This is a set of 100% bid documents for a federal construction project at the VA St. Louis Healthcare System, John Cochran Division, to create an observation unit at 915 North Grand Boulevard, St. Louis, Missouri 63106. The project number is 657-26-602JC, and the documents include architectural, mechanical, plumbing, and electrical drawings with comprehensive specifications.

The project involves creating three new observation rooms (E125, C113, C112), exam triage room (C111C), and associated infrastructure including wait room renovations, control room modifications, and corridor updates. Key requirements include infection control and risk assessment (ICRA) compliance with Class IV containment barriers, negative air pressure systems, and specific ante-room configurations. Construction must follow phased demolition and sequencing across four phases, with restricted work hours in the Sterile Processing Department (nights and weekends only) and during regular business hours on Floor 01, with ICRA barriers built after hours. The contractor must provide detailed ICRA barrier footprints and schedules for Contract Officer Representative (COR) approval, with the COR retaining the right to modify barriers and phasing to accommodate medical center requirements at no additional cost. Medical gas installations (oxygen, medical air, vacuum) must comply with VA Technical Information Library (TIL) standards and NFPA 99, with zone valves required to minimize shutdowns. New doors include solid core wood doors matching existing emergency department finishes, heavy-duty hinges, electronic touch-pad locks with VA-compatible key cores, and for emergency department double doors (Door #7), replacement within a single weekend window (Saturday 5:00 PM to Sunday 6:00 AM and Sunday 5:00 PM to Monday 6:00 AM). Flooring, finishes, and furniture specifications reference existing standards for consistency; all new HVAC, plumbing, and electrical work must tie into existing building automated systems with test and balance reports required for VA review.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMPLOYEE PARKING

2T

2T26 6A7 1T

5T 14 3

K

E

G

H

J

WINDSOR PL.

BELL AVE.

ENRIGHT AVE.

DELMAR AVE.

SP

R

IN

G

S T. G

R

AN

D A

VE

BUILDING SCHEDULE:

1 MAIN HOSPITAL

1T TENANTS

2 CONFERENCE, CHAPEL, LIBRARY

2T OATP CLINIC

2T2 OATP CLINIC

3 OIT, HTM

4 LOD

5T EMPLOYEE HEALTH

6 MAIL, TENANTS

6A IMPACT SPACE, WAREHOUSE

7 SAFETY

7A RESEARCH

14 GROUNDS MAINTENCE

16 ENGINEERING / HBPC

BUILDING KEY:

PATIENT BUILDING

EMPLOYEE BUILDING

NON-VA BUILDING

7A

P

EMPLOYEE PARKING

L

VACANT LOT

BUILDINGS

(NON VA)

AMEREN MISSOURI

SUBSTATION

UP

DOWN

UP

F

T

R Q

A

A

FRANKLIN AVE.

PO1

SALT

STORAGE

N M

S

TO

IN

TE

R

ST

AT

E

EMPLOYEE PARKING PATIENT PARKING

PATIENT

PARKING

PATIENT PARKING

EMPLOYEE PARKING

EMPLOYEE PARKING

STL VHA

JOHN

COCHRAN

PATIENT PARKING

PHYSICIAN

PARKING

UNDER

CONSTRUCTION

PARKING LOT SCHEDULE:

LOT A PATIENT & VISITOR

LOT E PATIENT & VISITOR & EMPLOYEE

LOT F PHYSICIAN

LOT G EMPLOYEE

LOT H EMPLOYEE

LOT J EMPLOYEE

LOT K PATIENT & VISITOR

LOT L PATIENT & VISITOR

LOT M PATIENT/VALET

LOT N EMPLOYEE

LOT P EMPLOYEE

LOT Q VALET

LOT R EMPLOYEE

LOT S MAINTENANCE & OPERATIONS

LOT T EMPLOYEE

P01 EMPLOYEE GARAGE

ENRIGHT EAST PATIENT

ENRIGHT WEST EMPLOYEE

PARKING KEY:

PATIENT PARKING

EMPLOYEE PARKING

PAVED ROAD/SIDEWALKS

SHUTTLE BUS STOP

PATIENT PARKING

N

0' 200'

300'

400'

500'100'

SCALE REFERENCE

EMPLOYEE

PARKING

VALET PARKING

PATIENT PARKINGEMPLOYEE PARKING

PATIENT PARKING

8B11

8A

8C

SHUTTLE BUS

STOP

SHUTTLE BUS

STOP

SHUTTLE BUS

STOP

U

EMPLOYEE

PARKING

TO

IN

TE

R

ST

AT

ES

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

TITLE SHEET

01-GI-001

JOHN COCHRAN DIVISION

CREATE OBSERVATION

UNIT, JC

US DEPARTMENT OF VETERANS AFFAIRS

VA ST. LOUIS HEALTH CARE SYSTEM

VA PROJECT NUMBER: 657-26-602JC

DRAWING INDEX

GENERAL

01-GI-001 TITLE SHEET

01-GJ-001 ICRA INFORMATION AND DETAILS

01-GJ-002 ICRA INFORMATION AND DETAILS

HAZARDOUS MATERIAL ASSESSMENT

01-HA-111 HAZARDOUS MATERIAL ASSESSMENT FLOOR PLANS

ARCHITECTURAL

01-AD-111 DEMO AND PHASING FLOOR PLAN - FLOOR 01

01-AE-101 ABOVE CEILING IMPACT FLOOR PLAN - FLOOR 00

01-AE-111 NEW FLOOR PLAN - FLOOR 01

01-AE-211 INTERIOR ELEVATIONS AND DETAILS

01-AE-611 DOOR SCHEDULE AND DETAILS

01-AC-111 REFLECTED CEILING PLAN - FLOOR 01

01-AF-111 FINISH SCHEDULE AND FURNITURE FLOOR PLAN - FLOOR 01

MECHANICAL

01-ME-111 MECHANICAL FLOOR PLANS & DETAILS

PLUMBING

01-PE-111 PLUMBING FLOOR PLANS & DETAILS

ELECTRICAL

01-EE-111 ELECTRICAL FLOOR PLANS & DETAILS

OVERALL CAMPUS SITE PLAN, BUILDING NUMBER, AND PROJECT LOCATOR

DRAWING INDEX LEGEND

BUILDING NUMBER SHEET TYPE DESIGNATORS

0 = GENERAL

1 = PLANS

2 = ELEVATIONS

3 = SECTIONS

4 = LARGE-SCALE VIEWS

5 = DETAILS

6 = SCHEDULES & DIAGRAMS

7 = USER DEFINED

8 = USER DEFINED

9 = 3D REPRESENTATIONS

DISCIPLINE DESIGNATORS EXAMPLES

GI = GENERAL INFORMATION

GC = GENERAL CONTRACT

CS = CIVIL SITE

AD = ARCHITECTURAL DEMOLITION

AS = ARCHITECTURAL SITE

AE = ARCHITECTURAL ELEMENTS

FLOOR PLANS, ELEVATIONS, DETAILS

AI = ARCHITECTURAL INTERIORS

AG = ARCHITECTURAL GRAPHICS

AF = ARCHITECTURAL FINISHES

AC = ARCHITECTURAL CEILING PLAN

AW = ARCHITECTURAL WAYFINDING

AP = ARCHITECTURAL SPACE PLANNING

FLOOR PLANS & SCHEDULES

AL = ARCHITECTURAL LIFE SAFETY

DRAWINGS

SG = STRUCTURAL GENERAL

SF = STRUCTURAL FRAMING

MG = MECHANICAL GENERAL

MH = MECHANICAL HVAC

PG = PLUMBING MEDICAL GAS

PL = PLUMBING FIXTURES

EG = ELECTRICAL GENERAL

EL = ELECTRICAL LIGHTING

FLOOR NUMBER ON PLAN SHEETS

SHEET NUMBER

##-XX-###

AutoCAD SHX Text

FH

AutoCAD SHX Text

FH

AutoCAD SHX Text

LOADING DOCK PAD

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

4" RUBBER COVE

WITH 16 GA. METAL

STUDS AT 16" O.C.

BOARD EACH SIDE.

WITH 5/8" GYPSUM

AS SCHEDULED

ACOUSTICAL CEILING

2' X 4' SUSPENDED

WALL CONST. TYPES (DETAILS)

TYPE A

BASE @ BOTH SIDES

4" RUBBER COVE

3 5/8" 16 GA. METAL

STUDS AT 16" O.C.

BOARD EACH SIDE.

WITH 5/8" GYPSUM

W A

LL

H

EI

G H T

V

ER

IE

S

TYPE B

C

EI

LI

N G

H

EI

G H T

'-0

ON FLOOR PLAN.

FI

EL

D V

ER

IF

Y

C

EI

LI

N G

H

EI

G H T

'-0

4 7/8"4 7/8"

W A

LL

H

EI

G H T

V

ER

IE

S

FI

EL

D V

ER

IF

Y

TO MATCH EXISTING AREA

TO MATCH EXISTING AREA

ROOF METAL DECKING

BASE @ BOTH SIDES

AS SCHEDULED

ACOUSTICAL CEILING

2' X 4' SUSPENDED

ON FLOOR PLAN.

3 5/8" INSULATED WALL

WALL TO EXTEND TO

ROOF METAL DECKING

GENERAL NOTES:

1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS IF INDICATED.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.

8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL

SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

6. WET MOP AREA WITH DISINFECTANT.

SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.

SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

PRIOR TO ANY CONSTRUCTION

POST CONSTRUCTION

1. OBTAIN APPROVAL FROM THE COR TO REMOVE BARRIERS.

POST ICRA, ILSM, FIRE INSPECTION

TEMP. ANTE ROOMHARD BARRIER

EITHER KEEP RUNNING

COVER ALL RETURNS

HEPA NEGATIVE AIR UNIT

TAPE ALL SERVICES

ABC TYPE FIRE EXTINGUISHER ON

FIRE RATED PLYWOOD

A

O

V

WEEKLY CHANGED

(OR MORE AS NEEDED)

MONTHLY CHANGED

HEPA FILTER

PRE-FILTER

SUPPLY DUCTS

OR COVER WITH FIRE

AT THE GRATE/DIFFUSERS

TO PROTECT AGAINST

PORTABLE FLOOR BRACKET

SHEETS VISIBLE TO PUBLIC

CONTAMINATION

(REFER TO ELEVATION)

FL

EX

D U

C T

EXISTING WINDOW FRAME

FIRE RATED PLYWOOD

(TEMP. REMOVE

HEPA NEGATIVE AIR UNIT

EXISTING FIRE

SPRINKLER SYSTEM

EXISTING CONCRETE SLAB FLOORING

FIRE/U.L. RATED PLASTIC

TO PREVENT DUST

GLASS PANEL)

FIRE/U.L. RATED PLASTIC

TO PREVENT DUST

E

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES

AND THE DIFFUSERS)

EXISTING WALLEXISTING WALL

INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE

(VERIFY DAILY), IF NOT VERIFY ALL OPENING

SUCH AS DOORS ARE CLOSED AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

(LOCKED AT ALL TIMES)

BLUE CORE LOCKSET

AA

OUTSIDE OF BUILDING

FINISHED FLOORING TO BE KEPT CLEAN.

FLOORS NOT BEING REPLACED TO BE

WITH FIRE RATED PLASTIC

SHEETING AND SECURE

WITH DUCT TAPE.

RATED PLASTIC SHEETING

AND SECURE WITH DUCT

TAPE TO KEEP DUST OUT.

(ILSM MAY REQUIRE MORE

THAN ONE OR WALL MOUNTED).

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

OR MORE IF NECESSARY

TO MAINTAIN CLEANLINESS).

(TYPICAL REGULATOR INSTALLATION).

(INSTALL PRIOR TO

CONSTRUCTION). PRIOR TO CONSTRUCTION).

TYPE B

TYPE A

FLEX DUCT

CART WITH CANVAS/

1-1/4" SQUARE

TUBE FRAME AND

ZIPPER SIDE ENTRY

PLASTIC WINDOW

HEPA NEGATIVE AIR UNIT

MOBILE CONTAINMENT

FLEX DUCT

NEED INSPECTION TAG AND

MONTHLY INSPECTION).

(INITIALS/DATED).

INFILTRATION (INSTALL

CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART

NOT TO SCALE

PROTECTED OR COVERED WITH ROSEN

PAPER/FIRE RATED PLYWOOD.

CLASS IV

ILSMICRA

MANOMETER

READING FORM

PROJECT

CONTACT

SHEET

POSTED ON THE CONTAINMENT DOOR IN CLEAR

PLASTIC SLEEVES

THE REQUIRED INFECTION CONTROL RISK ASSESSMENT FORMS

MUST BE COMPLETED AND POSTED IN THE PROPER AREA.

INTERIM LIFE SAFETY MEASURES:

INFECTION CONTROL RISK ASSESSMENT:

THE REQUIRED INTERIM LIFE SAFETY MEASURES FORMS

MUST BE COMPLETED AND POSTED IN THE PROPER AREA.

DAILY FIRE WATCH INSPECTIONS MUST BE PROVIDED DAILY BY THE

PROJECT COR OR PERSON(S) ASSIGNED BY THE PROJECT

COR. THIS MUST BE LOGGED IN WITH DOCUMENTATION.

PICRA:

ICRA

ILSM

REQUIREMENT. (NOT APPLICABLE ON SOME PROJECTS).

TO BE PROVIDED WHEN APPLICABLE WITH PROJECT

LOGGED IN WITH DOCUMENTATION.

INTERIM LIFE SAFETY MEASURES FORM WILL BE SIGNED BY

THE COR AND SAFETY REPRESENTATIVE.

SITE TO BE INSPECTED ON A DAILY BASES AND MUST BE

SITE AREA PLASTIC WALL AND/OR ANTE ROOM ENCLOSURE WILL

BE INSPECTED BY INFECTION CONTROL PREVENTION COORDINATOR,

SAFETY REPRESENTATIVE AND CONTRACT OFFICER REPRESENTATIVE

(COR) FOR APPROVAL PRIOR TO PROJECT START/RELEASE DATE.

REMOVAL OF PLASTIC WALLS AND ENCLOSURES TO BE REMOVED

UPON THEIR APPROVAL.

1. ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT AND SAFETY

GLASSES ALONG WITH ANY OTHER PPE REQUIRED IN THAT AREA.

2. ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.

3. PERMITS TO INCLUDE: ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES, UTILITY

SHUT-DOWN, FIRE/SMOKE WALL, FIRE ALARM SYSTEM.

4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION. NEGATIVE PRESSURE

MACHINES MUST BE ON AND OPERATIONAL 24/7. NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS. (WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY. CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF

EACH SHIFT. MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.

5. CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE

6. DURING CONSTRUCTION BE CERTAIN THAT: BARRIERS ARE INTACT AND MAINTAINED. PARTICAL COUNT

METER IS AVAILABLE. NEGATIVE INDICATOR IS AVAILABLE. ICRA REQUIREMENTS ARE INTACT AND VERIFY

ARE BEING MAINTAINED.

POST ICRA, ILSM, FIRE INSPECTION

TEMP. ANTE ROOM

HARD BARRIER

OUTSIDE OF BUILDING

EITHER KEEP RUNNING

COVER ALL RETURNS

NEGATIVE AIR UNIT

TAPE ALL SERVICES

FIRE EXTINGUISHER ON

PROVIDE STICKY MATS

A

O

V

WEEKLY CHANGED

(OR MORE AS NEEDED)

PRE-FILTER

SUPPLY DUCTS

OR COVER WHEN RUNNING

TO KEEP DUST OUT.

AT THE GRATE/DIFFUSERS

TO PROTECT AGAINST

(CHANGED HOURLY)

PORTABLE FLOOR BRACKET

SHEETS VISIBLE TO PUBLIC

CONTAMINATION

NEGATIVE AIR UNIT

EXISTING FIRE

SPRINKLER SYSTEM

EXISTING CONCRETE SLAB FLOORING

FIRE/U.L. RATED PLASTIC

TO PREVENT DUST

FIRE/U.L. RATED PLASTIC

TO PREVENT DUST

E

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES

AND THE DIFFUSERS)

FL

EX

D U

C T

MONTHLY CHANGED

HEPA FILTER

B

FLEX DUCT

DUCTWORK/FRAME/

DIFFUSER @ 12" A.F.F.

HARD BARRIER

TEMP. ANTE ROOM

EXISTING WALL

EXISTING WALL

PROVIDE FIRE SMOKE

WALL DIFFUSER THROUGH

FIRE RATED WALLS

NOTE:

GRATE/DIFFUSER

GRATE/DIFFUSER

INDICATOR MUST BE AT -0.01 OR GREATER

(VERIFY DAILY), IF NOT VERIFY ALL OPENING

SUCH AS DOORS ARE CLOSED AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

(LOCKED AT ALL TIMES)

BLUE CORE LOCKSET

B

(ILSM MAY REQUIRE MORE

THAN ONE).

(DOWNWARD DEFLECTION)

FLEX DUCT

CART WITH CANVAS/

1-1/4" SQUARE STEEL

TUBULAR FRAME

PLASTIC WINDOW

HEPA NEGATIVE AIR UNIT

MOBILE CONTAINMENT

FLEX DUCT

CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART

C O

R R

ID

O

R

H A

LL

W

A Y

(KEYS ISSUED TO C.O.R.)

CLASS IV (CONST. BARRIER TYPES)

FINISHED FLOORING TO BE KEPT CLEAN.

FLOORS NOT BEING REPLACED TO BE

PROTECTED OR COVERED WITH ROSEN

PAPER/FIRE RATED PLYWOOD.

ad ju st ab le h ei gh t ad ju st ab le h ei gh t

SWIVEL CASTERS

(ON ALL SIDES)

ZIPPER SIDE ENTRYWALL OPENING

OR WINDOW OPENING

COMPLETELY SEALED

TYPICAL IDEAL CONSTRUCTION LAYOUT

CLASS IV

NOT TO SCALE

TYPICAL ALTERNATE CONSTRUCTION LAYOUT

CLASS IV

UTILITIES SHUT-DOWNS:

THE AREA. PROJECT COR TO HAVE DOCUMENTED PROOF OF

THE PROJECT COR SHALL NOTIFY THE PROPER SHOP

PERSONNEL AND STAFF MEMBERS WITH A MIN. OF 21 CALENDAR DAYS

IN ADVANCE FOR ANY UTILITIES SHUT-DOWN(S) THAT WILL EFFECT

THIS ACTION.

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

ICRA INFORMATION AND DETAILS

00-GJ-001

ICRA INFORMATION AND DETAILS

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

ICRA INFORMATION AND DETAILS

00-GJ-002

ICRA INFORMATION AND DETAILS

INFECTION CONTROL NOTES

1. ISOLATE EXISTING HVAC SYSTEM IN AREAS WHERE WORK IS TO BE PERFORMED. ALL AIR

VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER

COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE

PRESSURE SYSTEMS. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR TO

DECK. ISOLATED HVAC SYSTEMS SHALL BE RETURNED IN PROPER WORKING ORDER AT THE

COMPLETION OF PROJECT WITH COR APPROVAL.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND

CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE

CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES.

THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST

MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR

MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL

AREAS MUST BE COMPLETELY TIGHTLY COVERED TO CONTAIN DUST DURING TRANSPORT.

DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES. ALL CART WHEELS MUST BE

CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.

3. CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE MAINTAINED IN

A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH EFFICIENCY

PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED WITH DISINFECTANT DAILY OR

MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING SHALL BE FREE

OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE. PROVIDE PERSONAL

PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND N95 RESPIRATORS

REQUIRED BY THE SAFETY SPECIFICATION.

4. INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR TO OBTAIN INFECTION

CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

5. STAGING AREAS WILL BE DESIGNATED BY THE COR. CONTRACTOR TO COORDINATE WITH

THE COR PRIOR TO CONSTRUCTON.

6. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT DOCUMENTATION AND THE

COR PRIOR TO IMPLEMENTATION.

7. CONTRACTOR TO PROVIDE PROTECTION ABOVE CEILING WITHIN THE CONTAINMENT AREA, IF

EXISTING WALLS AND/OR PARTITIONS DO NOT EXTEND TO THE STRUCTURE ABOVE.

8. COORDINATE WITH MEP/FP.

9. ALL MEDICAL GAS OUTLETS WITHIN THE ICRA BARRIER SHALL BE SEALED IN A MANNOR TO

PREVENT CONTAMINATION OF THE GAS OUTLET. FAILURE TO PREVENT CONTAMINATION

WILL RESULT IN THE CONTRACTOR RE-CERTIFYING THE MEDICAL GAS AT NO COST TO THE

GOVERNMENT.

10. ICRA PLANS DENOTE TOTAL DEFINED AREAS OF WORK ON ALL AFFECTED LEVELS. THE VA

MAY, BASED ON DYNAMIC UNFORESEEN VARIABLES (PATIENT CENSUS, OTHER PROJECTS,

ETC.), REQUIRE THE GENERAL CONTRACTOR TO MODIFY EXTENTS AND AREA SIZES OF ICRA

BARRIERS AT NO COST TO THE GOVERNMENT. ANY SUCH MODIFICATION WILL REQUIRE THE

SAME REQUISITE PROVISIONS REQUIRING CONTAINMENT (ANTE ROOM, WALK-OFF MATS,

ETC.) AIR-PRESSURIZATION CRITERIA, AND IDENTIFICATION AS NOTED ON THESE

DOCUMENTS.

11. UPON COMPLETION OF CONSTRUCTION BUT BEFORE THE ICRA CONTAINMENT BARRIER

MAY BE REMOVED, THE CONTRACTOR SHALL CLEAN THE ENTIRE CONSTRUCTION AREA OF

ALL DEBRIS AND DUST. ALL SURFACES SHALL BE HEPA FILTER VACUUMED AND WIPED

CLEAN WITH DISINFECTANT OF ALL DUST INCLUDING, BUT NOT LIMITED TO, FLOORS, WALLS, WINDOW SILLS, WINDOW BLINDS, FURNITURE, EQUIPMENT, ARTWORK, MEDICAL GAS

OUTLETS, ELECTRICAL OUTLETS, HVAC VENTS, THERMOSTATS, MIRRORS, SINKS, AND WALL

MOUNTED ANCELLARY COMPONANTS.

ADDITIONAL CONSTRUCTION NOTES

1. REFERENCE THE DRAWINGS OR SPECIFICATION FOR ALLOWABLE WORK HOURS. EACH

FLOOR OR PHASE MAY HAVE LISTED RESTRICTIONS ON ALLOWABLE WORK HOURS. THE COR

RESERVES THE RIGHT TO ALTER THE CONSTRUCTION SCHEDULE BASED ON PATIENT CARE

AT NO COST TO THE GOVERNMENT.

2. ALL CONSTRUCTION MATERIAL OR EQUIPMENT DELIVERIES OR DEBRIS REMOVAL MUST BE

COMPLETE BY 7:30 AM M-F. FOLLOW ALL ICRA GUIDELINES FOR SAFE HANDLING OF

MATERIAL AND CLEAN-UP OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER. ALL

DELIVERIES SHALL BE WRAPPED OR COVERED TO PREVENT ANY DUST OR DEBRIS

CONTAMINATION IN THE PATH OF TRAVEL. ALL DEBRIS SHALL BE REMOVED IN CARTS. CARTS

AND CART WHEELS SHALL BE FREE OF DUST AND WIPED DOWN BEFORE LEAVING THE

CONSTRUCTION AREA. CART OPENINGS SHALL HAVE A TIGHTLY CLOSING LID OR TIGHTLY

WRAPPED IN PLASTIC TO PREVENT ANY DUST OR DEBRIS CONTAMINATION IN THE PATH OF

TRAVEL.

3. ANY EXCESSIVE NOISE PERCEIVED OUTSIDE THE CONSTRUCTION CONTAINMENT BARRIER

ABOVE 85 DECIBELS SHALL BE COORDINATED WITH THE COR. THE COR RESERVES THE

RIGHT TO DELAY WORK FOR 1-2 HOURS SHOULD EXCESSIVE NOISE DISTURB PATIENT CARE

OR A PATIENT CARE PROCEDURE IN PROXIMITY TO THE CONSTRUCTION CONTAINMENT

BARRIER AT NO COST TO THE GOVERNMENT.

4. THE COR RESERVES THE RIGHT TO DELAY WORK FOR 1-2 HOURS FOR ANYTHING THE COR

HAS DEEMED EXCESSIVE OR DISRUPTIVE TO PATIENT CARE. A PLAN OF ACTION WILL BE

IMMEDIATELY PUT IN PLACE TO AVOID DISRUPTIONS TO THE CONSTRUCTION SCHEDULE AT

NO COST TO THE GOVERNMENT.

ICRA BARRIER ADDITIONAL NOTES

ICRA BARRIERS SHALL NOT BE BUILT DURING MEDICAL CENTER BUSINESS HOURS 8:00AM-4:30PM M-F. SOME

AREAS MAY HAVE ADDITIONAL TIME RESTRICTIONS.

ICRA BARRIERS AT MOST ROOMS SHALL BE CLASS IV. THERE MUST BE AN ANTE ROOM.

THE BID DOCUMENTS HAVE EXAMPLES OF ICRA/ILSM FORMS THAT WILL BE GENERATED AND POSTED FOR EVERY CONSTRUCTION CONTAINMENT BARRIER THAT THE CONTRACTOR WILL BE REQUIRED TO ADHERE TO FOR INFECTION PREVENTION WITHIN THE MEDICAL CENTER. DETAILS OF THE ICRA/ILSM DOCUMENTS MAY CHANGE AT ANY TIME PER INFECTION PREVENTION OR VA GUIDELINES ISSUED AT THAT TIME. THE CONTRACTOR IS REQUIRED TO ADHERE TO THESE CURRENT STANDARD ICRA/ILSM DOCUMENTS DURING THE DURATION OF THE CONTRACT AT NO COST TO THE GOVERNMENT. FAILURE TO COMPLY WITH THE POSTED ICRA/ILSM WILL RESULT IN DISCIPLINARY ACTION AND THE CONTRACTOR AND ITS EMPLOYEES REQUIRED TO ATTEND AN ON-STATION VA PROVIDED TRAINING SESSION AT NO COST TO THE GOVERNMENT.

ICRA BARRIERS AT LOCATIONS THAT WILL BE ACTIVE FOR LESS THAN 30 CALENDAR DAYS AND HAVE MINIMAL DUST GENERATING ACTIVITY MAY BE ALLOWED TO HAVE A PLASTIC ZIPPERED DOOR SEPARATING THE ANTE ROOM AND CONSTRUCTION ZONE. THE CONTRACTOR SHALL PROVIDE A WRITTEN PROPOSAL FOR VA INFECTION PREVENTION PERSONNEL TO REVIEW BUT MUST BE PREPARED TO PROVIDE A MORE

RESTRICTIVE BARRIER PER ICRA REQUIREMENTS AT NO COST TO THE GOVERNMENT.

ICRA BARRIERS AT SOME LOCATIONS MAY BE ALLOWED TO BE A MOBILE CONTAINMENT UNIT OR OTHER SIMILAR MOBILE OR MODULAR CONTAINMENT SYSTEM. THE CONTRACTOR SHALL PROVIDE A WRITTEN PROPOSAL FOR VA INFECTION PREVENTION PERSONNEL TO REVIEW BUT MUST BE PREPARED TO PROVIDE

A MORE RESTRICTIVE BARRIER PER ICRA REQUIREMENTS AT NO COST TO THE GOVERNMENT.

ALL GAPS IN THE CONTAINMENT BARRIER MUST BE TAPED AND SEALED. TAPING IS TO BE DONE IN A

MANNER AS TO NOT BE DESTRUCTIVE TO EXISTING INFRASTRUCTURE OR THE CONTRACTOR IS

RESPONSIBLE FOR REPAIR. TAPING IS TO BE INSPECTED DAILY AND ANY GAPS RESEALED OR RETAPED TO MAINTAIN THE REQUIRED NEGATIVE AIR PRESSURE. NEGATIVE AIR OUTLET SHALL USE A PIECE OF HARD FLAT MATERIAL IN THE WINDOW WITH A HOLE IN IT FOR THE TUBING AND USE A ROUND FLANGE AND

ATTACH THE TUBING WITH A BAND CLAMP OR SIMILAR VA APPROVED METHOD.

DOORS INTO ICRA BARRIERS SHALL BE:

· METAL AND WIPEABLE TO MAINTAIN A DUST FREE CLEAN SURFACE. NO WOOD ALLOWED.

· PRE-MANUFACTURED TEMPORARY WALL SYSTEMS ARE ALLOWED PER VA APPROVAL.

· ADA COMPLIANT THRESHOLD, OR NO THRESHOLD.

· HAVE A DOOR CLOSER.

· DOOR MUST CLOSE AND LATCH ON ITS OWN POWER WHILE THE NEGATIVE AIR IS OPERATIONAL.

· A DOOR LATCH AND LOCK COMPATIBLE WITH THE VA KEY CORE.

o CL3357 NZD 626 RH CT6 (LFIC LESS CONST. CORE) (STOREROOM FUNCTION) LOCK SET FOR JC

LARGE FORMAT INTERCHANGEABLE CORE.

o A POTENTIAL SUPPLIER - IDN-H HOFFMAN INC. 314-692-8391.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3'-0" DOOR

3'-0" D O

O R

3'-0" DOOR

3'-7.5" D O

O R

PULL

CORD

PULL

CORD

MED GAS

(6)

O 2-

M A-

VA

C

O 2-

M A-

VA

C

O2-MA-VAC

WORKROOM

C114

STORAGE

C114A

CORRIDOR

H126

EXAM

C111B

EXAM

C111A

HAS

C111

EXAM

C110A

TRIAGE

E125

TRIAGE

C113

RECEPTION

C112

ENTRYWAY

H125C

CORRIDOR

H125

CORRIDOR

H127A

CORRIDOR

H128

OFFFICE

C116

ELEVATOR

LOBBY

H122WAITING

C110

CONTROL

ROOM

C108

OFFFICE

C119

TELECOM

C136

ISOLATION

E128

ANTE

ROOM

E127

TOILET

E126

CORRIDOR

H132

SECURE

HOLD

E122

SECURE

HOLD

E123

NURSE

STATION

E134

WAITING

E124

ELECT.

C117

CORRIDOR

H134

HAC

E121

ALCOVE

E121A

TOILET

E135

ENTRYWAY

H125A

CORRIDOR

H125D

ENTRYWAY

H125B

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

HAZARDOUS MATERIAL ASSESSMENT

FLOOR PLANS

01-HA-111

GENERAL NOTES

NO HAZARDOUS MATERIAL REMOVAL IS REQUIRED FOR THIS PROJECT.

PER PROJECT 657-18-118 FCA PROVIDE ASBESTOS REPORT FOR JC-JB

CAMPUS, DATED 01/28/2019, THE REPORT SUBMITTED TO THE VA DID NOT

INDICATE HAZARDOUS MATERIALS WITHIN THE PROJECT AREA.

HAZARDOUS MATERIAL ASSESSMENT EXISTING FLOOR PLAN - BUILDING 01 - FLOOR 01

SCALE: 1/4" = 1'-0"

PLAN

NORTH

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3'-0" DOOR

3'-0" D O

O R

3'-0" DOOR

PULL

CORD

PULL

CORD

MED GAS

(6)

O 2-

M A-

VA

C

O 2-

M A-

VA

C

O2-MA-VAC

WORKROOM

C114

STORAGE

C114A

CORRIDOR

H126

EXAM

C111B

EXAM

C111A

HAS

C111

EXAM

C110A

TRIAGE

E125

TRIAGE

C113

RECEPTION

C112

ENTRYWAY

H125C

CORRIDOR

H125

CORRIDOR

H127A

CORRIDOR

H128

OFFFICE

C116

ELEVATOR

LOBBY

H122WAITING

C110

CONTROL

ROOM

C108

OFFFICE

C119

TELECOM

C136

ISOLATION

E128

ANTE

ROOM

E127

TOILET

E126

CORRIDOR

H132

SECURE

HOLD

E122

SECURE

HOLD

E123

NURSE

STATION

E134

WAITING

E124

ELECT.

C117

CORRIDOR

H134

HAC

E121

ALCOVE

E121A

TOILET

E135

ENTRYWAY

H125A

CORRIDOR

H125D

ENTRYWAY

H125B

3'-7.5" D O

O R

4'-0"

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

DEMO AND PHASING

FLOOR PLAN - FLOOR 01

01-AD-111

DEMO AND PHASING FLOOR PLAN - BUILDING 01 - FLOOR 01

SCALE: 1/4" = 1'-0"

PLAN

NORTH

GENERAL NOTES

1. THE CONTRACTOR IS ALLOWED TO WORK DURING REGULAR BUSINESS

HOURS ON FLOOR 01. ICRA BARRIERS ARE TO BE BUILT AFTER HOURS PER

01-GJ-001 AND 01-GJ-002. SOME WORK MAY NEED TO BE COMPLETED AFTER

HOURS AT THE DISCRETION OF THE COR AT NO ADDITIONAL COST TO THE

GOVERNMENT.

2. CONTRACTOR TO SUBMIT ICRA BARRIER FOOTPRINT AND SCHEDULE OF TIME

TO COMPLETE WORK FOR COR APPROVAL. COR RESERVES THE RIGHT TO

MODIFY ICRA BARRIER, SCHEDULE, AND PHASING PLAN TO ACCOMMODATE

MEDICAL CENTER REQUIREMENTS AT NO EXTRA COST TO THE GOVERNMENT.

3. THE COR MAY ALLOW THE ICRA BARRIER TO BE VENTED INTERNALLY

DEPENDING ON IMPACT AND FOOTPRINT. NEGATIVE AIR MUST VENT OUT TO

AT LEAST THE CORRIDOR SPACE. INFECTION PREVENTION MAY REQUIRE

MORE RESTRICTIVE VENTING REQUIREMENTS, ESPECIALLY TO NEGATIVE AIR

VENTED INTO THE CORRIDOR. SEE 01-GJ-001 AND 01-GJ-002 FOR ICRA

BARRIER REQUIREMENTS AND POTENTIAL VENTING OPTIONS. CONTRACTOR

TO BE PREPARED TO PROVIDE THE MOST RESTRICTIVE REQUIREMENT AT NO

EXTRA COST TO THE GOVERNMENT.

4. CONTRACTOR IS RESPONSIBLE FOR MOVING ALL FURNITURE AND MEDICAL

EQUIPMENT WITHIN ROOMS AFFECTED BY CONSTRUCTION. VA PERSONNEL

WILL BE RESPONSIBLE FOR REMOVING AND RELOCATING ALL PERSONAL

TYPE ITEMS FROM WALLS AND DESKS. VA OIT WILL BE RESPONSIBLE FOR

MOVING ALL COMPUTER TYPE EQUIPMENT (MONITORS AND DESKTOPS).

SOME FURNITURE WILL BE MOVED TO ANOTHER FLOOR WITHIN JOHN

COCHRAN BUILDING 1. SOME FURNITURE WILL BE CONSIDERED TRASH AND

THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL. ANY

FURNITURE OR EQUIPMENT LEFT IN THE CONSTRUCTION ZONE WILL NEED TO

BE PROTECTED AND WRAPPED IN PLASTIC OR MOVED OFF SITE AND

RETURNED BY CONTRACTOR FOR INSTALLING IN NEW ROOMS. SEE EACH

PHASING PLAN NOTES AND OTHER DRAWINGS IN THIS SET FOR MORE

DETAILED INFORMATION. COORDINATE ALL FURNITURE MOVES AND DISPOSAL

DECISIONS WITH THE COR.

5. AT THE END OF EACH PHASE, RETURN FURNITURE AND EQUIPMENT TO NEW

ROOMS AS DIRECTED BY COR.

6. REMOVE WALLS AS SHOWN AND CEILING GRID AND COMPONENTS AS

REQUIRED.

7. REMOVE ALL DOORS, HARDWARE, AND ELECTRONIC DOOR DEVICES AND

RETURN TO VA CARPENTER SHOP. VA CARPENTER SHOP OPTION TO KEEP

ITEMS, OR REQUEST CONTRACTOR TO REMOVE FROM PREMISE.

8. ALL MISCELLANEOUS WALL EQUIPMENT/DEVICES OR CEILING

EQUIPMENT/DEVICES (SPEAKERS, WIFI, CAMERAS, ETC.) SHALL BE KEPT AND

REINSTALLED. COORDINATE WITH COR.

9. CAP ALL EXISTING PLUMBING LINES.

PHASE 1

1. CONTRACTOR TO REMOVE ALL FURNITURE AND EQUIPMENT IN C114

AND RELOCATE TO A ROOM IN JOHN COCHRAN BUILDING 1 FLOOR 09.

COORDINATE FINAL LOCATION WITH THE COR. APPROXIMATELY 9

METAL DESKS WITH OVERHEAD BINS. SOME OF THIS FURNITURE MAY

BE CONSIDERED TRASH AND DISPOSED OF BY THE CONTRACTOR.

2. REMOVE WALL AS SHOWN. PROVIDE A FINISHED CASED OPENING AND

PATCH FLOORING WITH VCT. LEAVE CEILING IN PLACE. THIS ROOM

WILL BE THE TEMPORARY WAIT ROOM WHILE OTHER PHASES ARE

COMPLETED. RELOCATE TV. RELOCATE ANY EXISTING WAIT ROOM

CEILING DEVICES (CAMERAS, SMOKE DETECTORS, ETC.) RELOCATE

WAIT ROOM FURNITURE TO C114 AND CORRIDOR. COORDINATE ALL

LOCATIONS WITH COR.

3. REMOVE AND DISPOSE FOLDING GLASS DOORS IN H125 AT C112.

PHASE 1

PHASE 3 PHASE 2

PHASE 4

PHASE 2

1. CONTRACTOR TO REMOVE ALL FURNITURE AND EQUIPMENT IN C110A

AND C111 AND RELOCATE TO C112. COORDINATE FINAL LOCATION

WITH THE COR. APPROXIMATELY 2 METAL DESKS WITH OVERHEAD

BINS, 4 PATIENT CHAIRS, 4 TASK CHAIRS, 4 SHELVING UNITS,

REFRIGERATOR, AND MICROWAVE. REMOVE WALLS AS SHOWN AND

CEILING GRID AND COMPONENTS AS REQUIRED.

2. RELOCATE EXISTING CEILING CAMERA IN WAIT ROOM TO NEW

TEMPORARY WAIT ROOM. CAMERA TO BE RECONNECTED PER

EXISTING CONDITIONS. MOVE CAMERA BACK TO NEW WAIT ROOM

AFTER PHASE 2.

3. REMOVE GLASS WITH VA LOGO.

4. ALL VCT TILE IN EXISTING CORRIDORS WILL REMAIN INTACT. PROTECT

AS NECESSARY. VCT TILE IN C110, C110A, AND C111 WILL BE

REMOVED. SEE NEW FLOOR PLANS FOR NEW FLOORING,

COORDINATE EXACT DEMO WITH COR.

PHASE 3

1. VCT TILE IN C114 WILL BE REMOVED. SEE NEW FLOOR PLANS FOR

NEW FLOORING, COORDINATE EXACT DEMO WITH COR.

2. RETURN ANY WAIT ROOM WALL OR CEILING COMPONANTS BACK TO

NEW WAIT ROOM.

3. MOVE ALL FURNITURE AND EQUIPMENT TO NEW LOCATION FROM

TEMPORARY LOCATIONS IN PHASE 2.

PHASE 4

1. CONTRACTOR TO REMOVE ALL FURNITURE AND EQUIPMENT IN E125,

C112, AND C113 AND RELOCATE TO NEW TRIAGE ROOMS.

COORDINATE FINAL LOCATION WITH THE COR. APPROXIMATELY 2

METAL DESKS WITH OVERHEAD BINS, 4 PATIENT CHAIRS, 4 TASK

CHAIRS, 4 SHELVING UNITS.

2. PROVIDE A CASED OPENING AT ENTRANCE TO E125.

3. ALL VCT TILE IN EXISTING CORRIDORS WILL REMAIN INTACT. PROTECT

AS NECESSARY. VCT TILE IN E125, C112, AND C113 WILL BE REMOVED.

SEE NEW FLOOR PLANS FOR NEW FLOORING, COORDINATE EXACT

DEMO WITH COR.

4. REMOVE GLASS AT H125B.

REMOVE AND REPLACE EMERGENCY

DEPARTMENT DOORS. COORDINATE

SCHEDULE WITH COR. SEE NOTES

ABOUT DOORS ON SHEET 01-AE-611.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHASE

CH-CB-10CHASE

CH-CB-8

TELECOM

CB15A

CHASE

CH-CB-5

MECHANICAL

CB16A

CHASE

CH-CB-7

CB29

DECONTAMINATION

CB15

DECONTAMINATION

CB16

BIOMED

OFFICE

CB32

BREAK RM

B006

BIOMED

SHOP

CB31

EQUIP

REPAIR

CB36

CORRIDOR

H016

ELEVATOR

LOBBY

H014

ELEVATOR

LOBBY

H015

E8E7

SCOPE

PROCESSING

CB17A

FEMALE

SHOWER

CB15A

FEMALE

LOCKERS

CB13

MALE

LOCKERS

CB14

ANTE RM

CB12

ANTE RM

CB11

DETERGENT

AND

WATER

TREATMENT

CB10

CONFERENCE

B007

CHIEF

OFFICE

CB09

STAFF

OFFICE

CB07

CHASE

CH-CB-9

OFFICE

CB17

HAC

CB15B

CHASE

CH-CB-4

PREP RM /

STERILIZATION

CB26

SCOPE

STORAGE

CB18

ANTE RM

CB19

ANTE RM

CB20

STERILIZER

RECESSCB26C

MANUAL

WASH RM

CB30

CART WASH

CB16B

ASST CHIEF

OFFICE

CB08

IT CLOSET

CB05BREAK RM

CB04CORRIDOR

H022

CORRIDOR

H023

ELEV ELEV

APPROXIMATE

LOCATION OF

SINKS ABOVE

ON FLOOR 01

APPROXIMATE

LOCATION OF

SINKS ABOVE

ON FLOOR 01

APPROXIMATE

LOCATION OF

SINKS ABOVE

ON FLOOR 01

APPROXIMATE

LOCATION OF

SINKS ABOVE

ON FLOOR 01

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

ABOVE CEILING IMPACT

FLOOR PLAN - FLOOR 00

01-AE-101

GENERAL NOTES

1. THE AREA OF WORK IS IN THE STERILE PROCESSING (SPS) DEPARTMENT.

2. THE CONTRACTOR IS ONLY ALLOWED TO WORK NIGHTS AND/OR WEEKENDS

IN THE SPS DEPARTMENT.

3. CONTRACTOR TO SUBMIT ICRA BARRIER FOOTPRINT AND SCHEDULE OF TIME

TO COMPLETE WORK FOR COR APPROVAL. COR RESERVES THE RIGHT TO

MODIFY ICRA BARRIER AND SCHEDULE AT NO EXTRA COST TO THE

GOVERNMENT.

4. THE COR MAY ALLOW THE ICRA BARRIER TO BE VENTED INTERNALLY

DEPENDING ON IMPACT AND FOOTPRINT. NEGATIVE AIR FROM THE SPS AREA

MUST VENT OUT TO AT LEAST THE CORRIDOR SPACE. INFECTION

PREVENTION MAY REQUIRE MORE RESTRICTIVE VENTING REQUIREMENTS,

ESPECIALLY TO NEGATIVE AIR VENTED INTO THE CORRIDOR. SEE 01-GJ-001

AND 01-GJ-002 FOR ICRA BARRIER REQUIREMENTS AND POTENTIAL VENTING

OPTIONS. CONTRACTOR TO BE PREPARED TO PROVIDE THE MOST

RESTRICTIVE REQUIREMENT AT NO EXTRA COST TO THE GOVERNMENT.

ABOVE CEILING IMPACT IN STERILE PROCESSING (SPS) EXISTING FLOOR PLAN - BUILDING 01 - FLOOR 00

SCALE: 1/4" = 1'-0"

PLAN

NORTH

POTENTIAL FOOTPRINT OF ICRA BARRIER.

CEILING MATERIAL IN THIS LOCATION IS

"HARD LID" GYPSUM BOARD.

POTENTIAL FOOTPRINT OF ICRA BARRIER.

CEILING MATERIAL IN THIS LOCATION IS

LAY-IN CEILING TILE

POTENTIAL FOOTPRINT OF ICRA BARRIER.

CEILING MATERIAL IN THIS LOCATION IS

"HARD LID" GYPSUM BOARD.

POTENTIAL FOOTPRINT OF ICRA BARRIER.

CEILING MATERIAL IN THIS LOCATION IS

"HARD LID" GYPSUM BOARD.

NOTE ABOUT CB18. EXISTING SCOPE STORAGE SHELVING IN THE ROOM MUST BE

PROTECTED DURING CONSTRUCTION. CONTRACTOR'S OPTION TO TEMPORARILY

RELOCATE SHELVING TO A LOCATION DETERMINED BY COR, OR COMPLETELY

WRAP EQUIPMENT IN PLASTIC PER THE COR'S APPROVAL. CONTRACTOR IS

RESPONSIBLE FOR THE CONDITION OF THE EQUIPMENT DURING CONSTRUCTION

AND SHALL TURN OVER THE ROOM AND EQUIPMENT PER COR APPROVAL.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OBSERVATION

E125

OBSERVATION

C113

OBSERVATION

C112

9'-3"9'-3"

10'-0"

9' -0

3'-0" D O

O R

PULL

CORD

PULL

CORD

MED GAS

(6)

O 2-

M A-

VA

C

O 2-

M A-

VA

C

O2-MA-VAC

STORAGE

C114C

CORRIDOR

H126

EXAM

C111B

EXAM

C111A

HAS

C110A

HAS AOD

C110B

ENTRYWAY

H125C

CORRIDOR

H125

CORRIDOR

H127A

CORRIDOR

H128

OFFFICE

C116

ELEVATOR

LOBBY

H122

WAITING

C110

CONTROL

ROOM

C108

OFFFICE

C119

TELECOM

C136

ISOLATION

E128

ANTE

ROOM

E127

TOILET

E126

CORRIDOR

H132

SECURE

HOLD

E122

SECURE

HOLD

E123

NURSE

STATION

E134

WAITING

E124

ELECT.

C117

CORRIDOR

H134

HAC

E121

ALCOVE

E121A

TOILET

E135

ENTRYWAY

H125A

CORRIDOR

H125D

ENTRYWAY

H125B

WORKROOM

C114

EXAM

PROVIDER TRIAGE

C114B

EXAM

PROVIDER TRIAGE

C114A

'-0

1' -8

7/

8"

+/- 9'-6 3/4" EQUAL +/- 9'-6 3/4" EQUAL

4 7/8"

O2-MA-VACO2-MA-VAC

4'-6 1/2"

O2-MA-VAC

NEW GAS

O2-MA-VAC

NEW GAS

O2-MA-VAC

NEW GAS

NEW GAS NEW GAS

O 2-M

A-VAC

N

EW

G

AS

100°

1 2

FEC

13'-0 7/8"

13'-0 7/8"

5'-5"

9'-0 7/8"EXAM

TRIAGE

C111C

2'-6"

1'-0"

1'-0"

2' -0

2'-0"

4'-4" +/- VER

IFY

VERIFY FLOOR LAYOUT WITH

COR BEFORE CONSTRUCTING.

WALL TO BE 3-5/8" METAL STUDS WITH BATT

INSULATION WITH 5/8" GYPSUM BOARD BOTH SIDES

UP TO DECK. TAPE, FINISH, AND PAINT BOTH SIDES.

CAULK PERIMETER ALL SIDES. INSTALL 5/8" PLYWOOD

ON EXTERIOR SIDE FLOOR TO CEILING.

EXISTING BRICK

SURFACE TO REMAIN

UNPAINTED.

PARTIAL HEIGHT WALL.

SEE INTERIOR ELEVATIONS.

PATCH, REPAIR, PAINT

AS NECESSARY.

C

AS

ED

O

PE

N

IN

G

6' -0

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

NEW FLOOR PLAN - FLOOR 01

01-AE-111

NEW FLOOR PLAN - BUILDING 01 - FLOOR 01

SCALE: 1/4" = 1'-0"

PLAN

NORTH

GENERAL NOTES

1. COR RESERVES THE RIGHT TO MODIFY TO ADHEAR TO VA TILL AND MEDICAL

CENTER REQUIREMENTS AT NO ADDITIONAL COST TO THE GOVERNMENT.

2. VERIFY ALL FINISHES AND COLORS WITH COR.

3. CROSS REFERENCE ALL DISCIPLINE DRAWINGS (FLOOR PLANS, REFLECTED

CEILING PLANS, INTERIOR ELEVATIONS) FOR ANY ADDITIONAL WORK.

ARCHITECTURAL DRAWINGS MAY SHOW SPECIFIC CRITICAL LOCATIONS AND

HEIGHTS OF ELECTRICAL ELEMENTS.

4. CONTRACTOR WILL INVITE THE VA PERSONNEL TO INSPECT ALL

INSTALLATIONS BEFORE PERMANENT ENCLOSURE OF WALLS AND CEILINGS.

THE VA RESERVES THE RIGHT TO REFUSE WORK COMPLETED AT ANY TIME

AND REQUIRE THE CONTRACTOR TO REMOVE AND REPLACE PER VA

GUIDANCE AT NO COST TO THE GOVERNMENT.

5. ALL GLASS TO BE TEMPERED GLASS. ALUMINUM FRAMES TO BE SILVER

COLOR. VERIFY WITH COR.

6. ALL WALLS TO BE 3-5/8" METAL STUDS WITH 5/8" GYPSUM BOARD BOTH SIDES

UP TO DECK UNLESS NOTED OTHERWISE.

7. PROVIDE STAINLESS STEEL CORNER GUARDS AT ALL WALL CORNERS.

8. PROVIDE NEW WALL HANDRAILS AND FLOOR RAILS AT ALL LOCATIONS.

MATCH EXISTING STYLE AND FINISH. VERIFY FINISH WITH COR.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

O2-MA-VAC

ENT

EQUIP. O2-MA-VAC

ENT

EQUIP. O2-MA-VAC

ENT

EQUIP.

2' -0

"2'-8"2'-8"

1'-0" 1'-0"

4' -0

6"2'-0"

4'-7 1/2"9'-3"9'-3"4'-7 1/2"

SP

AC

E

FO

R E

Q U

IP

C H

AI

R

, O R

D

ES

K.

2'-4 1/2"

EMERGENCY CHECK IN

USB &

C PORT

LIGHT

SWITCH

QUAD

OUTLET

DATA

QUAD

OUTLET

NEW GAS NEW GAS NEW GAS

BEDBEDBED

NOTE: UTILITIES AND DIMENSIONS ARE

THE SAME AT EACH BED HEAD WALL.

5' -0

NURSE

CALL

SOLID SURFACE TOP

OPEN TO BEYOND

PA

R

TI

AL

W

AL

L H

EI

G

H T4' -0

1"

2' -6

3' -2

OPEN TO BEYOND

SOLID SURFACE TOP

MAKE WINDOW

MULLION AS SMALL

AS POSSIBLE

6'-0"

3' -2

6'-0"

MIRROR GLASS AT ROOM C110B.

MIRROR ON WAIT ROOM SIDE.

EMERGENCY SIGN - PLASTIC WITH RED

BACKGROUND AND WHITE LETTERING

WITH SIMPLE METAL FRAME.

7' -2

7' -2

7' -2

3' -2

MAKE WINDOW

MULLION AS SMALL

AS POSSIBLE

SOLID

SURFACE TOP

TOP IS SOLID FIXED GLASS WITH SPEAKER HOLE. BOTTOM IS A SLIDING GLASS OPENING.

CONTRACTOR OPTION TO USE EXISTING SLIDING GLASS HARDWARE OR PROPOSE

ALTERNATE SOLUTION. COR RESERVES THE RIGHT TO MAKE CHANGES UNTIL AN

AGREEABLE SOLUTION IS ACHIEVED WITH SLIDING GLASS OPENING.

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

INTERIOR ELEVATIONS AND DETAILS

01-AE-211

CORRIDOR ELEVATION

SCALE: 1/4" = 1'-0"1

OBSERVATION UNIT ELEVATION

SCALE: 1/4" = 1'-0"3

GENERAL NOTES

1. COR RESERVES THE RIGHT TO MODIFY TO ADHEAR TO VA TILL AND MEDICAL

CENTER REQUIREMENTS AT NO ADDITIONAL COST TO THE GOVERNMENT.

2. VERIFY ALL FINISHES AND COLORS WITH COR.

3. CROSS REFERENCE ALL DISCIPLINE DRAWINGS (FLOOR PLANS, REFLECTED

CEILING PLANS, INTERIOR ELEVATIONS) FOR ANY ADDITIONAL WORK.

ARCHITECTURAL DRAWINGS MAY SHOW SPECIFIC CRITICAL LOCATIONS AND

HEIGHTS OF ELECTRICAL ELEMENTS.

4. CONTRACTOR WILL INVITE THE VA PERSONNEL TO INSPECT ALL

INSTALLATIONS BEFORE PERMANENT ENCLOSURE OF WALLS AND CEILINGS.

THE VA RESERVES THE RIGHT TO REFUSE WORK COMPLETED AT ANY TIME

AND REQUIRE THE CONTRACTOR TO REMOVE AND REPLACE PER VA

GUIDANCE AT NO COST TO THE GOVERNMENT.

5. ALL GLASS TO BE TEMPERED GLASS. ALUMINUM FRAMES TO BE SILVER

COLOR. VERIFY WITH COR.

WAIT ROOM CHECK-IN ELEVATION

SCALE: 1/4" = 1'-0"2

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

VA ST. LOUIS HEALTHCARE SYSTEM

CREATE OBSERVATION UNIT, JC 657-26-602JC

JOHN COCHRAN DIVISION

915 NORTH GRAND BLVD - ST. LOUIS, MO 63106

INTEGRATED PROJECT TEAM 01

05 OCT 2026 WJS WJS

100% BID DOCUMENTS

DOOR SCHEDULE AND DETAILS

01-AE-611

DOOR NOTES

1. ADHERE TO ALL THE REQUIREMENTS AND SPECIFICATIONS OF THE VA TIL.

2. THE SUBMITTAL PROCESS WILL BE USED TO CONFIRM MATERIALS, PRODUCTS,

AND SERVICES.

3. ALL DOOR COMPONENTS AND HARDWARE TO BE EQUAL TO OR BETTER THAN

EXISTING EMERGENCY DEPARTMENT DOORS.

4. MATCH EXISTING HARDWARE AND HARDWARE FINISH OF THE DOORS IN THE

EMERGENCY DEPARTMENT AREA. REFERENCE INCLUDED PICTURES.

5. COR RESERVES THE RIGHT TO MODIFY TO ACCOMMODATE MEDICAL CENTER

REQUIREMENTS AT NO ADDITIONAL COST TO THE GOVERNMENT.

6. DOOR LATCH AND LOCK COMPATIBLE WITH THE VA KEY CORE.

o CL3357 NZD 626 RH CT6 (LFIC LESS CONST. CORE) (STOREROOM FUNCTION)

LOCK SET FOR JC LARGE FORMAT INTERCHANGEABLE CORE.

· A POTENTIAL SUPPLIER - IDN-H HOFFMAN INC. 314-692-8391.

DOOR #1

1. 3'-0" - 7'-0"

2. SOLID CORE WOOD DOOR WITH A BIRCH

FINISH. ALL DOORS SHALL MATCH THE

EXISTING CONSTRUCTION AND FINISH OF THE

WOOD DOORS IN THE EMERGENCY

DEPARTMENT AREA.

3. HOLLOW METAL DOOR FRAME. PAINT. COLOR

BY COR.

4. ELECTRONIC TOUCH PAD LOCK WITH KEY

CORE TO MATCH EXISTING TRIAGE EXAM

ROOM DOORS. THREE HINGES. STAINLESS

STEEL KICK PLATE.

DOOR SCHEDULE

EXISTING TRIAGE EXAM ROOM DOOR

SCALE: NONE

EXISTING EMERGENCY DEPARTMENT DOOR

SCALE: NONE

EXAMPLE 4'-0" AND 1'-3" DOUBLE DOOR

SCALE: NONE

DOOR #2

1. 3'-0" - 7'-0"

2. SOLID CORE WOOD DOOR WITH A BIRCH

FINISH. ALL DOORS SHALL MATCH THE

EXISTING CONSTRUCTION AND FINISH OF THE

WOOD DOORS IN THE EMERGENCY

DEPARTMENT AREA.

3. HOLLOW METAL DOOR FRAME. PAINT. COLOR

BY COR.

4. ELECTRONIC TOUCH PAD LOCK WITH KEY

CORE TO MATCH EXISTING TRIAGE EXAM

ROOM DOORS. THREE HINGES. STAINLESS

STEEL KICK PLATE.

DOOR #3

1. 3'-0" - 7'-0"

2. SOLID CORE WOOD DOOR WITH A BIRCH

FINISH. ALL DOORS SHALL MATCH THE

EXISTING CONSTRUCTION AND FINISH OF THE

WOOD DOORS IN THE EMERGENCY

DEPARTMENT AREA.

3. HOLLOW METAL DOOR FRAME. PAINT. COLOR

BY COR.

4. ELECTRONIC TOUCH PAD LOCK WITH KEY

CORE TO MATCH EXISTING TRIAGE EXAM

ROOM DOORS. THREE HINGES. STAINLESS

STEEL KICK PLATE.

DOOR #4

1. 4'-0" - 7'-0" AND 1'-3" - 7'-0"

2. SOLID CORE WOOD DOOR WITH A BIRCH

FINISH. SLIM WINDOW LITE IN 4'-0" LEAF LIKE

EXISTING DOOR . FIRE RATING 2 HOUR. ALL

DOORS SHALL MATCH THE EXISTING

CONSTRUCTION AND FINISH OF THE WOOD

DOORS IN THE EMERGENCY DEPARTMENT

AREA.

3. HOLLOW METAL DOOR FRAME. PAINT. COLOR

BY COR.

4. HEAVY DUTY PIANO TYPE HINGE THAT IS AN

UPGRADE TO THE EXISTING HINGES. NO

TRANSFER HINGES. STAINLESS STEEL KICK

PLATE AND DOOR EDGE GUARD, MATCH

EXISTING. PUSH/PULL PLATES BOTH SIDES.

5. HEAVY DUTY ELECTRONIC CLOSER WITH MAG

LOCK HOOKED UP TO EXISTING PIV BADGE.

SWING SENSORS. OPERATOR ROCKER

SWITCHES MOUNTED ON TOP OF OPERATOR

HEADER.

DOOR #5

1. 3'-0" - 7'-0"

2. SOLID CORE WOOD DOOR WITH A BIRCH

FINISH. ALL DOORS SHALL MATCH THE

EXISTING CONSTRUCTION AND FINISH OF THE

WOOD DOORS IN THE EMERGENCY

DEPARTMENT AREA.

3. HOLLOW METAL DOOR FRAME. PAINT. COLOR

BY COR.

4. ELECTRONIC TOUCH PAD LOCK WITH KEY

CORE TO MATCH EXISTING TRIAGE EXAM

ROOM DOORS. THREE HINGES. STAINLESS

STEEL KICK PLATE.

DOOR #6

1. 3'-0" - 7'-0"

2. ALUMINUM STOREFRONT WITH TEMPERED

GLASS. WIDE STILE TO ACCOMMODATE

ELECTRONIC LOCK. SILVER COLOR

3. ALUMINUM STOREFRONT FRAME. SILVER

COLOR.

4. ELECTRONIC TOUCH PAD LOCK WITH KEY

CORE TO MATCH EXISTING TRIAGE EXAM

ROOM DOORS. HEAVY DUTY HINGES.

EXISTING DOUBLE DOOR

SCALE: NONE

DOOR #7

1. (2) 3'-6" - 7'-0"

2. STEEL DOOR. SLIM WINDOW LITE LIKE

EXISTING DOOR. PAINT. COLOR BY COR. FIRE

RATING 2 HOUR.

3. HOLLOW METAL DOOR FRAME. PAINT. COLOR

BY COR.

4. PUSH/PULL PLATES BOTH SIDES.

5. HEAVY DUTY SWING-AWAY BUTT HINGES. NO

TRANSFER HINGES.

6. QUIET SOLENOID PANIC HARDWARE WITH

UPPER VERTICAL RODS/LATCHES

7. PANIC HARDWARE WIRED THROUGH FRAME TO

DOOR/PANIC BAR THROUGH METAL CLAD WIRE

LOOP. NO TRANSFER HINGES.

8. APPROPRIATE ASTRAGAL; PER DOOR

COORDINATION.

9. NEW MAGLOCKS.

10. OPERATOR ROCKER SWITCHES MOUNTED ON

TOP OF OPERATOR HEADER.

11. SWING SENSORS

12. PIV READERS

13. DEDICATED ELECTRICAL CIRCUIT RAN FROM

THE EMERGENCY ELECTRICAL PANEL LOCATED

IN ROOM #C117

REPLACE EMERGENCY ROOM DOUBLE DOORS. DUE TO THE SENSITIVE NATURE OF

OPERATIONAL IMPACT AT THIS LOCATION THE DOORS MUST BE DEMOED AND

REPLACED WITHIN ONE WEEKEND. ALLOWED WORKING HOURS ARE SATURDAY FROM

5:00PM TO SUNDAY 6:00AM AND SUNDAY 5:00PM TO MONDAY 6:00AM. PROVIDE A

DETAILED SUBMITTAL OF ALL NEW DOOR COMPONENTS TO COR. DOOR FUNCTION AND

QUALITY EQUAL OR BETTER TO EXISTING DOORS UNLESS SPECIFICALLY SPECIFIED.

EMERGENCY DEPARTMENT DOOR #7 NOTES

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .