36C25526R0091 STATEMENT OF BID ITEMS.pdf
PDF 207 KB Posted
- Solicitation number
- 36C25526R0091
About this file
This is a Statement of Proposal Items for a federal construction project at a Veterans Affairs Medical Center (VAMC).
Project 589A5-23-199 encompasses the replacement of existing roofing, windows, and security cameras at the VAMC facility. The solicitation includes three Contract Line Items (CLINs) with different scope variations: CLIN 0001 is the base bid covering general construction, alterations, roads, walks, grading, drainage, and removal of existing structures for the construction of Building 2 and Building 6 roofs with lightning protection; CLIN 0002 is a deduct option that excludes lightning protection from the base bid; CLIN 0003 is a second deduct option that excludes both lightning protection and Building 2 roof work from the base bid. The period of performance for all work is 210 days. Contractors are required to submit a total price for the work on the provided form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PRE-BID SIGN-IN.pdf | ||
| 36C25526R0091 0001.docx | DOCX document | |
| 36C25526R0091.docx | DOCX document | |
| P09 Specifications 02.pdf | ||
| P01 Plans DRAWINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF PROPOSAL ITEM(S)
Project 589A5-23-199 Replace existing roofing, window, security cameras VAMC
CLIN 0001, General Construction: (BASE Bid) A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction of BUILDING 2 & 6 ROOF & LIGHTNING
PROTECTION.
CLIN 0002, General Construction: (Deduct 1) : Work includes all work in base bid less LIGHTNING
PROTECTION
CLIN 0003, General Construction: (Deduct 2) : Work includes all work in base bid less LIGHTNING PROTECTION and BUILDING 2
ROOF
Period of Performance for all work is 210 days.
Total: _____________________________________________
File details come from the government source that posted it. Updated .