This document is an amendment to a solicitation for elevator repair and installation services at the Topeka VA Medical Center. The Department of Veterans Affairs Network Contracting Office is seeking proposals to repair life safety deficiencies and install additional elevators in Buildings 4 and 5 at the medical center in accordance with the 2016 elevator code. Proposals are due by August 8, 2023 at 2:00pm Central time and must be delivered to the specified address. The amendment clarifies that inside car audio and video monitoring is not required and that construction on Buildings 4 and 5 can occur simultaneously if one elevator per building remains operational during the work. The estimated schedule is a minimum of 27 weeks for submittals and materials with 12 weeks for installation plus 18 weeks for a third phase, totaling over 400 days, so the agency has indicated it will allow all elevator work to be completed at once to help meet the schedule.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to RFIs Solicitation No. 36C225523R0102 Amend A0003 589A6-21-101 Repair Life Safety/ FCA Deficiencies – Repair Install Additional Building 4 and 5 Life Safety Elevators

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 589A5-21-101 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25523R0102 07-17-2023

X

This project 589A5-21-101 Repair Life Safety Deficiencies, Topeka is amended as described below.

1. See attached, final Questions 15-16 with responses.

2. No further questions will be accepted.

3. Proposal are due 08/08/2023 by 2:00pm Central time to the door of the address listed in solicitation.

All other terms remain the same.

Timothy Parison Contracting officer

CONTINUATION PAGE

15. Given the comment in the Amendment and in other locations of the specs:

"All project work shall be installed in accordance with all applicable standards available at time of installation to include published commercial specifications as well as standards and preferences expressed in this document."

The current Kansas standard, and at most locations across the US, the elevator building code being used now, is the 2019 elevator code. KC VAMC is using this code and they are in the same VISN. The 2019 code includes a 3D door edge along with video monitoring inside the car. This video (and sometimes audio) is monitored 24/7/365 by on-campus staff like VA police or a similar group with full time 24/7/365 Staff. We believe this set of documents calls for the use of the 2016 elevator code, a less restrictive code which is not current. Please clarify what year of code you would like us to install to, given the above comment and conflict with using the 2016 elevator code?

Response: For this project “inside the car” audio and video is not required by the station.

16. The only way to come close to achieving the schedule is to do all elevators at one time. Will this be allowed? Phasing shown in the documents does not allow this situation.

Sequence/phasing would suggest the following be considered (New install from NTP to submittals to material arriving 27 weeks minimum, install 12 weeks minimum plus phase 3 install of 18 weeks minimum with absolutely no delays or 400+ days).

Response: VA Station is ok with having Building 4 and Building 5 construction going on at the same time. One elevator per building must be in operation during construction (the new elevator in the building must be operational before taking the existing elevator down for the update).