36C25620R0069-070.docx

DOCX document Posted

Attached to
Z1DA--CFM - Complete Sanipak Site Prep
Solicitation number
36C25620R0069
Issued by

About this file

36C25620R0069 4. VA Master Specs Table of Contents.docx

View the file

Other files

File Type Posted
00470-7AS204 CEP West Wall Elevations at Loading Dock Drawings.pdf PDF
037-7PL101-N1 CEP First Floor Plumbing N-1 Drawings.pdf PDF
00473-7AS207 CEP Loading Dock Elevations at Ramp Drawings.pdf PDF
192-7EP409 CEP First Floor Electric Room 1N100 Drawings.pdf PDF
171-7EP101-N1 CEP First Floor Power Plan N-1 Drawings.pdf PDF
035-7PL100-N1 CEP Underground Plumbing N-1 Drawings.pdf PDF
VA SE Louisiana Drawings.pdf PDF
00494-7AS314 CEP Dock Wall Elevations F3 Drawings.pdf PDF
037-7PL101-N1 CEP Second Floor Plumbing Drawings.pdf PDF
36C25620R0069-081.pdf PDF
36C25620R0069-077.pdf PDF
36C25620R0069-091.pdf PDF
36C25620R0069-085.pdf PDF
36C25620R0069-069.docx DOCX document
36C25620R0069-086.pdf PDF
36C25620R0069-071.pdf PDF
36C25620R0069-076.pdf PDF
36C25620R0069-092.pdf PDF
36C25620R0069-093.pdf PDF
36C25620R0069-082.pdf PDF
36C25620R0069-090.pdf PDF
36C25620R0069-073.pdf PDF
36C25620R0069-088.pdf PDF
36C25620R0069-072.pdf PDF
36C25620R0069-083.pdf PDF
36C25620R0069-084.pdf PDF
36C25620R0069-075.pdf PDF
36C25620R0069-080.pdf PDF
36C25620R0069-087.pdf PDF
36C25620R0069-078.pdf PDF
36C25620R0069-089.pdf PDF
36C25620R0069-074.pdf PDF
36C25620R0069-079.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-01-14 12-01-18

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 SPECIAL SECTIONS
DATE
00 01 15
List of Drawing Sheets
07-15
00 11 21
Request for Proposal to Design Build
11-15

DIVISION 01 GENERAL REQUIREMENTS

01 00 00
General Requirements
12-18
01 32 16.01
Architectural and Engineering CPM Schedules
01-11
01 32 16.13
Network Analysis Schedule – Major Projects
09-15
01 32 16.15
Project Schedules (Small Projects – Design/Bid/Build
04-13
01 32 16.16
Network Analysis Schedules (Design-Build Only)
02-15
01 32 16.17
Project Schedules (Small Projects – Design/Build)
04-11
01 33 23
Shop Drawings, Product Data, and Samples
05-17
01 35 26
Safety Requirements
02-17
01 42 19
Reference Standards
05-16
01 45 00
Quality Control
01-18
01 45 29
Testing Laboratory Services
11-18
01 45 35
Special Inspections
04-18
01 57 19
Temporary Environmental Controls
01-11
01 58 16
Temporary Interior Signage
07-15
01 74 19
Construction Waste Management
09-13
01 81 13
Sustainable Construction Requirements
10-17
01 81 13.01
Sustainability Certification Requirements – LEED NC V3
09-15
01 81 13.02
Sustainability Certification Requirements – LEED NC V4
09-15
01 81 13.11
Sustainability Certification Requirements – LEED HC V3
09-15
01 81 13.21
Sustainability Certification Requirements – GREEN GLOBES
09-15
01 91 00
General Commissioning Requirements
10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13
Site Surveys
08-16
02 41 00
Demolition
08-17
02 65 00
Underground Storage Tank Removal
08-16
02 82 11
Traditional Asbestos Abatement
09-15
02 82 13.13
Glovebag Asbestos Abatement
09-15
02 82 13.19
Asbestos Floor Tile and Mastic Abatement
09-15
02 82 13.21
Asbestos Roofing Abatement
09-15
02 82 13.31
Asbestos Transite Abatement
09-15
02 82 13.41
Asbestos Abatement for Total Demolition Project
04-15
02 83 33.13
Lead-Based Paint Removal and Disposal
08-16

DIVISION 03 – CONCRETE

03 23 00
Stressing Tendons
07-11
03 30 00
Cast-in-Place Concrete
12-15
03 30 53
(Short-Form) Cast-in-Place Concrete
02-16
03 37 13
Shotcrete
07-11
03 41 13
Precast Concrete Hollow Core Planks
07-11
03 41 33
Precast Structural Pretension Concrete
07-11
03 45 00
Precast Architectural Concrete
10-15
03 51 13
Cementitious Wood Fiber Decks
09-11
03 51 16
Gypsum Concrete Roof Decks
09-11
03 52 00
Lightweight Concrete Roof Insulation
05-15
03 55 11
Gypsum Concrete Floor Decks
07-11

DIVISION 04 – MASONRY

04 01 00
Maintenance of Masonry
02-16
04 05 13
Masonry Mortaring
10-17
04 05 16
Masonry Grouting
02-16
04 20 00
Unit Masonry
08-17
04 72 00
Cast Stone Masonry
02-15

DIVISION 05 – METALS

05 12 00
Structural Steel Framing
11-18
05 21 00
Steel Joist Framing
11-18
05 31 00
Steel Decking
02-16
05 36 00
Composite Metal Decking
10-15
05 40 00
Cold-Formed Metal Framing
05-16
05 50 00
Metal Fabrications
08-18
05 51 00
Metal Stairs
10-15

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00
Rough Carpentry
10-17
06 16 63
Cementitious Sheathing
02-16
06 20 00
Finish Carpentry
08-16

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 01 50.19
Preparation for Re-Roofing
02-16
07 08 00
Facility Exterior Closure Commissioning
11-16
07 11 13
Bituminous Dampproofing
02-16
07 12 00
Built-Up Bituminous Waterproofing
09-11
07 13 00
Sheet Waterproofing
04-13
07 13 52
Modified Bituminous Sheet Waterproofing
08-16
07 14 21
Latex Mastic Deck Covering
05-15
07 18 13
Pedestrian Traffic Coatings
05-15
07 21 13
Thermal Insulation
10-17
07 21 23
Loose-Fill Insulation
02-16
07 22 00
Roof and Deck Insulation
02-16
07 24 00
Exterior Insulation and Finish Systems
02-16
07 27 26
Fluid-Applied Membrane Air Barrier, Vapor Permeable
02-16
07 27 27
Fluid-Applied Membrane Air Barrier, Vapor Retarding
02-16
07 31 13
Asphalt Shingles
02-16
07 31 26
Slate Shingles
02-16
07 31 29.13
Wood Shingles
02-16
07 32 13
Clay Roof Tiles
02-16
07 40 00
Roofing and Siding Panels
10-15
07 51 00
Built-Up Bituminous Roofing
08-18
07 51 13.11
Hot-Applied Built-Up Asphalt Roofing
08-16
07 51 13.13
Cold-Applied Built-Up Asphalt Roofing
08-16
07 52 16.11
Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
08-16
07 52 16.12
Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing
08-16
07 53 23
Ethylene-Propylene-Diene-Monomer Roofing
02-16
07 54 16
Ethylene Interpolymer (KEE) Roofing
10-15
07 54 19
Polyvinyl-Chloride (PVC) Roofing
12-18
07 54 23
Thermoplastic Polyolefin (TPO) Roofing
08-16
07 56 00
Fluid-Applied Roofing
05-15
07 57 13
Sprayed Polyurethane Foam Roofing
10-15
07 60 00
Flashing and Sheet Metal
07-14
07 61 16
Batten Seam Copper Roofing
10-15
07 71 00
Roof Specialties
10-15
07 72 00
Roof Accessories
10-15
07 81 00
Applied Fireproofing
10-17
07 84 00
Firestopping
02-16
07 92 00
Joint Sealants
10-17
07 95 13
Expansion Joint Cover Assemblies
02-16

DIVISION 08 OPENINGS

08 11 13
Hollow Metal Doors and Frames
08-16
08 11 73
Sliding Metal Fire Doors
02-16
08 14 00
Interior Wood Doors
02-16
08 17 10
Integrated Door Assemblies
02-16
08 31 13
Access Doors and Frames
02-16
08 33 00
Coiling Doors and Grilles
02-16
08 33 13
Coiling Counter Doors
02-16
08 34 36
Darkroom Doors
07-15
08 34 53
Security Doors and Frames
05-15
08 34 59
Vault Doors and Day Gates
02-16
08 35 13.13
Accordion Folding Doors
05-15
08 36 13
Sectional Doors
05-15
08 38 16
Flexible Traffic Doors
02-16
08 41 13
Aluminum-Framed Entrances and Storefronts
08-16
08 42 33
Revolving Door Entrances
05-15
08 44 13
Glazed Aluminum Curtain Walls
03-17
08 51 13
Aluminum Windows
02-16
08 51 13.11
Side-Hinged Aluminum Windows
08-16
08 51 23
Steel Windows
02-16
08 51 69.11
Aluminum Storm Windows
05-15
08 56 19
Pass Windows
02-16
08 56 53
Blast Resistant Windows
02-16
08 56 59
Service and Teller Window Units
02-16
08 56 66
Detention Window Screens
02-16
08 63 00
Metal-Framed Skylights
10-15
08 71 00
Door Hardware
01-16
08 71 13
Automatic Door Operators
02-16
08 71 13.11
Low Energy Power Assist Door Operators
08-16
08 80 00
Glazing
10-15
08 90 00
Louvers and Vents
05-15

DIVISION 09 – FINISHES

09 05 16
Subsurface Preparation for Floor Finishes
02-15
09 06 00
Schedule for Finishes
04-15
09 22 16
Non-Structural Metal Framing
06-18
09 23 00
Gypsum Plastering
10-15
09 24 00
Portland Cement Plastering
10-15
09 26 00
Veneer Plastering
10-15
09 29 00
Gypsum Board
06-18
09 30 13
Ceramic/Porcelain Tiling
09-15
09 51 00
Acoustical Ceilings
12-18
09 54 23
Linear Metal Ceilings
10-15
09 63 13
Brick Flooring
02-16
09 63 40
Stone Flooring
10-15
09 65 13
Resilient Base and Accessories
02-16
09 65 16
Resilient Sheet Flooring
05-18
09 65 19
Resilient Tile Flooring
05-18
09 66 13
Portland Cement Terrazzo Flooring
10-15
09 66 16
Terrazzo Floor Tile
10-15
09 67 23.20
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
07-14
09 67 23.30
Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3)
07-14
09.67.23.40
Resinous Poured In Place Resilient Flooring (RES-4)
07-14
09 67 23.50
Resinous (Epoxy Terrazzo) Flooring (RES-5)
07-14
09 67 23.60
Resinous (Urethane and Epoxy Mortar) Flooring (RES-6)
07-14
09 68 00
Carpeting
10-15
09 68 21
Athletic Carpeting
10-15
09 69 00
Access Flooring
10-15
09 72 16
Vinyl-Coated Fabric Wall Covering
10-15
09 72 31
Polypropylene Fabric Wall Covering
05-15
09 84 33
Sound-Absorbing Wall Units
10-15
09 91 00
Painting
01-16
09 94 19
Multicolor Interior Finishing
08-16
09 96 59
High-Build Glazed Coatings
07-14

DIVISION 10 – SPECIALTIES

10 11 13
Chalkboards and Markerboards
10-15
10 11 23
Tackboards
10-15
10 13 00
Directories
05-15
10 14 00
Signage
10-15
10 21 13
Toilet Compartments
12-15
10 21 16
Shower and Dressing Compartments
08-16
10 21 23
Cubicle Curtain Tracks
05-15
10 22 13
Wire Mesh Partitions
10-15
10 22 19
Demountable Partitions
04-16
10 22 26.13
Accordion Folding Partitions
05-15
10 25 13
Patient Bed Service Walls
08-18
10 26 00
Wall and Door Protection
10-15
10 28 00
Toilet, Bath, and Laundry Accessories
02-16
10 44 13
Fire Extinguisher Cabinets
08-18
10 75 00
Flagpoles
02-16

DIVISION 11 – EQUIPMENT

11 05 12
General Motor Requirements for Equipment
11-11
11 12 00
Parking Control Equipment
02-16
11 17 36
Package Transfer Units
02-13
11 26 00
Unit Kitchens
11-11
11 27 00
Photographic Processing Equipment
11-11
11 40 11
Custom Fabricated Food Service Equipment
11-11
11 40 21
Food Service Equipment-Utility Distribution System
11-11
11 41 00
Food Storage Equipment
11-11
11 41 21
Walk-In Coolers and Freezers
05-15
11 44 00
Food Cooking Equipment
11-11
11 48 00
Cleaning and Disposal Equipment
11-11
11 53 13
Laboratory Fume Hoods
05-15
11 53 23
Laboratory Refrigerators
11-11
11 53 53
Biological Safety Cabinets Laminar Airflow Stations
01-11
11 53 61
Custom Fabricated Laboratory Equipment
11-11
11 53 71
Solution Warming Cabinets
11-11
11 71 01
Medical Washing and Sterilizing Equipment
02-11
11 71 02
Laboratory Washing and Sterilizing Equipment
10-11
11 73 00
Ceiling Mounted Patient Lift System
01-17
11 78 00
Mortuary Equipment
11-11
11 78 13
Mortuary Refrigerators
11-11
11 79 13
Hydrotherapy Equipment
11-11
11 82 19
Packaged Incinerators
11-11

DIVISION 12 – FURNISHINGS

12 22 16
Drapery Track and Accessories
05-15
12 24 00
Window Shades
08-17
12 24 21
Lightproof Shades
05-15
12 31 00
Manufactured Metal Casework
05-15
12 32 00
Manufactured Wood Casework
09-15
12 34 00
Manufactured Plastic Casework
10-15
12 35 70.21
Medication Cabinet
02-16
12 36 00
Countertops
12-18
12 56 70.11
Suspended Table
02-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41
Seismic Restraint Requirements for Non-Structural Components
01-14
13 17 23
Therapeutic Pools
05-15
13 17 23.11
Therapeutic Pool Accessories
05-15
13 19 13
Kennel Enclosures and Gates
02-16
13 21 29
Constant Temperature Rooms
08-16
13 34 19
Metal Building Systems
08-16
13 49 00
Radiation Protection
02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11
Traction and Winding Drum Dumbwaiter
10-18
14 21 00
Traction Elevators
10-18
14 21 11
Traction Cartlift
10-18
14 24 00
Hydraulic Elevators
10-18
14 24 11
Hydraulic Cartlift
10-18
14 24 24
Renovation Hydraulic Elevator (Custom Written by VACO)
14 26 26
Renovation Traction Elevator (Custom Written by VACO)
14 91 33
Laundry and Linen Chutes
06-12
14 91 82
Trash Chutes
06-12

DIVISION 21- FIRE SUPPRESSION

21 08 00
Commissioning of Fire Suppression System
11-16
21 12 00
Manual Dry Standpipe Systems
06-15
21 13 13
Wet-Pipe Sprinkler Systems
06-15
21 13 16
Dry-Pipe Sprinkler Systems
01-15
21-22-00
Clean Agent Fire Suppression Systems
05-15
21-30-13
Electric-Driven, Fire Pumps
05-15
21-30-16
Diesel-Driven, Fire Pumps
05-15

DIVISION 22 – PLUMBING

22 05 11
Common Work Results for Plumbing
07-16
22 05 12
General Motor Requirements for Plumbing Equipment
09-15
22 05 19
Meters and Gages for Plumbing Piping
09-15
22 05 23
General-Duty Valves for Plumbing Piping
09-15
22 05 33
Heat Tracing for Plumbing Piping
09-15
22 07 11
Plumbing Insulation
09-15
22 08 00
Commissioning of Plumbing Systems
11-16
22 11 00
Facility Water Distribution
09-15
22 11 23
Domestic Water Pumps
09-15
22 12 16
Facility Elevated, Potable-Water Storage Tanks
09-15
22 13 00
Facility Sanitary and Vent Piping
09-15
22 13 23
Sanitary Waste Interceptors
09-15
22 13 29
Sanitary Sewerage Pumps
09-15
22 13 29.13
Wet-Pit Mounted, Vertical Sewerage Pumps
09-15
22 13 33
Packaged, Submersible Sewerage Pump Units
09-15
22 14 00
Facility Storm Drainage
09-15
22 14 29
Sump Pumps
09-15
22 14 33
Packaged, Pedestal Drainage Pump Units
09-15
22 14 36
Packaged, Submersible, Drainage Pump Units
09-15
22 15 00
General Service Compressed-Air Systems
09-15
22 31 11
Water Softeners
09-15
22 33 00
Electric Domestic Water Heaters
09-15
22 34 00
Fuel-Fired Domestic Water Heaters
09-15
22 35 00
Domestic Water Heat Exchangers
12-16
22 40 00
Plumbing Fixtures
09-15
22 42 26
Commercial Disposers
09-15
22 61 13.74
Dental Compressed-Air Piping
09-15
22 61 19.74
Dental Compressed-Air Equipment
09-15
22 62 00
Vacuum Systems for Laboratory and Healthcare Facilities
09-15
22 62 19.74
Dental Vacuum and Evacuation Equipment
09-15
22 63 00
Gas Systems for Laboratory and Healthcare Facilities
09-15
22 66 00
Chemical-Waste Systems for Laboratory and Healthcare Facilities
09-15
22 67 19.16
Reverse-Osmosis Water Equipment
09-15
22 67 21
Water Dealkalizing System
09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 10
Common Work Results for Boiler Plant and Steam Generation
08-17
23 05 11
Common Work Results for HVAC
08-17
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
08-17
23 05 41
Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 51
Noise and Vibration Control for Boiler Plant
08-17
23 05 93
Testing, Adjusting, and Balancing for HVAC
02-15
23 07 11
HVAC and Boiler Plant Insulation
02-15
23 08 00
Commissioning of HVAC Systems
11-16
23 08 11
Demonstrations and Tests for Boiler Plant
08-17
23 09 11
Instrumentation and Control for Boiler Plant
08-17
23 09 23
Direct-Digital Control System for HVAC
09-11
23 10 00
Facility Fuel Systems
08-17
23 11 23
Facility Natural-Gas Piping
08-17
23 21 11
Boiler Plant Piping Systems
09-17
23 21 13
Hydronic Piping
08-17
23 21 23
Hydronic Pumps
08-17
23 22 13
Steam and Condensate Heating Piping
08-17
23 22 23
Steam Condensate Pumps
08-17
23 23 00
Refrigerant Piping
02-15
23 25 00
HVAC Water Treatment
02-15
23 31 00
HVAC Ducts and Casings
03-13
23 34 00
HVAC Fans
02-15
23 36 00
Air Terminal Units
02-15
23 37 00
Air Outlets and Inlets
02-15
23 38 13
Commercial-Kitchen Hoods
01-11
23 40 00
HVAC Air Cleaning Devices
02-12
23 50 11
Boiler Plant Mechanical Equipment
11-17
23 51 00
Breechings, Chimneys, and Stacks
08-17
23 52 25
Low-Pressure Water Heating Boilers
08-17
23 52 28
Low Pressure Steam Boilers
08-17
23 52 33
Water-Tube Boilers
08-17
23 52 39
Fire-Tube Boilers
08-17
23 56 00
Solar Energy Heating System
06-16
23 57 33
Geothermal Energy – Direct Use (Heating Applications)
06-16
23 64 00
Packaged Water Chillers
04-11
23 65 00
Cooling Towers
02-15
23 72 00
Air-to-Air Energy Recovery Equipment
05-11
23 73 00
Indoor Central-Station Air-Handling Units
04-11
23 74 13
Packaged, Outdoor, Central-Station Air-Handling Units
04-11
23 81 00
Decentralized Unitary HVAC Equipment
02-11
23 81 23
Computer-Room Air-Conditioners
04-11
23 81 43
Air-Source Unitary Heat Pumps
04-11
23 81 46
Water-Source Unitary Heat Pumps
04-11
23 81 49
Ground-Source Heat Pump
06-16
23 82 00
Convection Heating and Cooling Units
04-11
23 82 16
Air Coils
04-11
23 84 00
Humidity Control Equipment
05-11

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10
Advanced Utility Metering System
02-10

DIVISION 26 – ELECTRICAL

26 05 11
Requirements for Electrical Installations
01-16
26 05 13
Medium-Voltage Cables
01-17
26 05 19
Low-Voltage Electrical Power Conductors and Cables
01-17
26 05 26
Grounding and Bonding for Electrical Systems
01-17
26 05 33
Raceway and Boxes for Electrical Systems
01-18
26 05 36
Wireways for Radiology Equipment
01-18
26 05 39
Underfloor Raceways for Electrical Systems
01-18
26 05 41
Underground Electrical Construction
01-17
26 05 73
Overcurrent Protective Device Coordination Study
01-18
26 08 00
Commissioning of Electrical Systems
11-16
26 09 23
Lighting Controls
01-18
26 11 16
Secondary Unit Substations
01-18
26 12 19
Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers
01-18
26 13 13
Medium-Voltage Circuit Breaker Switchgear
01-17
26 13 16
Medium-Voltage Fusible Interrupter Switches
01-17
26 20 11
Isolated Power Systems
01-18
26 22 00
Low-Voltage Transformers
01-18
26 23 00
Low-Voltage Switchgear
01-17
26 23 13
Generator Paralleling Controls
01-17
26 24 13
Distribution Switchboards
01-18
26 24 16
Panelboards
01-18
26 24 19
Motor Control Centers
01-18
26 25 11
Busways
01-17
26 26 00
Power Distribution Units for Static Uninterruptible Power Systems
01-18
26 27 26
Wiring Devices
01-18
26 29 11
Motor Controllers
01-18
26 29 21
Enclosed Switches and Circuit Breakers
01-17
26 32 13
Engine Generators
01-18
26 33 53
Static Uninterruptible Power Supply
01-17
26 35 26
Harmonic Filters
01-18
26 36 23
Automatic Transfer Switches
01-17
26 41 00
Facility Lightning Protection
01-17
26 42 00
Cathodic Protection
01-17
26 43 13
Surge Protective Devices
01-17
26 51 00
Interior Lighting
01-18
26 55 71
Medical and Surgical Lighting Fixtures
01-18
26 56 00
Exterior Lighting
01-18

DIVISION 27 – COMMUNICATIONS

27 05 11
Requirements for Communications Installations
06-15
27 05 26
Grounding and Bonding for Communications Systems
06-15
27 05 33
Raceways and Boxes for Communications Systems
10-18
27 05 61
Leased Space, Communication Equipment and Systems
06-15
27 08 00
Commissioning of Communications Systems
11-16
27 10 00
Control, Communication and Signal Wiring
06-15
27 11 00
Communications Equipment Room Fittings
06-15
27 15 00
Communications Structured Cabling
01-16
27 31 00
Voice Communications Switching and Routing Equipment
06-15
27 31 31
Voice Communications Switching and Routing Equipment - Extension
06-15
27 32 41
Two-Way Radio Equipment and Systems
10-18
27 41 31
Master Antenna Television Equipment and Systems
06-15
27 51 16
Public Address and Mass Notification Systems
10-18
27 51 23
Intercommunications and Program Systems
06-15
27 52 23
Nurse Call and Code Blue Systems
10-18
27 52 41
Miscellaneous Medical Systems
06-15
27 53 19
Distributed Radio Antenna (Within Building) Equipment and System
10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00
Common Work Results for Electronic Safety and Security
04-18
28 05 13
Conductors and Cables for Electronic Safety and Security
10-18
28 05 26
Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33
Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00
Commissioning of Electronic Safety and Security Systems
11-16
28 13 00
Physical Access Control System
10-11
28 13 16
Physical Access Control System and Database Management
09-11
28 13 53
Security Access Detection
09-11
28 16 00
Intrusion Detection System
10-11
28 23 00
Video Surveillance
09-11
28 26 00
Electronic Personal Protection System
09-11
28 31 00
Fire Detection and Alarm
10-11
28 52 31
Emergency Call System
06-15

DIVISION 31 – EARTHWORK

31 20 00
Earthwork
07-16
31 20 11
Earthwork (Short Form)
10-12
31 23 19
Dewatering
10-12
31 23 23.33
Flowable Fill
10-12
31 32 23
Pressure Grouting Soil Stabilization
10-12
31 62 00
Driven Piles
10-12
31 63 16
Auger Cast Grout Piles
10-12
31 63 26
Drilled Caissons
10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23
Cement and Concrete for Exterior Improvements
08-16
32 12 16
Asphalt Paving
09-15
32 14 16
Brick Unit Paving
08-16
32 17 23
Pavement Markings
08-16
32 31 13
Chain Link Fences and Gates
06-18
32 31 40
High Security Fences and Gates
08-16
32 84 00
Planting Irrigation
08-16
32 90 00
Planting
08-16

DIVISION 33 – UTILITIES

33 08 00
Commissioning of Site Utility Systems
11-16
33 10 00
Water Utilities
03-17
33 30 00
Sanitary Sewer Utilities
06-13
33 40 00
Storm Sewer Utilities
12-17
33 46 13
Foundation Drainage
10-11
33 51 00
Natural-Gas Distribution
10-11
33 63 00
Steam Energy Distribution
09-17

DIVISION 34 – TRANSPORTATION

34 71 13
Passive Vehicle Barriers
04-18
34 75 13.13
Active Vehicle Barriers
08-16

DIVISION 48 – Electrical Power Generation

48 14 00
Solar Energy Electrical Power Generation System
10-17
48 15 00
Wind Energy Electrical Power Generation System
10-17
48 16 23
Geothermal Energy Electrical Power Generation System
10-17

00 01 10-1

File details come from the government source that posted it. Updated .