock Wall Elevations F3 Drawings.pdf PDF
037-7PL101-N1 CEP Second Floor Plumbing Drawings.pdf PDF
037-7PL101-N1 CEP First Floor Plumbing N-1 Drawings.pdf PDF
192-7EP409 CEP First Floor Electric Room 1N100 Drawings.pdf PDF
00470-7AS204 CEP West Wall Elevations at Loading Dock Drawings.pdf PDF
36C25620R0069-085.pdf PDF
36C25620R0069-069.docx DOCX document
36C25620R0069-084.pdf PDF
36C25620R0069-083.pdf PDF
36C25620R0069-089.pdf PDF
36C25620R0069-074.pdf PDF
36C25620R0069-078.pdf PDF
36C25620R0069-079.pdf PDF
36C25620R0069-087.pdf PDF
36C25620R0069-077.pdf PDF
36C25620R0069-086.pdf PDF
36C25620R0069-075.pdf PDF
36C25620R0069-090.pdf PDF
36C25620R0069-082.pdf PDF
36C25620R0069-080.pdf PDF
36C25620R0069-071.pdf PDF
36C25620R0069-081.pdf PDF
36C25620R0069-073.pdf PDF
36C25620R0069-076.pdf PDF
36C25620R0069-072.pdf PDF
36C25620R0069-091.pdf PDF
36C25620R0069-088.pdf PDF
36C25620R0069-092.pdf PDF
36C25620R0069-093.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14 12-01-18

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 SPECIAL SECTIONS
DATE
00 01 15
List of Drawing Sheets
07-15
00 11 21
Request for Proposal to Design Build
11-15

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
12-18
01 32 16.01
Architectural and Engineering CPM Schedules
01-11
01 32 16.13
Network Analysis Schedule – Major Projects
09-15
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build
04-13
01 32 16.16
Network Analysis Schedules (Design-Build Only)
02-15
01 32 16.17
Project Schedules (Small Projects – Design/Build)
04-11
01 33 23
Shop Drawings, Product Data, and Samples
05-17
01 35 26
Safety Requirements
02-17
01 42 19
Reference Standards
05-16
01 45 00
Quality Control
01-18
01 45 29
Testing Laboratory Services
11-18
01 45 35
Special Inspections
04-18
01 57 19
Temporary Environmental Controls
01-11
01 58 16
Temporary Interior Signage
07-15
01 74 19
Construction Waste Management
09-13
01 81 13
Sustainable Construction Requirements
10-17
01 81 13.01
Sustainability Certification Requirements – LEED NC V3
09-15
01 81 13.02
Sustainability Certification Requirements – LEED NC V4
09-15
01 81 13.11
Sustainability Certification Requirements – LEED HC V3
09-15
01 81 13.21
Sustainability Certification Requirements – GREEN GLOBES
09-15
01 91 00
General Commissioning Requirements
10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13
Site Surveys
08-16
02 41 00
Demolition
08-17
02 65 00
Underground Storage Tank Removal
08-16
02 82 11
Traditional Asbestos Abatement
09-15
02 82 13.13
Glovebag Asbestos Abatement
09-15
02 82 13.19
Asbestos Floor Tile and Mastic Abatement
09-15
02 82 13.21
Asbestos Roofing Abatement
09-15
02 82 13.31
Asbestos Transite Abatement
09-15
02 82 13.41
Asbestos Abatement for Total Demolition Project
04-15
02 83 33.13
Lead-Based Paint Removal and Disposal
08-16

DIVISION 03 – CONCRETE

03 23 00
Stressing Tendons
07-11
03 30 00
Cast-in-Place Concrete
12-15
03 30 53
(Short-Form) Cast-in-Place Concrete
02-16
03 37 13
Shotcrete
07-11
03 41 13
Precast Concrete Hollow Core Planks
07-11
03 41 33
Precast Structural Pretension Concrete
07-11
03 45 00
Precast Architectural Concrete
10-15
03 51 13
Cementitious Wood Fiber Decks
09-11
03 51 16
Gypsum Concrete Roof Decks
09-11
03 52 00
Lightweight Concrete Roof Insulation
05-15
03 55 11
Gypsum Concrete Floor Decks
07-11

DIVISION 04 – MASONRY

04 01 00
Maintenance of Masonry
02-16
04 05 13
Masonry Mortaring
10-17
04 05 16
Masonry Grouting
02-16
04 20 00
Unit Masonry
08-17
04 72 00
Cast Stone Masonry
02-15

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
11-18
05 21 00
Steel Joist Framing
11-18
05 31 00
Steel Decking
02-16
05 36 00
Composite Metal Decking
10-15
05 40 00
Cold-Formed Metal Framing
05-16
05 50 00
Metal Fabrications
08-18
05 51 00
Metal Stairs
10-15

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
10-17
06 16 63
Cementitious Sheathing
02-16
06 20 00
Finish Carpentry
08-16

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 01 50.19
Preparation for Re-Roofing
02-16
07 08 00
Facility Exterior Closure Commissioning
11-16
07 11 13
Bituminous Dampproofing
02-16
07 12 00
Built-Up Bituminous Waterproofing
09-11
07 13 00
Sheet Waterproofing
04-13
07 13 52
Modified Bituminous Sheet Waterproofing
08-16
07 14 21
Latex Mastic Deck Covering
05-15
07 18 13
Pedestrian Traffic Coatings
05-15
07 21 13
Thermal Insulation
10-17
07 21 23
Loose-Fill Insulation
02-16
07 22 00
Roof and Deck Insulation
02-16
07 24 00
Exterior Insulation and Finish Systems
02-16
07 27 26
Fluid-Applied Membrane Air Barrier, Vapor Permeable
02-16
07 27 27
Fluid-Applied Membrane Air Barrier, Vapor Retarding
02-16
07 31 13
Asphalt Shingles
02-16
07 31 26
Slate Shingles
02-16
07 31 29.13
Wood Shingles
02-16
07 32 13
Clay Roof Tiles
02-16
07 40 00
Roofing and Siding Panels
10-15
07 51 00
Built-Up Bituminous Roofing
08-18
07 51 13.11
Hot-Applied Built-Up Asphalt Roofing
08-16
07 51 13.13
Cold-Applied Built-Up Asphalt Roofing
08-16
07 52 16.11
Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
08-16
07 52 16.12
Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
08-16
07 53 23
Ethylene-Propylene-Diene-Monomer Roofing
02-16
07 54 16
Ethylene Interpolymer (KEE) Roofing
10-15
07 54 19
Polyvinyl-Chloride (PVC) Roofing
12-18
07 54 23
Thermoplastic Polyolefin (TPO) Roofing
08-16
07 56 00
Fluid-Applied Roofing
05-15
07 57 13
Sprayed Polyurethane Foam Roofing
10-15
07 60 00
Flashing and Sheet Metal
07-14
07 61 16
Batten Seam Copper Roofing
10-15
07 71 00
Roof Specialties
10-15
07 72 00
Roof Accessories
10-15
07 81 00
Applied Fireproofing
10-17
07 84 00
Firestopping
02-16
07 92 00
Joint Sealants
10-17
07 95 13
Expansion Joint Cover Assemblies
02-16

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
08-16
08 11 73
Sliding Metal Fire Doors
02-16
08 14 00
Interior Wood Doors
02-16
08 17 10
Integrated Door Assemblies
02-16
08 31 13
Access Doors and Frames
02-16
08 33 00
Coiling Doors and Grilles
02-16
08 33 13
Coiling Counter Doors
02-16
08 34 36
Darkroom Doors
07-15
08 34 53
Security Doors and Frames
05-15
08 34 59
Vault Doors and Day Gates
02-16
08 35 13.13
Accordion Folding Doors
05-15
08 36 13
Sectional Doors
05-15
08 38 16
Flexible Traffic Doors
02-16
08 41 13
Aluminum-Framed Entrances and Storefronts
08-16
08 42 33
Revolving Door Entrances
05-15
08 44 13
Glazed Aluminum Curtain Walls
03-17
08 51 13
Aluminum Windows
02-16
08 51 13.11
Side-Hinged Aluminum Windows
08-16
08 51 23
Steel Windows
02-16
08 51 69.11
Aluminum Storm Windows
05-15
08 56 19
Pass Windows
02-16
08 56 53
Blast Resistant Windows
02-16
08 56 59
Service and Teller Window Units
02-16
08 56 66
Detention Window Screens
02-16
08 63 00
Metal-Framed Skylights
10-15
08 71 00
Door Hardware
01-16
08 71 13
Automatic Door Operators
02-16
08 71 13.11
Low Energy Power Assist Door Operators
08-16
08 80 00
Glazing
10-15
08 90 00
Louvers and Vents
05-15

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
02-15
09 06 00
Schedule for Finishes
04-15
09 22 16
Non-Structural Metal Framing
06-18
09 23 00
Gypsum Plastering
10-15
09 24 00
Portland Cement Plastering
10-15
09 26 00
Veneer Plastering
10-15
09 29 00
Gypsum Board
06-18
09 30 13
Ceramic/Porcelain Tiling
09-15
09 51 00
Acoustical Ceilings
12-18
09 54 23
Linear Metal Ceilings
10-15
09 63 13
Brick Flooring
02-16
09 63 40
Stone Flooring
10-15
09 65 13
Resilient Base and Accessories
02-16
09 65 16
Resilient Sheet Flooring
05-18
09 65 19
Resilient Tile Flooring
05-18
09 66 13
Portland Cement Terrazzo Flooring
10-15
09 66 16
Terrazzo Floor Tile
10-15
09 67 23.20
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
07-14
09 67 23.30
Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3)
07-14
09.67.23.40
Resinous Poured In Place Resilient Flooring (RES-4)
07-14
09 67 23.50
Resinous (Epoxy Terrazzo) Flooring (RES-5)
07-14
09 67 23.60
Resinous (Urethane and Epoxy Mortar) Flooring (RES-6)
07-14
09 68 00
Carpeting
10-15
09 68 21
Athletic Carpeting
10-15
09 69 00
Access Flooring
10-15
09 72 16
Vinyl-Coated Fabric Wall Covering
10-15
09 72 31
Polypropylene Fabric Wall Covering
05-15
09 84 33
Sound-Absorbing Wall Units
10-15
09 91 00
Painting
01-16
09 94 19
Multicolor Interior Finishing
08-16
09 96 59
High-Build Glazed Coatings
07-14

DIVISION 10 – SPECIALTIES

10 11 13
Chalkboards and Markerboards
10-15
10 11 23
Tackboards
10-15
10 13 00
Directories
05-15
10 14 00
Signage
10-15
10 21 13
Toilet Compartments
12-15
10 21 16
Shower and Dressing Compartments
08-16
10 21 23
Cubicle Curtain Tracks
05-15
10 22 13
Wire Mesh Partitions
10-15
10 22 19
Demountable Partitions
04-16
10 22 26.13
Accordion Folding Partitions
05-15
10 25 13
Patient Bed Service Walls
08-18
10 26 00
Wall and Door Protection
10-15
10 28 00
Toilet, Bath, and Laundry Accessories
02-16
10 44 13
Fire Extinguisher Cabinets
08-18
10 75 00
Flagpoles
02-16

DIVISION 11 – EQUIPMENT

11 05 12
General Motor Requirements for Equipment
11-11
11 12 00
Parking Control Equipment
02-16
11 17 36
Package Transfer Units
02-13
11 26 00
Unit Kitchens
11-11
11 27 00
Photographic Processing Equipment
11-11
11 40 11
Custom Fabricated Food Service Equipment
11-11
11 40 21
Food Service Equipment-Utility Distribution System
11-11
11 41 00
Food Storage Equipment
11-11
11 41 21
Walk-In Coolers and Freezers
05-15
11 44 00
Food Cooking Equipment
11-11
11 48 00
Cleaning and Disposal Equipment
11-11
11 53 13
Laboratory Fume Hoods
05-15
11 53 23
Laboratory Refrigerators
11-11
11 53 53
Biological Safety Cabinets Laminar Airflow Stations
01-11
11 53 61
Custom Fabricated Laboratory Equipment
11-11
11 53 71
Solution Warming Cabinets
11-11
11 71 01
Medical Washing and Sterilizing Equipment
02-11
11 71 02
Laboratory Washing and Sterilizing Equipment
10-11
11 73 00
Ceiling Mounted Patient Lift System
01-17
11 78 00
Mortuary Equipment
11-11
11 78 13
Mortuary Refrigerators
11-11
11 79 13
Hydrotherapy Equipment
11-11
11 82 19
Packaged Incinerators
11-11

DIVISION 12 – FURNISHINGS

12 22 16
Drapery Track and Accessories
05-15
12 24 00
Window Shades
08-17
12 24 21
Lightproof Shades
05-15
12 31 00
Manufactured Metal Casework
05-15
12 32 00
Manufactured Wood Casework
09-15
12 34 00
Manufactured Plastic Casework
10-15
12 35 70.21
Medication Cabinet
02-16
12 36 00
Countertops
12-18
12 56 70.11
Suspended Table
02-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-14
13 17 23
Therapeutic Pools
05-15
13 17 23.11
Therapeutic Pool Accessories
05-15
13 19 13
Kennel Enclosures and Gates
02-16
13 21 29
Constant Temperature Rooms
08-16
13 34 19
Metal Building Systems
08-16
13 49 00
Radiation Protection
02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11
Traction and Winding Drum Dumbwaiter
10-18
14 21 00
Traction Elevators
10-18
14 21 11
Traction Cartlift
10-18
14 24 00
Hydraulic Elevators
10-18
14 24 11
Hydraulic Cartlift
10-18
14 24 24
Renovation Hydraulic Elevator (Custom Written by VACO)
14 26 26
Renovation Traction Elevator (Custom Written by VACO)
14 91 33
Laundry and Linen Chutes
06-12
14 91 82
Trash Chutes
06-12

DIVISION 21- FIRE SUPPRESSION

21 08 00
Commissioning of Fire Suppression System
11-16
21 12 00
Manual Dry Standpipe Systems
06-15
21 13 13
Wet-Pipe Sprinkler Systems
06-15
21 13 16
Dry-Pipe Sprinkler Systems
01-15
21-22-00
Clean Agent Fire Suppression Systems
05-15
21-30-13
Electric-Driven, Fire Pumps
05-15
21-30-16
Diesel-Driven, Fire Pumps
05-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
07-16
22 05 12
General Motor Requirements for Plumbing Equipment
09-15
22 05 19
Meters and Gages for Plumbing Piping
09-15
22 05 23
General-Duty Valves for Plumbing Piping
09-15
22 05 33
Heat Tracing for Plumbing Piping
09-15
22 07 11
Plumbing Insulation
09-15
22 08 00
Commissioning of Plumbing Systems
11-16
22 11 00
Facility Water Distribution
09-15
22 11 23
Domestic Water Pumps
09-15
22 12 16
Facility Elevated, Potable-Water Storage Tanks
09-15
22 13 00
Facility Sanitary and Vent Piping
09-15
22 13 23
Sanitary Waste Interceptors
09-15
22 13 29
Sanitary Sewerage Pumps
09-15
22 13 29.13
Wet-Pit Mounted, Vertical Sewerage Pumps
09-15
22 13 33
Packaged, Submersible Sewerage Pump Units
09-15
22 14 00
Facility Storm Drainage
09-15
22 14 29
Sump Pumps
09-15
22 14 33
Packaged, Pedestal Drainage Pump Units
09-15
22 14 36
Packaged, Submersible, Drainage Pump Units
09-15
22 15 00
General Service Compressed-Air Systems
09-15
22 31 11
Water Softeners
09-15
22 33 00
Electric Domestic Water Heaters
09-15
22 34 00
Fuel-Fired Domestic Water Heaters
09-15
22 35 00
Domestic Water Heat Exchangers
12-16
22 40 00
Plumbing Fixtures
09-15
22 42 26
Commercial Disposers
09-15
22 61 13.74
Dental Compressed-Air Piping
09-15
22 61 19.74
Dental Compressed-Air Equipment
09-15
22 62 00
Vacuum Systems for Laboratory and Healthcare Facilities
09-15
22 62 19.74
Dental Vacuum and Evacuation Equipment
09-15
22 63 00
Gas Systems for Laboratory and Healthcare Facilities
09-15
22 66 00
Chemical-Waste Systems for Laboratory and Healthcare Facilities
09-15
22 67 19.16
Reverse-Osmosis Water Equipment
09-15
22 67 21
Water Dealkalizing System
09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 10
Common Work Results for Boiler Plant and Steam Generation
08-17
23 05 11
Common Work Results for HVAC
08-17
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
08-17
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 51
Noise and Vibration Control for Boiler Plant
08-17
23 05 93
Testing, Adjusting, and Balancing for HVAC
02-15
23 07 11
HVAC and Boiler Plant Insulation
02-15
23 08 00
Commissioning of HVAC Systems
11-16
23 08 11
Demonstrations and Tests for Boiler Plant
08-17
23 09 11
Instrumentation and Control for Boiler Plant
08-17
23 09 23
Direct-Digital Control System for HVAC
09-11
23 10 00
Facility Fuel Systems
08-17
23 11 23
Facility Natural-Gas Piping
08-17
23 21 11
Boiler Plant Piping Systems
09-17
23 21 13
Hydronic Piping
08-17
23 21 23
Hydronic Pumps
08-17
23 22 13
Steam and Condensate Heating Piping
08-17
23 22 23
Steam Condensate Pumps
08-17
23 23 00
Refrigerant Piping
02-15
23 25 00
HVAC Water Treatment
02-15
23 31 00
HVAC Ducts and Casings
03-13
23 34 00
HVAC Fans
02-15
23 36 00
Air Terminal Units
02-15
23 37 00
Air Outlets and Inlets
02-15
23 38 13
Commercial-Kitchen Hoods
01-11
23 40 00
HVAC Air Cleaning Devices
02-12
23 50 11
Boiler Plant Mechanical Equipment
11-17
23 51 00
Breechings, Chimneys, and Stacks
08-17
23 52 25
Low-Pressure Water Heating Boilers
08-17
23 52 28
Low Pressure Steam Boilers
08-17
23 52 33
Water-Tube Boilers
08-17
23 52 39
Fire-Tube Boilers
08-17
23 56 00
Solar Energy Heating System
06-16
23 57 33
Geothermal Energy – Direct Use (Heating Applications)
06-16
23 64 00
Packaged Water Chillers
04-11
23 65 00
Cooling Towers
02-15
23 72 00
Air-to-Air Energy Recovery Equipment
05-11
23 73 00
Indoor Central-Station Air-Handling Units
04-11
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
04-11
23 81 00
Decentralized Unitary HVAC Equipment
02-11
23 81 23
Computer-Room Air-Conditioners
04-11
23 81 43
Air-Source Unitary Heat Pumps
04-11
23 81 46
Water-Source Unitary Heat Pumps
04-11
23 81 49
Ground-Source Heat Pump
06-16
23 82 00
Convection Heating and Cooling Units
04-11
23 82 16
Air Coils
04-11
23 84 00
Humidity Control Equipment
05-11

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10
Advanced Utility Metering System
02-10

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
01-16
26 05 13
Medium-Voltage Cables
01-17
26 05 19
Low-Voltage Electrical Power Conductors and Cables
01-17
26 05 26
Grounding and Bonding for Electrical Systems
01-17
26 05 33
Raceway and Boxes for Electrical Systems
01-18
26 05 36
Wireways for Radiology Equipment
01-18
26 05 39
Underfloor Raceways for Electrical Systems
01-18
26 05 41
Underground Electrical Construction
01-17
26 05 73
Overcurrent Protective Device Coordination Study
01-18
26 08 00
Commissioning of Electrical Systems
11-16
26 09 23
Lighting Controls
01-18
26 11 16
Secondary Unit Substations
01-18
26 12 19
Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers
01-18
26 13 13
Medium-Voltage Circuit Breaker Switchgear
01-17
26 13 16
Medium-Voltage Fusible Interrupter Switches
01-17
26 20 11
Isolated Power Systems
01-18
26 22 00
Low-Voltage Transformers
01-18
26 23 00
Low-Voltage Switchgear
01-17
26 23 13
Generator Paralleling Controls
01-17
26 24 13
Distribution Switchboards
01-18
26 24 16
Panelboards
01-18
26 24 19
Motor Control Centers
01-18
26 25 11
Busways
01-17
26 26 00
Power Distribution Units for Static Uninterruptible Power Systems
01-18
26 27 26
Wiring Devices
01-18
26 29 11
Motor Controllers
01-18
26 29 21
Enclosed Switches and Circuit Breakers
01-17
26 32 13
Engine Generators
01-18
26 33 53
Static Uninterruptible Power Supply
01-17
26 35 26
Harmonic Filters
01-18
26 36 23
Automatic Transfer Switches
01-17
26 41 00
Facility Lightning Protection
01-17
26 42 00
Cathodic Protection
01-17
26 43 13
Surge Protective Devices
01-17
26 51 00
Interior Lighting
01-18
26 55 71
Medical and Surgical Lighting Fixtures
01-18
26 56 00
Exterior Lighting
01-18

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
06-15
27 05 26
Grounding and Bonding for Communications Systems
06-15
27 05 33
Raceways and Boxes for Communications Systems
10-18
27 05 61
Leased Space, Communication Equipment and Systems
06-15
27 08 00
Commissioning of Communications Systems
11-16
27 10 00
Control, Communication and Signal Wiring
06-15
27 11 00
Communications Equipment Room Fittings
06-15
27 15 00
Communications Structured Cabling
01-16
27 31 00
Voice Communications Switching and Routing Equipment
06-15
27 31 31
Voice Communications Switching and Routing Equipment - Extension
06-15
27 32 41
Two-Way Radio Equipment and Systems
10-18
27 41 31
Master Antenna Television Equipment and Systems
06-15
27 51 16
Public Address and Mass Notification Systems
10-18
27 51 23
Intercommunications and Program Systems
06-15
27 52 23
Nurse Call and Code Blue Systems
10-18
27 52 41
Miscellaneous Medical Systems
06-15
27 53 19
Distributed Radio Antenna (Within Building) Equipment and System
10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 05 13
Conductors and Cables for Electronic Safety and Security
10-18
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00
Commissioning of Electronic Safety and Security Systems
11-16
28 13 00
Physical Access Control System
10-11
28 13 16
Physical Access Control System and Database Management
09-11
28 13 53
Security Access Detection
09-11
28 16 00
Intrusion Detection System
10-11
28 23 00
Video Surveillance
09-11
28 26 00
Electronic Personal Protection System
09-11
28 31 00
Fire Detection and Alarm
10-11
28 52 31
Emergency Call System
06-15

DIVISION 31 – EARTHWORK

31 20 00
Earthwork
07-16
31 20 11
Earthwork (Short Form)
10-12
31 23 19
Dewatering
10-12
31 23 23.33
Flowable Fill
10-12
31 32 23
Pressure Grouting Soil Stabilization
10-12
31 62 00
Driven Piles
10-12
31 63 16
Auger Cast Grout Piles
10-12
31 63 26
Drilled Caissons
10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23
Cement and Concrete for Exterior Improvements
08-16
32 12 16
Asphalt Paving
09-15
32 14 16
Brick Unit Paving
08-16
32 17 23
Pavement Markings
08-16
32 31 13
Chain Link Fences and Gates
06-18
32 31 40
High Security Fences and Gates
08-16
32 84 00
Planting Irrigation
08-16
32 90 00
Planting
08-16

DIVISION 33 – UTILITIES

33 08 00
Commissioning of Site Utility Systems
11-16
33 10 00
Water Utilities
03-17
33 30 00
Sanitary Sewer Utilities
06-13
33 40 00
Storm Sewer Utilities
12-17
33 46 13
Foundation Drainage
10-11
33 51 00
Natural-Gas Distribution
10-11
33 63 00
Steam Energy Distribution
09-17

DIVISION 34 – TRANSPORTATION

34 71 13
Passive Vehicle Barriers
04-18
34 75 13.13
Active Vehicle Barriers
08-16

DIVISION 48 – Electrical Power Generation

48 14 00
Solar Energy Electrical Power Generation System
10-17
48 15 00
Wind Energy Electrical Power Generation System
10-17
48 16 23
Geothermal Energy Electrical Power Generation System
10-17

00 01 10-1

File details come from the government source that posted it. Updated .