This is a Pre-Proposal Questions and Requests for Information document for solicitation 36C25526R0162 addressing the creation of an observation unit at the John Cochran Division of the VA St. Louis Health Care System, located at 915 North Grand Blvd, St. Louis, MO 63106, Building 1, Floor 01, Project 657-26-602JC.

The government clarified that project specifications will be issued by amendment, the proposal due date will be extended to accommodate the specification issuance and hazardous material survey requirements, and an additional question and answer period will be provided after specifications are released. Revised drawings are being submitted with responses to address missing schedules including room finish, door, hardware, and equipment schedules. General Note 6 standard finishes and paint colors for VA St. Louis will be provided in revised drawings. The contractor is expected to be versed in VA Technical Information Library (VA TIL) regulations accessible at https://www.cfm.va.gov/til. The hazardous material NESHAP report requirement has been removed; no report is needed and the revised drawing 01-HA-111 reflects this change. Clarifications have been provided on revised drawings for VAV terminal units, air change rates, electrical panel schedules, medical gas capacity, fire protection design-build scope, fire alarm system details (Notifier by Honeywell with Onyx Works system), nurse call system matching, building automation system conformance (WebCtrl 9.0 with ACES integration), telecommunications cabling standards, ICRA barrier specifications, and equipment furnishings designation. The contractor supplies door handles compatible with VA key cores; the VA will install the core and issue keys for return at project completion. Specifications will be issued for the project, and the contracting officer will provide replies to evaluation criteria clarification questions regarding the three-page supplemental response limit and submission of resumes, project examples, and past performance documents.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL QUESTIONS / REQUESTS FOR INFORMATION

Create Observation Unit, JC — VA St. Louis Health Care System, John Cochran Division

Solicitation: 36C25526R0162 Project: 657-26-602JC, Create Observation Unit, JC Location: John Cochran Division, 915 North Grand Blvd, St. Louis, MO 63106 — Building 1, Floor 01

1. The attachment titled "COMBINED SPECIFICATION AND DRAWINGS 657-26-602" contains thirteen (13) drawing sheets and no specification sections. Will the Government issue the project specifications by amendment?

Multiple solicitation requirements depend on specifications that do not appear in the bid set, including: the Statement of Work, which states the project "has a set of drawings and specifications" that "indicate the work to be performed" and which take precedence over the SOW; the Special Notice for Guarantee Period Services, which states those services are "listed in specification SECTION 28 05 00"; and Appendix 1, which requires a price breakdown "by specification division."

Reference: SOW, p.7–8; Special Notice Guarantee Period Services ¶A, p.6; Appendix 1, p.19; VAAR 852.236-71(e), p.68

A. THE GOVERNMENT WILL ISSUE A SPECIFICATION.

2. If specifications are issued by amendment, will the Government extend the proposal due date to allow offerors and subcontractors adequate time to price the specified work? An extension is also requested to accommodate the pre-bid hazardous material survey addressed in Section B below.

Reference: PROPOSAL DUE DATE, p.10

A. THE GOVERNMENT WILL EXTEND THE DUE DATE.

3. Will the Government provide an additional question and answer period after its responses to these questions and after issuance of the specifications and any revised drawing package? Offerors will necessarily have follow-on questions on documents that have not yet been made available, and a second question period would allow those matters to be resolved before the proposal due date rather than after award.

Reference: Questions due 08/12/2026, p.10

A. YES.

4. Sheet 01-AE-211 is titled "Interior Elevations, Schedules, and Details" but contains two interior elevations and general notes only. Will the Government provide the room finish schedule, door schedule, door hardware schedule, and equipment schedule referenced by that title?

Reference: Dwg 01-AE-211

A. YES. SEE REVISED DRAWINGS.

5. General Note 6 on Sheets 01-AE-111 and 01-AE-211 directs the contractor to "use VASTLHCS standard finishes and paint colors." Will the Government furnish the VA St. Louis standard finish and color schedule, identifying manufacturer, product, and model, so that all offerors price the same materials?

Reference: Dwg 01-AE-111 Gen. Note 6

A. YES. SEE REVISED DRAWINGS.

6. Numerous drawing notes direct the contractor to "adhere to all requirements of the VA TIL," and to install medical gas and sprinklers "per VA TIL." Will the Government identify the specific PG-18-1 design manuals, PG-18-3 standard details, and VA master construction specifications that apply to this project?

Reference: Dwgs 01-AE-111, 01-ME-111, 01-PE-111, 01-EE-111 Gen. Notes

A. IT IS EXPECTED ALL CONTRACTORS PREPARING OFFERS TO THE GOVERNMENT ARE COMPLETELY VERSED IN VA TIL REGULATIONS THAT ARE ACCESSABLE TO THE GENERAL PUBLIC. https://www.cfm.va.gov/til

7. The drawings are dated 04/08/2026 and stamped "BIDDING DOCUMENTS," and all revision blocks are blank.

Please confirm this is the complete and current bid set and that no revisions have been issued.

Reference: All sheets, title block

A. REVISED DRAWINGS ARE BEING SUBMITTED WITH THIS RESPONSE.

8. The General Note on Sheet 01-HA-111 requires the general contractor to provide, as part of its bid, "a full hazardous material NESHAP report for the areas that will be disturbed during construction" and to submit it with the bid, and states the contractor will be allowed to survey the existing area during the bidding process including "material sampling, minor destructive testing, and above ceiling inspections." The single site visit was held August 5, 2026. Will the Government provide additional escorted access before the proposal due date for destructive sampling and above-ceiling inspection, and if so, on what dates and under what infection control and escort requirements in an operating Emergency Department?

Reference: Dwg 01-HA-111 Gen. Note; Site Visit, p.9

A. NO REPORT IS NEEDED. SEE REVISED 01-HA-111.

9. Does the Government possess existing asbestos, lead, or other hazardous material survey data for the affected areas of Building 1, Floor 01? If so, will it be furnished to offerors?

Reference: Dwg 01-HA-111

10. Is the NESHAP report a pass/fail submittal for purposes of technical acceptability, or is it a deliverable required only of the successful offeror? Sheet 01-HA-111 requires submission "with their bid," but the report is not listed among the documents to submit in the Proposal Submittal Instructions.

Reference: Dwg 01-HA-111; Proposal Submittal Instructions ¶2, p.11

11. Sheet 01-HA-111 states that "any additional hazardous material found during construction will be responsibility of the contractor at no additional cost to the Government." FAR 52.236-2, Differing Site Conditions (Deviation Nov 2025), is incorporated into this solicitation. Please reconcile these provisions, or alternatively establish a hazardous material allowance or unit prices so that all offerors carry comparable risk.

Reference: Dwg 01-HA-111 Gen. Note; 52.236-2 (DEVIATION), p.24

12. Sheet 01-ME-111 identifies seventeen VAV terminal units (1-VAV-5 through 1-VAV-17) but no equipment schedule is provided. Will the Government furnish a VAV schedule identifying airflow, box size, reheat coil capacity, and control sequences, and confirm which units are new and which are existing to remain?

Reference: Dwg 01-ME-111

A. CLARIFICATION HAS BEEN PROVIDED ON SHEET 01-ME-111. A VAV SCHEDULE IS NOT AVAILABLE AT THIS TIME.

13. Please identify the manufacturer and version of the existing building automation system at John Cochran, and confirm whether a specific controls contractor is required for front-end integration and graphics.

Reference: Dwg 01-ME-111 Gen. Notes 2–3

A. MUST CONFORM WITH EXISTING BUILDING AUTOMATION SYSTEM. THE VA CURRENTLY HAS AUTOMATED CONTROLS EQUIPMENT SYSTEMS; WEBCTRL 9.0 IS THE CURRENT VERSION. ACES WOULD DO INTEGRATION AND GRAPHICS.

14. Will the Government provide the required air change rates, room pressure relationships, and filtration requirements for the observation rooms and renovated triage rooms? Please also confirm whether independent testing, adjusting, and balancing and/or third-party commissioning is required.

Reference: Dwg 01-ME-111

A. CLARIFICATION HAS BEEN ISSUED ON SHEET 01-ME-111. REFERENCE VA HVAC DESIGN MANUAL EMERGENCY CARE UNIT –

ROOM DATA SHEET FOR INDIVDUAL ROOM REQUIREMENTS.

15. Sheet 01-EE-111 provides a floor plan but no panel schedules, one-line diagram, or load calculations. Will the Government identify the panels serving this area, confirm that existing capacity is adequate for the new loads, and provide panel schedules?

Reference: Dwg 01-EE-111

A. CLARIFICATION HAS BEEN ISSUED ON SHEET 01-EE-111.

16. Sheets 01-AE-111 and 01-PE-111 show medical gas outlets (O2-MA-VAC, six per bay) at the observation bays.

Please confirm that existing medical gas mains have adequate capacity for the added outlets, or identify the extent of main extension or upsizing required. Please also confirm whether a third-party ASSE 6030 verifier is required in addition to the ASSE 6010 installer certification.

Reference: Dwgs 01-AE-111, 01-PE-111 Gen. Note 6

A. CLARIFICATION HAS BEEN ISSUED IN THE GENERAL NOTES ON SHEET 01-PE-111.

17. Sheet 01-PE-111 General Note 7 requires the contractor to install sprinklers per VA TIL, but no fire protection drawings or head layout are provided. Please confirm this is a delegated design-build scope, and identify the submittal, review, and authority having jurisdiction approval path.

Reference: Dwg 01-PE-111 Gen. Note 7

A. CLARIFICATION HAS BEEN ISSUED ON SHEET 01-PE-111. THIS IS A DESIGN BUILD SCOPE.

18. No fire alarm drawings are included. Please confirm the extent of fire alarm device relocation or addition required, and identify the existing fire alarm system manufacturer and model.

Reference: Drawing Index, Dwg 01-GI-001

A. TECH ELECTRONICS HOLDS THE CURRENT STLVAHCS MAINTENANCE CONTRACT. NOTIFIER BY HONEYWELL. THE SYSTEM IT USES IS ONYX WORKS. ALL FIRE ALARM AND SMOKE DETECTORS SHALL MEET NFPA CODES AND REGULATIONS. CLARIFICATIONS HAVE

BEEN ADDED TO THE REVISED DRAWINGS.

19. The drawings show pull cords at each observation bay. Please identify the existing nurse call / staff emergency call system manufacturer and model to be matched, and confirm whether head-end programming is within the contractor's scope.

Reference: Dwgs 01-AE-111, 01-A4-111

20. Sheet 01-EE-111 General Note 5 references data locations and other low voltage items, but no telecommunications drawings or cabling requirements are provided. Please identify the required cable type, pathway, termination, and labeling standards, and confirm whether VA OIT will self-perform any portion of this work.

Reference: Dwg 01-EE-111 Gen. Note 5

A. CLARIFICATION HAS BEEN ISSUED IN THE FORM OF DATA NOTES ON SHEET 01-EE-111.

21. The Wall Construction Types detail on Sheet 00-GJ-001 shows Type B extending to "roof metal decking." The work is located on Floor 01 of a multi-story building with floors and elevators above. Please clarify the intended termination of Type B walls and provide the deck or structure condition above Floor 01, together with any required attachment, bracing, or structural details. No structural sheets are included in the drawing index.

Reference: Dwg 00-GJ-001, Wall Const. Types; Drawing Index

A. SHEET 00-GJ-001 IS FOR THE TEMPORARY ICRA BARRIERS. DECK ABOVE IS CONCRETE.

22. The Phase 1 through Phase 4 sheets each include a plan titled "Floor Plan — Building 01 — Floor 00 Above Ceiling," depicting sterile processing, decontamination, scope processing, locker, and shower spaces. Please confirm whether any work is required above the ceiling on Floor 00, and if so, define the scope, the infection control requirements applicable to sterile processing areas, and the access windows available.

Reference: Dwgs 01-A1-111, 01-A2-111, 01-A3-111, 01-A4-111, detail 4

A. CLARIFICATION HAS BEEN PROVIDED IN THE REVISED DRAWINGS. WORK ABOVE CEILING IS RELATED TO THE INSTALLATION OF NEW SINKS. ICRA INFORMATION HAS BEEN PROVIDED ON THAT SHEET AND THE GENERAL ICRA SHEETS.

23. The General Notes on Sheet 01-A1-111 read in part "NEW DOOR. NEW CEILING LIGHTS DIFFUSERS. NEW FLOOR?"

Please confirm the extent of new flooring, ceiling, lighting, and doors required in each of the four phases.

Reference: Dwg 01-A1-111 Gen. Notes

A. CLARIFICATION HAS BEEN PROVIDED IN THE REVISED DRAWINGS.

24. The drawings depict equipment and furnishings including emergency department beds, workstations, files, refrigerator, microwave, printer, label maker, and family chairs. Please identify which items are contractor-furnished and installed, which are Government-furnished contractor-installed, and which are Government-furnished Government-installed.

Reference: Dwgs 01-AE-111, 01-A3-111, 01-AE-211

25. Sheet 00-GJ-002 requires ICRA barrier doors to have a latch and lock compatible with the VA key core, specifying CL3357 NZD 626 RH CT6 (LFIC less construction core), and notes keys are issued to the COR. Please confirm whether the Government will furnish the interchangeable cores and keys, or whether they are contractor-furnished.

Reference: Dwg 00-GJ-002, ICRA Barrier Additional Notes

A. THE CONTRACTOR SUPPLIES THE HANDLE COMPATABLE TO THE VA CORE. THE VA WILL PUT IN A CORE AND ISSUE KEYS TO THE CONTRACTOR. THE CORE AND KEYS WILL NEED TO BE RETURNED TO THE VA AT THE END OF THE PROJECT.

26. Please advise on room finishes or provide a finish schedule?

27. Sheet 01-HA-111 hazardous material assessment floor plans is provided but does not indicate location of hazardous materials. Please indicate quantities and area of hazardous materials.

28. Please provide details and materials for casework at rooms C111 and C110A-AOD.

29. Please provide a door and hardware schedule.

30. Do we trim the wall and handrail at corridor H126 or do we install all new handrail and guardrail at C114B and C114A phase 1?

31. Will there be a new automatic door opener at double door at corridor H127A leading to waiting room phase 2 work.

32. Please indicate phase 2 acoustical ceiling limits.

33. Please indicate phase 2 LVT flooring limits.

34. Phase 3 waiting south wall, is this wall similar to the wait room check in elevation with half height drywall partition and small aluminum framed glass window?

35. Please indicate demo limits for phase 3?

36. Please indicate new exterior wall make up for the new transport wheelchair space. Possible section view?

37. Please provide a Light fixture schedule

38. What is the scope of work for Nurse call?

39. What is the scope of work for Lighting controls?

40. What is the scope of work for Fire alarm?

A. ALL FIRE ALARM AND SMOKE DETECTORS SHALL MEET NFPA CODES AND REGULATIONS. CLARIFICATIONS HAVE BEEN ADDED

TO THE REVISED DRAWINGS.

41. What is the scope of work for PASS security card readers?

A. CLARIFICATION HAS BEEN PROVIDED IN THE REVISED DRAWINGS AND ON SHEET 01-AE-611.

42. What is the scope of work for Paging?

A. PAGING SHALL BE RELOCATED PER THE REVISED DRAWINGS.

43 Is there Power and data in the waiting offices?

Or there any new VAV boxes?

44. Factor 4 ask for us to submit technical the experience of our “Electronic Key Manufacturer” subcontractor. This project does not require an electronic key manufacturer/supplier/installation subcontractor.

A. CONTRACTING OFFICER WILL PROVIDE A REPLY. REACH OUT TO THE CONTRACTING OFFICER IF NO RESPONSE IS SUBMITTED.

45. Please revise Factor 4 to state what will need to be submitted under this contract.

A. CONTRACTING OFFICER WILL PROVIDE A REPLY. REACH OUT TO THE CONTRACTING OFFICER IF NO RESPONSE IS SUBMITTED.

46. Will specifications be provided for this project.

A. THE GOVERNMENT WILL ISSUE A SPECIFICATION.

47. Can we get a Hazardous Materials drawing/assessment for bidding purposes?

48. Please provide a reflective ceiling plan for each area depicting new lighting/diffusers/sprinklers/etc.

49. The drawings indicate multiple sinks/medical gases throughout the project.

50. Please provide notes to indicate what sinks/medical gases are: existing to remain, existing to be removed, or new.

51. Please provide a door schedule to reflect all hardware necessary for each door.

52. Could you please clarify what is included in the three-page limit?

A. CONTRACTING OFFICER WILL PROVIDE A REPLY. REACH OUT TO THE CONTRACTING OFFICER IF NO RESPONSE IS SUBMITTED.

The evaluation criteria request resumes for approximately 14 roles, with three to five completed projects from the past five years on each resume. They also request three to five relevant project examples and five CPARS, PPQs, or similar past-performance documents.

a) Because the PCAC F330 on file is limited and may not include the personnel or projects most relevant to this task order, may firms submit updated or additional resumes and project pages separately from the three-page supplemental response?

b) A. CONTRACTING OFFICER WILL PROVIDE A REPLY. REACH OUT TO THE CONTRACTING OFFICER IF NO RESPONSE IS SUBMITTED.

c) If all requested updated information is intended to fit within the three pages, please clarify whether firms should instead provide condensed summaries addressing each of the six evaluation factors.

d) A. CONTRACTING OFFICER WILL PROVIDE A REPLY. REACH OUT TO THE CONTRACTING OFFICER IF NO RESPONSE IS SUBMITTED.

e) Please confirm the CPARS and PPQs also be submitted as separate attachments without counting toward the limit?

f) A. CONTRACTING OFFICER WILL PROVIDE A REPLY. REACH OUT TO THE CONTRACTING OFFICER IF NO RESPONSE IS SUBMITTED.