36C25526Q0048 Water System Maintenance and Testing.pdf
PDF 384 KB Posted
- Solicitation number
- 36C25526Q0048
About this file
This is a Solicitation/Contract/Order for Commercial Products and Commercial Services (Standard Form 1449) for Water Treatment Systems Maintenance and Testing Services for the Kansas City VA Medical Center. The contract is a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) with five twelve-month ordering periods from 12/8/2025 to 12/7/2030, with a guaranteed minimum of $300,000 and a total contract ceiling of $1,900,000.
The solicitation is set aside with a tiered evaluation priority: (1) Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns, (2) Veteran-Owned Small Business (VOSB) concerns, (3) small business concerns with HUBZone and 8(a) participants having priority, and (4) large business concerns. The contractor will provide comprehensive water management services including program development, continuous monitoring, testing, maintenance, emergency response, and documentation for various water systems at the Kansas City VA Medical Center, including services for sterile processing, laboratory, dialysis, dental, and ultra-pure water systems. A site visit is scheduled for 11/13/2025, and questions must be submitted by 11/14/2025 by 10:00 a.m. CST.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
589-26-2-1829-0005
36C25526Q0048 11-05-2025
Ross, Leslie | leslie.ross2@va.gov 913.946.1964 11-25-2025
0900 CST
36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
X
Y
541380
$19 Million
NET 30 days
N/A
X
Kansas City VA Medical Center
4801 East Linwood Boulevard Kansas City MO 64128
36C255
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway
Leavenworth KS 66048
36C255
Department of Veterans Affairs Financial Services Center http://www.fsc.va.gov/einvoice.asp
Austin TX
877-353-9791 512-460-5429
See CONTINUATION Page
Water Treatment Systems Maintenance and Testing Services for the Kansas City VA Medical Center, Kansas City, MO.
This solicitation is for a Five (5) Year IDIQ with five twelve (12) month Ordering Periods; 12/8/2025 - 12/7/2030.
These services will be performed as detailed within the Performance Work Statement (PWS). A Site Visit is scheduled on 11/13/25. Please see Sec. 8.0 in the PWS for specifics.
IMPORTANT: Please refer to Addendum to FAR 52.212-1 Instructions to Offers Offerors for additional instructions.
This solicitation is being issued as tiered evaluation with the following tiers: (1) SDVOSB concerns, (2) VOSB concerns,
(3) small business concerns with HUBZone small business concerns and 8(a) participants having priority and (4) large business concerns. If award cannot be made, the solicitation will be cancelled and the requirement resolicited.
See CONTINUATION Page
See accounting and appropriation data
X X
X 1
Ross, Leslie Contracting Officer
36C25526Q0048
Table of Contents
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 PRICE/COST SCHEDULE
B.3 DELIVERY SCHEDULE
B.4 PERFORMANCE WORK STATEMENT
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES (NOV 2023)(DEVIATION AUG 2025)
C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.3 52.216-18 ORDERING (AUG 2020)
C.4 52.216-19 ORDER LIMITATIONS (OCT 1995)
C.5 52.216-22 INDEFINITE QUANTITY (OCT 1995)
C.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (SEP 2023) (DEVIATION AUG 2025)
E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
E.3 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2021)(DEVIATION AUG 2025)
E.4 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED
BY REFERENCE (JAN 2008)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: /POINT OF CONTACT/TITLE
E-MAIL ADDRESS
PHONE NUMBER
SAM UEI NO.
b. GOVERNMENT: Contracting Officer 36C255 Leslie Ross | leslie.ross2@va.gov
Department of Veterans Affairs
Network Contracting Office (NCO) 15
3450 S 4th Street Trafficway
Leavenworth KS 66048
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] Monthly, in arrears
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs, Financial Services Center, Austin TX https://www/fsc.va.gov/einvoice.asp
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.2 PRICE/COST SCHEDULE
This is a Five-Year IDIQ Contract with Pricing Periods:
The Guaranteed Minimum is: $300,000.00.
The Contract Ceiling for the Life of the Contract is: $1,900,000.00
Ordering Period 1: PoP 12-8-2025 – 12-7-2026
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES
ESTIMATED
QUANTITY UNIT UNIT PRICE AMOUNT
0001 1.00 YR __________________ __________________
Water System Maintenance Program
0002 1.00 YR NSP $0.00
Equipment Maintenance
0002AA 12.00 MO _______________ _______________
Bi-Monthly Services Sterile Processing Service (SPS) in accordance with the Performance Work Statement
0002AB 4.00 QTR __________________ __________________
Quarterly Service Dental V2-767 in accordance with the Performance Work Statement
0002AC 4.00 QTR __________________ __________________
Quarterly Service Main Lab M1-464 in accordance with the Performance Work Statement
0002AD 4.00 QTR __________________ __________________
Quarterly Service Histology M2-443 in accordance with the Performance Work Statement
0002AE 2.00 EA __________________ __________________
Semi-Annual Service Histology M2-443 in accordance with the Performance Work Statement
0002AF 1.00 EA __________________ __________________
Annual Service Biomed F6-130 in accordance with the Performance Work Statement
0002AG 4.00 QTR __________________ __________________
Quarterly Service Water Softener VB-100 in accordance with the Performance Work Statement
0002AH 12.00 MO __________________ __________________
Monthly Service Water Softener VB-100 in accordance with the Performance Work Statement
0002AI 12.00 MO __________________ __________________
Monthly Service Dialysis M7-306 in accordance with the Performance Work Statement
0002AJ 4.00 QTR __________________ __________________
Quarterly Service Dialysis M7-306 in accordance with the Performance Work Statement
0002AK 1.00 YR __________________ __________________
Semi-Annual Service Dialysis M7-306 in accordance with the Performance Work Statement
0002AL 12.00 MO __________________ __________________
Monthly Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
0002AM 1.00 YR __________________ __________________
Annual Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
0002AN 2.00 EA __________________ __________________
Semi Annual Service F3-121 Gemini Model 1102 Ultra-Pure in accordance with the Performance Work Statement
0002AO 2.00 EA __________________ __________________
Semi Annual Service F2-105C Ultra-Pure in accordance with the Performance Work Statement
0002AP 4.00 QTR __________________ __________________
Quarterly Service Water Softener MSB-100 in accordance with the Performance Work Statement
0002AQ 12.00 MO __________________ __________________
Monthly Service Water Softener MSB-100 in accordance with the Performance Work Statement
0002AR 12.00 MO __________________ __________________
Monthly Service - Water Monitors in accordance with the Performance Work Statement
0002AS 4.00 QTR __________________ __________________
Quarterly Service Water Monitors in accordance with the Performance Work Statement
0003 1.0 YR NSP $0.00
Water Lab Testing
0003AA 352.00 EA __________________ __________________
Quarterly Medical Center Water Testing - Quarterly Testing- Legionella Testing -Estimated quantity. Contractor is to invoice for actual samples taken.
0003AB 30.00 EA __________________ __________________
New Construction Activation - As Requested-Estimated quantity.
Contractor is to invoice for actual samples taken.
0003AC 48.00 EA __________________ __________________
Monthly HVAC Cooling Towers Testing -Estimated quantity.
Contractor is to invoice for actual samples taken.
0003AD 48.00 EA __________________ __________________
Monthly Sterile Processing Service (SPS) Testing - Bacteria, Organic Carbon and pH (Qty 48) -Estimated quantity. Contractor is to invoice for actual samples taken.
0003AE 4.00 EA __________________ __________________
Quarterly Sterile Processing Service (SPS) Testing - Organic Carbon, heavy metals, particulate, Ion analysis, hardness, chlorides, conductivity, ph, alkalinity, endotoxins (QTY 4) -Estimated quantity.
Contractor is to invoice for actual samples taken.
0003AF 56.00 EA __________________ __________________
Quarterly Dental Clinic Testing - Colony forming units of heterotrophic bacteria (Qty 56) -Estimated quantity. Contractor is to invoice for actual samples taken.
0003AG 12.00 EA __________________ __________________
Monthly Dialysis M7-306 Testing - Water cultures and LAL Bacterial endotoxins (Qty 12) -Estimated quantity. Contractor is to invoice for actual samples taken.
0003AH 1.00 EA __________________ __________________
Annual Dialysis M7-306 - Environmental testing (Qty 1) -Estimated quantity. Contractor is to invoice for actual samples taken.
0003AI 1.00 EA __________________ __________________
Annual F2-105C Ultra-Pure Testing (QTY 1)- Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity. Contractor is to invoice for actual samples taken.
0003AJ 1.00 EA __________________ __________________
Annual F3-121 Gemini Model 1102 Ultra-Pure Testing (QTY 1) - Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity.
Contractor is to invoice for actual samples taken.
0003AK 1.00 EA __________________ __________________
Annual Water Softener MSB-100 Testing (QTY 1) - Resin bed inspection, control valve maintenance, system sanitization -Estimated quantity. Contractor is to invoice for actual samples taken.
0004 1.00 EA __________________ __________________
Point-Of-Use Filter
0005 4.00 EA __________________ __________________
Reports, Maintenance
0006 48.00 EA __________________ __________________
Emergency Overnight Water Sampling
0007 1.00 YR NSP $0.00
Unscheduled/Emergency Testing and Maintenance Services in accordance with the Performance Work Statement - Estimated and not Guaranteed
0008 1.00 YR __________________ __________________
Existing equipment parts and repairs
0009 3.00 EA __________________ __________________
Replacement for Triplex Progressive Culligan CSM 300-3 Water Softeners - equipment and installation
0010 1.00 JB __________________ __________________
Replacement for Existing Equipment - equipment and installation - (This LIN is only to be used if offeror intends to replace the existing equipment currently in place. If not replacing, leave blank)
Ordering Period 1 Total__________________
Ordering Period 2: PoP 12-8-2026 – 12-7-2027
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES
ESTIMATED
QUANTITY UNIT UNIT PRICE AMOUNT
1001 1.00 YR __________________ __________________
Water System Maintenance Program
1002 1.00 YR NSP $0.00
Equipment Maintenance
1002AA 12.00 MO __________________ __________________
Bi-Monthly Services Sterile Processing Service (SPS) in accordance with the Performance Work Statement
1002AB 4.00 QTR __________________ __________________
Quarterly Service Dental V2-767 in accordance with the Performance Work Statement
1002AC 4.00 QTR __________________ __________________
Quarterly Service Main Lab M1-464 in accordance with the
1002AD 4.00 QTR __________________ __________________
Quarterly Service Histology M2-443 in accordance with the Performance Work Statement
1002AE 2.00 EA __________________ __________________
Semi-Annual Service Histology M2-443 in accordance with the Performance Work Statement
1002AF 1.00 EA __________________ __________________
Annual Service Biomed F6-130 in accordance with the Performance Work Statement
1002AG 4.00 QTR __________________ __________________
Quarterly Service Water Softener VB-100 in accordance with the Performance Work Statement
1002AH 12.00 MO __________________ __________________
Monthly Service Water Softener VB-100 in accordance with the Performance Work Statement
1002AI 12.00 MO __________________ __________________
Monthly Service Dialysis M7-306 in accordance with the Performance Work Statement
1002AJ 4.00 QTR __________________ __________________
Quarterly Service Dialysis M7-306 in accordance with the Performance Work Statement
1002AK 1.00 YR __________________ __________________
Semi-Annual Service Dialysis M7-306 in accordance with the Performance Work Statement
1002AL 12.00 MO __________________ __________________
Monthly Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
1002AM 1.00 YR __________________ __________________
Annual Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
1002AN 2.00 EA __________________ __________________
Semi Annual Service F3-121 Gemini Model 1102 Ultra-Pure in accordance with the Performance Work Statement
1002AO 2.00 EA __________________ __________________
Semi Annual Service F2-105C Ultra-Pure in accordance with the
1002AP 4.00 QTR __________________ __________________
Quarterly Service Water Softener MSB-100 in accordance with the Performance Work Statement
1002AQ 12.00 MO __________________ __________________
Monthly Service Water Softener MSB-100 in accordance with the Performance Work Statement
1002AR 12.00 MO __________________ __________________
Monthly Service - Water Monitors in accordance with the Performance Work Statement
1002AS 4.00 QTR __________________ __________________
Quarterly Service Water Monitors in accordance with the Performance Work Statement
1003 1.00 YR NSP $0.00
Water Lab Testing
1003AA 352.00 EA __________________ __________________
Quarterly Medical Center Water Testing - Quarterly Testing- Legionella Testing -Estimated quantity. Contractor is to invoice for actual samples taken.
1003AB 30.00 EA __________________ __________________
New Construction Activation - As Requested-Estimated quantity.
Contractor is to invoice for actual samples taken.
1003AC 48.00 EA __________________ __________________
Monthly HVAC Cooling Towers Testing -Estimated quantity.
Contractor is to invoice for actual samples taken.
1003AD 48.00 EA __________________ __________________
Monthly Sterile Processing Service (SPS) Testing - Bacteria, Organic Carbon and pH (Qty 48) -Estimated quantity. Contractor is to invoice for actual samples taken.
1003AE 4.00 EA __________________ __________________
Quarterly Sterile Processing Service (SPS) Testing - Organic Carbon, heavy metals, particulate, Ion analysis, hardness, chlorides, conductivity, ph, alkalinity, endotoxins (QTY 4) -Estimated quantity.
Contractor is to invoice for actual samples taken.
1003AF 56.00 EA __________________ __________________
Quarterly Dental Clinic Testing - Colony forming units of heterotrophic bacteria (Qty 56) -Estimated quantity. Contractor is to invoice for actual samples taken.
1003AG 12.00 EA __________________ __________________
Monthly Dialysis M7-306 Testing - Water cultures and LAL Bacterial endotoxins (Qty 12) -Estimated quantity. Contractor is to invoice for actual samples taken.
1003AH 1.00 EA __________________ __________________
Annual Dialysis M7-306 - Environmental testing (Qty 1) -Estimated quantity. Contractor is to invoice for actual samples taken.
1003AI 1.00 EA __________________ __________________
Annual F2-105C Ultra-Pure Testing (QTY 1)- Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity. Contractor is to invoice for actual samples taken.
1003AJ 1.00 EA __________________ __________________
Annual F3-121 Gemini Model 1102 Ultra-Pure Testing (QTY 1) - Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity.
Contractor is to invoice for actual samples taken.
1003AK 1.00 EA __________________ __________________
Annual Water Softener MSB-100 Testing (QTY 1) - Resin bed inspection, control valve maintenance, system sanitization -Estimated quantity. Contractor is to invoice for actual samples taken.
1004 1.00 EA __________________ __________________
Point-Of-Use Filter
1005 4.00 EA __________________ __________________
Reports, Maintenance
1006 48.00 EA __________________ __________________
Emergency Overnight Water Sampling
1007 1.00 YR NSP $0.00
Unscheduled/Emergency Testing and Maintenance Services in accordance with the Performance Work Statement - Estimated and not Guaranteed
1008 1.00 YR __________________ __________________
Existing equipment parts and repairs
Ordering Period 2 Total __________________
Ordering Period 3: PoP 12-8-2027 – 12-7-2028
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES
ESTIMATED
QUANTITY UNIT UNIT PRICE AMOUNT
2001 1.00 YR __________________ __________________
Water System Maintenance Program
2002 1.00 YR NSP $0.00
Equipment Maintenance
2002AA 12.00 MO __________________ __________________
Bi-Monthly Services Sterile Processing Service (SPS) in accordance with the Performance Work Statement
2002AB 4.00 QTR __________________ __________________
Quarterly Service Dental V2-767 in accordance with the Performance Work Statement
2002AC 4.00 QTR __________________ __________________
Quarterly Service Main Lab M1-464 in accordance with the Performance Work Statement
2002AD 4.00 QTR __________________ __________________
Quarterly Service Histology M2-443 in accordance with the Performance Work Statement
2002AE 2.00 EA __________________ __________________
Semi-Annual Service Histology M2-443 in accordance with the Performance Work Statement
2002AF 1.00 EA __________________ __________________
Annual Service Biomed F6-130 in accordance with the Performance Work Statement
2002AG 4.00 QTR __________________ __________________
Quarterly Service Water Softener VB-100 in accordance with the Performance Work Statement
2002AH 12.00 MO __________________ __________________
Monthly Service Water Softener VB-100 in accordance with the Performance Work Statement
2002AI 12.00 MO __________________ __________________
Monthly Service Dialysis M7-306 in accordance with the Performance Work Statement
2002AJ 4.00 QTR __________________ __________________
Quarterly Service Dialysis M7-306 in accordance with the Performance Work Statement
2002AK 1.00 YR __________________ __________________
Semi-Annual Service Dialysis M7-306 in accordance with the Performance Work Statement
2002AL 12.00 MO __________________ __________________
Monthly Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
2002AM 1.00 YR __________________ __________________
Annual Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
2002AN 2.00 EA __________________ __________________
Semi Annual Service F3-121 Gemini Model 1102 Ultra-Pure in accordance with the Performance Work Statement
2002AO 2.00 EA __________________ __________________
Semi Annual Service F2-105C Ultra-Pure in accordance with the Performance Work Statement
2002AP 4.00 QTR __________________ __________________
Quarterly Service Water Softener MSB-100 in accordance with the Performance Work Statement
2002AQ 12.00 MO __________________ __________________
Monthly Service Water Softener MSB-100 in accordance with the Performance Work Statement
2002AR 12.00 MO __________________ __________________
Monthly Service - Water Monitors in accordance with the Performance Work Statement
2002AS 4.00 QTR __________________ __________________
Quarterly Service Water Monitors in accordance with the Performance Work Statement
2003 1.00 YR NSP $0.00
Water Lab Testing
2003AA 352.00 EA __________________ __________________
Quarterly Medical Center Water Testing - Quarterly Testing- Legionella Testing -Estimated quantity. Contractor is to invoice for actual samples taken.
2003AB 30.00 EA __________________ __________________
New Construction Activation - As Requested-Estimated quantity.
Contractor is to invoice for actual samples taken.
2003AC 48.00 EA __________________ __________________
Monthly HVAC Cooling Towers Testing -Estimated quantity.
Contractor is to invoice for actual samples taken.
2003AD 48.00 EA __________________ __________________
Monthly Sterile Processing Service (SPS) Testing - Bacteria, Organic Carbon and pH (Qty 48) -Estimated quantity. Contractor is to invoice for actual samples taken.
2003AE 4.00 EA __________________ __________________
Quarterly Sterile Processing Service (SPS) Testing - Organic Carbon, heavy metals, particulate, Ion analysis, hardness, chlorides, conductivity, ph, alkalinity, endotoxins (QTY 4) -Estimated quantity.
Contractor is to invoice for actual samples taken.
2003AF 56.00 EA __________________ __________________
Quarterly Dental Clinic Testing - Colony forming units of heterotrophic bacteria (Qty 56) -Estimated quantity. Contractor is to invoice for actual samples taken.
2003AG 12.00 EA __________________ __________________
Monthly Dialysis M7-306 Testing - Water cultures and LAL Bacterial endotoxins (Qty 12) -Estimated quantity. Contractor is to invoice for actual samples taken.
2003AH 1.00 EA __________________ __________________
Annual Dialysis M7-306 - Environmental testing (Qty 1) -Estimated quantity. Contractor is to invoice for actual samples taken.
2003AI 1.00 EA __________________ __________________
Annual F2-105C Ultra-Pure Testing (QTY 1)- Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity. Contractor is to invoice for actual samples taken.
2003AJ 1.00 EA __________________ __________________
Annual F3-121 Gemini Model 1102 Ultra-Pure Testing (QTY 1) - Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity.
Contractor is to invoice for actual samples taken.
2003AK 1.00 EA __________________ __________________
Annual Water Softener MSB-100 Testing (QTY 1) - Resin bed inspection, control valve maintenance, system sanitization -Estimated quantity. Contractor is to invoice for actual samples taken.
2004 1.00 EA __________________ __________________
2005 4.00 EA __________________ __________________
Reports, Maintenance
2006 48.00 EA __________________ __________________
Emergency Overnight Water Sampling
2007 1.00 YR NSP $0.00
Unscheduled/Emergency Testing and Maintenance Services in accordance with the Performance Work Statement - Estimated and not Guaranteed
2008 1.00 YR __________________ __________________
Existing equipment parts and repairs
Ordering Period 3 Total __________________
Ordering Period 4: PoP 12-8-2028 – 12-7-2029
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES
ESTIMATED
QUANTITY UNIT UNIT PRICE AMOUNT
3001 1.00 YR __________________
Water System Maintenance Program
3002 1.00 YR NSP $0.00
Equipment Maintenance
3002AA 12.00 MO __________________ __________________
Bi-Monthly Services Sterile Processing Service (SPS) in accordance with the Performance Work Statement
3002AB 4.00 QTR __________________ __________________
Quarterly Service Dental V2-767 in accordance with the Performance Work Statement
3002AC 4.00 QTR __________________ __________________
Quarterly Service Main Lab M1-464 in accordance with the Performance Work Statement
3002AD 4.00 QTR __________________ __________________
Quarterly Service Histology M2-443 in accordance with the
3002AE 2.00 EA __________________ __________________
Semi-Annual Service Histology M2-443 in accordance with the Performance Work Statement
3002AF 1.00 EA __________________ __________________
Annual Service Biomed F6-130 in accordance with the Performance Work Statement
3002AG 4.00 QTR __________________ __________________
Quarterly Service Water Softener VB-100 in accordance with the Performance Work Statement
3002AH 12.00 MO __________________ __________________
Monthly Service Water Softener VB-100 in accordance with the Performance Work Statement
3002AI 12.00 MO __________________ __________________
Monthly Service Dialysis M7-306 in accordance with the Performance Work Statement
3002AJ 4.00 QTR __________________ __________________
Quarterly Service Dialysis M7-306 in accordance with the Performance Work Statement
3002AK 1.00 YR __________________ __________________
Semi-Annual Service Dialysis M7-306 in accordance with the Performance Work Statement
3002AL 12.00 MO __________________ __________________
Monthly Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
3002AM 1.00 YR __________________ __________________
Annual Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
3002AN 2.00 EA __________________ __________________
Semi Annual Service F3-121 Gemini Model 1102 Ultra-Pure in accordance with the Performance Work Statement
3002AO 2.00 EA __________________ __________________
Semi Annual Service F2-105C Ultra-Pure in accordance with the
3002AP 4.00 QTR __________________ __________________
Quarterly Service Water Softener MSB-100 in accordance with the Performance Work Statement
3002AQ 12.00 MO __________________ __________________
Monthly Service Water Softener MSB-100 in accordance with the Performance Work Statement
3002AR 12.00 MO __________________ __________________
Monthly Service - Water Monitors in accordance with the Performance Work Statement
3002AS 4.00 QTR __________________ __________________
Quarterly Service Water Monitors in accordance with the Performance Work Statement
3003 1.00 YR NSP $0.00
Water Lab Testing
3003AA 352.00 EA __________________ __________________
Quarterly Medical Center Water Testing - Quarterly Testing- Legionella Testing -Estimated quantity. Contractor is to invoice for actual samples taken.
3003AB 30.00 EA __________________ __________________
New Construction Activation - As Requested-Estimated quantity.
Contractor is to invoice for actual samples taken.
3003AC 48.00 EA __________________ __________________
Monthly HVAC Cooling Towers Testing -Estimated quantity.
Contractor is to invoice for actual samples taken.
3003AD 48.00 EA __________________ __________________
Monthly Sterile Processing Service (SPS) Testing - Bacteria, Organic Carbon and pH (Qty 48) -Estimated quantity. Contractor is to invoice for actual samples taken.
3003AE 4.00 EA __________________ __________________
Quarterly Sterile Processing Service (SPS) Testing - Organic Carbon, heavy metals, particulate, Ion analysis, hardness, chlorides, conductivity, ph, alkalinity, endotoxins (QTY 4) -Estimated quantity.
Contractor is to invoice for actual samples taken.
3003AF 56.00 EA __________________ __________________
Quarterly Dental Clinic Testing - Colony forming units of heterotrophic bacteria (Qty 56) -Estimated quantity. Contractor is to invoice for actual samples taken.
3003AG 12.00 EA __________________ __________________
Monthly Dialysis M7-306 Testing - Water cultures and LAL Bacterial endotoxins (Qty 12) -Estimated quantity. Contractor is to invoice for actual samples taken.
3003AH 1.00 EA __________________ __________________
Annual Dialysis M7-306 - Environmental testing (Qty 1) -Estimated quantity. Contractor is to invoice for actual samples taken.
3003AI 1.00 EA __________________ __________________
Annual F2-105C Ultra-Pure Testing (QTY 1)- Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity. Contractor is to invoice for actual samples taken.
3003AJ 1.00 EA __________________ __________________
Annual F3-121 Gemini Model 1102 Ultra-Pure Testing (QTY 1) - Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity.
Contractor is to invoice for actual samples taken.
3003AK 1.00 EA __________________ __________________
Annual Water Softener MSB-100 Testing (QTY 1) - Resin bed inspection, control valve maintenance, system sanitization -Estimated quantity. Contractor is to invoice for actual samples taken.
3004 1.00 EA __________________ __________________
Point-Of-Use Filter
3005 4.00 EA __________________ __________________
Reports, Maintenance
3006 48.00 EA __________________ __________________
Emergency Overnight Water Sampling
3007 1.00 YR NSP $0.00
Unscheduled/Emergency Testing and Maintenance Services in accordance with the Performance Work Statement - Estimated and not Guaranteed
3008 1.00 YR __________________ __________________
Existing equipment parts and repairs
Ordering Period 4 Total__________________
Ordering Period 5: PoP: 12-08-29 – 12-07-2030
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES
ESTIMATED
QUANTITY UNIT UNIT PRICE AMOUNT
4001 1.00 YR __________________ __________________
Water System Maintenance Program to Include all reports
4002 1.00 YR NSP $0.00
Equipment Maintenance
4002AA 12.00 MO __________________ __________________
Bi-Monthly Services Sterile Processing Service (SPS) in accordance with the Performance Work Statement
4002AB 4.00 QTR __________________ __________________
Quarterly Service Dental V2-767 in accordance with the Performance Work Statement
4002AC 4.00 QTR __________________ __________________
Quarterly Service Main Lab M1-464 in accordance with the Performance Work Statement
4002AD 4.00 QTR __________________ __________________
Quarterly Service Histology M2-443 in accordance with the Performance Work Statement
4002AE 2.00 EA __________________ __________________
Semi-Annual Service Histology M2-443 in accordance with the Performance Work Statement
4002AF 1.00 EA __________________ __________________
Annual Service Biomed F6-130 in accordance with the Performance Work Statement
4002AG 4.00 QTR __________________ __________________
Quarterly Service Water Softener VB-100 in accordance with the Performance Work Statement
4002AH 12.00 MO __________________ __________________
Monthly Service Water Softener VB-100 in accordance with the Performance Work Statement
4002AI 12.00 MO __________________ __________________
Monthly Service Dialysis M7-306 in accordance with the Performance Work Statement
4002AJ 4.00 QTR __________________ __________________
Quarterly Service Dialysis M7-306 in accordance with the Performance Work Statement
4002AK 1.00 YR __________________ __________________
Semi-Annual Service Dialysis M7-306 in accordance with the
4002AL 12.00 MO __________________ __________________
Monthly Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
4002AM 1.00 YR __________________ __________________
Annual Service Portable Heat Disinfect RO System in accordance with the Performance Work Statement
4002AN 2.00 EA __________________ __________________
Semi Annual Service F3-121 Gemini Model 1102 Ultra-Pure in accordance with the Performance Work Statement
4002AO 2.00 EA __________________ __________________
Semi Annual Service F2-105C Ultra-Pure in accordance with the Performance Work Statement
4002AP 4.00 QTR __________________ __________________
Quarterly Service Water Softener MSB-100 in accordance with the Performance Work Statement
4002AQ 12.00 MO __________________ __________________
Monthly Service Water Softener MSB-100 in accordance with the Performance Work Statement
4002AR 12.00 MO __________________ __________________
Monthly Service - Water Monitors in accordance with the Performance Work Statement
4002AS 4.00 QTR __________________ __________________
Quarterly Service Water Monitors in accordance with the Performance Work Statement
4003 1.00 YR NSP $0.00
Water Lab Testing
4003AA 352.00 EA __________________ __________________
Quarterly Medical Center Water Testing - Quarterly Testing- Legionella Testing -Estimated quantity. Contractor is to invoice for actual samples taken.
4003AB 30.00 EA __________________ __________________
New Construction Activation - As Requested-Estimated quantity.
Contractor is to invoice for actual samples taken.
4003AC 48.00 EA __________________ __________________
Monthly HVAC Cooling Towers Testing -Estimated quantity.
Contractor is to invoice for actual samples taken.
4003AD 48.00 EA __________________ __________________
Monthly Sterile Processing Service (SPS) Testing - Bacteria, Organic Carbon and pH (Qty 48) -Estimated quantity. Contractor is to invoice for actual samples taken.
4003AE 4.00 EA __________________ __________________
Quarterly Sterile Processing Service (SPS) Testing - Organic Carbon, heavy metals, particulate, Ion analysis, hardness, chlorides, conductivity, ph, alkalinity, endotoxins (QTY 4) -Estimated quantity.
Contractor is to invoice for actual samples taken.
4003AF 56.00 EA __________________ __________________
Quarterly Dental Clinic Testing - Colony forming units of heterotrophic bacteria (Qty 56) -Estimated quantity. Contractor is to invoice for actual samples taken.
4003AG 12.00 EA __________________ __________________
Monthly Dialysis M7-306 Testing - Water cultures and LAL Bacterial endotoxins (Qty 12) -Estimated quantity. Contractor is to invoice for actual samples taken.
4003AH 1.00 EA __________________ __________________
Annual Dialysis M7-306 - Environmental testing (Qty 1) -Estimated quantity. Contractor is to invoice for actual samples taken.
4003AI 1.00 EA __________________ __________________
Annual F2-105C Ultra-Pure Testing (QTY 1)- Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity. Contractor is to invoice for actual samples taken.
4003AJ 1.00 EA __________________ __________________
Annual F3-121 Gemini Model 1102 Ultra-Pure Testing (QTY 1) - Resistivity, TOC, Bacteria, Particulates, Silica -Estimated quantity.
Contractor is to invoice for actual samples taken.
4003AK 1.00 EA __________________ __________________
Annual Water Softener MSB-100 Testing (QTY 1) - Resin bed inspection, control valve maintenance, system sanitization -Estimated quantity. Contractor is to invoice for actual samples taken.
4004 1.00 EA __________________ __________________
4005 4.00 EA __________________ __________________
Reports, Maintenance
4006 48.00 EA __________________ __________________
Emergency Overnight Water Sampling
4007 1.00 YR NSP $0.00
Unscheduled/Emergency Testing and Maintenance Services in accordance with the Performance Work Statement - Estimated and not Guaranteed
4008 1.00 YR __________________ __________________
Existing equipment parts and repairs
Ordering Period 5 Total
Ordering Period 1 Total:
Ordering Period 2 Total:
Ordering Period 3 Total:
Ordering Period 4 Total:
Ordering Period 5 Total:
Total:
B.3 DELIVERY SCHEDULE
ITEM
NUMBER SHIPPING INFORMATION QUANTITY
DELIVERY
DATE
0001-
SHIP TO: Kansas City VAMC 4801 Linwood Blvd Kansas City, MO 64128
USA
ALL See Pop
B.4 PERFORMANCE WORK STATEMENT
Water Treatment Systems Maintenance and Testing Services
Kansas City VA Medical Center
1. SCOPE
The contractor will provide all tools, labor, materials, test equipment and supervision to perform all tasks as outlined in this Performance Work Statement at the Kansas City, VA Medical Center, Main Campus at 4801 Linwood Boulevard, Kansas City, MO 64128 and the Transitional Residence (TR) Building at 5100 E. 24th Street in Kansas City, Missouri 64126.
The Kansas City VA Medical Center requires a comprehensive Water Management Program, validation testing, maintaining or replacing of consumable equipment, and a web-based data management system to meet VHA Directive requirements. The Medical Center maintains multiple individual water treatment sites throughout the facility, each requiring regular technical service for routine testing, maintenance, troubleshooting, and repair according to all applicable standards.
Due to the critical nature of the systems supported by the specialty water treatment systems, 100% uptime is mandatory.
1.1 Facilities
Main Campus Facilities Kansas City VA Medical Center Main Campus The Main Campus includes the following facilities requiring water treatment services:
- Fisher House
- Building 1
- Building 3
- Building 6
- Building 15
- Building 26
- Building 56
- Boiler Plant (includes three cooling towers)
Auxiliary Facility Honor Annex 4251 Northern Ave Kansas City, MO 64133
Transitional Residence Building 5100 E. 24th Street Kansas City, MO 64127
1.2 Regulatory Framework
All services shall, at minimum, meet manufacturers’ performance and technical specifications, Federal Regulations, and other specifications that may apply such as Center for Disease Control (CDC), AAMI (Dialysis and SPS), CAP (Lab), National Electric Code (NFPA 70), Life Safety Code (NFPA 101), the Joint Commission (TJC) and VA Regulations.
The Contractor shall submit documentation to COR demonstrating:
- Current technician certifications
- Required training completion
- Compliance verification records
1.3 Service Coverage
The Contractor shall provide comprehensive water management services including development, implementation, and maintenance of a facility-wide Water Management Program (WMP) that ensures compliance with all applicable standards and regulations. Services shall include:
a) Water Management Program Development and Implementation
b) Continuous Water System and Other Equipment Monitoring
c) Regular Testing and Maintenance Services
d) Emergency Response Services
e) Documentation and Reporting
f) Quality Control and Validation
1.4 Primary Objectives
The Contractor shall:
a) Develop and implement the Water Management Program within Ordering Period 1 and maintain throughout contract time frame.
b) Maintain continuous compliance with all applicable regulatory requirements.
c) Ensure that KCVAMC water systems and equipment meets or exceeds requirements for successful operations.
d) Provides responsive emergency and routine testing and maintenance services.
e) Maintain comprehensive documentation and reporting.
2. GENERAL REQUIREMENTS
2.1 Contract Requirements
The Contractor shall perform the following tasks during the contract:
If DWSA equipment is unable to meet PWS requirements, the Contractor shall provide pricing to upgrade and maintain new DWSA systems for each incoming water feed as specified in Appendix A at the following locations:
- Building 1 Sub-Basement
- Building 26 Basement
- Building 15 Basement
- Building 56 Basement
2.1.1 Water Management Program Implementation:
The Contractor shall complete program implementation within 2 months of starting contract in accordance with the following schedule:
a) Phase 1: Program Development
- Complete facility assessment
- Develop program documentation
- Establish monitoring protocols
- Create implementation plan
b) Phase 2: System Integration
- Install and configure software systems
- Implement testing protocols
- Begin staff training
c) Phase 3: Program Implementation
- Begin Water Management Program
- Implement testing and maintenance procedures
- Complete staff training
- Initiate program documentation protocols
d) Phase 4: Program Validation
- Verify program system performance
- Validate testing and maintenance procedures
- Confirm and report documentation compliance
- Complete program assessment with Water Management Team
2.2 All Contract Years Requirements
2.2.1 Regular Service Requirements
The Contractor shall perform:
1. Water Systems and Equipment inspections according to Performance Work Statement and Water Management Program.
2. All contracted maintenance (emergency and non-emergency) as detailed in Performance Work Statement and Water Management Program
2. Validation testing of all water systems and equipment testing and maintenance following protocols in Performance Work Statement and Water Management Program.
2.2.2 Service Delivery Requirements
The Contractor shall provide:
1. Laboratory and service reports as specified in Performance Work Statement and Water Management Program. All report formats dictated by Performance Work Statement and Water Management Program or by COR approval.
2. Emergency response for:
- Emergency water testing.
- Emergency water systems and equipment repair.
- Emergency replacement of water systems components and equipment if required.
3. Inspection, Testing, and MAINTENANCE PROGRAM The Contractor shall implement a comprehensive Inspection, Testing, and Maintenance Program that ensures optimal performance and regulatory compliance of all water systems and equipment throughout KCVAMC facilities. This program shall include systematic procedures for regular inspections performed in accordance with manufacturer's literature and national standards, testing protocols that verify water quality parameters meet or exceed all applicable requirements, and maintenance activities that support 100% system uptime for critical operations. The Contractor shall maintain detailed documentation of all program activities within the Water Management Program software platform, coordinate service schedules to minimize impact on facility operations, and provide emergency response capabilities with 4-hour on-site service. All activities shall be performed by qualified personnel maintaining appropriate certifications and shall comply with current CDC, AAMI, CAP, Joint Commission, VA, and all other applicable regulatory standards. The program shall incorporate comprehensive quality control measures with validation procedures to verify effectiveness of all inspection, testing, and maintenance activities.
Contractor shall submit an electronic format for Inspection, Testing, and Maintenance program to the COR, for review and approval, within 14 calendar days of contract award. Inspection, Testing and Maintenance program shall be a capable of incorporating or removing any program components as requested by the COR to ensure that all required systems and equipment are covered.
3.1 Inspection, Testing, and Maintenance Requirements
The Contractor shall implement comprehensive inspection, testing, and maintenance procedures that fulfill all requirements specified within this Performance Work Statement, created Water Management Program, and/or as dictated by COR. These procedures shall be documented within the Water Management Program and performed, at minimum or otherwise directed by COR, according to the following requirements:
3.1.1 General Requirements
a) Program Documentation Requirements:
- Submit electronic format of Preventive Maintenance program to COR within 14 calendar days of contract award.
- Incorporate all COR-requested changes to program documentation.
- Maintain current documentation of manufacturer specifications and national standards.
- Update program documentation as requirements or systems changes, or as requested by COR.
b) Service Documentation Requirements:
- Provide maintenance service documentation sheet for each system and equipment.
- Install documentation sheets in durable transparent sleeve near equipment.
- Record all scheduled and unscheduled services at time of performance.
- Submit documentation sheets to COR digitally at time of each service completion.
- Maintain electronic records in SharePoint.
c) Service Sheet Documentation Requirements:
- Date and time of service.
- Technician's printed name and signature.
- Service type (scheduled/emergency).
- Service interval (monthly, quarterly, etc.).
- Brief description of work performed.
- Next service date.
- Parts replaced or required.
- Test results if applicable.
3.1.2 Inspection and Testing Requirements
a) Regular Inspection and Testing Protocols:
- Perform inspections according to VA requirements, manufacturer's specifications, or as dictated by
COR.
- Follows all VA directives, national standards, and regulatory requirements.
- Complete all items outlined in manufacturer's manual and by all applicable authorities.
- Document inspection findings and recommendations.
- Verify system performance parameters.
- Validate testing accuracy through quality control measures.
- Maintain testing schedules as specified in Performance Work Statement, Water Management Program, and/or as directed by COR.
- Follow testing all applicable requirements for each system or equipment type.
b) Emergency or Inspection/Testing Requirements:
- Respond within 4 hours for emergency situations.
- Perform comprehensive system evaluation.
- Document all findings and immediate actions taken.
- Provide recommendations for corrective actions.
- Follow up to verify resolution effectiveness.
- Follow emergency testing protocols specified in Appendix B.
- Submit samples for expedited analysis when requested or required.
3.1.3 Maintenance Requirements
a) Preventive Maintenance
- Follow, at minimum, manufacturers’ recommended maintenance schedules.
- Perform all required periodic maintenance activities.
- Replace expendable materials according to specifications.
- Document all maintenance activities performed.
- Verify system performance after maintenance.
b) Corrective Maintenance
- Respond within specified timeframes for system issues.
- Perform necessary repairs or replacements.
- Follow manufacturer's repair procedures.
- Document all corrective actions taken.
- Verify system restoration to proper operation.
3.1.4 Quality Control Requirements
a) Program Validation
- Verify completion of all required activities.
- Validate effectiveness of maintenance procedures.
- Confirm accuracy of testing results.
- Review documentation completeness.
- Assess program performance metrics.
b) Performance Monitoring
- Track systems and equipment uptime and reliability.
- Monitor response times for emergency services.
- Evaluate effectiveness of preventive maintenance.
- Analyze trending of test results.
- Document quality control findings.
3.2 Domestic Water System Analyzer Maintenance
System Components or Equipment:
ATI Metrinet DWSA Associated Software The Contractor shall perform monthly maintenance on all water monitoring systems, including the continuous water monitoring equipment and associated software components. This maintenance shall include sensor calibration, chemical reagent replacement, and system performance verification. The Contractor shall maintain an adequate supply of expendable materials and document all maintenance activities at each unit and in the WMP DDD system.
3.2.1 Data Collection Systems
The Contractor shall collect monitoring data through the DWSA equipment, with all data automatically transmitted to and managed within the associated software system. The system shall maintain dual connectivity through both cellular and local intranet connections.
3.2.2 Analysis Requirements
The Contractor shall utilize the water monitoring software system’s analytical capabilities to process and analyze all collected data. This analysis shall support the performance standards specified in Performance Work Statement, Water Management Program, and/or as dictated by COR and include comprehensive assessment activities.
3.2.3 Maintenance and Management
The Contractor shall perform, at minimum, maintenance according to these specifications:
a) Monthly Maintenance Requirements Sensor calibration verification Chemical reagent replacement System performance verification Data logging confirmation
b) Expendables Management Chemical inventory tracking Replacement schedule maintenance Usage documentation Quality verification
3.3 Sterile Processing Service (SPS) Maintenance
System Components or Equipment:
Two (2), banks of 12” DI tanks 12” Resin Tank Aqua Switch Thornton Meters Medivators The Contractor shall conduct required services of all Sterile Processing Service (SPS) water treatment systems. This service shall include comprehensive system inspection, performance verification testing, and necessary maintenance activities. The Contractor shall manage all expendable materials, including regular replacement of filtration media and chemical treatments according to manufacturer specifications.
3.4 Laboratory Water Systems
M1-464 System Components or Equipment:
Water Softener Carbon Filter Reverse Osmosis Machine UV Lamp Storage Tank Distribution Pump Post and Pre-Treatment Filters The Contractor shall perform required service on all laboratory water treatment systems, including comprehensive evaluation, performance testing, and chemical balance verification. Microbiology systems shall receive quarterly service and semi-annual intensive maintenance, with regular replacement of expendable materials.
Building-Specific Water Treatment System Components or Equipment:
Building 26 Basement System Triplex Progressive Culligan CSM 300-3 Water Softeners-Needs to be replacement as part of contract performance Building 1 Sub-Basement System Culligan Hi Flo 3e-3 Duplex Water Softener System The Building 26 water softener system shall receive, at minimum, monthly service and inspection, along with annual comprehensive maintenance.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .