36C25620R0069 Contract Opportunity Combined Synopsis/Solicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice
Z1DA
CFM - Complete Sanipak Site Prep 39531 36C25620R0069 05-28-2020 N
SDVOSBC
236220 Department of Veterans Affairs Gulf Coast Veterans Health Care System 400 Veterans Avenue Biloxi MS 39531 Charles Powell Contracting Officer 228-523-5068 Department of Veterans Affairs Southeast Louisiana Veteran Health Care System 2400 Canal Street New Orleans, LA 70119 70119
USA
charles.powell2@va.gov CFM - Complete Sanipak Site Prep
1.
SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," in dicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See __________
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government accepta nce after the date offers are due will not be considered and will be rejected.
36C25620R0069 X 04-28-2020 629-20-2-6600-0037 629-20-100 Department of Veterans Affairs Gulf Coast Veterans Health Care System 400 Veterans Avenue Biloxi MS 39531 Department of Veterans Affairs Gulf Coast Veterans Health Care System 400 Veterans Avenue, Bldg. T-102 Biloxi MS 39531 Charles Powell 228-523-5068 Project No: 629-20-100 CFM-Complete Sanipak Site Prep
Note: Any reference contained herein concerning "bid" or "bidder" means "offer" or "offeror".
This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) under Public Law (PL) 109-461. Offerors must be verified as a SDVOSB in the VetBiz Vendor Information (VIP) at http://www.vetbiz.va.gov. Offers received from contractorswho are n ot SDVOSB verified in VetBiz will not be considered for award.
This is a TWO-PHASE DESIGN-BUILD ACQUISITION - All qualified SDVOSB offerors may submit for Phase I. After Phase I evaluation, selected PHASE II offerors will be notified with instructions to submit PHASE II proposals.
The contractor shall provide all labor, material s, tools, equipment and supervision necessary to design and build (Design/Build) a project to complete site preparation and utilities for the installation of a new San-i-pak self-contained compactor and steam generator at the Southeast Louisiana Veterans Health Care System, 2400 Canal Street, New Orleans, Louisiana 70119. See attached technical specifications package for RFP instructions.
SITE VISIT: A site visit will be held for this project during Phase II proposals. Only the most highly qualified offerors from Phase I evaluations will be invited to attend the site visit which will be scheduled after Phase I evaluations.
MAGNITUDE OF CONSTRUCTION PROJECT: In accordance with FAR 36.204 and VAAR 836.20 , Disclosure of the Magnitude of Construction Projects, this project falls between the following price range: Between $250,000 and $500,000.
NAICS CODE: 236220 SMALL BUSINESS SIZE STANDARD: $39.5M
GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED: New Orleans, Louisiana
***END OF ITEMS***
X X 52.211-10 X
4:00 PM CST
05-28-2020 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23.
ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)
38 U.S.C. 8127(a)
26. ADMINISTERED BY
27. PAYMENT WILL BE
MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract.
The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any n umber means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
X 36C256 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 Department of Veterans Affairs Financial Services Center (667)
PO
Box 149971 Austin TX 78714-9971 1-877-353-9791 1-512-460-5429
WILLIAM A. GEARY
NCO165L3-0926
Table of Contents
| PART I - THE SCHEDULE | 3 | |
| SECTION A - SOLICITATION/CONTRACT FORM | 3 | |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 3 | |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 4 | |
| PERFORMANCE WORK STATEMENT | 7 | |
| Department of Veterans Affairs | 7 | |
| Project Number: 629-20-100 | 7 | |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 18 | |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 19 | |
| B. | PART II - RESPONSIBILITIES | 24 |
| 2.1 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) | 48 | |
| 2.2 52.216-1 TYPE OF CONTRACT (APR 1984) | 48 | |
| 2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 48 | |
| 2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 49 | |
| 2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 50 | |
| 2.6 52.228-1 BID GUARANTEE (SEP 1996) | 51 | |
| 2.7 52.233-2 SERVICE OF PROTEST (SEP 2006) | 51 | |
| 2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 52 | |
| 2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 52 | |
| 2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 53 | |
| 2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 53 | |
| 2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 54 | |
| 2.13 PARTNERING | 54 | |
| REPRESENTATIONS AND CERTIFICATIONS | 55 | |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) | 55 | |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019) | 59 | |
| 3.3 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018) | 60 | |
| GENERAL CONDITIONS | 62 | |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 62 | |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) | 62 | |
| 4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 63 | |
| 4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2020) | 63 | |
| 4.5 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015) | 66 | |
| 4.6 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 67 | |
| 4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014) | 68 | |
| 4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS | 71 | |
| 4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 72 | |
| 4.10 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014) | 73 | |
| 4.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 75 | |
| 4.12 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 77 | |
| 4.13 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 78 | |
| 4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 78 | |
| 4.15 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 79 | |
| 4.16 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 80 | |
| 4.17 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 80 | |
| 4.19 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR 2019) | 81 | |
| 4.20 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 82 | |
| 4.21 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 83 | |
| DESIGN BUILD SPECIFICATIONS | 84 | |
| 4.22 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES | 84 | |
| 4.23 OWNERSHIP OF ORIGINAL DOCUMENTS | 84 | |
| 4.24 RETENTION OF REVIEW DOCUMENTS | 84 | |
| 4.25 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION | 84 | |
| 4.26 COORDINATION WITH MEDICAL CENTER | 85 | |
| 4.27 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR | 85 |
PERFORMANCE WORK STATEMENT
Department of Veterans Affairs Southeast Louisiana Veterans Health Care System 2400 Canal Street, New Orleans, LA 70119
CFM – Complete San-i-pak Site Prep Design/Build Project Number: 629-20-100
A. GENERAL INFORMATION
1. Title of Project: CFM – Complete San-i-pak Site Prep
2. Scope of Work: The contractor shall provide all labor, materials, tools, equipment and supervision necessary to design and build (Design/Build) a project to complete site preparation and utilities for the installation of a new San-i-pak® self-contained compactor and steam generator. The work shall include: removal of existing utilities, structures and equipment and installing new utilities inside and outside the existing Central Energy Plant building, all in accordance with documents for supporting the new San-i-pak equipment at the Southeast Louisiana Veteran Health Care System (SLVHCS) campus located at 2400 Canal Street, New Orleans, LA 70119.
2.1 The contractor shall at a minimum be responsible for the design and installation of the following site services to support the new San-i-pak equipment:
| a. Remove existing hydraulic lift and all associated equipment. |
| b. Remove hydraulic pump and motor. |
| c. Remove fuse panel and all electrical to the hydraulic lift. |
| d. Fill existing pit with 4000-pound compressive strength concrete. |
| e. Raise the existing storm drain to the new slab elevation. |
| f. Remove dock leveler. |
| g. Connect new 12” sanitary drain to new holding tank under san-i-pak platform. |
| h. Connect ½” water line to steam generator. |
| i. Install new 480v/3 phase 100-amp service. |
| j. Install new 480v/3 phase 15-amp service. |
| k. Install new 480v/3 phase 40-amp service to marathon power unit. |
| l. Install new 120v/1 phase 20-amp service. |
| m. Install new 120v/ 1 phase 15-amp service. |
| n. Connect ½” water line to condensate tank. |
o. Furnish and install sanitary lift station with 3” pumped discharge to 4” sanitary line located under the second floor inside the first floor of the building.
p. Furnish and install any additional utilities required for the complete operation of the new San-i-pak equipment.
The contractor shall design and install all utilities and equipment to support manufacturer specifications for the new equipment. All designs and construction work shall be completed in accordance with the most recent codes including but not limited to National Fire Protection Agency (NFPA) 99, 70E, 101, OSHA, The Joint Commission, VA Directives, and Building Codes. The contractor shall be responsible for providing all background paperwork certifying installation and certifications of proper function. This shall include system commission and system testing. A one-year, all inclusive, warranty for parts, equipment and labor shall be furnished as part of this scope.
| 3. | Background: The VA operates a Veterans medical center located at 2400 Canal Street, New Orleans, LA 70119. The new San-i-pak equipment is to be located at the southwest side of the campus at the Central Energy Plant (CEP) loading dock location, entry accessible from Tulane Avenue. The new utilities will be piped from inside and outside the CEP to the loading dock at the location of the new San-i-pak equipment. The scope also includes selected site demolition and removal of existing site equipment. Positioning the San-i-pak equipment, installing container guide channels and assembling the equipment shall be performed as part of this scope. San-i-pak equipment has been purchased by the VA and will be delivered to the site by San-i-pak. The existing hydraulic lift and associated equipment at the VAMC shall be relocated to the opposite side of the loading parking lot adjacent to the Research Building. |
| 4. | Performance Period: Work shall begin within five (5) calendar days of the notice to proceed. Total time to complete this contract is one hundred twenty (120) calendar days. |
5. Type of Contract: Firm Fixed Price Contract.
| 6. | Work Hours: The Contractor may schedule work during the following time periods: 7:30 am to 4:00 pm, Monday – Friday. For any work involving a utility shut down, it must be scheduled outside the normal, designated work hours and must be scheduled no fewer than five (5) days in advance. Work may occur on Federal Holidays as long as it is scheduled with the Contracting Officer’s Representative (COR) or Contracting Officer (CO) in advance (minimum 48-hour notice). Recognized Federal Holidays: New Year’s Day, Martin Luther King Jr. Day, Washington’s Birthday (President’s Day), Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving, Christmas. |
| 7. | Work Restrictions: Plan and accomplish all work so that there is a minimum to no interference and inconvenience to occupants and/or operators of the facility. |
| 8. | Utility Outage: The Contractor shall submit a utility outage request for approval through the COR two weeks prior to any utility outage. The Contractor shall be responsible for coordinating all outages with the local utility providers and/or local VA staff. The Contractor will also be responsible for requesting all necessary permitting to complete the work. |
| 9. | Demolition: Contractor to coordinate the careful removal and storage of all existing fixtures and equipment with VA Contracting Officer/ Contracting Officer’s Representative (COR). |
| 10. | Cleanup: Remove rubbish and debris from the project site daily; do not allow accumulations on or around the project site. VA dumpsters are not to be used. Store materials that cannot be removed daily in areas specified by the VA Contracting Officer (CO)/ Contracting Officer’s Representative (COR). |
B. CONTRACT AWARD MEETING
1. Notice to Proceed: The Contractor shall not commence performance on the tasks in this Performance Work Statement (PWS) until the CO has conducted a kick-off meeting to issue the Notice to Proceed or has advised the Contractor that a kick-off meeting is waived.
| C. | DEFINITIONS: |
| 1. | Firm Fixed Price: The procurement of services by the Government to execute design and construction services previously executed for a specific project. The contractor bid price for such work shall include all components necessary to complete the project and is final and non-variable. |
| 2. | Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer. |
| 3. | VA Project Engineer/Contracting Officer's Representative (COR): The Contracting Officer's authorized representative at the construction site. The COR is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. |
| 5. | Contractor: This term, as used herein, refers to the Contractor under this contract or the construction team. |
| 6. | A/E: This term, as used herein, refers to the Architect Engineer firm(s) whom executed the design portion of the contract. |
| 7. | Tentative Schedule: The anticipated completion of this project is 120 calendar days after “Notice to Proceed” (NTP). |
D. REQUIREMENTS
1. GENERAL REQUIREMENTS
a. The Contractor shall provide all materials, tools, equipment, transportation, supervision, and labor required to provide the service described in this statement of work, specifications, drawings and attachments.
b. Pre-Work
i. Before any work is to begin, the Contractor shall make one site visit and field verify all work prior to bid submittal and start of project.
ii. The Contractor shall replace any items, equipment, vegetation damaged by the Contractor, sub-contractor, his employees or equipment.
c. Scheduling
i. All work shall be coordinated with the COR prior to, during, and after completion of this job.
ii. Scheduling for the work to begin shall be determined by VA personnel and relayed to the Contractor prior to start date.
iii. Any materials, equipment, tools, etc. shipped or delivered to the VA site on behalf of the contactor must be scheduled with COR in advance. The Contractor must be present for and must sign all receipts of materials pertaining to the project.
d. Environmental Controls
i. The Contractor shall be responsible for all demolition in order to complete the work described. Coordinate all demolition activities with VA CO & COR.
ii. The Contractor shall cleanup the work area after each work-day and must keep the work area clean at all times. Debris disposal shall be in accordance with NFPA 241.
e. The Contractor shall provide, at minimum, one 30-hour, OSHA deemed “competent person” to be at the site at all times while work occurs.
f. The Contractor shall provide appropriate safety signage, subject to VA approval, for the duration of the project. A detailed project related safety plan is also to be submitted for approval by the VA safety office prior to project start.
g. The Contractor shall supply all safety data sheets (SDS), general material, and finish submittals to the VA for approval before commencing any work.
h. Storage
i. Material storage space may be provided by the VA or made available on site. The Contractor will be responsible for providing temporary storage containers or sheds for materials in areas designated by VA should they wish to store the materials on site.
i. All workmanship shall carry a minimum one (1) year all-inclusive warranty from point of final acceptance. Material shall follow manufacturer’s warranty or workmanship warranty, or whichever is greater.
2. DESIGN & DESIGN SUBMITTALS/REQUIREMENTS:
a. The design shall be in accordance with and capture the following requirements:
i. The contractor shall adhere to all building codes and life safety standards as they pertain to the installation of medical gas in hospital facilities. The contractor shall adhere to the latest editions of NFPA 99 Health Care Facilities, American Society of Mechanical Engineers (ASME), American Society of Safety Engineers (ASSE), NFPA 101, VA directives, and The Joint Commission.
ii. All equipment and installation must meet manufacturers and VA specifications.
b. The Contractor shall furnish all supplies, equipment, facilities and services required for delivery and installation of the supplies and equipment.
c. The Contractor is responsible for any missing parts and components not included in order to carry out the installation.
d. Design Development (DD): The DB Contractor shall develop 35% and 100% DD documents.
e. Construction Documents (CD) plans and specifications shall be developed and used for construction upon review and approval by the VA in accordance with the A/E Submission Instructions for Minor and NRM Construction Programs; PG-18-15, Volume C.
f. Verify ALL dimensions and equipment requirements.
g. The design documents shall incorporate proper construction phasing of work within the project period of performance.
h. Design drawings shall include all demolition and new work, and enough detail to provide for a thorough review by the VA.
i. The work (design and construction) shall include, but not limited to, demolition, structural, electrical, HVAC & plumbing upgrades, modifications and capping of removed utilities.
j. Design submission shall include load calculations stamped by a Professional Engineer. The final design documents shall be stamped by registered a Professional Engineer for each discipline.
k. Design shall be in accordance with the VA Master Specifications (Table of Contents provided) and shall include all site investigation, site survey, calculations, testing and design for documents to construct the subject project. The following specification are provided with this solicitation and shall become a part of this contract and design documents:
i. 00 11 21 Request for Proposal to Design Build
ii. 01 00 00 General Requirements
iii. 01 32 16.17 Project Schedule
iv. 01 33 23 Shop Drawings, Product Data & Samples
v. 01 35 26 Safety Requirements
vi. 01 42 19 Reference Standards
vii. 01 45 00 Quality Control
viii. 01 57 19 Temporary Environmental Controls
ix. 01 74 19 Construction Waste Management NOTE: DB Contractor shall develop all other applicable project specifications.
3. DESIGN DELIVERABLE REQUIREMENTS:
a. SLVHCS Design Submissions – Statement of Task:
i. 35% Design Development (DD)
ii. 100% Design Development (DD) NOTE 1: Detailed design submission requirements can be found in VA Guide PG-18- 15.
NOTE 2: The VA staff shall have a minimum of five (5) calendar days to review and coordinate each AE design submissions. If the VA workload does not allow for a thorough review within the five (5) calendar day timeframe, the AE shall not proceed to the next design phase until comments have been received from the VA. The AE will be entitled to a time only contract extension for the number of VA review days beyond five (5) calendar days.
b. 35% Design Development: Investigate and survey project site. Verify any VA provided data. A/E is responsible for collecting any and all data required for the design. The A/E is responsible for visiting the site for measuring and collecting actual field data that may be required. These drawings shall be at the largest scale possible and shall show the architectural layout of each floor, approximate room dimensioning/square footage, room identification, fire exists, chases, columns and other pertinent information necessary to provide information that will carry the design to the next review.
i. Drawings & Specifications: Provide two 30”x42” size C sets and one unbound 11”x17” size B set of preliminary construction drawings.
ii. Provide one set of preliminary specifications indicating all of the A/E proposed edits in a 3-hole punch binder. Drawings and specifications to indicate potential deductive bid alternates and any phasing requirements. Also, provide electronic copies on a CD (Drawings PDF format, Specifications in Word format).
iii. Cost Estimate: Provide a detailed cost estimate indicating labor, material and equipment cost in RS Means CostWorks format. Estimate shall include Prime Contractors Overhead, Profit, Bond and Labor Burden (typically 32%). Estimate shall indicate feasible deductive bid alternates to bring the construction cost within the allotted construction budget. This cost estimate shall be submitted in hard copy with the Design Analysis and an electronic copy on a CD.
NOTE: The A/E shall not proceed with the 100% design without written concurrence from the VA COR.
c. 100% Design Development: This submission of drawings, specifications and cost estimate shall be complete. This review by the VA shall be to validate that 35% comments were incorporated into the project. There shall be nothing missing from the construction documents. The VAMC review of these documents should result in very minor comments to allow for the next submission to be final. If the comments of this set of documents results in numerous comments, then a 99% review or a check set of certain elements of the design may be required before the A/E shall proceed to the Final Construction Documents.
i. Drawings & Specifications: Submit in the same manner as the 35% DD submittal.
ii. Cost Estimate: Submit in the same manner as the 35% DD submittal.
d. Final Construction Documents: This submission shall incorporate all project requirements and previous comments. These documents shall be ready for bidding.
i. Drawings & Specifications: ALL ENGINEERS AND ARCHITECTS PROFESSIONAL “STAMPS” SHALL BE ON THIS SET OF DOUMENTS. Provide four 30”x42” size C sets and two 11”x17” size B sets of FINAL construction drawings (one set of the 11”x17” size drawings to be unbound). Provide two set of FINAL fully edited specifications (specs in a 3-hole punch notebook, printed on both sides of the paper). Drawings and specifications to indicate potential deductive bid alternates and any phasing requirements. Provide two CD electronic copies of the entire package (Construction Drawings and Specifications). The drawings shall be as AutoCAD (2017), Revit, and scanned individual PDF files per drawing. The specifications shall be in separate Word and separate PDF files for each specification section. Coordinate the naming and numbering of the files with the COR. Also, provide a PDF file for each complete volume of the specifications.
ii. Cost Estimate: Submit FINAL CostWorks cost estimate in the same manner as previous submittal.
4. CONSTRUCTION & CONSTRUCTION SUBMITAL REQUIREMENTS:
a. Submittals: Construction and product submittals shall be as outlined in the VA Master specifications and are to be submitted during the design phase and incorporated into the design once approved where possible/practical. Provide submittals in accordance with the Shop Drawings, Product Data & Samples Specification provided.
b. Work Hours/Dates: Monday through Friday 7:30am to 4:00pm, excluding federal holidays. The contractor may be required to accomplish some work after hours or on weekends to minimize disruption to hospital operations. All work shall be coordinated with the COR.
c. Utility Outages: Any required utility system outages needed in order to perform work will be scheduled at the convenience of the VA and may require work to be performed during hours or when government staffing is available. This may be either during business hours or after-hours work, depending on the nature of the outage and VA staffing availability. All utility outages will be coordinated two weeks in advance with the COR. Contractor shall not interrupt any utility service or fire alarm service during the process of this job without notification to VA personnel prior to work. All service interruptions must be scheduled and approved by the appropriate VA office a minimum of five (5) days prior.
d. Adjacent Space: Access and continued function/operation of adjacent occupied spaces (above, below and beside) shall be considered within the construction phasing plan to minimize the overall impact and disruptions generated by the construction activities.
e. Safety, Infection Control & Code Requirements: Contractor to work in accordance with the Infection Control Risk Assessment provided and in accordance with the General Requirements, Safety Requirements and Construction Waste Management specifications provided. Contractor shall follow all applicable Federal, State & Local Codes.
E. PERIOD OF PERFORMANCE:
1. Performance period for this contract shall be 120 calendar days for design and construction from NTP date per the following breakdown:
a. Notice to proceed – D Day
b. DD Submission (35%) –D+30
c. DD Review by VA complete – D+37
d. DD submission (100%) -D+53
e. CD Review by VA Complete – D + 60
f. Final Construction Document Submission (CD) – D + 63
g. Construction Submittal Submission and Review – D+77
h. Construction Complete – D + 120
F. DOCUMENTATION
f. Provide documentation and operator training for VA personnel on all systems installed.
g. Provide as-builts drawings in PDF, AutoCAD, Revit format.
h. Provide meeting minutes and written responses to review comments within one week of the meeting conclusion or receipt of comments for all formal meetings between the Contractor and the VA.
i. One final site visit shall be required for punch list and close-out deliverables.
| G. | EVALUATED OPTIONAL TASKS AND ASSOCIATED DELIVERABLES |
| N/A |
H. TRAVEL
1. The Contractor is responsible for providing transportation/travel for all materials, supplies, personnel and all items needed for the duration of this contract unless stated otherwise elsewhere.
I. GOVERNMENT RESPONSIBILITIES
| 1. | VA personnel will provide access to the facility as necessary for installation to |
| commence. |
J. CONTRACTOR EXPERIENCE REQUIREMENTS
| 1. | All qualified, experienced, and licensed personnel for the service will be |
| provided for by the Contractor. |
K. CONTRACTOR PERSONEL SECURITY REQUIREMENTS
1. The Contractor and their personnel shall follow all VA policies, standard operating procedures, applicable laws and regulations while on VA and VA leased property.
2. Violations of VA regulations and policies may result in citation and disciplinary measures for persons violating the law.
3. The Contractor and their personnel shall wear visible identification at all times while they are on the premises.
4. The Contractor shall sign in the VA Police services prior to beginning work each workday.
5. VA does not provide parking spaces at the work site; the Contractor must obtain parking at/near the work site if needed. It is the responsibility of the Contractor to park in the appropriate designated parking areas. VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
6. Smoking is prohibited inside/outside any building. There are no designated smoking areas on VA property.
| 7. | Possession of weapons is prohibited on VA property. |
| 8. | The Contractor shall obtain all necessary licenses and/or permits required to |
perform the work.
9. The Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.
L. CONFIDENTIALITY AND NONDISCLOSURE
It is agreed that:
| 1. | The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the Contractor in the performance of this request, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the request. |
| 2. | The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this request. No information shall be released by the Contractor. Any request for information relating to this task order, presented to the Contractor, shall be submitted to the CO for response. |
| 3. | Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO. |
ATTACHMENTS
See attached document: VA SE Louisiana Drawings.
See attached document: 035-7PL100-N1 CEP Underground Plumbing N-1 Drawings.
See attached document: 037-7PL101-N1 CEP First Floor Plumbing N-1 Drawings.
See attached document: 037-7PL101-N1 CEP Second Floor Plumbing Drawings.
See attached document: 171-7EP101-N1 CEP First Floor Power Plan N-1 Drawings.
See attached document: 192-7EP409 CEP First Floor Electric Room 1N100 Drawings.
See attached document: 00470-7AS204 CEP West Wall Elevations at Loading Dock Drawings.
See attached document: 00473-7AS207 CEP Loading Dock Elevations at Ramp Drawings.
See attached document: 00494-7AS314 CEP Dock Wall Elevations F3 Drawings.
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| The contractor shall provide all labor, materials, tools, equipment and supervision necessary to design and build (Design/Build) a project to complete site preparation and utilities for the installation of a new San-i-pak® self-contained compactor and steam generator. |
| 1.00 |
| EA |
| $ |
| $ |
| GRAND TOTAL |
| $ |
36C25620R0069
Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
(a) All offer materials will be forwarded by email.
| (b) | An offer guarantee is required. |
| (c) | If the contract award amount exceeds $30,000 but is less than $150,000, a Payment Bond or other Alternate Payment Protection must be provided that equals 100% of the original contract price. Please see 52.228-13 Alternate Payment Protections, contained herein. |
DESCRIPTION OF WORK: CFM-Complete San-i-pak Site Prep In accordance with FAR 36.204 & VAAR 836.204 Disclosure of the Magnitude of Construction Projects, the above described VA Project falls within the terms of the following cost range: Between $250,000 and $500,000
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
See attached document: 4. VA Master Specs Table of Contents.
SECTION 00 11 21
REQUEST FOR PROPOSAL TO DESIGN BUILD
cfm-COMPLETE SANIPAK SITE PREP (Project No. 629-20-100) (southeast louisiana Veterans Health Care System, New orleans, LA)
| A. | PART I - General |
| A1. | Scope of Contract |
A. This Request for Proposal (RFP) is issued as Two-Phase Design-Build procurement (Reference FAR 36.3). Proposals will be evaluated in Phase I to determine which offerors will submit proposals for Phase II. A maximum number of four (4) offerors will proceed to Phase II unless the contracting officer determines that a number greater than four (4) is in the Government’s interest and is consistent with the purposes and objectives of this two-phase design build project. Phase II RFP will be issued only to those successful offerors determined to be most highly qualified from Phase I. One contract will be awarded using competitive negotiation.
B. Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here in other specific tasks as further defined by this request for proposal (RFP).
A. Project Number: 629-20-100 B. Project Title: CFM-Complete Sanipak Site Prep C. Project Location: Southeast Louisiana Veterans Health Care System 2400 Canal Street, New Orleans, LA 70119
| D. Scope of Work: Attached to Solicitation | |
| E. General Drawing Submission Requirements: Shop Drawing Submission Requirements are available on the internet at the following address: http://www.cfm.va.gov/. As-built drawings for the Medical Center are available. (note: these drawings are not completely accurate. A/E shall verify existing conditions.) All drawings will be prepared with the VA Standard Title Block and Border. All drawings shall be provided in the 2017 version of AutoCAD and in PDF format. Each individual file on a DVD shall be named by numbers corresponding to the construction documents (i.e. the specs shall be named 00 11 22, 33 44 55, etc. and the drawings shall be E1, E2, etc.) and the final AutoCAD/specifications files shall be exactly as submitted in the final submission. | |
| F. Incorporated References: The following Department of Veterans Affairs, Office of Construction and Facilities Management, information is incorporated within the Scope of Work by reference and can be found on the VA web site at http://www.cfm.va.gov/ Master Specifications; Design Guides; Design Manuals; Standard Details; Design Alerts; and Quality Alerts. | |
| A2. | Definitions |
| A. | 1. Design-Build (D-B): As defined by the Department of Veterans Affairs (VA), is the |
procurement by the Government, under one contract, with one firm or Joint Venture (JV) for both design and construction services for a specific project.
| 2. | Contracting Officer (CO): A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the contracting officer acting within the limits of their authority as delegated by the contracting officer. “Administrative contracting officer (ACO)” refers to a contracting officer who is administering contracts. “Termination contracting officer (TCO)” refers to a contracting officer who is settling terminated contracts. A single contracting officer may be responsible for duties in any or all of these areas. |
| 3. | Contracting Officer’s Representative (COR): The Contracting Officer’s written designation of an authorized representative responsible for administering contracts under the immediate direction of the Contracting Officer. For the purposes of this contract the term “COR” will be used herein. |
4. Project Manager/Project Engineer: The Contracting Officer’s representative (COR) responsible for administering contracts under the immediate direction of the Contracting Officer. This person is the Contracting Officer’s authorized representative at the construction site. The Project Manager/COR is responsible for protecting the Government’s interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. The Resident Engineer may issue change orders to the Contractor within the limitations set forth in his delegation of authority from the Contracting Officer.
| 5. | Design-Build Contract: This term, as used herein, refers to the Contract(s) to perform the design and construction of the project. |
| 6. | Contractor: This term, as used herein, refers to the contractor under this contract or the D-B team. The contractor or D-B team is solely responsible for the management (planning, supervision, and contract coordination), design, and (professional) services and installation (including all labor, equipment, materials, tools, and inspections) to meet the requirements of this contract. |
| 7. | Architect/Engineer (A/E): This term, as used herein, refers to the A/E firm(s) that is a part of the D-B team, also referred to as D-B A/E. |
8. Firm-Fixed Price (FFP) Contract: This term, as used herein, refers to the Contract(s) to perform all provisions and implementation of the project.
B. Source Selection Procedures
1. Source Selection Overview: In accordance with FAR 15.3, the objective of source selection is to select the proposal that represents the best value. A contracting officer is designated as the source selection authority (SSA), unless the agency head appoints another individual. The SSA establishes an evaluation team that includes appropriate contracting, legal, and technical expertise to ensure a comprehensive evaluation of offers. The award decision is based on evaluation factors and significant sub-factors that are tailored to the acquisition. The factors represent the key areas of importance and emphasis to be considered in the source selection decision; and support meaningful comparison and discrimination between and among competing proposals.
2. Evaluation: The proposal evaluation is an assessment of the proposal and the offeror’s ability to perform the prospective contract successfully. The technical, price, and source selection boards will evaluate competitive proposals and then assess their qualities solely on the factors and subfactors specified in the solicitation. Evaluations shall be conducted using a combination of adjectival ratings and numerical weights. The relative strengths, deficiencies, significant weaknesses, and risks supporting proposal evaluation shall be documented in the contract file.
3. Past Performance: Past performance information is one indicator of an offeror’s ability to perform the contract successfully. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. This comparative assessment of past performance information is separate from the responsibility determination required under FAR Subpart 9.1.
4. Tradeoff Source Selection: If tradeoffs are performed, the source selection records shall include an assessment of each offeror’s ability to accomplish the technical requirements; and a summary, matrix, or quantitative ranking, along with appropriate supporting narrative, of each technical proposal using the evaluation factors.
5. SSA’s Final Decision: The SSA’s decision shall be based on a comparative assessment of proposals against all source selection criteria in the solicitation. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA’s independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments and tradeoffs made or relied on by the SSA, including benefits associated with additional costs. Although the rationale for the selection decision must be documented, that documentation need not quantify the tradeoffs that led to the decision.
6. Source Selection for this Procurement:
| a. Phase I of this procurement will result in a narrowing of offerors to a maximum of four (4) firms (unless the contracting officer determines that a number greater than four (4) is in the Government’s interest and is consistent with the purposes and objectives of this two-phase design build project) based on the following technical evaluation factors listed in descending order of importance: | |
| Phase I: |
(1) Technical Approach
(2) Technical Qualifications
| (2a.) Key Design Personnel & Experience |
| (2b.) Key Construction Personnel & Experience |
| (2c.) Capability to Perform |
(3) Past Performance
b. The Phase I successful offerors will receive a Phase II Request for Proposal (RFP). The Phase II RFP will be issued via amendment to the solicitation and issued to the four (4) most highly qualified offerors. The Phase I factors are not to be resubmitted in Phase II; however, the cumulative rating from the Phase I factors carries through to Phase II and is as equal in importance to Phase II, Factor 4 for proposal evaluation. Phase II evaluation technical factors (Factors 4 – 7) are listed below in descending order of importance. The Phase I and Phase II technical evaluation factors, when combined, are approximately equal to price.
Phase II:
(4) Technical Solution
(5) Design Concept
(6) Draft Project Schedule and Narrative
(7) Price
c. The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contract to other than the offeror submitting the lowest total price; and to award to the offeror submitting the highest technically rated or the lowest total price proposal; and to award to the offeror submitting the proposal determined to be the most advantageous best value to the Government. Offerors are advised an award may be made in Phase II without discussion or any contact concerning the proposals received. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.
| A3. | Pre-Proposal Site Visit |
| A pre-proposal site visit will be conducted in Phase II. The most highly qualified firms selected to proceed to Phase II will be invited to attend the pre-proposal site visit. The Contracting Officer will establish the date and time and notify the Phase II offerors in writing. See Federal Acquisition Regulation (FAR) Clause 52.236-27 of this solicitation. |
Location: Southeast Louisiana Veterans Health Care System, 2400 Canal Street, New Orleans, LA 70119
| All Offerors, consultants, subcontractors, manufacturers and suppliers are invited to attend. The following agenda is furnished for this meeting: | |
| 1. | Open meeting & Introductions; |
| 2. | Review of project and Design-Build method for construction contracting; |
| 3. | Specifications; Network analysis system and project phasing; |
| 4. | General requirements, Solicitation Documents and Offer Submission Procedure; |
| 5. | Review of "Buy American Act"; |
| 6. | Questions and answers; |
| 7. | Close; and |
| 8. | Site walk through – attendance is optional. |
*Please note that attendance for the pre-proposal conference and / or the site walkthrough is voluntary.
A5. Permit Requirements A. The D-B Contractor is responsible for obtaining all permits and approvals necessary to complete the project, prior to starting Construction.
A6. Selection Criteria (This section will be removed after award.)
A. In accordance with FAR part 15 The Government intends to award a contract resulting from this solicitation to the responsible Offeror on a best value basis after evaluation in accordance with the factors in the Two-Phase Design-Build solicitation. A responsible determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.
B. Evaluations: All Phase I and Phase II proposals shall be subject to evaluation by a team of Government personnel. In Phase I of the Two-Phase Design-Build process, Offerors will submit a Phase I proposal in accordance with the three (3) evaluation factors listed in C3. Upon receipt of the Phase I proposals, the VA team will evaluate and determine the highest qualified Offerors based on their Phase I proposal submissions. The Phase I proposals will only be evaluated on the three (3) evaluation factors listed. The Offerors not selected to provide Phase II proposals will be notified that they are no longer being considered for this project. The Phase II proposals will consist of both technical and price factors, which are listed in D4. The Government intends to award without discussions; however, the Government reserves the right to conduct discussions if determined necessary based on the initial evaluation of the Phase II proposals.
- - - E N D of Section- - -
| B. | PART II - RESPONSIBILITIES |
| B1. | VA Team |
A. The VA team consist of the following members: Contracting Officer, Project Manager/COR, Maintenance and Operations Staff, Infection Control Staff, Safety Staff and any other VA staff impacted by this project.
B2. Use of Advisors A. Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide technical advice on specialized matters or on specific problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained because of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of a vendor.
| B3. | Design-Build Team: |
| A. | The D-B team includes all J/V partners, consultants, and sub-contractors to the one firm. The D-B team shall provide Architectural and Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project. D-B Team prime contractor or controlling partner shall be a Service-Disabled Veteran-Owned Small business. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .