36C25618R0173-008.docx
DOCX document 23 KB Posted
- Attached to
- Construction IDIQ - Overton Brooks VAMC AWARD NOTIFICATIONS MADE JUNE 28, 2019 Federal contract opportunity
- Solicitation number
- 36C25618R0173
About this file
This solicitation is for multiple indefinite delivery indefinite quantity construction contracts to provide non-recurring maintenance, repair, and construction services at four Department of Veterans Affairs locations within VISN 16. Services are required at medical centers and outpatient clinics in Alexandria, Louisiana, Overton Brooks, Louisiana, Southeast Louisiana, and Gulf Coast, Mississippi/Florida. The government intends to award a minimum of two contracts at each location, with a guaranteed minimum of $500 and maximum of $25 million per contract over five years. Task orders will range from $2,000 to $500,000. Offerors must be verified service-disabled veteran-owned small businesses. The response time is approximately 30 days from the April 16, 2018 release of the request for proposals. Evaluation criteria include technical experience, past performance, and price.
36C25618R0173 EXHIBIT G RETURNABLES.docx
View the file
Other files for this federal contract opportunity
Show all 50
Construction IDIQ - Overton Brooks VAMC AWARD NOTIFICATIONS MADE JUNE 28, 2019 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Source Selection Sensitive Information—See FAR 2.101 & 3.104 Indefinite-Delivery Indefinite-Quantity (IDIQ) Construction Contract 36C25618R0173
EXHIBIT G
LIST OF RETURNABLES
The solicitation proposal shall contain the below minimum documents including, but not limited to the following:
1. Non-evaluated Documents
a. Master Quality Control Plan
b. Master Safety Plan
c. Master Infection Control Plan
2. Documents for Evaluation – The proposal(s) shall be submitted in three parts, Technical, Past Performance, and Price.
a. Standard Form 1442
i. Offerors shall submit a separate proposal for each location of interest.
ii. Submit completed/signed SF1442/SF1442 BACK with acknowledgement of amendments
b. Schedule of Offer Items with coefficients and all overhead and profit rates entered for each location of interest
c. See Section 1.2 Proposal Preparation and Evaluation Information for proposal preparation and submission requirements.
FACTOR 1 - TECHNICAL
A. Evaluations will be based on the following significant subfactors in descending order of importance:
• Previous construction experience with multiple-award (MATOC) or single-award (SATOC) (including JOC, SABER, etc.) construction IDIQ contracts demonstrating an ability to manage and complete multiple projects simultaneously;
• Corporate construction project experience;
• Key personnel construction experience; and
• Quality control.
Previous Construction Experience with MATOC/SATOC/JOC/SABER Construction IDIQ contracts: The offeror shall demonstrate an ability to manage and complete multiple projects under a construction IDIQ contract simultaneously. Provide a list of all construction IDIQ contracts under which the offeror has performed as prime contractor in the last three years from proposal issuance date along with a list of all task orders executed against those contracts. Include award and completion dates for the IDIQ contract(s) and each task order.
Corporate Construction Project Experience: The offeror shall demonstrate relevant corporate project experience. Provide a list of projects successfully completed by the offeror of similar size, scope, and complexity (in a Hospital facility or similar working conditions) within the last 3 years of proposal issuance date.
Key Personnel Construction Experience: Provide the names of the offeror’s proposed project management personnel (i.e. Site Superintendent, Project Manager,) along with a description of the individual’s experience and a list of successfully completed projects of similar size, scope, and complexity (in a Hospital facility or similar working conditions) within the last 3 years from proposal issuance date. Superintendent shall have a minimum of three (3) years of experience managing or supervising multiple projects of similar size and scope. If the person listed as proposed superintendent is not a current employee of the offeror but intends to become one upon award of the contract, OFFEROR SHALL SUBMIT A COPY OF A COMMITMENT LETTER FROM THAT PERSON AS A PART OF THE TECHNICAL PROPOSAL to verify offeror will be hiring him/her and he/she intends to accept the position.
Quality Control: The offeror shall have demonstrated quality control techniques used to maintain workmanship, materials, and overall management or oversight of previous projects. See SOW, Sections 15, 16, and 17 for Quality, Safety, and Infection Control Plan requirements.
B. OFFEROR SHALL FURNISH A COMPLETED COPY OF EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY AS A PART OF THE TECHNICAL PROPOSAL. In accordance with (IAW) VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION, offeror’s completed Exhibit D must demonstrate that the offeror has had no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or EPA violations in the past three years and has an Experience Modification Rate (EMR) of equal to or less than 1.0. If those totals are exceeded, the offeror shall attach an explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
All offerors shall submit information regarding their current EMR. This information shall be obtained from the offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an offeror’s EMR is above 1.0, offeror must attach a written explanation of the EMR from its insurance carrier, furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Bidder/Offeror a Unity Rating of 1.0.
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.”
OFFERORS WHO FAIL TO SUBMIT EXHIBIT D AND THE ADDITIONAL REQUIRED INFORMATION AS A PART OF THEIR PROPOSAL PACKAGE WILL BE EXCLUDED FROM AWARD CONSIDERATION IF AWARD IS MADE WITHOUT DISCUSSIONS.
C. OFFEROR SHALL FURNISH A COMPLETED COPY OF EXHIBIT E SURETY FORM ATTESTING TO BONDABILITY AS A PART OF THE TECHNICAL PROPOSAL. Offerors who fail to complete and submit Exhibit E as a part of their technical proposal will not be considered for award if award is made without discussions. Offerors who submit an Exhibit E that does not demonstrate a minimum single project bonding limit of $500,000 and a minimum aggregate bonding limit of $5,000,000 will not be considered for award.
FACTOR 2 – PAST PERFORMANCE
A. Evaluations will be based on the following in descending order of importance:
SIGNIFICANT SUBFACTORS
• VA Health Care construction experience;
• Previous construction experience in the geographic area(s) covered by this solicitation.
• Non-VA health care environment construction experience;
• Timely performance under previous construction projects;
• Client’s overall satisfaction with previous construction projects; and
Previous VA Health Care construction projects: Successful completion of previous construction projects for the Department of Veterans Affairs.
Geographic area performance: Demonstrated ability to successfully perform construction projects in the location(s) being proposed on.
Previous non-VA health care construction projects: Successful completion of previous construction projects outside the Department of Veterans Affairs in the health care field.
Timely performance: Demonstrated ability to perform of similar size, scope, and complexity successfully in accordance with approved progress schedules under previous construction projects.
Client’s Overall Satisfaction with Previous Projects: The Evaluation Panel may contact the references supplied for projects submitted. Each reference may be asked the following:
• Was the Contractor cooperative, capable, and effective in prosecuting the work?
• Did Contractor’s performance conform to the terms and conditions of the contract?
• Once completed, did the project require unexpected maintenance activity?
• Have any latent defects been found?
• Was the staffing level consistent with the project size and complexity?
• Would the client use this firm again? Why or why not?
Offeror shall provide the following information for each contract/project submitted for evaluation:
• Company Name/Address/Phone number/Email Address
• Project Title
• Contracting Office/Government Agency
• Contract Number
• Total Contract Amount
• Period of Performance
• Contracting Officer (CO) name, Phone Number and Email
• Contracting Officer’s Representative (COR) Name, Phone number, and email address
• Brief Description of the Project /Requirements and number of personnel assigned to the project.
The Offeror shall demonstrate recent (within the last three years from proposal issuance date) successful performance under contracts (ongoing or completed) which are similar in scope, magnitude, and complexity to the subject requirement via SUBMISSION WITH PAST PERFORMANCE PROPOSAL OF EXHIBIT A PERFORMANCE RELEVANCY SURVEY. SUBMIT EXHIBIT A ON NO LESS THAN FIVE (5) PROJECTS, including information on problems encountered and corrective actions.
Past Performance Questionnaire – Offerors shall prepare and forward to prior client(s) for submission to the Contracting Office EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE for all the projects listed by contractor and submitted using EXHIBIT A PERFORMANCE RELEVANCY SURVEY. This includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance and the Past and Present Performance Questionnaire for use in evaluating Past Performance.
Completed Past Performance Questionnaires shall be submitted to the Contracting Office so as to arrive not later than the closing date/time for receipt of proposals shown on the SF1442. Completed questionnaires shall be forwarded via email to beth.cook@va.gov. The subject line shall state 36C25618R0173 Past Performance for (Name of Company.) NOTE: Offeror shall not review the Past Performance Questionnaire prior to submission. Past Performance Questionnaire must be submitted by the client/evaluator directly to the Contracting Office.
Offerors should follow-up and encourage references to get the questionnaires to the Contracting Office in a timely manner. Do not include copies of the letters or questionnaires in the proposal.
B. The Government may evaluate past performance information through the use of Exhibit B completed by the offeror's references; use data independently obtained from other Government or commercial sources, including, but not limited to, Government databases; and/or rely upon personal business experience with the offeror. The evaluation may take into account Past Performance information regarding predecessor companies, key personnel who have relevant experience, and/or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition. Past Performance information on contracts not listed by the offeror, or that of planned subcontractors, may also be evaluated. The Government may contact references and contact parties other than those identified by the offeror, and information received may be used in the evaluation of the offeror’s Past Performance. While the Government may elect to consider data obtained from other sources, the burden of providing current accurate and complete Past Performance information rests with the offeror. The Government reserves the right to obtain and evaluate Past Performance information from any source it deems appropriate.
C. An offeror with limited or no past performance may receive a rating based on the evaluation of its subcontractors and/or key personnel, provided an EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT FORM has been executed and included in the proposal for proposed subcontractors and/or potential key personnel not employed by the offeror. These ratings shall have the same weight as the ratings of the offeror. Offerors without a record of relevant past performance will be assigned a neutral rating in accordance with FAR 15.305(a)(2)(iv). However, the proposal of an offeror with no relevant Past Performance history, while rated “Neutral” in Past Performance, may not represent the most advantageous proposal to the Government and thus, may be an unsuccessful proposal when compared to the proposal of other offerors.
D. In accordance with FAR 15.306(a)(2), if award will be made without conducting discussions, an offeror may be given the opportunity to clarify certain aspects of their proposal (i.e. the relevance of an offeror's past performance information) as related to this acquisition, address adverse past performance information to which the offeror has not previously had an opportunity to respond or to resolve minor clerical errors.
E. Performance Currency, Trends, and Relevancy: The government will consider the currency, trends and relevancy of the performance information while conducting its performance evaluation. For the purpose of this solicitation, performance currency is performance occurring within the last three (3) years from the proposal issuance date. Within this period, performance occurring later in the period may have greater significance than work occurring earlier in the period. For example, performance information for work occurring during March 2017 may have greater importance than performance information for work occurring during March 2015. Performance Trends may, depending upon the circumstances, have greater significance than sporadic incidents of "Exceptional" or "Unsatisfactory" performance. For the purpose of this solicitation, Performance Relevancy is defined as contracts (ongoing or completed) which are similar in scope, magnitude, and complexity to the current requirement. Higher relevancy will be assessed for contracts that are similar to the effort, or portion of effort, for which that contractor is being proposed, and may contribute to an overall higher relevancy score for the offeror. Based on the evaluation of offers, the Government will assign a performance confidence rating for each proposal at the factor level. The evaluation will consider the sub-factors as described herein. Following assignment of the performance confidence rating for each proposal, each offeror will receive a final risk rating for performance based on the cumulative rating of performance currency, trends and relevancy.
The below documents are incorporated within the technical and past performance section and are required as part of the proposal(s):
i. Commitment Letters, if applicable
ii. Exhibit A – Past Performance Relevancy Surveys
iii. Exhibit B – Past and Present Performance Questionnaire
iv. Exhibit C – Subcontractor Information and Consent Form
v. Exhibit D – Contractor Evaluation Form – Construction Safety
vi. Exhibit E – Surety Form
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THE PROPOSAL(S) ARE PREPARED AND THE DOCUMENTS ARE COMPLETED IN ACCORDANCE WITH THE SOLICITATION TERMS AND CONDITIONS.
File details come from the government source that posted it. Updated .